Takha
Name of Irrigation Scheme Jue Daraz Province
r
From To
[m/m] [m] QCWRm3/s] [m] [m2] [m] [m] [m]
5.230
0 CH: 0+000-13+662 0+000 13+662
1 Existing Lining + Existing Spi 0+000 0+092 0.0075 0.020 5.81 0.50 2.671 0.26 1.57 6.40 0.25 6.07
2 Earthen canal 0+092 0+280 0.0038 0.025 4.66 0.50 2.671 0.43 2.10 5.62 0.37 5.09
3 Offtake #1 0+280 0+280 0.0038 0.025 2.63 0.50 2.650 0.62 1.83 4.02 0.45 3.25
4 Earthen canal 0+280 0+410 0.0024 0.025 2.54 0.50 2.650 0.73 2.12 4.17 0.51 3.27
5 Protect MHP and Mill Canal 0+410 0+417.31 0.0028 0.025 1.26 0.00 2.650 1.67 2.11 4.61 0.46 1.26
6 Earthen canal 0+417.310+470.5 0.0028 0.020 1.42 0.50 2.650 0.88 1.63 3.38 0.48 2.30
7 Proposed Culvert #1 0+470.5 0+475 0.0028 0.020 8.27 0.50 2.650 0.29 2.40 8.91 0.27 8.56
8 Earthen canal 0+475 0+516 0.0028 0.025 8.27 0.50 2.650 0.33 2.76 9.00 0.31 8.60
9 Offtake #2 0+516 0+516 0.0025 0.025 2.33 0.50 2.597 0.75 2.04 4.01 0.51 3.08
10 Earthen canal 0+516 0+605 0.0030 0.020 3.67 0.50 2.597 0.46 1.79 4.70 0.38 4.13
11 Turnout #1 0+605 0+605 0.0030 0.020 3.67 0.50 2.593 0.46 1.79 4.70 0.38 4.13
12 Earthen canal 0+605 0+800 0.0030 0.025 4.32 0.50 2.593 0.47 2.16 5.38 0.40 4.79
13 Earthen canal 0+800 0+840 0.0030 0.025 3.67 0.50 2.593 0.53 2.07 4.85 0.43 4.20
14 Turnout #2 0+840 0+840 0.0030 0.025 1.67 0.50 2.583 0.87 1.84 3.62 0.51 2.54
15 Earthen canal 0+840 1+050 0.0030 0.025 2.51 0.50 2.583 0.67 1.92 4.02 0.48 3.18
16 Protection wall L=90m 1+050 1+140 0.0010 0.020 2.72 0.00 2.583 0.90 2.46 4.53 0.54 2.72
17 Turnout #3 1+170 1+170 0.0010 0.020 4.34 0.50 2.570 0.58 2.67 5.63 0.47 4.92
18 Offtake #3 1+201 1+201 0.0010 0.025 4.68 0.50 2.551 0.63 3.14 6.08 0.52 5.31
19 Turnout #4 1+201 1+234 0.0080 0.020 5.00 0.50 2.545 0.28 1.42 5.62 0.25 5.28
20 Earthen canal 1+234 1+247 0.0080 0.025 3.50 0.50 2.545 0.40 1.47 4.39 0.34 3.90
21 Offtake #4 1+247 1+247 0.0080 0.025 5.87 0.50 2.516 0.28 1.71 6.51 0.26 6.15
22 Earthen canal 1+247 1+446 0.0080 0.020 5.97 0.50 2.516 0.25 1.50 6.52 0.23 6.22
23 Offtake #5 1+446 1+446 0.0036 0.025 4.95 0.50 2.478 0.40 2.07 5.85 0.35 5.35
24 Earthen canal 1+446 1+600 0.0068 0.020 4.30 0.50 2.478 0.31 1.40 5.00 0.28 4.61
25 Earthen canal 1+600 1+838 0.0068 0.020 4.21 0.50 2.478 0.32 1.39 4.92 0.28 4.53
26 Offtake #6 1+838 1+838 0.0004 0.025 2.55 0.50 2.433 1.16 3.65 5.15 0.71 3.71
27 Earthen canal 1+838 1+908 0.0004 0.025 2.00 0.50 2.433 1.35 3.61 5.02 0.72 3.35
28 Offtake #7 1+908 1+908 0.0004 0.020 4.00 0.50 2.404 0.75 3.30 5.68 0.58 4.75
29 Earthen canal 1+908 1+975 0.0004 0.025 3.82 0.50 2.404 0.89 3.80 5.81 0.65 4.71
30 Offtake #8 1+975 1+975 0.0004 0.020 3.82 0.50 2.383 0.77 3.25 5.55 0.59 4.59
31 Earthen canal 1+974 2+000 0.0074 0.025 3.50 0.50 2.383 0.39 1.45 4.38 0.33 3.89
32 Earthen canal 2+000 2+132 0.0074 0.025 3.44 0.50 2.383 0.40 1.44 4.33 0.33 3.84
33 Turnout #5 2+132 2+132 0.0074 0.020 3.21 0.50 2.379 0.36 1.22 4.02 0.30 3.57
