Joydaraz - Canal - Hydraulic and Optimization

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 30

Hydraulic Design Calculation Sheet Jue Daraz Canal based

Takha
Name of Irrigation Scheme Jue Daraz Province
r

District Taloqan Project EIDA EIDA-MC-040

Type of Section Station


S.No i n w z Main canal Depth A P R TopW

From To
[m/m] [m] QCWRm3/s] [m] [m2] [m] [m] [m]

5.230
0 CH: 0+000-13+662 0+000 13+662
1 Existing Lining + Existing Spi 0+000 0+092 0.0075 0.020 5.81 0.50 2.671 0.26 1.57 6.40 0.25 6.07
2 Earthen canal 0+092 0+280 0.0038 0.025 4.66 0.50 2.671 0.43 2.10 5.62 0.37 5.09
3 Offtake #1 0+280 0+280 0.0038 0.025 2.63 0.50 2.650 0.62 1.83 4.02 0.45 3.25
4 Earthen canal 0+280 0+410 0.0024 0.025 2.54 0.50 2.650 0.73 2.12 4.17 0.51 3.27
5 Protect MHP and Mill Canal 0+410 0+417.31 0.0028 0.025 1.26 0.00 2.650 1.67 2.11 4.61 0.46 1.26
6 Earthen canal 0+417.310+470.5 0.0028 0.020 1.42 0.50 2.650 0.88 1.63 3.38 0.48 2.30
7 Proposed Culvert #1 0+470.5 0+475 0.0028 0.020 8.27 0.50 2.650 0.29 2.40 8.91 0.27 8.56
8 Earthen canal 0+475 0+516 0.0028 0.025 8.27 0.50 2.650 0.33 2.76 9.00 0.31 8.60
9 Offtake #2 0+516 0+516 0.0025 0.025 2.33 0.50 2.597 0.75 2.04 4.01 0.51 3.08
10 Earthen canal 0+516 0+605 0.0030 0.020 3.67 0.50 2.597 0.46 1.79 4.70 0.38 4.13
11 Turnout #1 0+605 0+605 0.0030 0.020 3.67 0.50 2.593 0.46 1.79 4.70 0.38 4.13
12 Earthen canal 0+605 0+800 0.0030 0.025 4.32 0.50 2.593 0.47 2.16 5.38 0.40 4.79
13 Earthen canal 0+800 0+840 0.0030 0.025 3.67 0.50 2.593 0.53 2.07 4.85 0.43 4.20
14 Turnout #2 0+840 0+840 0.0030 0.025 1.67 0.50 2.583 0.87 1.84 3.62 0.51 2.54
15 Earthen canal 0+840 1+050 0.0030 0.025 2.51 0.50 2.583 0.67 1.92 4.02 0.48 3.18
16 Protection wall L=90m 1+050 1+140 0.0010 0.020 2.72 0.00 2.583 0.90 2.46 4.53 0.54 2.72
17 Turnout #3 1+170 1+170 0.0010 0.020 4.34 0.50 2.570 0.58 2.67 5.63 0.47 4.92
18 Offtake #3 1+201 1+201 0.0010 0.025 4.68 0.50 2.551 0.63 3.14 6.08 0.52 5.31
19 Turnout #4 1+201 1+234 0.0080 0.020 5.00 0.50 2.545 0.28 1.42 5.62 0.25 5.28
20 Earthen canal 1+234 1+247 0.0080 0.025 3.50 0.50 2.545 0.40 1.47 4.39 0.34 3.90
21 Offtake #4 1+247 1+247 0.0080 0.025 5.87 0.50 2.516 0.28 1.71 6.51 0.26 6.15
22 Earthen canal 1+247 1+446 0.0080 0.020 5.97 0.50 2.516 0.25 1.50 6.52 0.23 6.22
23 Offtake #5 1+446 1+446 0.0036 0.025 4.95 0.50 2.478 0.40 2.07 5.85 0.35 5.35
24 Earthen canal 1+446 1+600 0.0068 0.020 4.30 0.50 2.478 0.31 1.40 5.00 0.28 4.61
25 Earthen canal 1+600 1+838 0.0068 0.020 4.21 0.50 2.478 0.32 1.39 4.92 0.28 4.53
26 Offtake #6 1+838 1+838 0.0004 0.025 2.55 0.50 2.433 1.16 3.65 5.15 0.71 3.71
27 Earthen canal 1+838 1+908 0.0004 0.025 2.00 0.50 2.433 1.35 3.61 5.02 0.72 3.35
28 Offtake #7 1+908 1+908 0.0004 0.020 4.00 0.50 2.404 0.75 3.30 5.68 0.58 4.75
29 Earthen canal 1+908 1+975 0.0004 0.025 3.82 0.50 2.404 0.89 3.80 5.81 0.65 4.71
30 Offtake #8 1+975 1+975 0.0004 0.020 3.82 0.50 2.383 0.77 3.25 5.55 0.59 4.59
31 Earthen canal 1+974 2+000 0.0074 0.025 3.50 0.50 2.383 0.39 1.45 4.38 0.33 3.89
32 Earthen canal 2+000 2+132 0.0074 0.025 3.44 0.50 2.383 0.40 1.44 4.33 0.33 3.84
33 Turnout #5 2+132 2+132 0.0074 0.020 3.21 0.50 2.379 0.36 1.22 4.02 0.30 3.57
34 Earthen canal 2+132 2+184 0.0074 0.025 2.89 0.50 2.379 0.44 1.38 3.88 0.36 3.33
35 Turnout #6 2+184 2+184 0.0074 0.020 3.70 0.50 2.376 0.33 1.27 4.44 0.29 4.03
36 Earthen canal 2+184 2+266 0.0074 0.025 3.60 0.50 2.376 0.38 1.46 4.46 0.33 3.98
37 Turnout #7 2+266 2+266 0.0074 0.025 4.10 0.50 2.370 0.35 1.51 4.89 0.31 4.45
38 Earthen canal 2+266 2+349 0.0074 0.025 3.75 0.50 2.370 0.37 1.47 4.58 0.32 4.12
39 Offtake #9 2+349 2+349 0.0118 0.020 3.68 0.50 2.328 0.28 1.08 4.31 0.25 3.96
40 Earthen canal 2+349 2+380 0.0118 0.025 4.21 0.50 2.328 0.30 1.30 4.87 0.27 4.51
41 Earthen canal 2+380 2+400 0.0118 0.025 2.80 0.50 2.328 0.39 1.16 3.66 0.32 3.19
42 Protection wall L=30m 2+400 2+410 0.0014 0.020 3.89 0.00 2.328 0.56 2.17 5.01 0.43 3.89
43 Earthen canal 2+410 2+709 0.0014 0.020 7.38 0.50 2.328 0.35 2.64 8.16 0.32 7.73
44 Offtake #10 2+709 2+709 0.0058 0.025 3.25 0.50 2.287 0.43 1.50 4.22 0.36 3.68
45 Offtake #11 2+709 2+717 0.0045 0.020 3.25 0.50 2.264 0.40 1.40 4.15 0.34 3.65
46 Earthen canal 2+717 2+800 0.0045 0.020 4.00 0.50 2.264 0.35 1.48 4.79 0.31 4.35
47 Earthen canal 2+800 2+827 0.0045 0.025 3.87 0.50 2.264 0.41 1.69 4.80 0.35 4.28
48 Offtake #12 2+827 2+827 0.0023 0.020 3.27 0.50 2.194 0.49 1.71 4.36 0.39 3.76
49 Earthen canal 2+827 2+920 0.0028 0.025 3.87 0.50 2.194 0.47 1.94 4.93 0.39 4.34
50 Turnout #8 2+920 2+920 0.0045 0.020 3.87 0.50 2.188 0.35 1.43 4.66 0.31 4.22
51 Earthen canal 2+920 3+140 0.0045 0.025 3.97 0.50 2.188 0.40 1.67 4.86 0.34 4.37
52 Turnout #9 3+140 3+140 0.0042 0.020 3.70 0.50 2.180 0.37 1.45 4.53 0.32 4.07
53 Earthen canal 3+140 3+200 0.0042 0.025 3.00 0.50 2.180 0.49 1.59 4.10 0.39 3.49
54 Turnout #10 3+200 3+200 0.0042 0.025 3.89 0.50 2.175 0.41 1.69 4.81 0.35 4.30
55 Offtake #13 3+209 3+209 0.0010 0.020 4.00 0.50 2.153 0.55 2.33 5.22 0.45 4.55
56 Earthen canal 3+209 3+308 0.0010 0.025 4.11 0.50 2.153 0.62 2.72 5.49 0.50 4.73
57 Offtake #14 3+308 3+308 0.0004 0.020 4.11 0.50 2.094 0.71 3.19 5.71 0.56 4.82
58 Earthen canal 3+308 3+563 0.0004 0.030 3.76 0.50 2.094 0.97 4.13 5.93 0.70 4.73
59 Offtake #15 3+563 3+563 0.0009 0.020 3.76 0.50 2.075 0.58 2.34 5.05 0.46 4.34
60 Earthen canal 3+563 3+600 0.0018 0.025 2.50 0.50 2.075 0.70 1.99 4.06 0.49 3.20
61 Earthen canal 3+600 3+737 0.0018 0.025 3.49 0.50 2.075 0.56 2.12 4.75 0.45 4.05
62 Turnout #11 3+737 3+741 0.0018 0.020 5.16 0.50 2.067 0.38 2.03 6.01 0.34 5.54
63 Offtake #16 3+741 3+741 0.0055 0.025 5.16 0.50 2.046 0.31 1.62 5.84 0.28 5.47
64 Earthen canal 3+741 3+843 0.0022 0.025 2.77 0.50 2.046 0.61 1.86 4.13 0.45 3.38
65 Proposed Culvert #2 3+843 3+839 0.0007 0.020 2.77 0.50 2.046 0.76 2.40 4.47 0.54 3.53
66 Earthen canal 3+839 3+927 0.0020 0.025 4.41 0.50 2.046 0.46 2.13 5.44 0.39 4.87
67 Offtake #17 3+927 3+927 0.0020 0.020 4.41 0.50 1.991 0.39 1.82 5.29 0.34 4.80
68 Earthen canal 3+926 4+000 0.0018 0.030 2.80 0.50 1.991 0.70 2.20 4.36 0.50 3.50
69 Earthen canal 4+000 4+136 0.0018 0.030 4.45 0.50 1.991 0.52 2.43 5.61 0.43 4.97
70 Offtake #18 4+120 4+120 0.0125 0.020 4.46 0.50 1.956 0.22 1.01 4.95 0.20 4.68
71 Earthen canal 4+120 4+332 0.0024 0.030 3.90 0.50 1.956 0.51 2.13 5.05 0.42 4.41
72 Turnout #12 4+332 4+332 0.0024 0.030 4.30 0.50 1.950 0.48 2.18 5.37 0.41 4.78
73 Earthen canal 4+332 4+346 0.0013 0.025 4.60 0.50 1.950 0.50 2.44 5.72 0.43 5.10
74 Offtake #19 4+346 4+346 0.0013 0.020 4.60 0.50 1.922 0.43 2.09 5.57 0.38 5.03
75 Earthen canal 4+346 4+400 0.0004 0.025 2.50 0.50 1.922 1.09 3.31 4.93 0.67 3.59
