Professional Documents
Culture Documents
Buildding Works - Canopy Window and Door Admin CCR
Buildding Works - Canopy Window and Door Admin CCR
CONCRETEE WALL
REKAPITULASI
FRAMELLESS GLAS PANEL DOOR Nr FD1 2.00 x 2.10 0.10 2.60 1.00 - - 1.00 1.00 0.26 55.00 14.30
FRAMELLESS GLAS PANEL DOOR Nr FD2 1.50 x 2.50 0.10 2.10 1.00 - - 1.00 1.00 0.21 55.00 11.55
FRAMELLESS GLAS PANEL DOOR Nr FD3 1.50 x 2.10 0.10 2.10 1.00 3.00 - - 3.00 0.63 55.00 34.65
FRAMELLESS GLAS PANEL DOOR Nr FD4 1.00 x 2.10 0.10 1.60 1.00 7.00 2.00 2.00 11.00 1.76 55.00 96.80
FRAMELLESS GLAS PANEL DOOR Nr FD5 0.95 x 2.10 0.10 1.55 1.00 - - - - - 55.00 -
BUILLDING WORK
CONCRETEE WALL
REKAPITULASI
Amount
TOTAL
No Breakdown Unit Node Dimension (m)
AMOUNT
AT WC1 AT WC2 AT WC2A AT WC3
Amount Concrete
No Breakdown Node Amount BAR
(cu,m)
Amount Amount of
TOTAL Rasio Bar Amount BAR
No Breakdown Unit Node Dimension (m) Thick (m) Wide (m) Long (m) Concrete
AMOUNT (Kg/Cu,m) (Kg)
AT WC1 AT WC2 AT WC2A AT WC3 (Cu,m)
HEAVY DUTY METAL LOUVERED Nr HLD1 1.00 x 2.10 0.10 1.60 1.00 1.00 2.00 3.00 - 6.00 0.96 55.00 52.80
HEAVY DUTY METAL LOUVERED Nr HLD2 1.50 x 2.10 0.10 2.10 1.00 - - - 2.00 2.00 0.42 55.00 23.10
Amount
TOTAL
No Breakdown Unit Node Dimension (m)
AMOUNT
AT WC1 AT WC2 AT WC2A AT WC3
Amount Amount of
TOTAL Rasio Bar Amount BAR
No Breakdown Unit Node Dimension (m) Thick (m) Wide (m) Long (m) Concrete
AMOUNT (Kg/Cu,m) (Kg)
AT WC1 AT WC2 AT WC2A AT WC3 (Cu,m)
BLAST RESISTANT WINDOWS Nr BRW1 2.00 x 1.20 0.10 2.60 1.00 - - - 1.00 1.00 0.26 55.00 14.30
BLAST RESISTANT WINDOWS Nr BRW2 1.50 x 1.20 0.10 2.10 1.00 - - - 3.00 3.00 0.63 55.00 34.65
BLAST RESISTANT WINDOWS Nr BRW3 1.00 x 1.20 0.10 1.60 1.00 - - - 9.00 9.00 1.44 55.00 79.20
BLAST RESISTANT WINDOWS Nr BRW4 2.00 x 0.60 0.10 2.60 1.00 - - - 4.00 4.00 1.04 55.00 57.20
3.37 185.35
BUILLDING WORK
CONCRETEE CANOPY
REKAPITULASI
Amount Amount of
TOTAL Rasio Bar Amount BAR
No Breakdown Unit Node Dimension (m) Thick (m) Wide (m) Long (m) Concrete
AMOUNT (Kg/Cu,m) (Kg)
AT WC1 AT WC2 AT WC2A AT WC3 (Cu,m)
BLAST RESISTANT DOOR Nr BRD1 2.50 x 2.50 0.10 3.10 1.00 - - - 1.00 1.00 0.31 55.00 17.05
BLAST RESISTANT DOOR Nr BRD2 2.00 x 2.50 0.10 2.60 1.00 - - - 3.00 3.00 0.78 55.00 42.90
BLAST RESISTANT DOOR Nr BRD3 1.50 x 2.50 0.10 2.10 1.00 - - - 2.00 2.00 0.42 55.00 23.10
BLAST RESISTANT DOOR Nr BRD4 1.20 x 2.50 0.10 1.80 1.00 - - - 4.00 4.00 0.72 55.00 39.60
2.23 122.65
BUILLDING WORK
DOOR TOILET
REKAPITULASI
Amount
TOTAL
No Breakdown Unit Node Dimension (m)