34 Earthen canal 2+132 2+184 0.0074 0.025 2.89 0.50 2.379 0.44 1.38 3.88 0.36 3.33
35 Turnout #6 2+184 2+184 0.0074 0.020 3.70 0.50 2.376 0.33 1.27 4.44 0.29 4.03
36 Earthen canal 2+184 2+266 0.0074 0.025 3.60 0.50 2.376 0.38 1.46 4.46 0.33 3.98
37 Turnout #7 2+266 2+266 0.0074 0.025 4.10 0.50 2.370 0.35 1.51 4.89 0.31 4.45
38 Earthen canal 2+266 2+349 0.0074 0.025 3.75 0.50 2.370 0.37 1.47 4.58 0.32 4.12
39 Offtake #9 2+349 2+349 0.0118 0.020 3.68 0.50 2.328 0.28 1.08 4.31 0.25 3.96
40 Earthen canal 2+349 2+380 0.0118 0.025 4.21 0.50 2.328 0.30 1.30 4.87 0.27 4.51
41 Earthen canal 2+380 2+400 0.0118 0.025 2.80 0.50 2.328 0.39 1.16 3.66 0.32 3.19
42 Protection wall L=30m 2+400 2+410 0.0014 0.020 3.89 0.00 2.328 0.56 2.17 5.01 0.43 3.89
43 Earthen canal 2+410 2+709 0.0014 0.020 7.38 0.50 2.328 0.35 2.64 8.16 0.32 7.73
44 Offtake #10 2+709 2+709 0.0058 0.025 3.25 0.50 2.287 0.43 1.50 4.22 0.36 3.68
45 Offtake #11 2+709 2+717 0.0045 0.020 3.25 0.50 2.264 0.40 1.40 4.15 0.34 3.65
46 Earthen canal 2+717 2+800 0.0045 0.020 4.00 0.50 2.264 0.35 1.48 4.79 0.31 4.35
47 Earthen canal 2+800 2+827 0.0045 0.025 3.87 0.50 2.264 0.41 1.69 4.80 0.35 4.28
48 Offtake #12 2+827 2+827 0.0023 0.020 3.27 0.50 2.194 0.49 1.71 4.36 0.39 3.76
49 Earthen canal 2+827 2+920 0.0028 0.025 3.87 0.50 2.194 0.47 1.94 4.93 0.39 4.34
50 Turnout #8 2+920 2+920 0.0045 0.020 3.87 0.50 2.188 0.35 1.43 4.66 0.31 4.22
51 Earthen canal 2+920 3+140 0.0045 0.025 3.97 0.50 2.188 0.40 1.67 4.86 0.34 4.37
52 Turnout #9 3+140 3+140 0.0042 0.020 3.70 0.50 2.180 0.37 1.45 4.53 0.32 4.07
53 Earthen canal 3+140 3+200 0.0042 0.025 3.00 0.50 2.180 0.49 1.59 4.10 0.39 3.49
54 Turnout #10 3+200 3+200 0.0042 0.025 3.89 0.50 2.175 0.41 1.69 4.81 0.35 4.30
55 Offtake #13 3+209 3+209 0.0010 0.020 4.00 0.50 2.153 0.55 2.33 5.22 0.45 4.55
56 Earthen canal 3+209 3+308 0.0010 0.025 4.11 0.50 2.153 0.62 2.72 5.49 0.50 4.73
57 Offtake #14 3+308 3+308 0.0004 0.020 4.11 0.50 2.094 0.71 3.19 5.71 0.56 4.82
58 Earthen canal 3+308 3+563 0.0004 0.030 3.76 0.50 2.094 0.97 4.13 5.93 0.70 4.73
59 Offtake #15 3+563 3+563 0.0009 0.020 3.76 0.50 2.075 0.58 2.34 5.05 0.46 4.34
60 Earthen canal 3+563 3+600 0.0018 0.025 2.50 0.50 2.075 0.70 1.99 4.06 0.49 3.20
61 Earthen canal 3+600 3+737 0.0018 0.025 3.49 0.50 2.075 0.56 2.12 4.75 0.45 4.05
62 Turnout #11 3+737 3+741 0.0018 0.020 5.16 0.50 2.067 0.38 2.03 6.01 0.34 5.54
63 Offtake #16 3+741 3+741 0.0055 0.025 5.16 0.50 2.046 0.31 1.62 5.84 0.28 5.47
64 Earthen canal 3+741 3+843 0.0022 0.025 2.77 0.50 2.046 0.61 1.86 4.13 0.45 3.38
65 Proposed Culvert #2 3+843 3+839 0.0007 0.020 2.77 0.50 2.046 0.76 2.40 4.47 0.54 3.53
66 Earthen canal 3+839 3+927 0.0020 0.025 4.41 0.50 2.046 0.46 2.13 5.44 0.39 4.87
67 Offtake #17 3+927 3+927 0.0020 0.020 4.41 0.50 1.991 0.39 1.82 5.29 0.34 4.80
68 Earthen canal 3+926 4+000 0.0018 0.030 2.80 0.50 1.991 0.70 2.20 4.36 0.50 3.50