76 Earthen canal 4+400 4+642 0.0004 0.025 2.90 0.50 1.922 0.99 3.36 5.11 0.66 3.89
77 Turnout #13 4+642 4+642 0.0004 0.020 3.10 0.50 1.910 0.82 2.89 4.94 0.58 3.92
78 Earthen canal 4+642 4+495 0.0004 0.020 3.40 5.00 1.910 0.59 3.74 9.41 0.40 9.29
79 Turnout #14 4+495 4+495 0.0004 0.025 3.33 0.50 1.906 0.90 3.40 5.34 0.64 4.23
80 Earthen canal 4+495 4+520 0.0004 0.020 3.35 0.50 1.906 0.78 2.92 5.10 0.57 4.13
81 Turnout #15 4+520 4+520 0.0020 0.020 3.41 0.50 1.893 0.45 1.64 4.42 0.37 3.86
82 Earthen canal 4+520 4+625 0.0050 0.025 3.30 0.50 1.893 0.40 1.39 4.19 0.33 3.70
83 Turnout #16 4+625 4+625 0.0050 0.020 3.60 0.50 1.879 0.33 1.23 4.33 0.28 3.93
84 Earthen canal 4+625 4+642 0.0050 0.025 3.70 0.50 1.879 0.37 1.43 4.52 0.32 4.07
85 Offtake #20 4+642 4+642 0.0050 0.020 3.90 0.50 1.857 0.31 1.25 4.59 0.27 4.21
86 Earthen canal 4+642 4+656 0.0082 0.025 3.10 0.50 1.857 0.35 1.15 3.89 0.30 3.45
87 Existing Offtake #21 4+740 4+740 0.0123 0.020 3.00 0.00 1.824 0.28 0.85 3.57 0.24 3.00
88 Earthen canal 4+740 4+800 0.0123 0.025 3.00 0.50 1.824 0.31 0.99 3.70 0.27 3.31
89 Earthen canal 4+800 4+896 0.0123 0.025 3.00 0.50 1.824 0.31 0.99 3.70 0.27 3.31
90 Turnout #17 4+896 4+896 0.0016 0.020 3.00 0.50 1.819 0.51 1.66 4.14 0.40 3.51
91 Earthen canal 4+896 5+005 0.0016 0.025 3.20 0.50 1.819 0.56 1.95 4.45 0.44 3.76
92 Protection wall L=50m 5+005 5+055 0.0047 0.020 3.70 0.00 1.819 0.33 1.23 4.37 0.28 3.70
93 Earthen canal 5+055 5+076 0.0047 0.025 3.53 0.50 1.819 0.38 1.41 4.38 0.32 3.91
94 Turnout #18 5+076 5+076 0.0047 0.020 4.12 0.50 1.813 0.30 1.28 4.79 0.27 4.42
95 Earthen canal 5+076 5+090 0.0047 0.025 4.12 0.50 1.813 0.34 1.47 4.89 0.30 4.46
96 Existing Offtake #22 5+090 5+090 0.0021 0.020 3.40 0.00 1.728 0.44 1.50 4.29 0.35 3.40
97 Offtake #23 Flow divider 5+204 5+204 0.0040 0.025 4.00 0.50 0.975 0.25 1.04 4.56 0.23 4.25
98 Earthen canal 5+204 5+550 0.0005 0.025 3.00 0.50 0.975 0.56 1.84 4.25 0.43 3.56
99 Offtake #24 5+550 5+550 0.0037 0.025 3.70 0.50 0.956 0.27 1.03 4.30 0.24 3.97
100 Earthen canal 5+550 5+600 0.0024 0.020 2.80 0.50 0.956 0.32 0.94 3.51 0.27 3.12
101 Earthen canal 5+600 5+736 0.0024 0.020 3.35 0.50 0.956 0.28 0.99 3.98 0.25 3.63
102 Offtake #25 5+736 5+736 0.0145 0.025 3.35 0.50 0.921 0.18 0.63 3.76 0.17 3.53
103 Protection wall L=20m 5+832 5+852 0.0050 0.020 3.80 0.50 0.921 0.20 0.80 4.26 0.19 4.00
104 Earthen canal 5+852 6+000 0.0014 0.025 2.00 0.50 0.921 0.52 1.19 3.17 0.37 2.52
105 Earthen canal 6+000 6+354 0.0014 0.025 3.90 0.50 0.921 0.34 1.38 4.66 0.30 4.24
106 Offtake #26 6+353 6+353 0.0065 0.020 3.43 0.50 0.899 0.20 0.70 3.87 0.18 3.63
107 Earthen canal 6+353 6+400 0.0020 0.025 2.00 0.50 0.899 0.46 1.03 3.03 0.34 2.46
108 Earthen canal 6+400 6+453 0.0020 0.025 3.43 0.50 0.899 0.33 1.17 4.16 0.28 3.76
109 Turnout #19 6+453 6+453 0.0014 0.020 3.30 0.50 0.884 0.32 1.13 4.03 0.28 3.62
110 Protection wall L=40 6+520 6+560 0.0027 0.025 2.90 0.50 0.884 0.33 1.01 3.63 0.28 3.23
111 Earthen canal 6+560 6+606 0.0060 0.020 3.00 0.50 0.884 0.22 0.68 3.49 0.19 3.22
112 Protection wall L=40m 6+606 6+646 0.0060 0.020 2.70 0.50 0.884 0.23 0.66 3.22 0.20 2.93
113 Earthen canal 6+646 6+685 0.0010 0.020 2.80 0.50 0.884 0.40 1.19 3.69 0.32 3.20
114 Tournout with 8m wall #20 6+682 6+682 0.0019 0.025 3.00 0.00 0.874 0.37 1.12 3.75 0.30 3.00
115 Earthen canal 6+693 6+732 0.0019 0.020 2.90 0.50 0.874 0.32 0.97 3.61 0.27 3.22
116 Turnout #21 6+732 6+732 0.0019 0.025 2.50 0.50 0.863 0.40 1.07 3.39 0.32 2.90
117 Earthen canal 6+732 6+800 0.0019 0.025 2.48 0.50 0.863 0.40 1.07 3.37 0.32 2.88
118 Offtake #27 6+800 6+903 0.0007 0.020 2.70 0.50 0.824 0.43 1.27 3.67 0.34 3.13
119 Earthen canal 6+903 7+200 0.0097 0.025 1.88 0.50 0.824 0.28 0.56 2.51 0.23 2.16
120 Earthen canal 7+200 7+332 0.0097 0.025 3.10 0.50 0.824 0.20 0.65 3.55 0.18 3.30
121 Offtake #28 7+332 7+332 0.0140 0.025 2.80 0.00 0.797 0.20 0.55 3.19 0.17 2.80
122 Earthen canal 7+332 7+591 0.0012 0.020 2.30 0.50 0.797 0.40 1.00 3.20 0.31 2.70
123 Offtake #29 7+591 7+591 0.0008 0.020 2.36 0.00 0.781 0.49 1.16 3.34 0.35 2.36
124 Existing lining 7+591 7+600 0.0069 0.025 2.00 0.50 0.781 0.29 0.62 2.65 0.23 2.29
125 Earthen canal 7+600 7+686 0.0069 0.025 2.17 0.50 0.781 0.27 0.63 2.78 0.23 2.44
126 Offtake #30 7+686 7+686 0.0069 0.020 1.98 0.50 0.758 0.25 0.52 2.54 0.21 2.23
127 Earthen canal 7+686 7+886 0.0017 0.025 2.00 0.50 0.758 0.44 0.97 2.98 0.33 2.44
128 Proposed Culvert #3 7+886 7+903 0.0017 0.020 2.51 0.50 0.758 0.33 0.88 3.24 0.27 2.84
129 Earthen canal 7+903 8+001 0.0008 0.025 2.00 0.50 0.758 0.56 1.29 3.26 0.39 2.56
130 Offtake #31 8+001 8+010 0.0020 0.020 1.97 0.50 0.734 0.36 0.77 2.77 0.28 2.33
131 Protection wall 8+010 8+080 0.0071 0.025 2.10 0.50 0.734 0.27 0.60 2.70 0.22 2.37
132 Earthen canal 8+080 8+189 0.0071 0.020 2.80 0.50 0.734 0.19 0.56 3.23 0.17 2.99
133 Offatke #32 Flow divider 8+189 8+189 0.0160 0.020 3.90 0.50 0.610 0.11 0.43 4.15 0.10 4.01
134 Earthen canal 8+200 8+400 0.0039 0.020 1.80 0.50 0.610 0.28 0.53 2.42 0.22 2.08
135 Earthen canal 8+400 8+515 0.0039 0.020 2.60 0.50 0.610 0.22 0.59 3.09 0.19 2.82
136 Offtake #33 8+515 8+515 0.0010 0.020 2.21 0.50 0.580 0.36 0.85 3.01 0.28 2.57
137 Earthen canal 8+515 8+535 0.0010 0.025 2.21 0.50 0.580 0.41 0.99 3.12 0.32 2.62
138 Drop Structure 8+535 8+535 0.0010 0.020 2.10 0.50 0.580 0.37 0.84 2.92 0.29 2.47
139 Earthen canal 8+535 8+800 0.0049 0.025 1.80 0.50 0.580 0.29 0.56 2.44 0.23 2.09
140 Earthen canal 8+800 9+152 0.0049 0.025 2.00 0.50 0.580 0.27 0.57 2.60 0.22 2.27
141 Turnout #22 9+152 9+152 0.0027 0.020 1.90 0.50 0.571 0.29 0.58 2.54 0.23 2.19
142 Earthen canal 9+152 9+200 0.0027 0.025 2.30 0.50 0.571 0.29 0.71 2.95 0.24 2.59
143 Earthen canal 9+200 9+237 0.0027 0.025 2.51 0.50 0.571 0.27 0.73 3.12 0.23 2.78
144 Offtake #34 9+237 9+237 0.0035 0.020 2.51 0.50 0.512 0.21 0.54 2.97 0.18 2.72
145 Earthen canal 9+237 9+261 0.0035 0.025 2.08 0.50 0.512 0.27 0.59 2.68 0.22 2.35
146 Offtake #35 9+261 9+261 0.0035 0.025 2.08 0.50 0.489 0.26 0.57 2.66 0.22 2.34
147 Earthen canal 9+261 9+450 0.0022 0.020 2.34 0.50 0.489 0.24 0.60 2.88 0.21 2.58
148 Offatke #36 9+450 9+450 0.0075 0.020 2.63 0.50 0.466 0.15 0.41 2.97 0.14 2.78
149 Earthen canal 9+450 9+530 0.0090 0.025 2.21 0.50 0.466 0.18 0.42 2.62 0.16 2.39
150 Turnout #23 9+563 9+563 0.0003 0.020 2.34 0.50 0.462 0.43 1.11 3.31 0.33 2.77
151 Earthen canal 9+563 9+600 0.0010 0.020 1.40 0.50 0.462 0.42 0.67 2.33 0.29 1.82
152 Earthen canal 9+600 9+810 0.0010 0.020 2.70 0.50 0.462 0.27 0.77 3.31 0.23 2.97
153 Offtake #37 9+820 9+820 0.0010 0.020 4.40 0.50 0.438 0.19 0.87 4.83 0.18 4.59
154 Earthen canal 9+820 10+000 0.0043 0.020 1.70 0.50 0.438 0.23 0.41 2.20 0.19 1.93

