Professional Documents
Culture Documents
0036 - O19035-C-Hp-16-Rc-0036-Rc Detail of Beams at First Floor Level (Sheet 6 of 6)
0036 - O19035-C-Hp-16-Rc-0036-Rc Detail of Beams at First Floor Level (Sheet 6 of 6)
0036 - O19035-C-Hp-16-Rc-0036-Rc Detail of Beams at First Floor Level (Sheet 6 of 6)
1 This drawing is the property of L&T Construction ,B&F-EDRC and must not be passed on to any person or body not authorised by
us to receive it nor be copied or otherwise made use either in full or in part by such person or body without our prior permission
A 1475 575 1150 575 1475
C 1475 1475
D in writing.
350
12 350 300
200
3-Y32-08-T3 3-Y32-07-T2 3-Y25-05-T1
3-Y25-03-T1 14 14 300 155
650
650
3-Y32-04-T2 2-Y32-14-T3 + 05 2 2-Y16-32-T1 2-Y10-34-HB 56 56 56
400
05 03 04 14 04 04 04 155 155
07 14 04
200
08 1-Y25-188-T3 300 151 55 55 55 170
188 188 05 05 05 79 49 79 170 170
250 151 151
05
32
32
H H
03
32 32
123
123
33
33
10
154
600
600
07
160
200
200
08
450
900
02
900
35
11
02 2-Y20-33-B1 + 1-Y16-123-B1
12
2
300 11 10 12 38-Y8-35-80-2L-STPS
650
200
200
33 33 152 152 156 156
2-Y20-12-B2 3-Y12-41-HB 3-Y32-10-B1 3-Y12-42-HB 1475 575 3-Y32-11-B1 123 152 164
300
1 L.S OF BEAM 1F-B58 (250 x 450)- FOLLOW MIRROR DETAIL 153 153 176 176
11 11 11 SECTION 2 - 2 SECTION 5 - 5 80 64 80
23-Y10-01-95-2L-STPS 26-Y10-01-125-2L-STPS 24-Y10-01-90-2L-STPS 20-Y8-02-250-2L-STPS 12 12 77 77 SECTION 14-14
2050 2050
SECTION 1 - 1
3 L.S OF BEAM 1F-B22 (350 x 900) SECTION 8 - 8
G 1475
H 1475 625
(FOLLOW SIMILAR DETAIL FOR BEAM 1F-B51)
1475
J
2100 350
2-Y32-20-T3 2-Y12-181-HB
12 14
18 3-Y20-09-T2 2-Y12-181-HB
2-Y32-44-T2+ 20 20 14 3-Y25-151-T1
650
G 3-Y32-18-T1 09 19 300 18 3-Y32-19-T1 300 5 151 G
20 44 09 09 09
200
20
650
200
200
1-Y20-189-T2 2-Y10-34-HB 2-Y16-37-T1 4 250
189 18 18 18 300
151
151
37 37
09
19 189
18
37
37
152
152
43
450
127
126
127
126
44
35
23
120
900
13
200
200
200
153 153
16
02
24
2-Y25-127-B1 + 1-Y16-126-B1 850 3-Y32-152-B1 2-Y20-153-B2 850
22 43 24 22 ,13,16 23 4 127 127 5
650
200
400
300
120 126
2-Y32-16-B1 + 2-Y32-13-B2+ 650 525 925 2-Y32-43-B1 + 1-Y20-24-B1 2-Y25-23-B2 16-Y8-35-250-2L-STPS 24-Y8-154-180-2L-STPS 22-Y8-154-180-2L-STPS
1-Y20-120-B1 1-Y32-22-B2 SECTION 4 - 4
200
200
2-Y16-90-T1 13
(FOLLOW SIMILAR DETAIL FOR BEAM 1F-B52) SECTION 3 - 3 90 90
90
90
6 350
D G
450
F 137 F
1475 525 500 525 1475 92
91
91
137 137
300
2-Y8-133-HB 27 27 27 7 300
500
D G
200
3-Y32-136-T1 2-Y8-133-HB
300
500