AMOUNT
@ WC1 @ WC2 @ WC2A @ WC3 @ W T1
Amount
TOTAL
No Breakdown Unit Node Dimension (m)
AMOUNT
@ WC1 @ WC2 @ WC2A @ WC3 @ W T1
Amount
TOTAL
No Breakdown Unit Node Dimension (m)
AMOUNT
@ WC1 @ WC2 @ WC2A @ WC3 @ W T1
No Total
Major Dimension (m) Number Amount Less Amount (m) Number Amount Less Amount (m) Number Amount Less Amount (m) Number Amount
No Breakdown (CW) Note Node Sketsa Type Wall Breakdown (FD) No Breakdown (W) No Breakdown (HLD) Amount Note
Number (pcs)/side Sq.m (pcs)/side Sq.m (pcs)/side Sq.m (pcs)/side Sq.m
Wide High Thicknes Node Wide High Thicknes Node Wide High Thicknes Node Wide High Thicknes (sq.m)
-
I 1 Concrete Wall WC1 Vert Dwg 3.500 5.150 0.100 2.000 18.03 - - - 18.03
2 Concrete Wall WC1 Vert Dwg 6.000 5.150 0.100 2.000 30.90 - - - 30.90
3 Concrete Wall WC1 Vert Dwg 6.000 5.150 0.100 2.000 30.90 - - - 30.90
4 Concrete Wall WC1 Vert Dwg 3.500 5.150 0.100 2.000 18.03 - - - 18.03
5 Concrete Wall WC1 Vert Dwg 6.000 5.150 0.100 2.000 30.90 - - - 30.90
6 Concrete Wall WC1 Vert Dwg 6.300 5.150 0.100 2.000 32.45 FD4 1.000 2.100 2.00 4.20 Windows W3 0.600 1.200 4.00 2.88 - 25.37
7 Concrete Wall WC1 Vert Dwg 4.230 5.150 0.100 2.000 21.78 FD4 1.000 2.100 2.00 4.20 - - 17.58
8 Concrete Wall WC1 Vert Dwg 3.350 5.150 0.100 2.000 17.25 - - - 17.25
SUB JUMLAH 1 200.24 8.40 2.88 - 188.96
II 1 Concrete Wall WC1 Horz Dwg 10.010 5.150 0.100 2.000 51.55 FGP DOOR FD4 1.000 2.100 2.00 4.20 - - - 47.35
2 Concrete Wall WC1 Horz Dwg 10.010 5.150 0.100 2.000 51.55 FGP DOOR FD3 1.500 2.100 2.00 6.30 - - - 45.25
3 Concrete Wall WC1 Horz Dwg 7.150 5.150 0.100 2.000 36.82 FGP DOOR FD3 1.500 2.100 2.00 6.30 - - - 30.52
4 Concrete Wall WC1 Horz Dwg 2.830 5.150 0.100 2.000 14.57 FGP DOOR FD3 1.500 2.100 2.00 6.30 - - - 8.27
5 Concrete Wall WC1 Horz Dwg 2.470 5.150 0.100 2.000 12.72 - - - - - 12.72
6 Concrete Wall WC1 Horz Dwg 5.100 5.150 0.100 2.000 26.27 FGP DOOR FD4 1.000 2.100 2.00 4.20 Windows W5 3.900 1.200 2.00 9.36 - - 12.71
7 Concrete Wall WC1 Horz Dwg 4.600 5.150 0.100 2.000 23.69 FGP DOOR FD4 1.000 2.100 2.00 4.20 Windows W4 3.380 1.200 2.00 8.11 - - 11.38
8 Concrete Wall WC1 Horz Dwg 4.500 5.150 0.100 2.000 23.18 FGP DOOR FD4 1.000 2.100 2.00 4.20 Windows W4 3.380 1.200 2.00 8.11 - - 10.87
9 Concrete Wall WC1 Horz Dwg 4.500 5.150 0.100 2.000 23.18 - - Windows W3 3.500 1.200 2.00 8.40 HD Louvered door HLD1 1.000 2.100 2.00 4.20 10.58
10 Concrete Wall WC1 Horz Dwg 4.500 5.150 0.100 2.000 23.18 FGP DOOR FD4 1.000 2.100 2.00 4.20 Windows W2 4.000 1.200 2.00 9.60 HD Louvered door - - - - - 9.38