155 Earthen canal 10+000 10+400 0.0043 0.020 1.70 0.50 0.438 0.23 0.41 2.20 0.19 1.93
156 Earthen canal 10+400 10+603 0.0043 0.020 4.40 0.50 0.438 0.12 0.55 4.68 0.12 4.52
157 Offtake #38 10+603 10+603 0.0005 0.020 2.80 0.50 0.412 0.31 0.91 3.49 0.26 3.11
158 Earthen canal 10+603 10+800 0.0035 0.025 1.50 0.50 0.412 0.29 0.48 2.15 0.22 1.79
159 Earthen canal 10+800 10+865 0.0035 0.025 2.49 0.50 0.412 0.21 0.54 2.96 0.18 2.70
160 Turnout #24 10+865 10+865 0.0035 0.020 2.49 0.50 0.405 0.18 0.47 2.89 0.16 2.67
161 Earthen canal 10+865 11+056 0.0035 0.025 2.78 0.50 0.405 0.19 0.55 3.21 0.17 2.97
162 Offtake #39 11+056 11+056 0.0012 0.020 1.90 0.50 0.388 0.29 0.60 2.55 0.23 2.19
163 Earthen canal 11+056 11+140 0.0012 0.020 1.89 0.50 0.388 0.29 0.60 2.55 0.23 2.18
164 Both side canal lining L=35m11+198 11+198 0.0033 0.025 1.90 0.50 0.388 0.24 0.49 2.45 0.20 2.14
165 Earthen canal 11+198 11+200 0.0054 0.020 2.00 0.50 0.388 0.18 0.37 2.39 0.15 2.18
166 Earthen canal 11+200 11+273 0.0054 0.020 2.00 0.50 0.388 0.18 0.37 2.39 0.15 2.18
167 Offtake #40 11+197 11+197 0.0054 0.025 1.90 0.50 0.363 0.20 0.40 2.35 0.17 2.10
168 Earthen canal 11+197 11+273 0.0015 0.020 2.00 0.50 0.363 0.25 0.53 2.56 0.21 2.25
169 Offtake #41 11+286 11+286 0.0015 0.025 2.10 0.50 0.344 0.27 0.60 2.70 0.22 2.37
170 Earthen canal 11+286 11+347 0.0015 0.020 2.00 0.50 0.344 0.24 0.52 2.54 0.20 2.24
171 Offtake #42 11+347 11+347 0.0015 0.025 2.30 0.50 0.305 0.24 0.57 2.83 0.20 2.54
172 Earthen canal 11+347 11+600 0.0042 0.025 1.50 0.50 0.305 0.23 0.37 2.01 0.18 1.73
173 Earthen canal 11+600 11+700 0.0042 0.025 1.98 0.50 0.305 0.19 0.39 2.40 0.16 2.17
174 Turnout #24 11+615 11+615 0.0032 0.025 2.32 0.00 0.301 0.19 0.44 2.70 0.16 2.32
175 Earthen canal 11+615 11+895 0.0032 0.020 2.14 0.50 0.301 0.17 0.38 2.52 0.15 2.31
176 Turnout #25 11+895 11+895 0.0032 0.025 2.21 0.50 0.296 0.19 0.43 2.63 0.16 2.40
177 Earthen canal 11+895 11+912 0.0032 0.020 2.34 0.50 0.296 0.16 0.38 2.69 0.14 2.50
178 Protection wall L=60m 11+912 11+972 0.0032 0.025 2.34 0.00 0.296 0.19 0.44 2.72 0.16 2.34
179 Earthen canal 11+971 12+000 0.0120 0.020 1.30 0.50 0.296 0.15 0.21 1.64 0.13 1.45
180 Earthen canal 12+000 12+131 0.0120 0.020 1.80 0.50 0.296 0.12 0.23 2.08 0.11 1.92
181 Offtake #43 12+131 12+131 0.0108 0.020 1.80 0.50 0.277 0.12 0.23 2.08 0.11 1.92
182 Earthen canal 12+131 12+291 0.0009 0.020 1.53 0.50 0.277 0.30 0.50 2.20 0.23 1.83
183 Turnout #26 12+291 12+291 0.0009 0.025 1.56 0.50 0.266 0.33 0.57 2.30 0.25 1.89
184 Earthen canal 12+291 12+387 0.0009 0.020 1.80 0.50 0.266 0.26 0.51 2.39 0.21 2.06
185 Offtake #44 12+387 12+387 0.0070 0.025 1.80 0.50 0.183 0.13 0.23 2.08 0.11 1.93
186 Canal Widening l=171M 12+387 12+400 0.0048 0.020 1.20 0.50 0.183 0.16 0.21 1.56 0.13 1.36
187 Canal Widening l=171M 12+400 12+537 0.0048 0.020 1.20 0.50 0.183 0.16 0.21 1.56 0.13 1.36
188 Both side canal lining 12+536 12+626 0.0021 0.025 1.50 0.50 0.183 0.20 0.33 1.96 0.17 1.70
189 Both side canal lining 12+626 12+651 0.0021 0.020 1.23 0.50 0.183 0.20 0.27 1.68 0.16 1.43
190 Earthen canal 12+651 12+639 0.0021 0.020 1.29 0.50 0.183 0.20 0.27 1.73 0.16 1.49
191 Proposed Culvert #4 12+639 12+644 0.0028 0.025 1.29 0.50 0.183 0.21 0.29 1.75 0.16 1.50
192 Canal Widening l=133M 12+653 12+798 0.0028 0.020 1.20 0.50 0.183 0.19 0.24 1.62 0.15 1.39
193 Offtake #45 12+798 12+798 0.0052 0.020 1.28 0.50 0.119 0.11 0.15 1.54 0.10 1.39
194 Earthen canal 12+798 12+800 0.0052 0.020 1.00 0.50 0.119 0.13 0.14 1.30 0.11 1.13
195 Protection wall L=50m 12+804 12+854 0.0052 0.020 1.78 0.00 0.119 0.10 0.17 1.97 0.09 1.78
196 Canal Widening L=342m 12+854 13+232 0.0053 0.020 1.00 0.50 0.119 0.13 0.14 1.30 0.11 1.13

