Head Wall-7A (Typ-Of 3) P1: Infiltration Trench 851,800 L Fire Storage Tank

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

INV = 7.

550

FIRE PUMP HOUSE

P3
P1
X X

X
P11
S

X
P4
P2

X
CS

P9 P8

X
P6
P5 P7

X
X X X X

S S

P10 P12

X
X

GEN
X
X
P14
X X X

CS03
13

GO2
851,800 L

851,800 L
FIRE STORAGE TANK

FIRE STORAGE TANK


INFILTRATION TRENCH

D
D HEAD WALL-7A (TYP-OF 3)
P2 P1
D

C1

C1

SCAL 1:400
PLAN - CU-078
P1

P2
POINT
P9
P8
P7
P6
P5
P4
P3
P2
P1

P14
P13
P12
P11
P10
POINT

EASTING

369045.8958
EASTING

369052.853
369035.992
369036.276

369052.9284
369042.9568
369042.8814
369042.9191
369035.2824
369036.6287
369034.7748
369029.3994
369022.3437
369036.8168
369029.7611

NORTHING
HEAD WALL-7A

2956983.0278
369063.4037 2957004.2276
INV IN
LEVEL
NORTHING

2957086.4228
2957085.4256
2957084.6723
2957085.6694
2957085.1709
2957077.4152
2957076.7734
2957077.5444
2957077.5108
2957078.7272
2957072.2155
2957078.0412
2957081.1991
2957087.0248

INV OUT 6.40


6.48

MATCH LINE (CU-79)


NOTES:
LEGEND: REFERENCES : IFC.DRAWING.

1 ) SMH 1. REFFER TO IFC DRAWINGS FROM CU - 100 TO CU - 526 1 - ALL DIMENSIONS ARE IN MILLIMETERS & LEVELS, ELEVATIONS IN METERS UNLESS NOTED
SEWER MAIN HOLE
OTHERWISE.
CU-78

2) ST SEPTIC TANK
2 - BUILDING SEWER OUTLET LINES ARE 100mm PVC PIPES WITH A MINIMUM SLOPE OF 2.00%
3) LS LIFT STATION TO THE FIRST BEND UNLESS OTHERWISE NOTED.
4) P POINT OF COORDINATE
3 - SEWER COLLECTOR PIPES ARE 160mm PVC PIPES WITH A MINIMUM SLOPE OF 1.50%
5) S SEWER LINE UNLESS OTHERWISE INDICATED.
CU-80
CU-79
CU-74

CU-81

6) D DRANGE PIPE 4 - ALL SEWER MAINS ARE 200mm PVC PIPE WITH A MIN. SLOPE OF 0.5%UNLESS OTHERWISE
7) FM INDICATED.
FORCE MAIN LINE
TELECOM
ARCHITECT
CU-75

8) INV IN
ELECTRICAL

INVERT LEVEL IN
MECHANICAL
STRUCTURAL

9) INV OUT
DEPARTMENT

INVERT LEVEL OUT


FIRE PROTECTION
OTHER TRADES

10) SE SOUTH EAST


11) SW SOUTH WAST
KEYPLAN:

CU-76

CONT.

12) NW NOURTH WAST


CU-81A

13) NE NORTH EAST


Q/C

14) S MAIN HOLE


COORDINATION CLEARANCE
CU-77

* DRAWING IS COORDINATED WITH

ROYAL SAUDI LAND FORCES PROJECT DESIGNER DESIGN BY: ISSUE DATE:
MARCH 03, 2020
24th ARTILLERY BRIGADE
DRAWN BY: CKD BY:
SA-459583 SOLICITATION NO.:
IMRAN M.AYESH
C:\Users\USER\Pictures\logo.png

TETRA TECH
EASTERN PROVINCE, KINGDOM OF SAUDI ARABIA
-

SUBMITTED BY: CONTRACT NO.:

US Army Corps
SHEET ID

SEWER WATER LINE PLOT SCALE: AS SHOWN


of Engineers
FILE NO.: 00 FOR APPROVAL 18-07-2020
SHOP DRAWING

CU-078

Middle East District SIZE: A0


REV. DESCRIPTION DATE APPR REV. DESCRIPTION DATE APPR

You might also like