Daily Operations Report (DOR)

26-Jun-2019
Report No.: 1
Well Name RAAG 50-01-204 (INF 21) Field Name RDG (Block: RJ-ON 90/1)
Rig Quippo-4 RT Elev. 7.01
Obj: Basalt and Felsic GL Elev. 52.50

General Drilling Parameters Position Name Phone


Spud Date 6/26/2019 10:00:00 AM Avg. WOB (1000 lbf) 4 Wellsite Leader Yogendra Misra +918588964081
Planned Days 31 Avg. ROP (m/h) 13 Night Wellsite Leader Anil Srivastava +918369480575
Days since spud 0.58 Avg. RPM (RPM) 60 Drilling Sup. Ved Prakash +917838898452
Planned TD (m) 4,008 Torque (1000 ft.lbf) 3 Well Engineer Ankit Kumar Singh +918527698588
MD (m) at 00:00 (Hrs) 198.00 Stand Pipe Press. (psi) 1,450 IDS Geologist Ravindra Shelke +919822770106
Daily Footage (m) 165.00 Pickup Weight (1000 lbf) 44 Client Witness S Mazumdar +919116147313
NPT (Last 24 hrs) (hrs) Slackoff Weight (1000 lbf) 40 Client Engineer Abhishek Misra +918527698591
Cumul NPT (Days) Rotating Weight (1000 lbf) 43 Rig Manager Satish Kumar +919725701958
Total Excessive(Days) Total Drilling Time (h) 7.25 Safety Coord. Kaifee Aboo Sultan +917412000437
NPT Total (%) 0.0% Circulating Press. (psi) 1,450
24 Hours Summary SPUD WELL RAAG-50-01-204(INF21) AT 1000HRS. AND TAGGED BOTTOM AT 33M. DRILLED 12 1/4" DIRECTIONAL HOLE FROM 33M TO 198
M.
00:00-06:00 Hrs Summary DRILLED 12 1/4" DIRECTIONAL HOLE FROM 198 M TO 295M.
24 Hours Forecast DRILL 12 1/4" DIRECTIONAL HOLE TO SECTION TD + / - 1070M
Time Breakdown
Time (HH:mm) Measured
Depth (m) Section Operations Plan Time Vend Comments
Start End Duration Start End Name Class
10:00 17:00 7:00 33 105 Drilling run - Drill to Y P SPUD WELL BY TAGGING BOTTOM AT 33M AT 1000HRS.
depth * Continued driiling 12 1/4" directional hole from 33m tp 105 m in rotary
mode.
* Parameters :
WOB: 3 Kips, RPM: 60, Flow: 720 gpm, Off bottom SPP: 1350psi, On bottom
SPP: 1450 psi, Off bottom Torque: 1.0 Klbs-dt, On bottom torque: 2.0
Klbs/ft., P/U wt: 36Klbs, S/Off: 34 Klbs, Rot wt: 35 Klbs.
* Avg ROP: 11 m/hr., On bottom ROP: 20 m/hr.
* Pumped 10 bbl Hi Vis at every stand to facilitate hole cleaning.

17:00 00:00 7:00 105 198 Drilling run - Drill to Y P DRILLED 12 1/4" DIRECTIONAL HOLE FROM 105M TO 198M IN ROTARY
depth MODE.
* Parameters :
WOB: 4 Kips, RPM: 60, Flow: 720 gpm, Off bottom SPP: 1350psi, On bottom
SPP: 1450 psi, Off bottom Torque: 1.0 Klbs-dt, On bottom torque: 2.5
Klbs/ft., P/u wi:44 Klbs, S/Off wt: 38 Klbs, rOT WT: 43 Klbs
* Avg ROP: 13 m/hr., On bottom ROP: 26 m/hr.
* Pumped 10 bbl Hi Vis at every stand to facilitate hole cleaning.
* Bit Hours[ 24 hrs / cumulative]: [ 9.78 / 9.78]
* Circulating time[ 24 hrs / Cumulative]: [11.9 / 11.9]
* Ct-Ct from plan at 161.64m MD: 0.07m, 0.07m Left, 0.0m Above

* Cleaned strainers of MP#1.

Page 1 of 3 Printed: 26-Jun-2019


Daily Operations Report (DOR)

26-Jun-2019
Report No.: 1
Comments 0000-0030: POOH one stand of 5" HWDP and RIH drilling jar stand.
0030-0600: Drilled 12-1/4" directional hole from 198 m to 295 m.
Parameters: WOB 7 Klbs, RPM: 65, Flow: 720 gpm, Off bottom Pressure: 1500 psi, On bottom SPP: 1600 psi, Off bottom torque: 1.0 Klbs-ft, On bottom torque: 2.5 Klbs-ft, P/U wt:
57 Klbs, S/off wt: 55 Klbs, Rot wt: 56 Klbs

Offline Activities:
- Opened protectors, cleaned threads and drifted 36 joints of 9-5/8" casing.