197 Earthen canal 13+232 13+200 0.0053 0.020 0.60 0.50 0.119 0.19 0.13 1.02 0.13 0.79
198 Protection wall L=95m 13+232 13+327 0.0061 0.020 0.70 0.00 0.119 0.18 0.13 1.06 0.12 0.70
199 Earthen canal 13+327 13+600 0.0026 0.020 0.60 0.50 0.119 0.23 0.17 1.12 0.15 0.83

200 Canal Widening L=346m 13+600 13+656 0.0026 0.020 0.60 0.50 0.119 0.23 0.17 1.12 0.15 0.83

201 Nun irrigated area 13+600 13+656 0.0026 0.020 0.60 0.50 0.119 1.14 1.34 3.15 0.42 1.74
Daraz Canal based (Qmax)
Starti
ng N 37
` Point
IDA-MC-040 E 70

Compare
v avg Froude Qcalc Adopted Design Parameters
type of flow
( existing
situation)
[m/s] [m3/s] b h FB D

Trail&Dep(m) (m) (m) (m)

1.70 1.07 2.67 0.26 5.81 0.26 0.20 0.46 supercritical


1.27 0.63 2.67 0.43 4.66 0.43 0.20 0.63 subcritical
1.45 0.62 2.65 0.62 2.63 0.62 0.20 0.82 subcritical
1.25 0.49 2.65 0.73 2.54 0.73 0.20 0.93 subcritical
1.26 0.31 2.65 1.67 1.26 1.67 0.20 1.87 subcritical
1.63 0.62 2.65 0.88 1.42 0.88 0.20 1.08 subcritical
1.10 0.67 2.65 0.29 8.27 0.29 0.20 0.49 subcritical
0.96 0.54 2.65 0.33 8.27 0.33 0.20 0.53 subcritical
1.27 0.50 2.60 0.75 2.33 0.75 0.20 0.95 subcritical
1.45 0.70 2.60 0.46 3.67 0.46 0.20 0.66 subcritical
1.45 0.70 2.59 0.46 3.67 0.46 0.20 0.66 subcritical
1.20 0.57 2.59 0.47 4.32 0.47 0.20 0.67 subcritical
1.25 0.57 2.59 0.53 3.67 0.53 0.20 0.73 subcritical
1.40 0.53 2.58 0.87 1.67 0.87 0.20 1.07 subcritical
1.35 0.55 2.58 0.67 2.51 0.67 0.20 0.87 subcritical
1.05 0.35 2.58 0.90 2.72 0.90 0.20 1.10 subcritical
0.96 0.42 2.57 0.58 4.34 0.58 0.20 0.78 subcritical
0.81 0.34 2.55 0.63 4.68 0.63 0.20 0.83 subcritical
1.79 1.10 2.54 0.28 5.00 0.28 0.20 0.48 supercritical
1.73 0.90 2.54 0.40 3.50 0.40 0.20 0.60 subcritical
1.47 0.89 2.51 0.28 5.87 0.28 0.20 0.48 subcritical
1.68 1.09 2.52 0.25 5.97 0.25 0.20 0.45 supercritical
1.20 0.62 2.48 0.40 4.95 0.40 0.20 0.60 subcritical
1.77 1.02 2.48 0.31 4.30 0.31 0.20 0.51 supercritical
1.78 1.02 2.48 0.32 4.21 0.32 0.20 0.52 supercritical
0.67 0.21 2.43 1.16 2.55 1.16 0.20 1.36 subcritical
0.67 0.21 2.43 1.35 2.00 1.35 0.20 1.55 subcritical
0.73 0.28 2.40 0.75 4.00 0.75 0.20 0.95 subcritical
0.63 0.22 2.40 0.89 3.82 0.89 0.20 1.09 subcritical
0.73 0.28 2.38 0.77 3.82 0.77 0.20 0.97 subcritical
1.65 0.86 2.38 0.39 3.50 0.39 0.20 0.59 subcritical
1.65 0.86 2.38 0.40 3.44 0.40 0.20 0.60 subcritical
1.95 1.06 2.38 0.36 3.21 0.36 0.20 0.56 supercritical
1.73 0.86 2.38 0.44 2.89 0.44 0.20 0.64 subcritical
1.87 1.06 2.37 0.33 3.70 0.33 0.20 0.53 supercritical
1.63 0.86 2.37 0.38 3.60 0.38 0.20 0.58 subcritical
1.57 0.86 2.37 0.35 4.10 0.35 0.20 0.55 subcritical
1.61 0.86 2.37 0.37 3.75 0.37 0.20 0.57 subcritical
2.16 1.32 2.33 0.28 3.68 0.28 0.20 0.48 supercritical
1.80 1.07 2.33 0.30 4.21 0.30 0.20 0.50 supercritical
2.01 1.07 2.33 0.39 2.80 0.39 0.20 0.59 supercritical
1.07 0.46 2.33 0.56 3.89 0.56 0.20 0.76 subcritical
0.88 0.48 2.33 0.35 7.38 0.35 0.20 0.55 subcritical
1.53 0.77 2.29 0.43 3.25 0.43 0.20 0.63 subcritical
1.62 0.84 2.26 0.40 3.25 0.40 0.20 0.60 subcritical
1.53 0.84 2.26 0.35 4.00 0.35 0.20 0.55 subcritical
1.34 0.68 2.26 0.41 3.87 0.41 0.20 0.61 subcritical
1.28 0.61 2.19 0.49 3.27 0.49 0.20 0.69 subcritical
1.13 0.54 2.19 0.47 3.87 0.47 0.20 0.67 subcritical
1.53 0.84 2.19 0.35 3.87 0.35 0.20 0.55 subcritical
1.31 0.68 2.19 0.40 3.97 0.40 0.20 0.60 subcritical
1.50 0.81 2.18 0.37 3.70 0.37 0.20 0.57 subcritical
1.37 0.65 2.18 0.49 3.00 0.49 0.20 0.69 subcritical
1.28 0.65 2.17 0.41 3.89 0.41 0.20 0.61 subcritical
0.92 0.41 2.15 0.55 4.00 0.55 0.20 0.75 subcritical
0.79 0.33 2.15 0.62 4.11 0.62 0.20 0.82 subcritical
0.66 0.26 2.09 0.71 4.11 0.71 0.20 0.91 subcritical
0.51 0.17 2.09 0.97 3.76 0.97 0.20 1.17 subcritical
0.89 0.39 2.07 0.58 3.76 0.58 0.20 0.78 subcritical
1.04 0.42 2.07 0.70 2.50 0.70 0.20 0.90 subcritical
0.98 0.43 2.07 0.56 3.49 0.56 0.20 0.76 subcritical
1.02 0.54 2.07 0.38 5.16 0.38 0.20 0.58 subcritical
1.26 0.74 2.05 0.31 5.16 0.31 0.20 0.51 subcritical
1.10 0.47 2.05 0.61 2.77 0.61 0.20 0.81 subcritical
0.85 0.33 2.05 0.76 2.77 0.76 0.20 0.96 subcritical
0.96 0.46 2.05 0.46 4.41 0.46 0.20 0.66 subcritical
1.10 0.57 1.99 0.39 4.41 0.39 0.20 0.59 subcritical
0.90 0.36 1.99 0.70 2.80 0.70 0.20 0.90 subcritical
0.82 0.37 1.99 0.52 4.45 0.52 0.20 0.72 subcritical
1.94 1.33 1.96 0.22 4.46 0.22 0.20 0.42 supercritical
0.92 0.42 1.96 0.51 3.90 0.51 0.20 0.71 subcritical