300 3-Y32-27-T2
3-Y32-139-T2 143 300 300 137 3-Y32-137-T3 138 138 1475 525 800 1200 2-Y20-91-B1 2-Y8-89-HB
500
2-Y32-140-T3 47 350
500
139 27 300 24-Y8-92-140-2L-STPS
500
3-Y32-45-T2 2-Y8-133-HB 350
2-Y8-133-HB 2-Y8-133-HB SECTION 13 - 13
500
500
300
2-Y32-46-T1+ 300 28 28 28
3-Y32-27-T2
138
3-Y32-47-T3 47 28 3-Y25-28-T3
200
1-Y20-26-T1
45 27 27 27 84 84 L.S OF BEAM 1F-B61 (250 x 450)
137
27
500
150 150
200
27
500
46 26 46
138
82 83 82
136
139
250
140
47 26
26
1000
134 ,135
27 28
150 149 150
46
29,135
45
114 114 10
25
25
46
150 150
200
800
25
25
143 134 29 2-Y32-82-T1+
500
500
2-Y32-84-T2
500
500
450
900
02
900
3-Y16-31-HB 35 1-Y25-83-T1
01
128
128
30
200
500
48
29
135 + 1-Y32-134-B2 300 3-Y32-25-B1 2-Y32-135-B2 135 + 1-Y32-29-B2
200
450
2-Y16-143-CB 6
500
250
48 29
200
500
300 2 x 3-Y8-150-SF 25 25 25
83
82
84
135 29 135 2-Y25-48-B2 3-Y16-31-HB 2-Y32-25-B1 + 1-Y25-128-B1 30 2-Y32-29-B2+ 115 115
86
11-Y10-142-100 18-Y8-149-120-2L-STPS 14-Y10-148-140-2L-STPS 18-Y8-149-120-2L-STPS 7
200
300 1-Y25-30-B2
83
87 84
E 2L-STPS 2000 2000 2000 E
(350 X 750) (350 X 1000) SECTION 6 - 6 17-Y10-01-125-2L-STPS 24-Y10-01-125-2L-STPS 21-Y10-01-100-2L-STPS 25 128 25 86 87 86
82
29 30 29
2000 2000 SECTION 12 - 12
86
87
L.S OF BEAM 1F-B25a (350 x 750) L.S OF BEAM 1F-B25b (350 x 1000) L.S OF BEAM 1F-B49 (350 x 900) SECTION 7 - 7 SECTION 10 - 10 350 300
200
500
8 63 93 63 2-Y32-86-B1+ 2-Y10-78-HB
10
A C E
200
1475 575 1150 575 1475 1475 625 1150 850 1250 1250 850 61 61 61 1-Y20-87-B1 300
54 54 54 2-Y16-59-HB
200
56 55
200
51
79
MATCH LINE A - A
L.S OF BEAM 1F-B68 (350 x 900)
55
103 103
NOTES:
56
1200
103 103 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS STATED OTHERWISE.
100
2. GRADE OF DESIGN CONCRETE MIX FOR BEAMS SHALL BE M30
77
103 103
300 77 65 , 66 64 80 70 67 , 81 66 65 71 NOT LESS THAN 500 N/mm² CONFORMING TO IS: 1786-2008
300
200
D 2-Y32-65-B1+ 2-Y32-67-B1+ D
2-Y20-77-B2 80 + 64 70 2-Y25-70-B2 71 2-Y25-71-B2
2-Y32-80-B1+ 3-Y16-144-HB 2-Y10-78-HB 65 + 66 1-Y20-66-B1 67 + 81 1-Y20-81-B1 FOR ALL OTHER NOTES REFER DRAWING NO : O19035-C-HP-16-RC-0031
200
1-Y25-64-B1 2100 97 99 97
8 925 525 600 925 525 650
THE SPACING OF THE STIRRUPS SHALL NOT EXCEED 150mm AT
23-Y8-02-120-2L-STPS 18-Y10-01-125-2L-STPS 31-Y8-76-100-2L-STPS 24-Y8-02-90-2L-STPS 18-Y8-02-130-2L-STPS 23-Y8-02-140-2L-STPS 18-Y8-02-130-2L-STPS 19-Y8-02-120-2L-STPS 32-Y8-02-100-2L-STPS LOCATION OF LAPPING / SPLICING OF LONGITUDINAL BARS IN BEAM
