MVC Los Suenos Water Heater Submittal PLANO TALLER CASA CALENTADORES - ACS MVC

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

MVC ACS Comments: General Points On

Water/Heating System

1. Ensure that all


rigid/flexible connection
points and seismic details
are in accordance with local
codes & Zurich Report BOMBA RESPALDO
Comments dated March TERMOMETRO Consultant
Address
Consultant
Address
BOMBA RETORNO AC Address Address
26th 2020. Phone
Fax
e-mail
Phone
Fax
e-mail

Consultant Consultant
Address Address
Address Address
Phone Phone
Fax Fax
e-mail e-mail

No. Description Date

SUMINISTRO DE GAS

TUBERIA AGUA POTABLE

TUBERIA RETORNO
TUBERIA SUMINISTRO AGUA CALIENTE MARRIOTT

2. Confirm that in Agua caliente


accordance with local
GAMA
electrical codes, there
are no electrical panel Project number 0
9/6/2020
locations immediately Date

Drawn by GAMA
adjacent to water boiler Checked by .
system.

7/6/2020 20:47:05
TUBERIAS DIST
see pix. Scale
Consultant Consultant
Address Address
Address Address
Phone Phone
Fax Fax
e-mail e-mail

Consultant Consultant
Address Address
Address Address
Phone Phone
Fax Fax
e-mail e-mail

REGULADORA SEGUNTA ETAPA No. Description Date

VALVULA SOLENOIDE

VALVULA ANTISISMICA

3. Please confirm the heater


MARRIOTT
equipment is either on TUBERIA SUMINISTRO GAS
housekeeping pads or with a CONEXION
clearance off the floor of 6" (air GAS
gap underneath). Project number

4.Please issue cut sheet for the Date 9/6/2020


Drawn by
GAMA
hot water tanks. Checked by

5. Confirm check valve on main

7/6/2020 20:15:23
PLANO TALLER
inlet line (potable supply) to
Scale
water heater (avoid pressure
return on recirculation pump)
See picture
Consultant Consultant
Address Address
Address Address
Phone Phone
Fax Fax
e-mail e-mail

Consultant Consultant
Address Address
Address Address
Phone Phone
Fax Fax
TERMOMETRO e-mail e-mail

SUMINISTRO AGUA CALIENTE


TUBERIA AGUA CALIENTE A LOS TANQUES

No. Description Date


AGUA POTABLE

SUMINISTRO GAS

MARRIOTT

Agua caliente

GAMA
Project number 0
Date 9/6/2020
Drawn by GAMA
Checked by .

7/6/2020 21:17:37
TUBERIAS DIST
Scale
INYECCION DE AIRE

Consultant Consultant
Address Address
Address Address
Phone Phone
TUBERIA SUMINISTRO AGUA CALIENTE Fax
e-mail
Fax
e-mail

Consultant Consultant
Address Address
Address Address
Phone Phone
Fax Fax
e-mail e-mail

TERMOMETRO

EXTRACCION DE AIRE
No. Description Date

VALVULA DE SEGURIDAD

FILTRO DE AGUA CONDENSADO

TUBERIA DE AGUA CALIENTE A LOS TANQUES


BOMBA DE CIRCULACION
MARRIOTT
TUBERIA DE CIRCULACION
Agua caliente

GAMA
DESAGUE DE CONDENSADO
Project number 0

DESAGUE DE VALVULA DE SEGURIDAD Date 9/6/2020


Drawn by GAMA
Checked by .

7/6/2020 21:05:06
TUBERIAS DIST