0.89 0.42 1.95 0.48 4.30 0.48 0.20 0.68 subcritical
0.80 0.37 1.95 0.50 4.60 0.50 0.20 0.70 subcritical
0.92 0.46 1.92 0.43 4.60 0.43 0.20 0.63 subcritical
0.58 0.19 1.92 1.09 2.50 1.09 0.20 1.29 subcritical
0.57 0.20 1.92 0.99 2.90 0.99 0.20 1.19 subcritical
0.66 0.25 1.91 0.82 3.10 0.82 0.20 1.02 subcritical
0.51 0.26 1.91 0.59 3.40 0.59 0.20 0.79 subcritical
0.56 0.20 1.90 0.90 3.33 0.90 0.20 1.10 subcritical
0.65 0.25 1.90 0.78 3.35 0.78 0.20 0.98 subcritical
1.15 0.57 1.89 0.45 3.41 0.45 0.20 0.65 subcritical
1.36 0.71 1.89 0.40 3.30 0.40 0.20 0.60 subcritical
1.53 0.87 1.88 0.33 3.60 0.33 0.20 0.53 subcritical
1.31 0.71 1.88 0.37 3.70 0.37 0.20 0.57 subcritical
1.49 0.87 1.86 0.31 3.90 0.31 0.20 0.51 subcritical
1.61 0.89 1.86 0.35 3.10 0.35 0.20 0.55 subcritical
2.14 1.28 1.82 0.28 3.00 0.28 0.20 0.48 supercritical
1.84 1.08 1.82 0.31 3.00 0.31 0.20 0.51 supercritical
1.84 1.08 1.82 0.31 3.00 0.31 0.20 0.51 supercritical
1.10 0.51 1.82 0.51 3.00 0.51 0.20 0.71 subcritical
0.93 0.41 1.82 0.56 3.20 0.56 0.20 0.76 subcritical
1.47 0.82 1.82 0.33 3.70 0.33 0.20 0.53 subcritical
1.29 0.69 1.82 0.38 3.53 0.38 0.20 0.58 subcritical
1.42 0.84 1.81 0.30 4.12 0.30 0.20 0.50 subcritical
1.23 0.69 1.81 0.34 4.12 0.34 0.20 0.54 subcritical
1.15 0.55 1.73 0.44 3.40 0.44 0.20 0.64 subcritical
0.94 0.61 0.98 0.25 4.00 0.25 0.20 0.45 subcritical
0.53 0.24 0.97 0.56 3.00 0.56 0.20 0.76 subcritical
0.93 0.59 0.96 0.27 3.70 0.27 0.20 0.47 subcritical
1.02 0.59 0.96 0.32 2.80 0.32 0.20 0.52 subcritical
0.97 0.59 0.96 0.28 3.35 0.28 0.20 0.48 subcritical
1.46 1.11 0.92 0.18 3.35 0.18 0.20 0.38 supercritical
1.16 0.83 0.92 0.20 3.80 0.20 0.20 0.40 subcritical
0.78 0.36 0.92 0.52 2.00 0.52 0.20 0.72 subcritical
0.67 0.37 0.92 0.34 3.90 0.34 0.20 0.54 subcritical
1.29 0.94 0.90 0.20 3.43 0.20 0.20 0.40 subcritical
0.87 0.43 0.90 0.46 2.00 0.46 0.20 0.66 subcritical
0.77 0.44 0.90 0.33 3.43 0.33 0.20 0.53 subcritical
0.78 0.45 0.88 0.32 3.30 0.32 0.20 0.52 subcritical
0.88 0.50 0.88 0.33 2.90 0.33 0.20 0.53 subcritical
1.30 0.90 0.88 0.22 3.00 0.22 0.20 0.42 subcritical
1.34 0.91 0.88 0.23 2.70 0.23 0.20 0.43 subcritical
0.74 0.39 0.88 0.40 2.80 0.40 0.20 0.60 subcritical
0.78 0.41 0.87 0.37 3.00 0.37 0.20 0.57 subcritical
0.90 0.53 0.87 0.32 2.90 0.32 0.20 0.52 subcritical
0.81 0.42 0.86 0.40 2.50 0.40 0.20 0.60 subcritical
0.81 0.42 0.86 0.40 2.48 0.40 0.20 0.60 subcritical
0.65 0.33 0.82 0.43 2.70 0.43 0.20 0.63 subcritical
1.46 0.91 0.82 0.28 1.88 0.28 0.20 0.48 subcritical
1.27 0.91 0.82 0.20 3.10 0.20 0.20 0.40 subcritical
1.46 1.05 0.80 0.20 2.80 0.20 0.20 0.40 supercritical
0.80 0.42 0.80 0.40 2.30 0.40 0.20 0.60 subcritical
0.68 0.31 0.78 0.49 2.36 0.49 0.20 0.69 subcritical
1.26 0.77 0.78 0.29 2.00 0.29 0.20 0.49 subcritical
1.23 0.78 0.78 0.27 2.17 0.27 0.20 0.47 subcritical
1.45 0.95 0.76 0.25 1.98 0.25 0.20 0.45 subcritical
0.78 0.40 0.76 0.44 2.00 0.44 0.20 0.64 subcritical
0.86 0.50 0.76 0.33 2.51 0.33 0.20 0.53 subcritical
0.59 0.27 0.76 0.56 2.00 0.56 0.20 0.76 subcritical
0.95 0.53 0.73 0.36 1.97 0.36 0.20 0.56 subcritical
1.23 0.78 0.73 0.27 2.10 0.27 0.20 0.47 subcritical
1.31 0.97 0.73 0.19 2.80 0.19 0.20 0.39 subcritical
1.40 1.36 0.61 0.11 3.90 0.11 0.20 0.31 supercritical
1.14 0.72 0.61 0.28 1.80 0.28 0.20 0.48 subcritical
1.03 0.72 0.61 0.22 2.60 0.22 0.20 0.42 subcritical
0.68 0.38 0.58 0.36 2.21 0.36 0.20 0.56 subcritical
0.59 0.31 0.58 0.41 2.21 0.41 0.20 0.61 subcritical
0.69 0.38 0.58 0.37 2.10 0.37 0.20 0.57 subcritical
1.04 0.65 0.58 0.29 1.80 0.29 0.20 0.49 subcritical
1.02 0.65 0.58 0.27 2.00 0.27 0.20 0.47 subcritical
0.98 0.60 0.57 0.29 1.90 0.29 0.20 0.49 subcritical
0.80 0.49 0.57 0.29 2.30 0.29 0.20 0.49 subcritical
0.79 0.49 0.57 0.27 2.51 0.27 0.20 0.47 subcritical
0.95 0.68 0.51 0.21 2.51 0.21 0.20 0.41 subcritical
0.86 0.55 0.51 0.27 2.08 0.27 0.20 0.47 subcritical
0.85 0.55 0.49 0.26 2.08 0.26 0.20 0.46 subcritical
0.82 0.54 0.49 0.24 2.34 0.24 0.20 0.44 subcritical
1.15 0.96 0.47 0.15 2.63 0.15 0.20 0.35 subcritical
1.12 0.85 0.47 0.18 2.21 0.18 0.20 0.38 subcritical
0.42 0.21 0.46 0.43 2.34 0.43 0.20 0.63 subcritical
0.69 0.36 0.46 0.42 1.40 0.42 0.20 0.62 subcritical
0.60 0.38 0.46 0.27 2.70 0.27 0.20 0.47 subcritical
0.50 0.37 0.44 0.19 4.40 0.19 0.20 0.39 subcritical
1.07 0.74 0.44 0.23 1.70 0.23 0.20 0.43 subcritical

