Method Statement of Rectification of Defect No. E398
Method Statement of Rectification of Defect No. E398
Method Statement of Rectification of Defect No. E398
Method Statement of
Rectification of Defect No. E398
Project:
Provision of
Electrical & Instrument Rectification Service
(KPC1901-0000-PRC-TP-027)
Client:
Contractor:
KPC027-MST-KPS1-037-00 Page 1 of 13
Project Title: Provision of Electrical & Instrument Rectification Services Revision: 01
Contract No: KPC1901-0000-PRC-TP-027
Document Title Method Statements for Defect Item No. E398
Document No.: KPC027-MST-KPS1-037-01 Page 2 of 13
1 Introduction ........................................................................................................................... 3
2 The Purpose of the Defect Rectification................................................................................. 3
3 Definitions ............................................................................................................................. 3
4 Abbreviations......................................................................................................................... 4
5 Scope of Work ....................................................................................................................... 4
6 Reference Documents ........................................................................................................... 4
7 HSE Requirements ................................................................................................................ 5
8 Planning & Preparation .......................................................................................................... 5
9 Engineering ........................................................................................................................... 6
9.1 Philosophy of connection: ........................................................................................ 6
9.2 Latched annunciator specification:........................................................................... 7
9.3 Expanding a trip signal ............................................................................................ 7
9.4 Proper installation location on the panel door: ......................................................... 8
9.5 Wiring inside the switchgear cubicle: ....................................................................... 9
10 Procurement .......................................................................................................................... 9
11 Execution ............................................................................................................................ 10
12 Testing and Commissioning ................................................................................................ 11
13 Requirements ...................................................................................................................... 12
13.1 Tools and Equipment:............................................................................................ 12
13.2 Documents: ........................................................................................................... 12
14 Manpower ........................................................................................................................... 12
14.1 Engineering team .................................................................................................. 12
14.2 Execution team...................................................................................................... 12
14.3 Testing team ......................................................................................................... 12
15 Material take-off................................................................................................................... 13
16 Demobilization ..................................................................................................................... 13
KPC027-MST-KPS1-037-01 Page 2 of 13
Project Title: Provision of Electrical & Instrument Rectification Services Revision: 01
Contract No: KPC1901-0000-PRC-TP-027
Document Title Method Statements for Defect Item No. E398
Document No.: KPC027-MST-KPS1-037-01 Page 3 of 13
1 Introduction
This Method Statement is to describe required engineering, procurement, execution, and
test activities for rectifying the defect with the following detail:
3 Definitions
COMPANY KPC (Kurdistan Pipeline Company)
SITE KPS1
KPC027-MST-KPS1-037-01 Page 3 of 13
Project Title: Provision of Electrical & Instrument Rectification Services Revision: 01
Contract No: KPC1901-0000-PRC-TP-027
Document Title Method Statements for Defect Item No. E398
Document No.: KPC027-MST-KPS1-037-01 Page 4 of 13
4 Abbreviations
Abbreviation Definition
MS Method Statement
5 Scope of Work
6 Reference Documents
- Project HSE Plan.
- The survey report UNTI1801-KPS1-ELC-RE-0000-2 (only related part): Schematic
diagram of transformer signal (Existing)
- Panel layout of transformer feeder’s cubicle (Modified)
- Schematic diagram of the transformer signal (Modified)
KPC027-MST-KPS1-037-01 Page 4 of 13
Project Title: Provision of Electrical & Instrument Rectification Services Revision: 01
Contract No: KPC1901-0000-PRC-TP-027
Document Title Method Statements for Defect Item No. E398
Document No.: KPC027-MST-KPS1-037-01 Page 5 of 13
7 HSE Requirements
- Site Induction.
- TBT before start work by contractor HSE supervisor and Team leader. All of the
team including technicians and labors will attend.
- Risk Assessment & PTW, including approved Method of Statements.
- Ensure that all electrical equipment is inspected by a competent person.
- PPE Required for the activity:
Foot protection Eye protection Hand protection Head protection Protective clothing Face protection
- Use suitable barriers, barricades and warning signs around the workplace.
- Before start arrange with the electrical department to apply LOTO.
- During rectifying this defect power tools will be used and using the proper
protection is necessary.
- Housekeeping.