69 Earthen canal 4+000 4+136 0.0018 0.030 4.45 0.50 1.991 0.52 2.43 5.61 0.43 4.97
70 Offtake #18 4+120 4+120 0.0125 0.020 4.46 0.50 1.956 0.22 1.01 4.95 0.20 4.68
71 Earthen canal 4+120 4+332 0.0024 0.030 3.90 0.50 1.956 0.51 2.13 5.05 0.42 4.41
72 Turnout #12 4+332 4+332 0.0024 0.030 4.30 0.50 1.950 0.48 2.18 5.37 0.41 4.78
73 Earthen canal 4+332 4+346 0.0013 0.025 4.60 0.50 1.950 0.50 2.44 5.72 0.43 5.10
74 Offtake #19 4+346 4+346 0.0013 0.020 4.60 0.50 1.922 0.43 2.09 5.57 0.38 5.03
75 Earthen canal 4+346 4+400 0.0004 0.025 2.50 0.50 1.922 1.09 3.31 4.93 0.67 3.59
76 Earthen canal 4+400 4+642 0.0004 0.025 2.90 0.50 1.922 0.99 3.36 5.11 0.66 3.89
77 Turnout #13 4+642 4+642 0.0004 0.020 3.10 0.50 1.910 0.82 2.89 4.94 0.58 3.92
78 Earthen canal 4+642 4+495 0.0004 0.020 3.40 5.00 1.910 0.59 3.74 9.41 0.40 9.29
79 Turnout #14 4+495 4+495 0.0004 0.025 3.33 0.50 1.906 0.90 3.40 5.34 0.64 4.23
80 Earthen canal 4+495 4+520 0.0004 0.020 3.35 0.50 1.906 0.78 2.92 5.10 0.57 4.13
81 Turnout #15 4+520 4+520 0.0020 0.020 3.41 0.50 1.893 0.45 1.64 4.42 0.37 3.86
82 Earthen canal 4+520 4+625 0.0050 0.025 3.30 0.50 1.893 0.40 1.39 4.19 0.33 3.70
83 Turnout #16 4+625 4+625 0.0050 0.020 3.60 0.50 1.879 0.33 1.23 4.33 0.28 3.93
84 Earthen canal 4+625 4+642 0.0050 0.025 3.70 0.50 1.879 0.37 1.43 4.52 0.32 4.07
85 Offtake #20 4+642 4+642 0.0050 0.020 3.90 0.50 1.857 0.31 1.25 4.59 0.27 4.21
86 Earthen canal 4+642 4+656 0.0082 0.025 3.10 0.50 1.857 0.35 1.15 3.89 0.30 3.45
87 Existing Offtake #21 4+740 4+740 0.0123 0.020 3.00 0.00 1.824 0.28 0.85 3.57 0.24 3.00
88 Earthen canal 4+740 4+800 0.0123 0.025 3.00 0.50 1.824 0.31 0.99 3.70 0.27 3.31
89 Earthen canal 4+800 4+896 0.0123 0.025 3.00 0.50 1.824 0.31 0.99 3.70 0.27 3.31
90 Turnout #17 4+896 4+896 0.0016 0.020 3.00 0.50 1.819 0.51 1.66 4.14 0.40 3.51
91 Earthen canal 4+896 5+005 0.0016 0.025 3.20 0.50 1.819 0.56 1.95 4.45 0.44 3.76
92 Protection wall L=50m 5+005 5+055 0.0047 0.020 3.70 0.00 1.819 0.33 1.23 4.37 0.28 3.70
93 Earthen canal 5+055 5+076 0.0047 0.025 3.53 0.50 1.819 0.38 1.41 4.38 0.32 3.91
94 Turnout #18 5+076 5+076 0.0047 0.020 4.12 0.50 1.813 0.30 1.28 4.79 0.27 4.42
95 Earthen canal 5+076 5+090 0.0047 0.025 4.12 0.50 1.813 0.34 1.47 4.89 0.30 4.46
96 Existing Offtake #22 5+090 5+090 0.0021 0.020 3.40 0.00 1.728 0.44 1.50 4.29 0.35 3.40
97 Offtake #23 Flow divider 5+204 5+204 0.0040 0.025 4.00 0.50 0.975 0.25 1.04 4.56 0.23 4.25
98 Earthen canal 5+204 5+550 0.0005 0.025 3.00 0.50 0.975 0.56 1.84 4.25 0.43 3.56
99 Offtake #24 5+550 5+550 0.0037 0.025 3.70 0.50 0.956 0.27 1.03 4.30 0.24 3.97
100 Earthen canal 5+550 5+600 0.0024 0.020 2.80 0.50 0.956 0.32 0.94 3.51 0.27 3.12
101 Earthen canal 5+600 5+736 0.0024 0.020 3.35 0.50 0.956 0.28 0.99 3.98 0.25 3.63
102 Offtake #25 5+736 5+736 0.0145 0.025 3.35 0.50 0.921 0.18 0.63 3.76 0.17 3.53