* Materials in:
- 12 1/4" PDC bit, SDI519HBPX - 01 no. Sl no. SD1438

Manpower Shortage:
- None

Rig Equipment Condition


- MP#2 SPM is fluctuating and could be run maximum 80 spm and that too not sustainable.
- MP#1 lubricating oil pump seal damaged. Changed same.
Bit Last Prev. BHA Casing
Bit Number 12 1/4" Bit BHA Number 12 1/4" Motor 1 Last Size (in)
Bit Model SDI519MBPX Telepacer BHA
Set MD (m) 33.00
Description OD ID Length
Bit Run 1 Next Size (in) 9.625
Type PDC (in) (in) (m)
Set MD (m) 1,070.00
12 1/4" Bit 12.25 0.32
IADC Code Mud Volumes (m3)
A825MXP 8.25 6.25 8.85
Serial # JP2961 Starting 0.00
Start Depth (m) 33.00 Float Sub with ported float 8.31 2.88 0.78
Built 46.90
End Depth (m) 198.00 11 3/4" String Stab 8.00 2.81 2.03
Received 111.93
Drilled Length (m) 165.00 UBHO 8.00 3.25 0.98
Hole Loss
Bit Hours 7.25 Telepacer-HDS-1R 8.25 3.25 9.24
Surface Loss 12.56
Nozzles 1 x 16.00 NMDC 8.25 3.25 9.24
Dumped
(# x 1/32 in) 4 x 18.00 XO 8.25 3.00 0.80
Returned
TFA (in2) 1.19 17 x 5" HWDP 5.00 3.00 156.99
Adjusted
I-O-D-L Drilling Jar 6.50 2.75 9.11
Consumed
B-G-O-R 8 x 5" HWDP 5.00 3.00 73.48
Ending 146.27
Cumulative BHA Length (m) 271.82
Connection Gas
Drilled Length (m) 165.00 BHA Weight (ton) 0.00
Trip Gas
Bit Hours 7.25
Background Gas
ROP (m/h) 22.76

Drilling Fluid
Mud Type Dens. In Temp. In Fun. PV YP Gels (lbf/100ft2) LTLP HTHP Alkalinity RPM 3
(lbm/gal) (degC) (s) (cP) (lbf/100ft2) 10 sec. 10 min. (cm3) (cm3) PF MF PM (deg)
WBM 9.30 36 47.00 14.00 16 6.00 9.00 4.60 0.30 0.50 0.30 5
Time Dens. Out Temp. Out Ca ++ Cl- Solids Sand Water Oil LGS PH E. Stb. Cake RPM 6
(HH:mm) (lbm/gal) (degC) (kg/m3) (kg/m3) (%) (%) (%) (%) (%) (V) (1/32 in) (deg)
23:45 9.30 43 0 1 5.00 0.35 95.00 9.10 6
Formations
Formation Tests Lithology Top(m) Bottom(m) Comments
EMW Test lbm/gal
PP EMW lbm/gal
FP EMW lbm/gal
Test Date
BOP Test Date: BOP Comments:

Operations Integrity
Meetings / Check List Type Start Time End time Comments
Safety M-Safety Meeting 19:00 19:15
HSE
Stop Days Since Last Date of Last Drill
Cards LTA Spill Well Kill H2S Test QHSE Mtg. Kick-Trip Kick-Drill Fire Spill
42 159 26-Jun-2019
HSE Accident/Incidents
Time Incident Comments
Directional Survey
MD Angle Azimuth TVD N/S E/W Build DLS Tool
(m) (deg) (deg) (m) (m) (m) (deg/30m) (deg/30m)
0.00 0.00 0.000 0.00 0.000 0.000 0.000 0.000 MWD
7.01 0.01 191.390 7.01 -0.001 0.000 0.043 0.043 MWD
68.52 0.07 191.390 68.52 -0.043 -0.009 0.029 0.029 MWD

Page 2 of 3 Printed: 26-Jun-2019


Daily Operations Report (DOR)

26-Jun-2019
Report No.: 1
Directional Survey
MD Angle Azimuth TVD N/S E/W Build DLS Tool
(m) (deg) (deg) (m) (m) (m) (deg/30m) (deg/30m)
87.13 0.11 109.010 87.13 -0.060 0.006 0.064 0.197 MWD
106.22 0.04 110.350 106.22 -0.068 0.030 -0.110 0.110 MWD
124.57 0.11 40.110 124.57 -0.057 0.047 0.114 0.169 MWD
143.50 0.09 223.090 143.50 -0.054 0.049 -0.032 0.317 MWD
161.64 0.13 33.320 161.64 -0.047 0.050 0.066 0.363 MWD
Personnel Pumps
Company People Man Hours Time Slow Circulate Rate Press. Liner Eff.
Speed? Size
IDS 4 48.00
Others 46 552.00 (gal/min) (1/min) (psi) (in) (%)
Others 28 336.00
Totals 78 936.00
Bulk Materials
Material Name UOM Initial Received Consumed Returned Adjusted Ending
Barite ton 0.00 43.50 43.50
Bentonite ton 0.00 0.00 0.00
Calcium Carbonate ton 0.00 2.00 2.00
Caustic Soda ton 0.00 0.28 0.03 0.25
Lime ton 0.00 0.00
Soda Ash ton 0.00 1.00 1.00