REFERENCE DESIGN DRAWINGS : KEY PLAN

Q
IB
N

LA
REFERENCE NO. REV TITLE

N
O
RT
A-1216 7 GENERAL ARRANGEMENT PLAN SERVICED
N-2

H
SIDE
APARTMENTS SECOND AND THIRD LEVEL CANAL LA

SI
TP

DE
R

E
PA

ID
S-0800 2 LEVEL 03 OVERALL PLAN PART PLAN-1

HS
UT
LEVEL 03 GENERAL ARRANGEMENT

SO
S-0801 5 HOTEL
PART PLAN 01 OF 03 T SID
E
FRON

P-3103-01 3rd FLOOR (G+3) PART PLAN-1 HVAC RESIDENTIAL


4
LAYOUT

FM-MX-SD-L3-11010 1 3rd FLOOR (G+3) PART PLAN-1


Note:
PLUMBING LAYOUT
1. ALL DIMENSION ARE IN MILLIMETERS.
2. ALL EQUIPMENT, FITTING MATERIALS, ACCESSORIES SHALL
BE AS PER THE RESPECTIVE APPROVED SUBMITTALS.
3. FOR SERVICES DRAWING REFER TO RELATED SHOP
DRAWINGS.
4. FONDUE DRAWINGS FOR KITCHEN AREA & ID LAYOUTS TO
BE APPROVED BY CLIENT & THE SAME MIGHT HAVE
CHANGES WHICH MAY AFFECT THE BUILDERS WORK.
5. CONNECTIONS TO ALL FIXTURES SHALL BE AS PER FINAL
APPROVED SANITARY WARE.
6. ALL BOP MEASURED FROM THE RESPECTIVE FLOOR LEVEL.
7. PIPE SUPPORT, INSTALLATION & TYPICAL DETAILS SHALL
BE SUBMITTED SEPARATELY IN TYPICAL INSTALLATION
DETAILS LAYOUT.
8. ALL REQUIRED OPENINGS ARE COORDINATED IN BUILDERS
WORK DRAWINGS.
09. ONLY APPROVED MATERIALS WILL BE USED FOR THE
PERMANENT WORKS.

LEGEND FOR WATER SUPPLY


DEWA MAIN LINE (DML)

COLD WATER SUPPLY (CWS)

HOT WATER SUPPLY (HWS)

HOT WATER RETURN (HWR)

DOMESTIC COLD WATER SUPPLY


TRANSFER (DCWST)

ISOLATION VALVE (IV)


PRESSURE REDUCING
VALVE (PRV)
DOUBLE REGULATING
VALVE (DRV)
HOSE BIB (HB)
WATER HAMMER
ARRESTOR (WHA)
ACCESS PANEL (600x600) AP1

1000
CONTINUATION REFER DWG NO: Ø40 CWS ACCESS PANEL (450x450) AP2

BOP:2480
FM-MX-SD-L3-11010 ACCESS PANEL (300x300) AP3

E IV
WM IV Ø40 CWS PRESSURE GAUGE PG
BOP:2480
WATER METER WM

WATER HEATER HWT


PIPE UP UP

PIPE DOWN DN
TO ABOVE T/A

X4 F TO BELOW T/B
FROM ABOVE F/A

FROM BELOW F/B

NOMINAL PIPE SCHEDULE :-

EQUIVALENT
DESIGN DRAWING PPR PRESSURE
PIPE SIZE (mm)
PIPE (mm)
15 25
20 32
25 40
32 50
40 63
50 75
65 90
80 110

POOL PLANT BY 100


150
150
200
WATER MASTER 200 250

X5

Y1

1 REVISED AS PER COMMENTS 08.06.2020 LR


0 ISSUED FOR APPROVAL 05.02.2020 GM
Rev Description Date By

Certified for Coordination and Compliance with the Contract documents

Date. Subcontractor Sig.

MEP -ELECTRICAL

Y2 Y3 01 MEP -PLUMBING

MEP -HVAC

ALUMINUM

OTHERS

ROBERTS REVIEW
Date. Signature

CLIENT:

OMNIYAT INVESTMENTS &


MANAGEMENT LLC LEVEL 26, ONE
BUSINESS BAY TOWER BUSINESS BAY,
DUBAI U.A.E.
T +971 4 2942042 F +971 4 2942101
EMAIL: INFO@BSBGULF.COM

LEVEL-3 POOL PLANT ROOM PLUMBING LAYOUT DESIGN AND BUILD CONTRACTOR :

1 : 50
CONSTRUCTIONS

Roberts-Pizzarotti JV

DESIGN CONSULTANT

BREWER SMITH BREWER GULF


P.O.BOX 50667
DUBAI, U.A.E.
T +971 4 2942042 F +971 4 2942101
EMAIL: INFO@BSBGULF.COM

STRUCTURE ENGINEER

BG&E
1007-1008 DUSSELDORF BUSINESS POINT,
INTERCHANGE 4, AL BARSHA 1, DUBAI UAE
T +971 4 4475224
EMAIL: INFO@BGEENG.COM
BGEGENG.COM

MEP ENGINEER

CLARKE SAMADHIN ASSOCIATES


P.O.BOX 120223
DUBAI, U.A.E.
T +971 4 4342135 F +971 4 4342136
EMAIL: INFO@CLARKESAMADHIN.COM

MEP CONSULTANTS

DESIGN & BUILD CONTRACTOR

PROJECT

Plot 18, Plot BB.B03.018


Business Bay
Dubai
DRAWING TITLE Shop Drawing

LEVEL-3 POOL PLANT ROOM


CSA-MX-MD-PO-00310-RVT

PLUMBING LAYOUT

Drawn:- GM Checked:- RS Authorised:- DG


SCALE 1:50 DATE 05.02.2010
DRAWING No. REV.
FM-MX-SD-L3-04104 1