2050 3475 2100 3050 2100
SECTION 9 - 9
J L.S OF BEAM 1F-B31a (350 x 900)
1150 625 1475
H D
11
F SIGNATURE:
200
1700 1700
MATCH LINE A - A
54 52 61 63 1-Y25-93-T3 2-Y32-107-T2
200
300
200
350 350
103 3-Y32-94-T2 2-Y25-95-T3 3-Y32-104-T2 2-Y20-106-T1 + 106
107 12
800
93
200
650
400
3-Y25-96-T1 1-Y20-114-T1
800
104
54
61
94 95
114
400
63
93
103
106
106
114
96
115
96
95
1150
97
67
109
109
C 81 115 C
94
110
99
110
107
104
200
97, 99
12
105
72
2-Y20-115-B1
105 111, 900
200
350
67 + 81 2-Y20-72-B2
500
500
650
350 550
925 525 2 x 3-Y10-103-SF 300
2-Y16-105-B2 2-Y25-109-B1+ 2-Y20-111-B2 9-Y8-35-250-2L-STPS
2-Y16-102-CB 2-Y32-97-B1+ 1-Y32-99-B1 11
300
2-Y16-113-HB 1-Y20-110-B1 (250 X 450)
9
20-Y8-02-115-2L-STPS 13-Y8-112-150-2L-STPS 18-Y8-112-150-2L-STPS 13-Y8-112-145-2L-STPS 0 ISSUED AS GOOD FOR CONSTRUCTION
2100 22-Y10-100-110-2L-STPS 28-Y10-01-115-2L-STPS 20-Y10-01-115-2L-STPS
1700 1700 HVA 30.06.2020 SUK 30.06.2020 RAA/SKK 30.06.2020 SJT 30.06.2020
2100 (300 X 900)
A ISSUED FOR APPROVAL HVA SUK RAA/SKK SJT
(350 X 1200) (350 X 900)
L.S OF BEAM 1F-B41 (300 x 900) L.S OF BEAM 1F-B62 (250 x 450) 300 HVA 27.05.2020 SUK 27.05.2020 RAA/SKK 28.05.2020 SJT 28.05.2020
L.S OF BEAM 1F-B31b (350 x 1200) L.S OF BEAM 1F-B31c (350 x 900) 107 107
REV.NO. DESCRIPTION DESIGNED DRAWN CHECKED APPROVED
114
925 2075
C 2100 750 106 106 REVISIONS
2100 E 2100 1150 CLIENT :
A 14
900
112
ASSAM CANCER CARE FOUNDATION
156
164
PROJECT : Proposed Cancer Centre At 18 Locations In Assam For CONSULTANT: Engineering Design and Research Center (EDRC),
176 176 168 165 156 165
200
164 163 166 Assam Cancer Care Foundation & M/s. Tata Trusts L&T Construction - Buildings & Factories.
650 168
2-Y32-156-B1+ 2-Y16-176-B2 14 1050 625 550 925 2-Y32-168-B1 + 1-Y20-165-B1 2-Y32-163-B1+ 109 109 CONCEPT Engineering Design and Research Center (EDRC),
625 550 925 1-Y20-166-B1 110 SILCHAR CANCER CENTRE
200
2100
H 2075 750 400 NAME SIGN DATE
SILCHAR - HOSPITAL
MARKING
2-Y25-173-T1 + 1-Y20-179-T1
J 150 DSGN HVA HVA 27.05.2020
162 162 173 180 172 200 RC DETAIL OF BEAMS AT FIRST FLOOR
200
200
3-Y25-162-T2 DRAWING
MATCH LINE B-B
NUMBER
2-Y10-145-T1
200 200
179
173
2-Y12-38-T1
CHKD RAA/SKK RAA/SKK 28.05.2020 SCALE
300
200
300
28.05.2020
174
167
200
200
163
167
166
2-Y12-187-HB 2-Y12-187-HB
DRAWING No. O19035-C-HP-14-RC-0036 A1 0
2-Y32-174-B1 + 1-Y20-167-B1 2-Y20-175-B2
925 550 625 C.S OF BEAM DB1 (150 X 300) C.S OF BEAM DB2 (200 X 300) FIRST ANGLE