103 Protection wall L=20m 5+832 5+852 0.0050 0.020 3.80 0.50 0.921 0.20 0.80 4.26 0.19 4.00
104 Earthen canal 5+852 6+000 0.0014 0.025 2.00 0.50 0.921 0.52 1.19 3.17 0.37 2.52
105 Earthen canal 6+000 6+354 0.0014 0.025 3.90 0.50 0.921 0.34 1.38 4.66 0.30 4.24
106 Offtake #26 6+353 6+353 0.0065 0.020 3.43 0.50 0.899 0.20 0.70 3.87 0.18 3.63
107 Earthen canal 6+353 6+400 0.0020 0.025 2.00 0.50 0.899 0.46 1.03 3.03 0.34 2.46
108 Earthen canal 6+400 6+453 0.0020 0.025 3.43 0.50 0.899 0.33 1.17 4.16 0.28 3.76
109 Turnout #19 6+453 6+453 0.0014 0.020 3.30 0.50 0.884 0.32 1.13 4.03 0.28 3.62
110 Protection wall L=40 6+520 6+560 0.0027 0.025 2.90 0.50 0.884 0.33 1.01 3.63 0.28 3.23
111 Earthen canal 6+560 6+606 0.0060 0.020 3.00 0.50 0.884 0.22 0.68 3.49 0.19 3.22
112 Protection wall L=40m 6+606 6+646 0.0060 0.020 2.70 0.50 0.884 0.23 0.66 3.22 0.20 2.93
113 Earthen canal 6+646 6+685 0.0010 0.020 2.80 0.50 0.884 0.40 1.19 3.69 0.32 3.20
114 Tournout with 8m wall #20 6+682 6+682 0.0019 0.025 3.00 0.00 0.874 0.37 1.12 3.75 0.30 3.00
115 Earthen canal 6+693 6+732 0.0019 0.020 2.90 0.50 0.874 0.32 0.97 3.61 0.27 3.22
116 Turnout #21 6+732 6+732 0.0019 0.025 2.50 0.50 0.863 0.40 1.07 3.39 0.32 2.90
117 Earthen canal 6+732 6+800 0.0019 0.025 2.48 0.50 0.863 0.40 1.07 3.37 0.32 2.88
118 Offtake #27 6+800 6+903 0.0007 0.020 2.70 0.50 0.824 0.43 1.27 3.67 0.34 3.13
119 Earthen canal 6+903 7+200 0.0097 0.025 1.88 0.50 0.824 0.28 0.56 2.51 0.23 2.16
120 Earthen canal 7+200 7+332 0.0097 0.025 3.10 0.50 0.824 0.20 0.65 3.55 0.18 3.30
121 Offtake #28 7+332 7+332 0.0140 0.025 2.80 0.00 0.797 0.20 0.55 3.19 0.17 2.80
122 Earthen canal 7+332 7+591 0.0012 0.020 2.30 0.50 0.797 0.40 1.00 3.20 0.31 2.70
123 Offtake #29 7+591 7+591 0.0008 0.020 2.36 0.00 0.781 0.49 1.16 3.34 0.35 2.36
124 Existing lining 7+591 7+600 0.0069 0.025 2.00 0.50 0.781 0.29 0.62 2.65 0.23 2.29
125 Earthen canal 7+600 7+686 0.0069 0.025 2.17 0.50 0.781 0.27 0.63 2.78 0.23 2.44
126 Offtake #30 7+686 7+686 0.0069 0.020 1.98 0.50 0.758 0.25 0.52 2.54 0.21 2.23
127 Earthen canal 7+686 7+886 0.0017 0.025 2.00 0.50 0.758 0.44 0.97 2.98 0.33 2.44
128 Proposed Culvert #3 7+886 7+903 0.0017 0.020 2.51 0.50 0.758 0.33 0.88 3.24 0.27 2.84
129 Earthen canal 7+903 8+001 0.0008 0.025 2.00 0.50 0.758 0.56 1.29 3.26 0.39 2.56
130 Offtake #31 8+001 8+010 0.0020 0.020 1.97 0.50 0.734 0.36 0.77 2.77 0.28 2.33
131 Protection wall 8+010 8+080 0.0071 0.025 2.10 0.50 0.734 0.27 0.60 2.70 0.22 2.37
132 Earthen canal 8+080 8+189 0.0071 0.020 2.80 0.50 0.734 0.19 0.56 3.23 0.17 2.99
133 Offatke #32 Flow divider 8+189 8+189 0.0160 0.020 3.90 0.50 0.610 0.11 0.43 4.15 0.10 4.01
134 Earthen canal 8+200 8+400 0.0039 0.020 1.80 0.50 0.610 0.28 0.53 2.42 0.22 2.08
135 Earthen canal 8+400 8+515 0.0039 0.020 2.60 0.50 0.610 0.22 0.59 3.09 0.19 2.82
136 Offtake #33 8+515 8+515 0.0010 0.020 2.21 0.50 0.580 0.36 0.85 3.01 0.28 2.57
