17th April, 2018

The Project Director,

GTA-POWERMECH FZE
Lekki FTZ, Ibeju Lekki,
Lagos.

Attn: Mr. Tanaji Shinde

Dear Sir,
QUOTATION FOR PROVISION NON CONTAINERIZED PORTACABIN 6M X 3M X 2.5 HEAD ROOM.

We wish to submit our quote for the PROVISION NON CONTAINERIZED PORTACABIN 6M X
3M X 2.5 HEAD ROOM at your site.
Our Lump-sum price is N7,313,626.00 (Seven Million, Three Hundred and Thirteen
Thousand, Six Hundred and Twenty-Six Naira) Only.
We shall commence job upon approval of our quotation, while payment shall be
upon completion.
Our execut1on period shall be (3 Weeks).
This quotation is exclusive of VAT.
We look forward to hearing from you.

Yours Faithfully,

Oludamisi Kuku
(0803 – 718 – 7201)
For: Siborg Engineering & Technical Services Nig. Ltd.

SIBORGENGINEERING&TECH.SERVICESNIG.LTD.
Head Office: Branch Office: Tel:
#1 Engineering Close #26 Christ Avenue 234-803 718 7201

E-mail:
Off Idowu Taylor Street Off Aker Road 234-802 795 9078
Victoria Island Off Iwofe Road, Rumuolumeni
Lagos Port Harcourt siborgengineering@gmail.com
NON CONTAINERIZED PORTACABIN 6M X 3M X 2.5 HEAD ROOM
S/N DESCRIPTION OF ITEMS QTY UNIT AMOUNT(N)
1 UPN 200 x 75 x 12M 2 nos. 137,750 275,500
2 IPE 12 x 64 x 12m 2 nos. 79,750 159,500
3 Hollow Section 80 x 40 x 2mm 25 nos. 13,775 344,375
4 4mm Plate 4' x 8' 7 sheets 50,750 355,250
5 3mm Plate 5' x 20' 3 sheets 114,550 343,650
6 1mm Galv. Plate 4' x 8' 8 sheets 30,450 243,600
7 Polystyrene Insulated Panels (walls) 1.17 x 2.5 x 50 mm 24 sheets 18,850 /m2 1,323,270
8 Polystyrene Insulated Panels (Roof) of 1.17 x 3m x 50mm 6 sheets 18,850 /m2 396,981
9 Bending of Steel
Allow for Bending of Steel
(A) Roof Profiles
(B) Panel Tracks
(C) Angles & U Channels 290,000
(D) Columns
(E) Omega
(F) End Cover
10 Allow for provision of Paints & Corrosion Control, 116,000
Treatment of Steel
Application of felt on the bottom externally,
Provision of Primer
Provision of Intermediate 116,000
Provision of Final Coat 116,000
11 Allow for provision of Consumables, Diesel & Grinding 174,000
disc, Cover -all, Nose mask, Oxygen /Acetylene , Silicon,
Emery cloth, Sand papers
12 Provide all Electrical Trunking, Lighting, Nigerian cables, 377,000
Distribution Board, Breakers, Sockets, Switches, External
Lightings etc. All Distribution Boards, Breakers, Switches
& Sockets, All ABB Earth Boss.
13 Allow Provision of 2 nos Entrance 2 nos. 290,000 580,000
Allow for provision of 4nos. Windows 4 nos. 72,500 290,000
14 Allow for Provision of fixed Canopy on Doors/Windows 72,500
15 Allow for Floor Finish Approx. 30m2 of Ceramics Tiles 406,000
with BRC, Sand, Cement & Cleaning Chemicals and Skirting
16 Allow for Labour, Fitting, Panels Assembly, Electrical 580,000
Installation Painting, Door & Window Installation
17 Allow for provision of Aluminum Roofing sheets & 464,000
installation Accessories/installation cost 0.7mm Gauge
Stucco mill
18 Allow for Transportation of materials and Logistics 290,000
TOTAL 7,313,626

SIBORGENGINEERING&TECH.SERVICESNIG.LTD.
Head Office: Branch Office: Tel:
#1 Engineering Close #26 Christ Avenue 234-803 718 7201

E-mail:
Off Idowu Taylor Street Off Aker Road 234-802 795 9078
Victoria Island Off Iwofe Road, Rumuolumeni
Lagos Port Harcourt siborgengineering@gmail.com

You might also like