subcritical
1.07 0.74 0.44 0.23 1.70 0.23 0.20 0.43
0.79 0.72 0.44 0.12 4.40 0.12 0.20 0.32 subcritical
0.45 0.27 0.41 0.31 2.80 0.31 0.20 0.51 subcritical
0.86 0.53 0.41 0.29 1.50 0.29 0.20 0.49 subcritical
0.76 0.54 0.41 0.21 2.49 0.21 0.20 0.41 subcritical
0.87 0.67 0.40 0.18 2.49 0.18 0.20 0.38 subcritical
0.73 0.54 0.40 0.19 2.78 0.19 0.20 0.39 subcritical
0.65 0.40 0.39 0.29 1.90 0.29 0.20 0.49 subcritical
0.65 0.40 0.39 0.29 1.89 0.29 0.20 0.49 subcritical
0.78 0.52 0.39 0.24 1.90 0.24 0.20 0.44 subcritical
1.06 0.82 0.39 0.18 2.00 0.18 0.20 0.38 subcritical
1.06 0.82 0.39 0.18 2.00 0.18 0.20 0.38 subcritical
0.91 0.66 0.36 0.20 1.90 0.20 0.20 0.40 subcritical
0.68 0.45 0.36 0.25 2.00 0.25 0.20 0.45 subcritical
0.57 0.36 0.34 0.27 2.10 0.27 0.20 0.47 subcritical
0.67 0.44 0.34 0.24 2.00 0.24 0.20 0.44 subcritical
0.53 0.36 0.31 0.24 2.30 0.24 0.20 0.44 subcritical
0.83 0.58 0.31 0.23 1.50 0.23 0.20 0.43 subcritical
0.78 0.58 0.31 0.19 1.98 0.19 0.20 0.39 subcritical
0.68 0.50 0.30 0.19 2.32 0.19 0.20 0.39 subcritical
0.80 0.63 0.30 0.17 2.14 0.17 0.20 0.37 subcritical
0.68 0.51 0.30 0.19 2.21 0.19 0.20 0.39 subcritical
0.77 0.63 0.30 0.16 2.34 0.16 0.20 0.36 subcritical
0.67 0.50 0.30 0.19 2.34 0.19 0.20 0.39 subcritical
1.40 1.17 0.30 0.15 1.30 0.15 0.20 0.35 supercritical
1.27 1.17 0.30 0.12 1.80 0.12 0.20 0.32 supercritical
1.20 1.11 0.28 0.12 1.80 0.12 0.20 0.32 supercritical
0.55 0.34 0.28 0.30 1.53 0.30 0.20 0.50 subcritical
0.47 0.27 0.27 0.33 1.56 0.33 0.20 0.53 subcritical
0.53 0.34 0.27 0.26 1.80 0.26 0.20 0.46 subcritical
0.78 0.71 0.18 0.13 1.80 0.13 0.20 0.33 subcritical
0.89 0.73 0.18 0.16 1.20 0.16 0.20 0.36 subcritical
0.89 0.73 0.18 0.16 1.20 0.16 0.20 0.36 subcritical
0.56 0.41 0.18 0.20 1.50 0.20 0.20 0.40 subcritical
0.68 0.50 0.18 0.20 1.23 0.20 0.20 0.40 subcritical
0.67 0.50 0.18 0.20 1.29 0.20 0.20 0.40 subcritical
0.64 0.46 0.18 0.21 1.29 0.21 0.20 0.41 subcritical
0.75 0.57 0.18 0.19 1.20 0.19 0.20 0.39 subcritical
0.77 0.74 0.12 0.11 1.28 0.11 0.20 0.31 subcritical
0.83 0.74 0.12 0.13 1.00 0.13 0.20 0.33 subcritical
0.70 0.72 0.12 0.10 1.78 0.10 0.20 0.30 subcritical
0.83 0.75 0.12 0.13 1.00 0.13 0.20 0.33 subcritical

subcritical
0.92 0.72 0.12 0.19 0.60 0.19 0.20 0.39
0.94 0.71 0.12 0.18 0.70 0.18 0.20 0.38 subcritical
subcritical
0.71 0.51 0.12 0.23 0.60 0.23 0.20 0.43

subcritical
0.71 0.51 0.12 0.23 0.60 0.23 0.20 0.43

supercritical
1.43 1.53 1.906 1.141 0.60 1.14 1.20 2.34
Design of Canal Cross Section

