PLANNING & PREPARATION (Step 1)

Company Name:
Plant Location:
Customer Name:

Model Year/Number:

STRUCTURE ANALYSIS (STEP 2)

1. Process item 3. Process


Activities to work
be executed /
System, Subsystem, Part 2. Process step element
tasks to be completed /
Station No. and Name of Focus
element or process characteristics to
Overall
Name line Operation
or cell
of Process orelement
station Technical
Influencers be4M type /
product specifications
achieved
or assemblyfor which analysis is Proces 5M+1E factors
results / These are candidates defines
for
being done how the output
Health & Safety causes (Dominent Sources of the process could fail
Electric motor assy line OP 10_ sintred bearing press inofOperator
Variation) to meet the functional
process Negative of these will be Failure
Material requirement or design
Effect Negative of these willintent
Press machine be (fit and function)
Refer colour codes to establish relationship causes
Grey cell are related one to one, Blue cells are related one to one, Pink coloured cell are related one to one ( from s
Vulcanisation Green hose loading Pick up specified
green hose as per
Bar code lable

Pick up specified
mandrel as per the
route card

Apply lubrication as
per method sheet
456-908

Sub Assembly of Timing OP-10A Operator


Tensioner Press Fitting Arm with Pulley
Material

Press machine

Mwthod

Timing Tensioner
Assembly Line
2

9
10

Pressing operation OP-10B Operator


Press Fitting Pivot Bushing in
Arm Sub-Assembly Material

Press machine

6
7

10

Caulking operation OP-20 Operator


Caulking of Pivot Tube &
Support Plate Material

Press machine

3
4

10

Caulking operation OP-30 Operator


Manaual Assembly & Caulking
Material

Press machine
1

8
9

10

Testing & Marking OP-40 Operator


Performance Testing &
Marking Material

Press machine

5
6

10

Inspection & Packaging OP-50 Operator


Visual Inspection & Packaging
Material

Press machine

2
3

10
FUNCTION ANALYSIS (STEP 3)

2. Function of the
o be executed / process step and product
e completed1. / Function of the process item char.
aracteristicsFunction
to of system, Sub system, Part element or Process
(Quantitative value is
d optional )
candidates defines
for Technical product
how the output
specifications /
ominent Sources
of the processProces
could results
fail
n) /
to meet
Your the(NP+AE):
Plant functional
Health & Safety Press in sintered bearing
requirement
Assy of shaft or
intodesign
pole housing assembly. to achieve axial position
f these willintent
be to(fit
Ship andNegative
Plant function)of these will be
(CE): in pole housing to max
Assy
e to one, Pink of motor
coloured into
arevehicle
failure
cell mode door
related gap function
one to one ( from structure to function, 0.05 mmto failure)
End User (FE):
Window raises and lowers
To give a specified shape and cure the rubber to attain the To meet desired shape of
material properties the hose

Your Plant (NP+AE): Pressing of Arm with Pulley. Arm Pressing with Pulley
to achieve the Pull out
Ship to Plant (CE): Assy of tensioner on engine. load >1500 N

End User (FE): Not applicable

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):


Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):


Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):


Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):


Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):


Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):


Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):


Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):


Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):


Subject:
PFMEA Origin Date:
PFMEA Rev. Date/ Rev No.: -

CFT :

FAILURE ANALYSIS (STEP 4)

Severity (S) of FE
3.Function of the process work
element and process Char. 2. Failure Mode (FM) of
1. Failure Effects (FE) the process step (Focus
"What is being done"
element)
(Quantitative value is optional )

Machine presses the sintered Your Plant (NP+AE): 9 Axial position of


bearing into the pole housing Clearance too small to assemble sintered bearing is not
until the defined axial position shaft without potential damage reached (Incomplete
o failure) Ship to Plant (CE): action)
Assy of motor to vehicle door
requires additional insertion force
or with potential damage
End User (FE):
Comfort closing time too long for
user
To load with out tearing / NP : Uncured hose 9
scratching / breaking the hose by
using lubrication AE : Does not conform to specififed Incorrect Mandrel
dimensions Dimensions

Leak Incorrect green hose


dimensions
CE : Routing concerns / fouling

Bulge

Burst

Leak

Product Reliability
( B10 weibull life)

Machine presess Arm into the Your Plant (NP+AE): Offset rejection
pulley untill butting position of sub assembly.
reach.
Ship to Plant (CE): Pulley may
disassemble from arm due less pull Arm pressing with
out load. 8 pulley load less then
1500N
End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE): 6


Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):


Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):


Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):


Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):


Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):


Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):


Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):


Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):

Your Plant (NP+AE):

Ship to Plant (CE):

End User (FE):


PFMEA ID Number:
Process Responsibility:
Confidentialilty Level:

EP 4) RISK ANALYSIS (STEP 5)

Occurrence (O) of

Detection (D) of

Characteristic
PFMEA AP
Current

Special
FC/FM
3. Failure Cause (FC) of Current Prevention Detection Prevention

FC
the work element Control (PC) of FC Controls (DC) Action
of FM or FC

Machine stops before Proximity sensor 6 Use of 9


reaching the final position Go/NoGo
Gauge
H
incorrect mandrel picked
up for loading

1-Less travel of ram


1.PLC controlled
2-Alignment of arm and
2.Fixture design
pulley is not as per the
requirement
controlled 3 9 M
3.Fixture
3.Part resting face of
revalidation
fixture worn out

6 4 M
OPTIMIZATION (STEP 6)

Occurrence (O)

Detection (D)
SpProd Char
Severity (S)

PFMEA AP
Detection Resp. Person Target Action taken Completion
Completion Status with pointer
Action Name
date of evidence date
Remarks
What if Failure

Not meeetig the intended funtion(s)

e.g Wall clock


Failures - symptoms
Shows less time (actual se kam)
Shows more time ( actual > real time)
stop
Funtion of wall clock To provide accurate time
Structure Hands, Gears, Spring , Wooden bezel, Glass cover + pendulam

Input Process
Spring force _> Kinetic Energy Gear wheels Rotation

spring force less Coil spring lower torque -> slow gear wheels rotation -> Slower hand movement -> In accur
Stops early
Spring coil (no of coils ) less

Failure effect
Failure mode
Failure cause
Control of failure cause
Wooden bezel, Glass cover + pendulam

Output
Time needles rotate as per the speed / gear ratio

ar wheels rotation -> Slower hand movement -> In accurate time ( less time)