137 Earthen canal 8+515 8+535 0.0010 0.025 2.21 0.50 0.580 0.41 0.99 3.12 0.32 2.62
138 Drop Structure 8+535 8+535 0.0010 0.020 2.10 0.50 0.580 0.37 0.84 2.92 0.29 2.47
139 Earthen canal 8+535 8+800 0.0049 0.025 1.80 0.50 0.580 0.29 0.56 2.44 0.23 2.09
140 Earthen canal 8+800 9+152 0.0049 0.025 2.00 0.50 0.580 0.27 0.57 2.60 0.22 2.27
141 Turnout #22 9+152 9+152 0.0027 0.020 1.90 0.50 0.571 0.29 0.58 2.54 0.23 2.19
142 Earthen canal 9+152 9+200 0.0027 0.025 2.30 0.50 0.571 0.29 0.71 2.95 0.24 2.59
143 Earthen canal 9+200 9+237 0.0027 0.025 2.51 0.50 0.571 0.27 0.73 3.12 0.23 2.78
144 Offtake #34 9+237 9+237 0.0035 0.020 2.51 0.50 0.512 0.21 0.54 2.97 0.18 2.72
145 Earthen canal 9+237 9+261 0.0035 0.025 2.08 0.50 0.512 0.27 0.59 2.68 0.22 2.35
146 Offtake #35 9+261 9+261 0.0035 0.025 2.08 0.50 0.489 0.26 0.57 2.66 0.22 2.34
147 Earthen canal 9+261 9+450 0.0022 0.020 2.34 0.50 0.489 0.24 0.60 2.88 0.21 2.58
148 Offatke #36 9+450 9+450 0.0075 0.020 2.63 0.50 0.466 0.15 0.41 2.97 0.14 2.78
149 Earthen canal 9+450 9+530 0.0090 0.025 2.21 0.50 0.466 0.18 0.42 2.62 0.16 2.39
150 Turnout #23 9+563 9+563 0.0003 0.020 2.34 0.50 0.462 0.43 1.11 3.31 0.33 2.77
151 Earthen canal 9+563 9+600 0.0010 0.020 1.40 0.50 0.462 0.42 0.67 2.33 0.29 1.82
152 Earthen canal 9+600 9+810 0.0010 0.020 2.70 0.50 0.462 0.27 0.77 3.31 0.23 2.97
153 Offtake #37 9+820 9+820 0.0010 0.020 4.40 0.50 0.438 0.19 0.87 4.83 0.18 4.59
154 Earthen canal 9+820 10+000 0.0043 0.020 1.70 0.50 0.438 0.23 0.41 2.20 0.19 1.93
155 Earthen canal 10+000 10+400 0.0043 0.020 1.70 0.50 0.438 0.23 0.41 2.20 0.19 1.93
156 Earthen canal 10+400 10+603 0.0043 0.020 4.40 0.50 0.438 0.12 0.55 4.68 0.12 4.52
157 Offtake #38 10+603 10+603 0.0005 0.020 2.80 0.50 0.412 0.31 0.91 3.49 0.26 3.11
158 Earthen canal 10+603 10+800 0.0035 0.025 1.50 0.50 0.412 0.29 0.48 2.15 0.22 1.79
159 Earthen canal 10+800 10+865 0.0035 0.025 2.49 0.50 0.412 0.21 0.54 2.96 0.18 2.70
160 Turnout #24 10+865 10+865 0.0035 0.020 2.49 0.50 0.405 0.18 0.47 2.89 0.16 2.67
161 Earthen canal 10+865 11+056 0.0035 0.025 2.78 0.50 0.405 0.19 0.55 3.21 0.17 2.97
162 Offtake #39 11+056 11+056 0.0012 0.020 1.90 0.50 0.388 0.29 0.60 2.55 0.23 2.19
163 Earthen canal 11+056 11+140 0.0012 0.020 1.89 0.50 0.388 0.29 0.60 2.55 0.23 2.18
164 Both side canal lining L=35m11+198 11+198 0.0033 0.025 1.90 0.50 0.388 0.24 0.49 2.45 0.20 2.14
165 Earthen canal 11+198 11+200 0.0054 0.020 2.00 0.50 0.388 0.18 0.37 2.39 0.15 2.18
166 Earthen canal 11+200 11+273 0.0054 0.020 2.00 0.50 0.388 0.18 0.37 2.39 0.15 2.18
167 Offtake #40 11+197 11+197 0.0054 0.025 1.90 0.50 0.363 0.20 0.40 2.35 0.17 2.10
168 Earthen canal 11+197 11+273 0.0015 0.020 2.00 0.50 0.363 0.25 0.53 2.56 0.21 2.25
169 Offtake #41 11+286 11+286 0.0015 0.025 2.10 0.50 0.344 0.27 0.60 2.70 0.22 2.37
170 Earthen canal 11+286 11+347 0.0015 0.020 2.00 0.50 0.344 0.24 0.52 2.54 0.20 2.24