Name of the project: Joydaraz Irrigation Canal, Takhar province

Abbreviations:
Qreq ⁼ Reqired Discharge (from crop water requirement calculation)
L/U ⁼ Canal type Lined or Unlined (fom survey drawing )
L slope ⁼ Longitudinal slope of the canal bed (Long section of canal from Survey drawing)
n ⁼ Manning's roughness coefficient
B ⁼ Bed Width
d ⁼ depth of water flow
SS ⁼ Side slope of canal (m)
P ⁼ Wetted primeter
A ⁼ Cross sectional area of the water flow
R ⁼ Hydraulic radius
Q ⁼ Calculated Discharge
V ⁼ Calculated Velocity
Vmax ⁼ Maximim permissible Velocity (see other sheet allowable velocity)
FB ⁼ Free board
D ⁼ Overall depth of the canal (water depth plus free board)
Fr ⁼ Froud number (When Fr>1, Supercritical flow, Fr=1 Critical Flow and Fr<1 subcritical flow
Re ⁼ Reynold Number (when Re<5000 Laminar Flow, 5000<Re<2000 Transitional flow and Re>2
Joedaraz Irrigation Canal

Existing width as per water measurement


Proposed Proposed (B)
width for depth for
drawing drawing

From To Qreq Type(L/U)

0+000 0+092 2.671 Existing Lining + Existing Spillway


6.10
0+092 0+280 2.671 Earthen canal

2.650
0+280 0+280 Offtake #1
3.20
0+280 0+410 2.650 Earthen canal
0+410 0+417.31 2.650 Protect MHP and Mill Canal
0+417.31 0+470.5 2.650 Earthen canal
0+470.5 0+475 2.650 Proposed Culvert #1
0+475 0+516 2.650 Earthen canal
0+516 0+516 2.597 Offtake #2
0+516 0+605 2.597 Earthen canal
0+605 0+605 2.593 Turnout #1
0+605 0+800 2.593 Earthen canal 3.50
0+800 0+840 2.593 Earthen canal
0+840 0+840 2.583 Turnout #2
0+840 1+050 2.583 Earthen canal
1+050 1+140 2.583 Protection wall L=90m
1+170 1+170 2.570 Turnout #3
1+201 1+201 2.551 Offtake #3 4.70
1+201 1+234 2.545 Turnout #4
1+234 1+247 2.545 Earthen canal
1+247 1+247 2.516 Offtake #4
1+247 1+446 2.516 Earthen canal
1+446 1+446 2.478 Offtake #5
1+446 1+600 2.478 Earthen canal 4.00
1+600 1+838 2.478 Earthen canal
1+838 1+838 2.433 Offtake #6
1+838 1+908 2.433 Earthen canal
1+908 1+908 2.404 Offtake #7
1+908 1+975 2.404 Earthen canal
1+975 1+975 2.383 Offtake #8
1+974 2+000 2.383 Earthen canal 3.80
2+000 2+132 2.383 Earthen canal
2+132 2+132 2.379 Turnout #5
2+132 2+184 2.379 Earthen canal
2+184 2+184 2.376 Turnout #6
2+184 2+266 2.376 Earthen canal
2+266 2+266 2.370 Turnout #7
2+266 2+349 2.370 Earthen canal
2+349 2+349 2.328 Offtake #9
2+349 2+380 2.328 Earthen canal
2+380 2+400 2.328 Earthen canal 3.00
2+400 2+410 2.328 Protection wall L=30m
2+410 2+709 2.328 Earthen canal
2+709 2+709 2.287 Offtake #10
2+709 2+717 2.264 Offtake #11
2+717 2+800 2.264 Earthen canal 4.00
2+800 2+827 2.264 Earthen canal
2+827 2+827 2.194 Offtake #12
2+827 2+920 2.194 Earthen canal
2+920 2+920 2.188 Turnout #8
2+920 3+140 2.188 Earthen canal
3+140 3+140 2.180 Turnout #9
3+140 3+200 2.180 Earthen canal 3.20
3+200 3+200 2.175 Turnout #10
3+209 3+209 2.153 Offtake #13
3+209 3+308 2.153 Earthen canal
3+308 3+308 2.094 Offtake #14
3+308 3+563 2.094 Earthen canal
3+563 3+563 2.075 Offtake #15

2.80 1.00 2.80


3+563 3+600 2.075 Earthen canal
3+600 3+737 2.075 Earthen canal
3+737 3+741 2.067 Turnout #11
3+741 3+741 2.046 Offtake #16
3+741 3+843 2.046 Earthen canal
3+843 3+839 2.046 Proposed Culvert #2
3+839 3+927 2.046 Earthen canal
3+927 3+927 1.991 Offtake #17
3+926 4+000 1.991 Earthen canal 3.20
4+000 4+136 1.991 Earthen canal
4+120 4+120 1.956 Offtake #18
4+120 4+332 1.956 Earthen canal
4+332 4+332 1.950 Turnout #12
4+332 4+346 1.950 Earthen canal
4+346 4+346 1.922 Offtake #19

