Dear Sir
At the outset, we thank you for the opportunity to be part of your prestigious project. While
thanking you for the valued consideration, we are pleased to hereby forward our
“Plumbing Offer” for your kind consideration.
(Sri Lanka Rupees Six Million Eight Hundred and Twenty Two Thousand Nine Hundred
and Thirty and Cents Seventy One)
Basis of pricing: Our above selling price includes the cost of all local material, imported
material (on duty paid basis), plants & equipment, special machinery, tools, labor,
supervision, engineering, testing, commissioning and handing over
Special notes:
1. Manholes, Concrete plinths, Water Proofing works, slab opening /covering works
are not considered in our costing.
2. Wall chasing, patch works after pipe / conduit installation on the walls are included
in our scope of works.
3. Any increase or addition of government taxes, levies & duties shall be borne by
client.
4. This offer is strictly based on our attached “Schedule of Make & Origin of Material”
5. All sanitary fittings & accessories (Sanitary fixtures, Taps and accessories.) shall be
supplied by Client. Include all Angle valves, Bottle traps, Flexible hoses, basin waste
cups and pan connector rates are in our costing.
Project Duration:
Consider 06 Month
System Warranty:
All systems, material, plants & equipment supplied and installed by BSE shall cover 12
months warranty from the date of handing over.
Payment Terms:
We trust our proposal is in line with your requirements and look forward to your
due response in this regard.
Thanking you.
Yours truly,
General Notes
Contractor shall refer to the drawings, specifications, notes, measurement & rate
1
clauses and trade
All fittings and pipe specials used in the plumbing installation shall be suitable and
3
compatible with all respects to the pipe line to which fittings and specials
Sanitary fittings, taps and accessories will be supplied by the Employer. Contractor
shall include other necessary short lengths of pipes, fittings, etc required in complete
4
installation. Vanity counters will be done by others but the Contractor shall be
coordinated with the other party for installation of sanitary fittings and
accessories. Note
(a) Complying with the relevant Sri Lankan, British or any other standard as given
under the specifications and with the regulations of the Local Authority and or any
other relevant authorities.
(c) All specials such as elbows, bends, tees, junctions, plugs, reducers and
similar pipe fittings except for valves which will be measured separately.
Note
(d) Connecting pipes to sanitary fixtures and appliances.
(e) Casing to brick walls etc. and making good all works disturbed.
(f) Necessary screws, nails sockets, connection back nuts standard pipe fixing or
supporting clips, saddles, brackets, holder bats, straps etc.
(s) All necessary accessories, threaded & grooved fittings unless otherwise
measured separately.
(t) Sundry items related to the work where necessary as required by the Engineer.
6 (d) Installation, testing and commissioning of the entire installation work. Sanitary Note
fittings and accessories will be supplied by the Employer. All necessary short
lengths of pipes, valves, sealant, joints etc shall be included in the rates.
Engineer.
Sanitary Fittings
"Fix only" of sanitary fittings including necessary connectors, angle valve, supporting
A brackets, etc
Include supply cost of "Rocell" A280 Angle valve, "Rocell" 03172 90 Deg. Pan
Connector, "Rocell" A181A Bottle Trap, "Rocell" A706 Basin waste cup, and "Rocell"
20002 45cm flexible hose & allsanitary installation rate.
In ground floor
Ceramic uninal basins with trap, flushing system, etc 3 nr 6,333.00 18,999.00
A.4
In first floor -
Ceramic uninal basins with trap, flushing system, etc 3 nr 6,333.00 18,999.00
A.8
In second floor
Ceramic uninal basins with trap, flushing system, etc 3 nr 6,333.00 18,999.00
A.12
In third floor
Ceramic uninal basins with trap, flushing system, etc 3 nr 6,333.00 18,999.00
A.16
Page total carried to next page 564,836.00
No Description Qty Unit Rate (Rs) Amount (Rs)
In fourth floor
Ceramic uninal basins with trap, flushing system, etc 3 nr 6,333.00 18,999.00
Sanitary Accessories
A.20
"Fix only" of sanitary accessories including necessary supporting brackets, fittings, etc
In ground floor
In second floor
Toilet Mirror
Frameless 5mm thick imported double coated mirror with pencil edge including
backing and fixed with stainless steel screws to the approval of the Architect
In ground floor
All pipe lines buried in trenches, outside the building, shall be 1’ below ground level
2 and laid on a bed of 3 ” thick layer of sand and covered with a 3” thick layer of sand
before back filling. The filling material shall be
All pipe lines to be embedded in walls shall be laid in suitable chasings in the walls.
3
No exposed pipes are
All pipe lines crossing roadways shall be laid in 3 ” heavy duty GI pipe used as a
4 sleeve. The GI pipe shall be covered with 3” thick 1:2:4 mass concrete. The use of 8"
concrete hume pipes as a sleeve will also be
accepted. Note
pump.
