12 11 10 9 8 7 6 5 4 3 2 1

1 This drawing is the property of L&T Construction ,B&F-EDRC and must not be passed on to any person or body not authorised by
us to receive it nor be copied or otherwise made use either in full or in part by such person or body without our prior permission
A 1475 575 1150 575 1475
C 1475 1475
D in writing.
350
12 350 300

200
3-Y32-08-T3 3-Y32-07-T2 3-Y25-05-T1
3-Y25-03-T1 14 14 300 155

650

650
3-Y32-04-T2 2-Y32-14-T3 + 05 2 2-Y16-32-T1 2-Y10-34-HB 56 56 56

400
05 03 04 14 04 04 04 155 155
07 14 04

200
08 1-Y25-188-T3 300 151 55 55 55 170
188 188 05 05 05 79 49 79 170 170
250 151 151

05

32

32
H H
03

32 32

123

123
33

33
10

154

600

600
07

160

200

200
08

450
900
02

900
35

11
02 2-Y20-33-B1 + 1-Y16-123-B1
12

2
300 11 10 12 38-Y8-35-80-2L-STPS

650
200

200
33 33 152 152 156 156
2-Y20-12-B2 3-Y12-41-HB 3-Y32-10-B1 3-Y12-42-HB 1475 575 3-Y32-11-B1 123 152 164
300
1 L.S OF BEAM 1F-B58 (250 x 450)- FOLLOW MIRROR DETAIL 153 153 176 176
11 11 11 SECTION 2 - 2 SECTION 5 - 5 80 64 80
23-Y10-01-95-2L-STPS 26-Y10-01-125-2L-STPS 24-Y10-01-90-2L-STPS 20-Y8-02-250-2L-STPS 12 12 77 77 SECTION 14-14
2050 2050
SECTION 1 - 1
3 L.S OF BEAM 1F-B22 (350 x 900) SECTION 8 - 8
G 1475
H 1475 625
(FOLLOW SIMILAR DETAIL FOR BEAM 1F-B51)
1475
J
2100 350
2-Y32-20-T3 2-Y12-181-HB
12 14
18 3-Y20-09-T2 2-Y12-181-HB
2-Y32-44-T2+ 20 20 14 3-Y25-151-T1

650
G 3-Y32-18-T1 09 19 300 18 3-Y32-19-T1 300 5 151 G
20 44 09 09 09

200
20

650
200

200
1-Y20-189-T2 2-Y10-34-HB 2-Y16-37-T1 4 250
189 18 18 18 300

151

151
37 37
09

19 189
18

37

37

152

152
43

450
127
126

127
126
44
35

23
120

900
13

200

200

200
153 153
16

02

24
2-Y25-127-B1 + 1-Y16-126-B1 850 3-Y32-152-B1 2-Y20-153-B2 850
22 43 24 22 ,13,16 23 4 127 127 5

650

200

400
300

120 126
2-Y32-16-B1 + 2-Y32-13-B2+ 650 525 925 2-Y32-43-B1 + 1-Y20-24-B1 2-Y25-23-B2 16-Y8-35-250-2L-STPS 24-Y8-154-180-2L-STPS 22-Y8-154-180-2L-STPS
1-Y20-120-B1 1-Y32-22-B2 SECTION 4 - 4
200

3 L.S OF BEAM 1F-B56 (250 x 450) -FOLLOW MIRROR DETAIL


18-Y8-02-150-2L-STPS
24-Y8-02-95-2L-STPS 26-Y8-02-125-2L-STPS 19-Y8-02-120-2L-STPS 16 120 16 L.S OF BEAM 1F-B57 (300 x 600)-FOLLOW MIRROR DETAIL
2100 13 22 13 (FOLLOW MIRROR DETAIL FOR BEAM 1F-B55)
2100
L.S OF BEAM 1F-B23 (350 x 900) 250

