S171?C1F.lCAT1 (JN ,. ,, ,..: QQ-S-775E Interim Amendment-1
S171?C1F.lCAT1 (JN ,. ,, ,..: QQ-S-775E Interim Amendment-1
S171?C1F.lCAT1 (JN ,. ,, ,..: QQ-S-775E Interim Amendment-1
com
QQ-S-775E
INTERIM AMENDMENT-1 (NAVy-SHJ’
o STEEL smrm,
FSDI?RAL S171?C1F.lCAT1(JN ,.
CAR130N, z lNC-C33ATED
,,
( CALV,4NI ZED)
,..
29 September 1978
BY Tll).:,
HOT-DIP PROCESS ,
,., ,..
,. ::”.. ,
...
.This interim, aiiei$ment was ,dcve l,oped &y the’ D&par trnent Of the “,Nay,, N.val
Ship EnglneeringC. nt’e<, Washington, DC 20362, based upon currently avail-
able te. bnical information. It is, recmm.nded that Federal ‘aqen.Sie. .s.
it in procurement and forward, reconmw?nclatior$s for changes to the preparinq
activity at the address shown above, .
The General $erviccs Administration has authorized the use of this i~terin
amendment as a “slid.e.cept).on to Federal S[,ecification QQ-s-775E.
‘,
PAW 1
coatinc~
-cl,.., de.iqnatim Dc. criptio.
PACE 2
“’”’”’ ?&“ -
material supp .ed to tyl,.?I, all classes, sh~ “ “ “ “ “ ““’‘“ ~c
11.1.ss otherwise
in accordance
specified (see 3.1.2) ,
with ASTM A 526 with general
0 req. ikements
‘3.1.2
in accordance
may be in accordance
~
with ASTM A 525.
~, .1. ss.s
w~TM
.?,
A
~, and
52~A
~. Material Suppli.<! to type
528, or A 642 uith general
1, classes
requirements
d, e, and f,
in accordance
with AST!l A 525. ”
3.3, after ,,
Decimal thick,.. . . .., add “ (minimum or nominal] ‘,.
PACES 2 AND 3 :3
‘“4.1 Rcsponsibil ity .fo> inspection. u“l.?ss otl,crwisc specified in tbe contract, the
contractor is responsible ~ the performance of all inspection requirements as specified
herein . Except as otherwise specified in the contract, the contractor may use his own or a“y
oth. r facilities s.it.able for the pet.formence OE the inspcctitin req. irmnerits specified
herein, .J)l. ss dis. pp.<”kd by the kwernmt?nt. The Government reserves the riqht tO Perform
any of the inspections set forth X. the speci fic.,ticm where such inspections tire deemed
necessary to assure s.ppl ies .“r! services conform to prescribed requirements. ,,
,
Downloaded from http://www.everyspec.com
QQ-S-775E
INTERIM AFISND14SNT-1
(NAVY-SH)
PAGE 3
“6.1.1 The weight or class of coating specified should be compatible with the desired
service life, thick.es8 of the base metal, and with tbe forming requirements involved as
specified in 3.1.1 and 3.1.2. Under atmospheric conditions, the protection afforded by the
co.atinqis directly prowrtional to the weiqht of coating. The coatinq is expressed ZL8the
total coating on both surfaces in ounces Per Squdre frx.t (oz/ft2) .-
6.2(b): Delete ‘(see 1.2.1)’ and Substitute ‘(see 1.2.1, 3.1.1, a“d 3.1.2 ).-
Preparing activity:
Navy - SM
(Project 9515-N026)
●.
I
●