171 Offtake #42 11+347 11+347 0.0015 0.025 2.30 0.50 0.305 0.24 0.57 2.83 0.20 2.54
172 Earthen canal 11+347 11+600 0.0042 0.025 1.50 0.50 0.305 0.23 0.37 2.01 0.18 1.73
173 Earthen canal 11+600 11+700 0.0042 0.025 1.98 0.50 0.305 0.19 0.39 2.40 0.16 2.17
174 Turnout #24 11+615 11+615 0.0032 0.025 2.32 0.00 0.301 0.19 0.44 2.70 0.16 2.32
175 Earthen canal 11+615 11+895 0.0032 0.020 2.14 0.50 0.301 0.17 0.38 2.52 0.15 2.31
176 Turnout #25 11+895 11+895 0.0032 0.025 2.21 0.50 0.296 0.19 0.43 2.63 0.16 2.40
177 Earthen canal 11+895 11+912 0.0032 0.020 2.34 0.50 0.296 0.16 0.38 2.69 0.14 2.50
178 Protection wall L=60m 11+912 11+972 0.0032 0.025 2.34 0.00 0.296 0.19 0.44 2.72 0.16 2.34
179 Earthen canal 11+971 12+000 0.0120 0.020 1.30 0.50 0.296 0.15 0.21 1.64 0.13 1.45
180 Earthen canal 12+000 12+131 0.0120 0.020 1.80 0.50 0.296 0.12 0.23 2.08 0.11 1.92
181 Offtake #43 12+131 12+131 0.0108 0.020 1.80 0.50 0.277 0.12 0.23 2.08 0.11 1.92
182 Earthen canal 12+131 12+291 0.0009 0.020 1.53 0.50 0.277 0.30 0.50 2.20 0.23 1.83
183 Turnout #26 12+291 12+291 0.0009 0.025 1.56 0.50 0.266 0.33 0.57 2.30 0.25 1.89
184 Earthen canal 12+291 12+387 0.0009 0.020 1.80 0.50 0.266 0.26 0.51 2.39 0.21 2.06
185 Offtake #44 12+387 12+387 0.0070 0.025 1.80 0.50 0.183 0.13 0.23 2.08 0.11 1.93
186 Canal Widening l=171M 12+387 12+400 0.0048 0.020 1.20 0.50 0.183 0.16 0.21 1.56 0.13 1.36
187 Canal Widening l=171M 12+400 12+537 0.0048 0.020 1.20 0.50 0.183 0.16 0.21 1.56 0.13 1.36
188 Both side canal lining 12+536 12+626 0.0021 0.025 1.50 0.50 0.183 0.20 0.33 1.96 0.17 1.70
189 Both side canal lining 12+626 12+651 0.0021 0.020 1.23 0.50 0.183 0.20 0.27 1.68 0.16 1.43
190 Earthen canal 12+651 12+639 0.0021 0.020 1.29 0.50 0.183 0.20 0.27 1.73 0.16 1.49
191 Proposed Culvert #4 12+639 12+644 0.0028 0.025 1.29 0.50 0.183 0.21 0.29 1.75 0.16 1.50
192 Canal Widening l=133M 12+653 12+798 0.0028 0.020 1.20 0.50 0.183 0.19 0.24 1.62 0.15 1.39
193 Offtake #45 12+798 12+798 0.0052 0.020 1.28 0.50 0.119 0.11 0.15 1.54 0.10 1.39
194 Earthen canal 12+798 12+800 0.0052 0.020 1.00 0.50 0.119 0.13 0.14 1.30 0.11 1.13
195 Protection wall L=50m 12+804 12+854 0.0052 0.020 1.78 0.00 0.119 0.10 0.17 1.97 0.09 1.78
196 Canal Widening L=342m 12+854 13+232 0.0053 0.020 1.00 0.50 0.119 0.13 0.14 1.30 0.11 1.13
197 Earthen canal 13+232 13+200 0.0053 0.020 0.60 0.50 0.119 0.19 0.13 1.02 0.13 0.79
198 Protection wall L=95m 13+232 13+327 0.0061 0.020 0.70 0.00 0.119 0.18 0.13 1.06 0.12 0.70
199 Earthen canal 13+327 13+600 0.0026 0.020 0.60 0.50 0.119 0.23 0.17 1.12 0.15 0.83
200 Canal Widening L=346m 13+600 13+656 0.0026 0.020 0.60 0.50 0.119 0.23 0.17 1.12 0.15 0.83
201 Nun irrigated area 13+600 13+656 0.0026 0.020 0.60 0.50 0.119 1.14 1.34 3.15 0.42 1.74
Daraz Canal based (Qmax)
Starti
ng N 37
` Point
IDA-MC-040 E 70
Compare
v avg Froude Qcalc Adopted Design Parameters
type of flow
( existing
situation)