KPC027-MST-KPS1-037-01 Page 5 of 13
Project Title: Provision of Electrical & Instrument Rectification Services Revision: 01
Contract No: KPC1901-0000-PRC-TP-027
Document Title Method Statements for Defect Item No. E398
Document No.: KPC027-MST-KPS1-037-01 Page 6 of 13
9 Engineering
9.1 Philosophy of connection:
According to the site survey report, the available signals of the transformer KPS1-PWE-
DTT-005 are as the following:
KPC027-MST-KPS1-037-01 Page 6 of 13
Project Title: Provision of Electrical & Instrument Rectification Services Revision: 01
Contract No: KPC1901-0000-PRC-TP-027
Document Title Method Statements for Defect Item No. E398
Document No.: KPC027-MST-KPS1-037-01 Page 7 of 13
KPC027-MST-KPS1-037-01 Page 7 of 13
Project Title: Provision of Electrical & Instrument Rectification Services Revision: 01
Contract No: KPC1901-0000-PRC-TP-027
Document Title Method Statements for Defect Item No. E398
Document No.: KPC027-MST-KPS1-037-01 Page 8 of 13
KPC027-MST-KPS1-037-01 Page 8 of 13
Project Title: Provision of Electrical & Instrument Rectification Services Revision: 01
Contract No: KPC1901-0000-PRC-TP-027
Document Title Method Statements for Defect Item No. E398
Document No.: KPC027-MST-KPS1-037-01 Page 9 of 13
10 Procurement
The annunciator, auxiliary relay set and other wiring and termination materials purchased
based on approved EMS documents from certified manufacturers or agents.
The proposed material specification at the engineering section (section 9) will be
reflected in the EMS in detail.
KPC027-MST-KPS1-037-01 Page 9 of 13
Project Title: Provision of Electrical & Instrument Rectification Services Revision: 01
Contract No: KPC1901-0000-PRC-TP-027
Document Title Method Statements for Defect Item No. E398
Document No.: KPC027-MST-KPS1-037-01 Page 10 of 13
11 Execution
The execution can proceed as the following steps as in the following chart:
Start
Installation of annunciator
End
- Applying LOTO procedure and turning the load off (this step will be performed by
KPC operation team or by Unitech according to site operation instructions).
- Turning the AC supply and DC supply of control circuit for related switchgear cubicle
(this step will be performed by KPC operation team or by Unitech according to site
operation instructions).
- Choosing the proper location, it will be aligned with protection device and 1 inch far
from it.
- Define the limits of cutting.
- Isolating of existing circuitry by using thick fabric cover to prevent the falling the hot
filings inside the terminals and other parts.
- Make 4 holes at corners of cutting limit (inside of limit).
KPC027-MST-KPS1-037-01 Page 10 of 13
Project Title: Provision of Electrical & Instrument Rectification Services Revision: 01
Contract No: KPC1901-0000-PRC-TP-027
Document Title Method Statements for Defect Item No. E398
Document No.: KPC027-MST-KPS1-037-01 Page 11 of 13
- Cutting the panel door with a small Dremel tool or jigsaw according to attachment
Panel layout of transformer feeder’s cubicle (Modified).
- Removing sharp edges of metal by using metallic file.
- Cleaning and painting the cut edges.
- Coat the cut edges at least two times by using paint marker pen.
- Installation of annunciator without damage.
- Removing the existing connection according to attachment Schematic diagram of
transformer signal (Existing).
- Make new wiring according to attachment Schematic drawing of transformer
signal (Modified).
- Check the labels and connections.
- Starting the test and commissioning according to section 12.
KPC027-MST-KPS1-037-01 Page 11 of 13
Project Title: Provision of Electrical & Instrument Rectification Services Revision: 01
Contract No: KPC1901-0000-PRC-TP-027
Document Title Method Statements for Defect Item No. E398
Document No.: KPC027-MST-KPS1-037-01 Page 12 of 13
13 Requirements
13.1 Tools and Equipment:
- Hand Tools
- Power tools (Dremel or jigsaw and heat gun)
- Multimeter
- Fire extinguisher
13.2 Documents:
- MST
- RFI
- ITP
- PTW
- JRA
- Datasheet of annunciator and auxiliary relay
- Panel layout of transformer feeder’s cubicle (Modified)
- Schematic diagram of the transformer signal (Existing)
- Schematic diagram of the transformer signal (Modified)
14 Manpower
14.1 Engineering team
- An electrical Engineer
- An HSE supervisor
- A QA/QC Engineer.
KPC027-MST-KPS1-037-01 Page 12 of 13
Project Title: Provision of Electrical & Instrument Rectification Services Revision: 01
Contract No: KPC1901-0000-PRC-TP-027
Document Title Method Statements for Defect Item No. E398
Document No.: KPC027-MST-KPS1-037-01 Page 13 of 13
15 Material take-off
16 Demobilization
- Close the PTW.
- Housekeeping.
KPC027-MST-KPS1-037-01 Page 13 of 13