200
2-Y16-90-T1 13
(FOLLOW SIMILAR DETAIL FOR BEAM 1F-B52) SECTION 3 - 3 90 90

90

90
6 350
D G

450
F 137 F
1475 525 500 525 1475 92

91

91
137 137
300
2-Y8-133-HB 27 27 27 7 300
500

D G

200
3-Y32-136-T1 2-Y8-133-HB
300

500

2-Y8-141-HB 3-Y32-138-T1 138 13 91 91


500

300 3-Y32-27-T2
3-Y32-139-T2 143 300 300 137 3-Y32-137-T3 138 138 1475 525 800 1200 2-Y20-91-B1 2-Y8-89-HB

500
2-Y32-140-T3 47 350

500
139 27 300 24-Y8-92-140-2L-STPS

500
3-Y32-45-T2 2-Y8-133-HB 350
2-Y8-133-HB 2-Y8-133-HB SECTION 13 - 13
500

500
300
2-Y32-46-T1+ 300 28 28 28
3-Y32-27-T2

138
3-Y32-47-T3 47 28 3-Y25-28-T3

200
1-Y20-26-T1
45 27 27 27 84 84 L.S OF BEAM 1F-B61 (250 x 450)

137

27

500
150 150

200
27

500
46 26 46
138

82 83 82
136
139

250
140

47 26

26
1000
134 ,135

27 28
150 149 150

46
29,135

45
114 114 10
25

25

46
150 150

200

800
25

25
143 134 29 2-Y32-82-T1+
500

500

2-Y32-84-T2
500

500

450
900
02

900
3-Y16-31-HB 35 1-Y25-83-T1
01

128

128
30

200

500
48

29
135 + 1-Y32-134-B2 300 3-Y32-25-B1 2-Y32-135-B2 135 + 1-Y32-29-B2

200

450
2-Y16-143-CB 6

500

250
48 29

200

500
300 2 x 3-Y8-150-SF 25 25 25

83
82
84
135 29 135 2-Y25-48-B2 3-Y16-31-HB 2-Y32-25-B1 + 1-Y25-128-B1 30 2-Y32-29-B2+ 115 115

86
11-Y10-142-100 18-Y8-149-120-2L-STPS 14-Y10-148-140-2L-STPS 18-Y8-149-120-2L-STPS 7

200
300 1-Y25-30-B2

83
87 84
E 2L-STPS 2000 2000 2000 E
(350 X 750) (350 X 1000) SECTION 6 - 6 17-Y10-01-125-2L-STPS 24-Y10-01-125-2L-STPS 21-Y10-01-100-2L-STPS 25 128 25 86 87 86

82
29 30 29
2000 2000 SECTION 12 - 12

86
87
L.S OF BEAM 1F-B25a (350 x 750) L.S OF BEAM 1F-B25b (350 x 1000) L.S OF BEAM 1F-B49 (350 x 900) SECTION 7 - 7 SECTION 10 - 10 350 300

200

500
8 63 93 63 2-Y32-86-B1+ 2-Y10-78-HB
10
A C E

200
1475 575 1150 575 1475 1475 625 1150 850 1250 1250 850 61 61 61 1-Y20-87-B1 300
54 54 54 2-Y16-59-HB
200

2-Y32-79-T1+ 3-Y32-56-T3 3-Y32-55-T2 49 + 79 3-Y25-50-T1 2-Y32-51-T3 3-Y32-57-T2


1-Y25-49-T1 3-Y25-52-T1 3-Y32-58-T2 2-Y25-62-T3 52 27-Y8-02-100-2L-STPS
50 49 57 51 57 52 50 58 62 62 58
49,79

56 55
200

51
79

MATCH LINE A - A
L.S OF BEAM 1F-B68 (350 x 900)
55

103 103
NOTES:
56

1200
103 103 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS STATED OTHERWISE.
100
2. GRADE OF DESIGN CONCRETE MIX FOR BEAMS SHALL BE M30
77