[m/s] [m3/s] b h FB D
subcritical
1.07 0.74 0.44 0.23 1.70 0.23 0.20 0.43
0.79 0.72 0.44 0.12 4.40 0.12 0.20 0.32 subcritical
0.45 0.27 0.41 0.31 2.80 0.31 0.20 0.51 subcritical
0.86 0.53 0.41 0.29 1.50 0.29 0.20 0.49 subcritical
0.76 0.54 0.41 0.21 2.49 0.21 0.20 0.41 subcritical
0.87 0.67 0.40 0.18 2.49 0.18 0.20 0.38 subcritical
0.73 0.54 0.40 0.19 2.78 0.19 0.20 0.39 subcritical
0.65 0.40 0.39 0.29 1.90 0.29 0.20 0.49 subcritical
0.65 0.40 0.39 0.29 1.89 0.29 0.20 0.49 subcritical
0.78 0.52 0.39 0.24 1.90 0.24 0.20 0.44 subcritical
1.06 0.82 0.39 0.18 2.00 0.18 0.20 0.38 subcritical
1.06 0.82 0.39 0.18 2.00 0.18 0.20 0.38 subcritical
0.91 0.66 0.36 0.20 1.90 0.20 0.20 0.40 subcritical
0.68 0.45 0.36 0.25 2.00 0.25 0.20 0.45 subcritical
0.57 0.36 0.34 0.27 2.10 0.27 0.20 0.47 subcritical
0.67 0.44 0.34 0.24 2.00 0.24 0.20 0.44 subcritical
0.53 0.36 0.31 0.24 2.30 0.24 0.20 0.44 subcritical
0.83 0.58 0.31 0.23 1.50 0.23 0.20 0.43 subcritical
0.78 0.58 0.31 0.19 1.98 0.19 0.20 0.39 subcritical
0.68 0.50 0.30 0.19 2.32 0.19 0.20 0.39 subcritical
0.80 0.63 0.30 0.17 2.14 0.17 0.20 0.37 subcritical
0.68 0.51 0.30 0.19 2.21 0.19 0.20 0.39 subcritical
0.77 0.63 0.30 0.16 2.34 0.16 0.20 0.36 subcritical
0.67 0.50 0.30 0.19 2.34 0.19 0.20 0.39 subcritical
1.40 1.17 0.30 0.15 1.30 0.15 0.20 0.35 supercritical
1.27 1.17 0.30 0.12 1.80 0.12 0.20 0.32 supercritical
1.20 1.11 0.28 0.12 1.80 0.12 0.20 0.32 supercritical
0.55 0.34 0.28 0.30 1.53 0.30 0.20 0.50 subcritical
0.47 0.27 0.27 0.33 1.56 0.33 0.20 0.53 subcritical
0.53 0.34 0.27 0.26 1.80 0.26 0.20 0.46 subcritical
0.78 0.71 0.18 0.13 1.80 0.13 0.20 0.33 subcritical
0.89 0.73 0.18 0.16 1.20 0.16 0.20 0.36 subcritical
0.89 0.73 0.18 0.16 1.20 0.16 0.20 0.36 subcritical
0.56 0.41 0.18 0.20 1.50 0.20 0.20 0.40 subcritical
0.68 0.50 0.18 0.20 1.23 0.20 0.20 0.40 subcritical
0.67 0.50 0.18 0.20 1.29 0.20 0.20 0.40 subcritical
0.64 0.46 0.18 0.21 1.29 0.21 0.20 0.41 subcritical
0.75 0.57 0.18 0.19 1.20 0.19 0.20 0.39 subcritical
0.77 0.74 0.12 0.11 1.28 0.11 0.20 0.31 subcritical
0.83 0.74 0.12 0.13 1.00 0.13 0.20 0.33 subcritical
0.70 0.72 0.12 0.10 1.78 0.10 0.20 0.30 subcritical
0.83 0.75 0.12 0.13 1.00 0.13 0.20 0.33 subcritical
subcritical
0.92 0.72 0.12 0.19 0.60 0.19 0.20 0.39
0.94 0.71 0.12 0.18 0.70 0.18 0.20 0.38 subcritical
subcritical
0.71 0.51 0.12 0.23 0.60 0.23 0.20 0.43
subcritical
0.71 0.51 0.12 0.23 0.60 0.23 0.20 0.43
supercritical
1.43 1.53 1.906 1.141 0.60 1.14 1.20 2.34
Design of Canal Cross Section
Abbreviations:
Qreq ⁼ Reqired Discharge (from crop water requirement calculation)
L/U ⁼ Canal type Lined or Unlined (fom survey drawing )
L slope ⁼ Longitudinal slope of the canal bed (Long section of canal from Survey drawing)
n ⁼ Manning's roughness coefficient
B ⁼ Bed Width
d ⁼ depth of water flow
SS ⁼ Side slope of canal (m)
P ⁼ Wetted primeter