2.70 1.15 2.70


4+346 4+400 1.922 Earthen canal
4+400 4+642 1.922 Earthen canal
4+642 4+642 1.910 Turnout #13
4+642 4+495 1.910 Earthen canal
4+495 4+495 1.906 Turnout #14
4+495 4+520 1.906 Earthen canal
4+520 4+520 1.893 Turnout #15
4+520 4+625 1.893 Earthen canal
4+625 4+625 1.879 Turnout #16
4+625 4+642 1.879 Earthen canal
4+642 4+642 1.857 Offtake #20
4+642 4+656 1.857 Earthen canal
4+740 4+740 1.824 Existing Offtake #21
4+740 4+800 1.824 Earthen canal 3.20
4+800 4+896 1.824 Earthen canal
4+896 4+896 1.819 Turnout #17
4+896 5+005 1.819 Earthen canal
5+005 5+055 1.819 Protection wall L=50m
5+055 5+076 1.819 Earthen canal
5+076 5+076 1.813 Turnout #18
5+076 5+090 1.813 Earthen canal
5+090 5+090 1.728 Existing Offtake #22
5+204 5+204 0.975 Offtake #23 Flow divider 3.70
5+204 5+550 0.975 Earthen canal
5+550 5+550 0.956 Offtake #24
5+550 5+600 0.956 Earthen canal 2.60
5+600 5+736 0.956 Earthen canal
5+736 5+736 0.921 Offtake #25
5+832 5+852 0.921 Protection wall L=20m
5+852 6+000 0.921 Earthen canal 2.60
6+000 6+354 0.921 Earthen canal
6+353 6+353 0.899 Offtake #26
6+353 6+400 0.899 Earthen canal 2.60
6+400 6+453 0.899 Earthen canal
6+453 6+453 0.884 Turnout #19
6+520 6+560 0.884 Protection wall L=40
6+560 6+606 0.884 Earthen canal
6+606 6+646 0.884 Protection wall L=40m
6+646 6+685 0.884 Earthen canal
6+682 6+682 0.874 Tournout with 8m wall #20
6+693 6+732 0.874 Earthen canal
6+732 6+732 0.863 Turnout #21
6+732 6+800 0.863 Earthen canal 2.50
6+800 6+903 0.824 Offtake #27
6+903 7+200 0.824 Earthen canal 1.80
7+200 7+332 0.824 Earthen canal
7+332 7+332 0.797 Offtake #28
7+332 7+591 0.797 Earthen canal
7+591 7+591 0.781 Offtake #29
7+591 7+600 0.781 Existing lining 2.00
7+600 7+686 0.781 Earthen canal
7+686 7+686 0.758 Offtake #30
7+686 7+886 0.758 Earthen canal
7+886 7+903 0.758 Proposed Culvert #3
7+903 8+001 0.758 Earthen canal 2.30
8+001 8+010 0.734 Offtake #31
8+010 8+080 0.734 Protection wall
8+080 8+189 0.734 Earthen canal
8+189 8+189 0.610 Offatke #32 Flow divider
8+200 8+400 0.610 Earthen canal 2.00
8+400 8+515 0.610 Earthen canal
8+515 8+515 0.580 Offtake #33
8+515 8+535 0.580 Earthen canal
8+535 8+535 0.580 Drop Structure
8+535 8+800 0.580 Earthen canal 2.00
8+800 9+152 0.580 Earthen canal
9+152 9+152 0.571 Turnout #22
9+152 9+200 0.571 Earthen canal 2.30
9+200 9+237 0.571 Earthen canal
9+237 9+237 0.512 Offtake #34
9+237 9+261 0.512 Earthen canal
9+261 9+261 0.489 Offtake #35
9+261 9+450 0.489 Earthen canal
9+450 9+450 0.466 Offatke #36
9+450 9+530 0.466 Earthen canal
9+563 9+563 0.462 Turnout #23
9+563 9+600 0.462 Earthen canal 1.50
9+600 9+810 0.462 Earthen canal
9+820 9+820 0.438 Offtake #37
9+820 10+000 0.438 Earthen canal 1.50
1.60
10+000 10+400 0.438 Earthen canal
10+400 10+603 0.438 Earthen canal
10+603 10+603 0.412 Offtake #38
10+603 10+800 0.412 Earthen canal 1.40
10+800 10+865 0.412 Earthen canal
10+865 10+865 0.405 Turnout #24
10+865 11+056 0.405 Earthen canal
11+056 11+056 0.388 Offtake #39
11+056 11+140 0.388 Earthen canal
11+198 11+198 0.388 Both side canal lining L=35m
11+198 11+200 0.388 Earthen canal 1.80
11+200 11+273 0.388 Earthen canal
11+197 11+197 0.363 Offtake #40
11+197 11+273 0.363 Earthen canal
11+286 11+286 0.344 Offtake #41
11+286 11+347 0.344 Earthen canal
11+347 11+347 0.305 Offtake #42
11+347 11+600 0.305 Earthen canal 1.30
11+600 11+700 0.305 Earthen canal
11+615 11+615 0.301 Turnout #24
11+615 11+895 0.301 Earthen canal
11+895 11+895 0.296 Turnout #25
11+895 11+912 0.296 Earthen canal
11+912 11+972 0.296 Protection wall L=60m
11+971 12+000 0.296 Earthen canal 1.00
12+000 12+131 0.296 Earthen canal
12+131 12+131 0.277 Offtake #43
12+131 12+291 0.277 Earthen canal
12+291 12+291 0.266 Turnout #26
12+291 12+387 0.266 Earthen canal
12+387 12+387 0.183 Offtake #44
12+387 12+400 0.183 Canal Widening l=171M 1.00
12+400 12+537 0.183 Canal Widening l=171M
12+536 12+626 0.183 Both side canal lining
12+626 12+651 0.183 Both side canal lining
12+651 12+639 0.183 Earthen canal
12+639 12+644 0.183 Proposed Culvert #4
12+653 12+798 0.183 Canal Widening l=133M
12+798 12+798 0.119 Offtake #45
12+798 12+800 0.119 Earthen canal 0.80
12+804 12+854 0.119 Protection wall L=50m
12+854 13+100 0.119 Canal Widening L=342m

0.80
13+100 13+200 0.119 Earthen canal
13+232 13+327 0.119 Protection wall L=95m

0.50
13+327 13+600 0.119 Earthen canal
13+600 13+656 0.119 Canal Widening L=346m
13+600 13+656 0.119 Non irrigated area
13+656 7+590 0.119 Non irrigated area
ey drawing)
Existing Depth of water as per water

0.70
measurement (d) (m)

nd Fr<1 subcritical flow)


extra hieght of water rquired to meet CWR

1.10
value

Available free board in the existing canal

0.4
as per photo

nsitional flow and Re>2000 Turbulent Flow)


V (measured by MC with curent meter)

0.8
Q (as per curent meter)

3.42
Result

Ok
Increase embankment

velocity with 25% increased of current


meter

1.000
Q (as per average 30% added velocity)

0.000
Result as per 30% added (V)

Not Ok
Canal capacity check based on velocity of current meter and w
0.78 1.13 2.82 Ok 1.413 0.000 Not Ok

1.08 0.79 2.99 Ok 0.988 0.000 Not Ok

1.00 0.63 2.96 Ok 0.788 0.000 Not Ok

1.31 0.64 3.35 Ok 0.800 0.000 Not Ok

0.78 0.98 2.90 Ok 1.225 0.000 Not Ok

1.36 0.682 2.78 Ok 0.853 0.000 Not Ok


0.80 1.21 3.87 Ok 1.513 0.000 Not Ok

1.07 0.78 2.67 Ok 0.975 0.000 Not Ok

1.00 0.10 0.1 0.68 1.90 Not Ok 0.850 2.380 OK

1.13 0.598 2.16 Ok 0.748 0.000 Not Ok

1.15 0.49 0.49 0.57 1.77 Not Ok 0.713 2.212 OK


1.15 0.58 2.13 Ok 0.725 0.000 Not Ok

1.03 0.557 2.12 Ok 0.696 0.000 Not Ok

0.91 0.69 1.63 Ok 0.863 0.000 Not Ok

1.30 0.586 1.98 Ok 0.733 0.000 Not Ok

1.00 0.556 1.45 Ok 0.695 0.000 Not Ok

1.04 0.553 1.44 Ok 0.664 0.000 Not Ok

1.05 0.906 1.71 Ok 1.133 0.000 Not Ok

1.17 0.692 1.62 Ok 0.865 0.000 Not Ok


0.96 0.538 1.19 Ok 0.673 0.000 Not Ok

0.80 0.473 0.76 Ok 0.591 0.000 Not Ok

0.75 1.25 0.5 0.306 1.22 Ok 0.367 0.000 Not Ok

0.46 0.66 0.2 0.369 0.95 Ok 0.443 0.000 Not Ok

0.90 1.20 0.3 0.269 0.85 Ok 0.323 0.000 Not Ok

0.35 0.75 0.4 0.271 0.45 Ok 0.325 0.000 Not Ok


0.28 0.58 0.3 0.338 0.47 Ok 0.406 0.000 Not Ok

0.28 0.43 0.15 0.722 0.72 Ok 0.866 0.000 Not Ok

0.17 0.47 0.3 0.35 0.40 Ok 0.420 0.000 Not Ok


0.25 0.55 0.3 0.523 0.54 Ok 0.628 0.000 Not Ok

0.23 0.53 0.3 0.447 0.34 Ok 0.536 0.000 Not Ok

0.26 0.46 0.2 0.413 0.30 Ok 0.496 0.000 Not Ok

0.26 0.26 0.36 0.15 Ok 0.432 0.000 Not Ok

0.14 0.34 0.2 0.33 0.13 Ok 0.396 0.000 Not Ok

0.15 0.60 0.45 0.32 0.12 Ok 0.384 0.000 Not Ok


f current meter and with 30% more velocity of current meter

Reference Picture Remark

Annex 10.13, Picture #01 Annex


10.4, Picture #02,03,04
The existing sectin is fine, no
improement required

The existing sectin is fine, no


improement required
0.2 m left side bank shall be raised

At this point left side bank shall be


raised upto 0.3m
40 cm width improvement is required

40 cm width improvement is required


Just cleaning and reshaping

You might also like