Note
Service Meter to transfer pump
40mm diameter PVC pipe including running sockets and embeded to wall incuding all
B.1
specials to transfer
40mm diameter PVC pipe including running sockets and embeded to wall incuding all
B.2
specials to ground
Type 1000 uPVC pipes with all necessary specials, buried in brick walls/ floor or
clipped. Rate shall include for necessary fittings.
In ground floor
In first floor
B.15 Isolating valves with valve socket, All valves shall be Peglar-UK or equivalent
In ground floor
B.16 25mm dia (Include Brass Globe Valve Rate) 2 nr 3,877.00 7,754.00
B.18 25mm dia (Include Brass Globe Valve Rate) 3 nr 3,877.00 11,631.00
In second floor
B.20 25mm dia (Include Brass Globe Valve Rate) 3 nr 3,877.00 11,631.00
B.22 25mm dia (Include Brass Globe Valve Rate) 3 nr 3,877.00 11,631.00
B.24 25mm dia (Include Brass Globe Valve Rate) 3 nr 3,877.00 11,631.00
Gate Valves
In ground floor
Roof top
B.35 Pumps
Notes
The pumps shall be permanently installed with the necessary valves, flexible coupling,
1
non-return valves
Water transfer pump set consisting two pumps ( one duty, one standby) with motor
B.36
control center c/w safety devices, control devices, control cable, power
Water Tanks
Supply and installation of suitable capacity polyurethane water tanks, including all
B.38 piping connections, water level sensors and valves etc, for tank including surface
preparation for the tanks. (water
tanks shall be with 10 year guarantee) (As given, Include 5000 Ltr tank) 4 nr 184,524.00 738,096.00
C INSTALLATIONS
Notes
All PVC pipes used for internal wastewater and sewerage shall be type 600 unless
1
otherwise stated. All external sewer and wastewater pipes shall be type
All accessories used such as floor gullies, valves, bottle traps, flexible hoses etc shall
5
be of very good quality. Samples should be forwarded and approved
All waste water lines shall preferably be pressure tested to 1 bar pressure using a
6
hydraulic pressure testing pump or subjected to a water column test of
10’. Note
All manholes for 110mm both Sewer and Wastewater systems use special fittings
7 with large access door (marketed by ‘Anton’ or equivalent) and are ‘Dry Type’. The
manhole is only to provide access and
mechanical protection to the special fittings. Note
Type 600 uPVC pipe with all necessary specials laid for internal sewage Disposal
system buried in brick walls / floor, clipped to any location / soffit or laid through
ground soil where necessary.Rate shall include for necessary fittings.
In ground floor
Page total brought forward from previous page Waste Water Disposal 494,815.65
uPVC floor drain with removable trap, fixing accessories for complete installation
C.20 Type 600 uPVC pipe with all necessary specials laid for internal sewage Disposal
system buried in brick walls / floor, clipped to any location / soffit or laid through
ground soil where necessary.Rate shall include for necessary fittings.
In ground floor
In second floor
110 mm dia. PVC type 600 in soil stacks c/w fittings, supports and all accessories
C.37
required to complete
Page total brought forward from previous page External drainage 1,323,986.40
Type 1000 uPVC pipe running underground with all necessary specials in trenches.
Rate shall include for excavation of trenches, backfilling)
C.41 Pumps
Notes
All necessary isolating valves and non return valves shall be provided. Valves and
3
accessories must be made of Brass or any other material suitable to be
Supply and installation of sewerage transfer pump (one duty, one standby) of
C.42
submersible type with water cooled electric motor, safety devices, control devices
and all other accessories. ( As specification, Include capacity 4 l/s at 5m, 1 Duty 1
Stand By rate)
1 Set 1,249,283.00 1,249,283.00
Supply, installation of pump suction pipe, including foot valve, delivery lines up to the
C.43 discharge header complete with all valves, pressure gauges, strainers, all fixtures and
fittings required to complete pump
Supply and installation of sump 1.5m Dia. X 2.5 m effective depth, and discharge line
C.46
from both sumps is
Allow for connecting new sewer lines to city sewer line (Exclude all authority charges
C.47
from our scope. Include connection cost only)
1 Item 50,000.00 50,000.00
TOTAL FOR SEWER AND WASTE WATER DISPOSAL INSTALLATIONS CARRIED
TO COLLECTION
3,390,237.40
No Description Qty Unit Rate (Rs) Amount (Rs)
KURUNEGALA
COLLECTION
GRAND TOTAL FOR PLUMBING AND DRAINAGE SYSTEM (Without VAT) 6,822,930.71
ISO 9001: 2008 Quality Management System
Quality Management System Forms
Date Issued
Document No: OPR-TDE- 005
:29/09/2017
Revision No :00 Page No : 1 of 1
List Of Manufacturers
Date : 05.02.2019
Name of the Project: Proposed DFCC Bank at Kurunegala
Nature of the Project: Plumbing &Drainage Ststem