3. Y-DENOTES THERMO MECHANICALLY TREATED BARS OF GRADE Fe 500D YIELD STRENGTH


80
64

103 103
300 77 65 , 66 64 80 70 67 , 81 66 65 71 NOT LESS THAN 500 N/mm² CONFORMING TO IS: 1786-2008
300
200

D 2-Y32-65-B1+ 2-Y32-67-B1+ D
2-Y20-77-B2 80 + 64 70 2-Y25-70-B2 71 2-Y25-71-B2
2-Y32-80-B1+ 3-Y16-144-HB 2-Y10-78-HB 65 + 66 1-Y20-66-B1 67 + 81 1-Y20-81-B1 FOR ALL OTHER NOTES REFER DRAWING NO : O19035-C-HP-16-RC-0031
200

1-Y25-64-B1 2100 97 99 97
8 925 525 600 925 525 650
THE SPACING OF THE STIRRUPS SHALL NOT EXCEED 150mm AT
23-Y8-02-120-2L-STPS 18-Y10-01-125-2L-STPS 31-Y8-76-100-2L-STPS 24-Y8-02-90-2L-STPS 18-Y8-02-130-2L-STPS 23-Y8-02-140-2L-STPS 18-Y8-02-130-2L-STPS 19-Y8-02-120-2L-STPS 32-Y8-02-100-2L-STPS LOCATION OF LAPPING / SPLICING OF LONGITUDINAL BARS IN BEAM
2050 3475 2100 3050 2100
SECTION 9 - 9
J L.S OF BEAM 1F-B31a (350 x 900)
1150 625 1475
H D
11
F SIGNATURE:
200

1700 1700
MATCH LINE A - A

3-Y32-61-T2 2-Y32-63-T3 + 9 300 850 1250


3-Y25-54-T1
200

54 52 61 63 1-Y25-93-T3 2-Y32-107-T2
200

300
200

350 350
103 3-Y32-94-T2 2-Y25-95-T3 3-Y32-104-T2 2-Y20-106-T1 + 106
107 12

800
93

200
650

400

3-Y25-96-T1 1-Y20-114-T1

800
104
54
61

94 95

114
400
63
93

103

106
106
114

96

115
96
95

1150
97

67

109
109

C 81 115 C
94

110
99

110

107
104

200
97, 99

12
105

72
2-Y20-115-B1
105 111, 900
200

350
67 + 81 2-Y20-72-B2
500
500

650

350 550
925 525 2 x 3-Y10-103-SF 300
2-Y16-105-B2 2-Y25-109-B1+ 2-Y20-111-B2 9-Y8-35-250-2L-STPS
2-Y16-102-CB 2-Y32-97-B1+ 1-Y32-99-B1 11
300
2-Y16-113-HB 1-Y20-110-B1 (250 X 450)
9
20-Y8-02-115-2L-STPS 13-Y8-112-150-2L-STPS 18-Y8-112-150-2L-STPS 13-Y8-112-145-2L-STPS 0 ISSUED AS GOOD FOR CONSTRUCTION
2100 22-Y10-100-110-2L-STPS 28-Y10-01-115-2L-STPS 20-Y10-01-115-2L-STPS
1700 1700 HVA 30.06.2020 SUK 30.06.2020 RAA/SKK 30.06.2020 SJT 30.06.2020
2100 (300 X 900)
A ISSUED FOR APPROVAL HVA SUK RAA/SKK SJT
(350 X 1200) (350 X 900)
L.S OF BEAM 1F-B41 (300 x 900) L.S OF BEAM 1F-B62 (250 x 450) 300 HVA 27.05.2020 SUK 27.05.2020 RAA/SKK 28.05.2020 SJT 28.05.2020

