BCW Pump- 5B Commissioning LOG Sheet

Date : 22.11.2007

CW Flow : 60 %
Drum Level Before Start Of Pump : 560
Drum Level After Start Of Pump : 380

Sl Time Motor Suc Manifold Casing DP Cavity


No Current Temp Temp Temp

1 10.20 71 24.5 23.9 2.8 38


2 11.30 73 26.0 25.3 2.7 40
3 12.30 73 27.1 26.5 2.8 40.5
4 13.30 72 27.8 27.1 2.8 41.1
5 14.30 72 28.2 28.2 2.8 42.3
6 15.30 72 29.8 30.6 2.7 44.5
7 16.30 72 30.7 31.5 2.7 45.2
8 17.30 72 31.4 32.1 2.8 45.4