Crusher Targets
###
Run Factor 14.08% Crusher
Reliability Factor 99.51% Reliability Factor
Availability Factor 33.22% Availability Factor
Performance Factor 75.71% Performance Factor
Overall Equipment Effectiveness 25.15% Overall Equipment Effectiveness
Mean Time between Failures 40.56 Mean Time between Failures
Specific Power Consumption 0.43 Specific Power Consumption
Kiln ###
Kiln
Run Factor 5.58% Run Factor
Reliability Factor 100.00% Reliability Factor
Availability Factor 5.58% Availability Factor
Performance Factor 86.20% Performance Factor
Overall Equipment Effectiveness 4.81% Overall Equipment Effectiveness
Mean Time between Failures 10000.00 Mean Time between Failures
Specific Power Consumption 17.42 Specific Power Consumption
Specific Heat Consumption 2.94 Specific Heat Consumption
OK Mill ###
Run Factor 74.95% OK Mill
Reliability Factor 100.00% Reliability Factor
Availability Factor 100.00% Availability Factor
Performance Factor 89.11% Performance Factor
Overall Equipment Effectiveness 89.11% Overall Equipment Effectiveness
Mean Time between Failures 10000.00 Mean Time between Failures
Specific Power Consumption 27.72 Specific Power Consumption
Kiln 0.00
Cal. Time 288.00
Op. Hrs. 16.08
DT Circ. 0.00
DT Plan. 271.92
DT Inc. 0.00
Production 3466.14
Incidents Nr. 0.00
Circum. Nr. 0.00
Planned Nr. 1.00
OK Mill 0.00
Cal. Time 288.00
Op. Hrs. 215.85
DT Circ. 72.15
DT Plan. 0.00
DT Inc. 0.00
Production 61548.00
Incidents Nr. 0.00
Circum. Nr. 2.00
Planned Nr. 0.00
Raw Mill L1
Cal. Time 288.00
Op. Hrs. 0.00
DT Circ. 272.74
DT Plan. 0.00
DT Inc. 1.98
Production 0.00
Incidents Nr. 1.00
Circum. Nr. 1.00
Planned Nr. 0.00
Kiln L1
Cal. Time 288.00
Op. Hrs. 0.00
DT Circ. 0.00
DT Plan. 271.92
DT Inc. 0.00
Production 0.00
Incidents Nr. 0.00
Circum. Nr. 0.00
Planned Nr. 1.00