A ⁼ Cross sectional area of the water flow
R ⁼ Hydraulic radius
Q ⁼ Calculated Discharge
V ⁼ Calculated Velocity
Vmax ⁼ Maximim permissible Velocity (see other sheet allowable velocity)
FB ⁼ Free board
D ⁼ Overall depth of the canal (water depth plus free board)
Fr ⁼ Froud number (When Fr>1, Supercritical flow, Fr=1 Critical Flow and Fr<1 subcritical flow
Re ⁼ Reynold Number (when Re<5000 Laminar Flow, 5000<Re<2000 Transitional flow and Re>2
Joedaraz Irrigation Canal
2.650
0+280 0+280 Offtake #1
3.20
0+280 0+410 2.650 Earthen canal
0+410 0+417.31 2.650 Protect MHP and Mill Canal
0+417.31 0+470.5 2.650 Earthen canal
0+470.5 0+475 2.650 Proposed Culvert #1
0+475 0+516 2.650 Earthen canal
0+516 0+516 2.597 Offtake #2
0+516 0+605 2.597 Earthen canal
0+605 0+605 2.593 Turnout #1
0+605 0+800 2.593 Earthen canal 3.50
0+800 0+840 2.593 Earthen canal
0+840 0+840 2.583 Turnout #2
0+840 1+050 2.583 Earthen canal
1+050 1+140 2.583 Protection wall L=90m
1+170 1+170 2.570 Turnout #3
1+201 1+201 2.551 Offtake #3 4.70
1+201 1+234 2.545 Turnout #4
1+234 1+247 2.545 Earthen canal
1+247 1+247 2.516 Offtake #4
1+247 1+446 2.516 Earthen canal
1+446 1+446 2.478 Offtake #5
1+446 1+600 2.478 Earthen canal 4.00
1+600 1+838 2.478 Earthen canal
1+838 1+838 2.433 Offtake #6
1+838 1+908 2.433 Earthen canal
1+908 1+908 2.404 Offtake #7
1+908 1+975 2.404 Earthen canal
1+975 1+975 2.383 Offtake #8
1+974 2+000 2.383 Earthen canal 3.80
2+000 2+132 2.383 Earthen canal
2+132 2+132 2.379 Turnout #5
2+132 2+184 2.379 Earthen canal
2+184 2+184 2.376 Turnout #6
2+184 2+266 2.376 Earthen canal
2+266 2+266 2.370 Turnout #7
2+266 2+349 2.370 Earthen canal
2+349 2+349 2.328 Offtake #9
2+349 2+380 2.328 Earthen canal
2+380 2+400 2.328 Earthen canal 3.00
2+400 2+410 2.328 Protection wall L=30m
2+410 2+709 2.328 Earthen canal
2+709 2+709 2.287 Offtake #10
2+709 2+717 2.264 Offtake #11
2+717 2+800 2.264 Earthen canal 4.00
2+800 2+827 2.264 Earthen canal
2+827 2+827 2.194 Offtake #12
2+827 2+920 2.194 Earthen canal
2+920 2+920 2.188 Turnout #8
2+920 3+140 2.188 Earthen canal
3+140 3+140 2.180 Turnout #9
3+140 3+200 2.180 Earthen canal 3.20
3+200 3+200 2.175 Turnout #10
3+209 3+209 2.153 Offtake #13
3+209 3+308 2.153 Earthen canal
3+308 3+308 2.094 Offtake #14
3+308 3+563 2.094 Earthen canal
3+563 3+563 2.075 Offtake #15
0.80
13+100 13+200 0.119 Earthen canal
13+232 13+327 0.119 Protection wall L=95m
0.50
13+327 13+600 0.119 Earthen canal
13+600 13+656 0.119 Canal Widening L=346m
13+600 13+656 0.119 Non irrigated area
13+656 7+590 0.119 Non irrigated area
ey drawing)
Existing Depth of water as per water
0.70
measurement (d) (m)
1.10
value
0.4
as per photo
0.8
Q (as per curent meter)
3.42
Result
Ok
Increase embankment
1.000
Q (as per average 30% added velocity)
0.000
Result as per 30% added (V)
Not Ok
Canal capacity check based on velocity of current meter and w
0.78 1.13 2.82 Ok 1.413 0.000 Not Ok