Head Wall-7A (Typ-Of 3) P1: Infiltration Trench 851,800 L Fire Storage Tank
Head Wall-7A (Typ-Of 3) P1: Infiltration Trench 851,800 L Fire Storage Tank
Head Wall-7A (Typ-Of 3) P1: Infiltration Trench 851,800 L Fire Storage Tank
550
P3
P1
X X
X
P11
S
X
P4
P2
X
CS
P9 P8
X
P6
P5 P7
X
X X X X
S S
P10 P12
X
X
GEN
X
X
P14
X X X
CS03
13
GO2
851,800 L
851,800 L
FIRE STORAGE TANK
D
D HEAD WALL-7A (TYP-OF 3)
P2 P1
D
C1
C1
SCAL 1:400
PLAN - CU-078
P1
P2
POINT
P9
P8
P7
P6
P5
P4
P3
P2
P1
P14
P13
P12
P11
P10
POINT
EASTING
369045.8958
EASTING
369052.853
369035.992
369036.276
369052.9284
369042.9568
369042.8814
369042.9191
369035.2824
369036.6287
369034.7748
369029.3994
369022.3437
369036.8168
369029.7611
NORTHING
HEAD WALL-7A
2956983.0278
369063.4037 2957004.2276
INV IN
LEVEL
NORTHING
2957086.4228
2957085.4256
2957084.6723
2957085.6694
2957085.1709
2957077.4152
2957076.7734
2957077.5444
2957077.5108
2957078.7272
2957072.2155
2957078.0412
2957081.1991
2957087.0248
1 ) SMH 1. REFFER TO IFC DRAWINGS FROM CU - 100 TO CU - 526 1 - ALL DIMENSIONS ARE IN MILLIMETERS & LEVELS, ELEVATIONS IN METERS UNLESS NOTED
SEWER MAIN HOLE
OTHERWISE.
CU-78
2) ST SEPTIC TANK
2 - BUILDING SEWER OUTLET LINES ARE 100mm PVC PIPES WITH A MINIMUM SLOPE OF 2.00%
3) LS LIFT STATION TO THE FIRST BEND UNLESS OTHERWISE NOTED.
4) P POINT OF COORDINATE
3 - SEWER COLLECTOR PIPES ARE 160mm PVC PIPES WITH A MINIMUM SLOPE OF 1.50%
5) S SEWER LINE UNLESS OTHERWISE INDICATED.
CU-80
CU-79
CU-74
CU-81
6) D DRANGE PIPE 4 - ALL SEWER MAINS ARE 200mm PVC PIPE WITH A MIN. SLOPE OF 0.5%UNLESS OTHERWISE
7) FM INDICATED.
FORCE MAIN LINE
TELECOM
ARCHITECT
CU-75
8) INV IN
ELECTRICAL
INVERT LEVEL IN
MECHANICAL
STRUCTURAL
9) INV OUT
DEPARTMENT
CU-76
CONT.
ROYAL SAUDI LAND FORCES PROJECT DESIGNER DESIGN BY: ISSUE DATE:
MARCH 03, 2020
24th ARTILLERY BRIGADE
DRAWN BY: CKD BY:
SA-459583 SOLICITATION NO.:
IMRAN M.AYESH
C:\Users\USER\Pictures\logo.png
TETRA TECH
EASTERN PROVINCE, KINGDOM OF SAUDI ARABIA
-
US Army Corps
SHEET ID
CU-078