RUNNER MOTORS LIMITED

1, Kazi Shahjahan Road,


Mymensingh Road, Gazipura, Tongi
ESTIMATE
DATE: 12/29/2019
CUSTOMER NAME: ANWAR GALVANIZING LTD. WORK ORDER: 141958
Registration No: DM-THA-14-2583 Latest Odometer:

SPARE PARTS DETAILS


SL PART NO PART NAME QTY UNIT UNIT PRICE PRICE IN BDT
1 IB003175 Cylinder Power ( Bil)-IB003175/New:ID301739
1 Pcs 1869 1,869.00
2 IB003176 Pcs
Cylinder Assy | Clutch Master-IB003176-NEW:ID301739
1 1564.92 1,564.92
3 DOT3 BRAKE OIL DOT3 -CRTN 1 Lit 590 590.00
4 ME602733 Cover Clutch Rocker Arm-ME602733 1 Pcs 238.39 238.39
5 ID201496 Clutch Facing Kit - IB999509/ID201496 1 Pcs 1914.15 1,914.15
6 ME602727 Arm|Clutch Release-ME602727 1 Pcs 597.56 597.56
7 ID305142 Pcs
ASSY CLUTCH RELEASE BEARING - ME602710/ID305142
1 2305.8 2,305.80
8 XL15W40-DRMENGINE OIL DRUM 11 Lit 336.6 3,702.60
9 ID201024 By Pass Filter-ID201024 1 Pcs 724.5 724.50
10 IB002922 Oil Filter Element Kit - IB002922 1 Pcs 287.74 287.74
11 ID320451 FUEL-WATER SEPARATOR SPIN ON LCV 1& MCV Pcs 2467.5 2,467.50
TOTAL AMOUNT: ৳ 16,262.16
LABOUR CHARGE DETAILS
1 NA FRONT WHEEL HUB GREASE 2.3 Hr 350.00 805.00
2 NA REAR WHEEL HUB GREASE 2.9 Hr 350.00 1,015.00
3 NA ENGINE OIL REPLACEMENT 0.7 Hr 350.00 245.00
4 NA OIL FILTER REPLACEMENT 0.3 Hr 350.00 105.00
5 NA BYPASS FILTER REPLACEMENT 0.3 Hr 350.00 105.00
6 NA FUEL FILTER REPLACEMENT 0.5 Hr 350.00 175.00
7 NA CLUTCH FACING REPLACEMENT 4.3 Hr 350.00 1,505.00
8 NA CLUTCH MASTER CYLINDER REPLACEMENT 1.5 Hr 350.00 525.00
9 NA CLUTCH POWER CYLINDER REPLACEMENT 0.9 Hr 350.00 315.00
10 NA CLUTCH FACING RIVETING 1 Hr 250.00 250.00
11 NA NIPPLE GREASE 1.7 Hr 350.00 595.00
12 NA BRAKE ADJUST 1.1 Hr 350.00 385.00
13 NA GLASS REGULATOR FITTING 1 Hr 350.00 350.00
14 NA IF REQUIRE 1 NA 2,000.00 2,000.00
TOTAL AMOUNT: 8,375.00
WITH 10% VAT ON LABOUR: 837.50
GRAND TOTAL: ৳ 25,474.66
Terms & Condition:
#1. Current parts price will be revised with respect to update of the regular price & this estimate will be valid up to 15
days from the date of quotation submission.
#2. Work will be started after receiving work order & 50% advance have to be pay with work order. Rest of the payment
will be pay during delivery in cash.
#3. If you not releasing the vehicle after 24 hours of complete the vehicle then 300 Taka per day PARKING CHARGE will
be include in your final bill, also it is applicable after 3 days of estimate send If not get the work order.
#4. If you agree with this estimate, please send us work order.
#4. If you agree with this estimate, please send us work order.

CUSTOMER SIGNATURE AUTHORIZED SIGNATURE