Cost Rob LC 112
Cost Rob LC 112
112 on
Kanti - Marwan Road section in the district of Muzaffarpur
Ex. Ch. LC 100 Design Ch. LC 112
S. No Description of item Unit Length Width Height no Quantity RATE
12.1 Foundation
1 Earth work in excavation of foundation of structures cu m 2951 294.24
RAILWAY PIER 10.80 4.80 2.00 2 207
VIADUCT PIER 5.60 5.60 2.00 14 878
Retaining Wall 15.00 2.00 3 4 360
RCC BOX IN APPROACH 102.00 12.30 0.60 2 1506
Providing and laying in position Plain Cement Concrete
of Grade M 15 in leveling course below Pile cap
4 12.39 cu m 465 7726.76
complete as per drawings and Technical Specification
section 1500,1700
RAILWAY PIER 10.60 4.60 0.15 2 15
VIADUCT PIER 5.40 5.40 0.15 14 61
Retaining Wall 15.00 1.90 0.15 4 17
RCC BOX IN APPROACH 102.00 12.15 0.15 2 372
Bored cast-in-situ M35 grade R.C.C. Pile excluding
Reinforcement complete as per Drawing and Technical
Specifications and removal of excavated earth with all
12.25 Rm 1440 20,328.26
lifts and lead upto 1000 m all complete as per Technical
specifications and as directed by the Engineer-in-
charge.
RAILWAY PIER Rm 20.00 16 320
VIADUCT PIER Rm 20.00 56 1120
Retaining Wall 0
RCC BOX IN APPROACH 0
Steel Liner 6mm thick MT 72 4 2891 Kg/m 833 84690.76
44 nos 2 88
14 Reinforced Cement Concrete Crash Barrier M40 RMT 271.20 4 1085 4209.00
868290.47
3591042.62
29272694.40
70519469.99
6723292.66
14932871.37
15136810.92
AMOUNT
8323239.78
22307235.49
12010.92
13816398.96
805311.20
9033261.60
AMOUNT
16444540.00
29276986.92
1091531.70
62049.68
12947400.00
4565923.20
4565923.20
134515.20
850.00
SERVICE ROAD AT ROB at LC No. 112
1 SITE CLEARANCE
SERVICE ROAD
BOTH SIDE cum 177.00 6.50 0.50 2.00 1150.50
Drain cum 177.00 1.00 0.85 4.00 601.80
Total 1752 294.24 515597
6 250MM WMM
SERVICE ROAD cum 177.00 5.50 0.250 4.00 973.50
7 230MM GSB
SERVICE ROAD cum 177.00 5.50 0.230 4.00 895.62
8 500MM SUB-GRADE
SERVICE ROAD cum 177.00 5.50 0.500 4.00 1947