L.S OF BEAM 1F-B31b (350 x 1200) L.S OF BEAM 1F-B31c (350 x 900) 107 107
REV.NO. DESCRIPTION DESIGNED DRAWN CHECKED APPROVED
114
925 2075
C 2100 750 106 106 REVISIONS
2100 E 2100 1150 CLIENT :
A 14

MATCH LINE B-B


3-Y20-169-T1 170 169 155 2-Y20-155-T2 3-Y32-170-T1 170 155 171 170 2-Y25-171-T1+ 161 2-Y32-161-T2 + 172 171 2-Y25-172-T1 + 1-Y20-180-T1
161
200

1-Y20-186-T1 1-Y20-177-T2 186


B 186 177 177 180 B
169

900
112
ASSAM CANCER CARE FOUNDATION
156
164

PROJECT : Proposed Cancer Centre At 18 Locations In Assam For CONSULTANT: Engineering Design and Research Center (EDRC),
176 176 168 165 156 165
200

164 163 166 Assam Cancer Care Foundation & M/s. Tata Trusts L&T Construction - Buildings & Factories.
650 168
2-Y32-156-B1+ 2-Y16-176-B2 14 1050 625 550 925 2-Y32-168-B1 + 1-Y20-165-B1 2-Y32-163-B1+ 109 109 CONCEPT Engineering Design and Research Center (EDRC),
625 550 925 1-Y20-166-B1 110 SILCHAR CANCER CENTRE
200

1-Y32-164-B1 ARCHITECT: L&T Construction - Buildings & Factories.


12-Y8-159-200-2L-STPS 24-Y8-160-150-2L-STPS 20-Y8-160-110-2L-STPS 24-Y8-157-120-2L-STPS 111 111 ( A Government of Assam and Tata Trusts Initiative).
2075 2075 2725 13-Y8-157-220-2L-STPS 19-Y8-157-120-2L-STPS 23-Y8-157-130-2L-STPS 17-Y8-157-170-2L-STPS SUPPLIER/ CONTRACTOR : Larsen & Toubro Limited, Construction, Buildings & Factories
L.S OF BEAM 1F-B48 (300 x 600) 2100 2750 SECTION 11 - 11 JOB No : O19035 TITLE:
SECTION/
ELEVATION

2100
H 2075 750 400 NAME SIGN DATE
SILCHAR - HOSPITAL
MARKING

2-Y25-173-T1 + 1-Y20-179-T1
J 150 DSGN HVA HVA 27.05.2020
162 162 173 180 172 200 RC DETAIL OF BEAMS AT FIRST FLOOR
200

200

3-Y25-162-T2 DRAWING
MATCH LINE B-B

179 145 145 38 38 DRWN SUK SUK 27.05.2020 LEVEL (SHEET 6 OF 6)


200

NUMBER
2-Y10-145-T1
200 200
179
173

2-Y12-38-T1
CHKD RAA/SKK RAA/SKK 28.05.2020 SCALE
300

200

300

147 2-Y10-146-B1 40 2-Y12-39-B1


A A
APPD SJT SJT 1:40, 1:25
175

28.05.2020
174
167

146 146 6-Y8-147-150-2L-STPS 6-Y8-40-150-2L-STPS


39 39 PROJECTION SIZE REV
174 ,175 300 300
300

200

200

163
167
166
2-Y12-187-HB 2-Y12-187-HB
DRAWING No. O19035-C-HP-14-RC-0036 A1 0
2-Y32-174-B1 + 1-Y20-167-B1 2-Y20-175-B2
925 550 625 C.S OF BEAM DB1 (150 X 300) C.S OF BEAM DB2 (200 X 300) FIRST ANGLE

16-Y10-158-145-2L-STPS 18-Y8-157-195-2L-STPS 11-Y8-157-220-2L-STPS


22-Y8-157-100-2L-STPS 2075 2075 RELEASED FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
2100 L.S OF BEAM 1F-B48 (300 x 600)
12 11 10 9 8 7 6 5 4 3 2 1