SUB JUMLAH 2 286.71 39.90 43.58 4.20 199.03
No No Total
Major Dimension (m) Number Amount Less Amount (m) Number Amount Less Amount (m) Number Amount Less Amount (m) Number Amount
Breakdown (CW) Note Node Sketsa Type Wall Breakdown (HLD) No Breakdown (FD) No Breakdown (W) Amount Note
Number (pcs)/side Sq.m (pcs)/side Sq.m (pcs)/side Sq.m (pcs)/side Sq.m
Wide High Thicknes Node Wide High Thicknes Node Wide High Thicknes Node Wide High Thicknes (sq.m)
-
I 1 Concrete Wall WC2 Vert Dwg 3.200 5.150 0.100 2.000 16.48 - - - 16.48
2 Concrete Wall WC2 Vert Dwg 3.200 5.150 0.100 2.000 16.48 HD Louvered door HLD1 1.000 2.100 2.00 4.20 - - 12.28
3 Concrete Wall WC2 Vert Dwg 3.200 5.150 0.100 2.000 16.48 HD Louvered door HLD1 1.000 2.100 2.00 4.20 - - 12.28
4 Concrete Wall WC2 Vert Dwg 3.200 5.150 0.100 2.000 16.48 - - FGP DOOR FD4 1.000 2.100 2.00 4.20 Windows W7 0.600 1.900 2.00 2.28 10.00
5 Concrete Wall WC2 Vert Dwg 3.200 5.150 0.100 2.000 16.48 - - FGP DOOR FD4 1.000 2.100 2.00 4.20 - 12.28
- - - - - -
- - - - -
- - - - -
SUB JUMLAH 1 5.00 82.40 8.40 8.40 2.28 63.32
II 1 Concrete Wall WC2 Horz Dwg 3.850 5.150 0.100 2.000 19.83 - - - 19.83
2 Concrete Wall WC2 Horz Dwg 3.850 5.150 0.100 2.000 19.83 - - - 19.83
- - - - -
- - - - -
- - - - -
SUB JUMLAH 2 2.00 39.66 - - - - - 39.66
No No Total
Major Dimension (m) Number Amount Less Amount (m) Number Amount Less Amount (m) Number Amount Less Amount (m) Number Amount
Breakdown (CW) Note Node Sketsa Type Wall Breakdown (FD) No Breakdown (HD) No Breakdown (HLD) Amount Note
Number (pcs)/side Sq.m (pcs)/side Sq.m (pcs)/side Sq.m (pcs)/side Sq.m
Wide High Thicknes Node Wide High Thicknes Node Wide High Thicknes Node Wide High Thicknes (sq.m)
-
I 1 Concrete Wall WC2A Horz Dwg 3.750 5.150 0.200 2.000 19.31 - - - 19.31
2 Concrete Wall WC2A Horz Dwg 3.750 5.150 0.200 2.000 19.31 - - - 19.31
3 Concrete Wall WC2A Horz Dwg 6.300 5.150 0.200 2.000 32.45 - - - 32.45
4 Concrete Wall WC2A Horz Dwg 6.600 5.150 0.200 2.000 33.99 - - - 33.99
5 Concrete Wall WC2A Horz Dwg 8.200 5.150 0.200 2.000 42.23 - HEAVY DUTY HD4 1.000 2.100 2.00 4.20 - 38.03
6 Concrete Wall WC2A Horz Dwg 8.300 5.150 0.200 2.000 42.75 - HEAVY DUTY HD2 1.500 2.500 2.00 7.50 - 35.25
7 Concrete Wall WC2A Horz Dwg 12.000 5.150 0.200 2.000 61.80 - HEAVY DUTY HD1 2.000 2.500 2.00 10.00 - 51.80
8 Concrete Wall WC2A Horz Dwg 6.625 5.150 0.200 2.000 34.12 - HEAVY DUTY HD4 1.000 2.100 2.00 4.20 - 29.92
9 Concrete Wall WC2A Horz Dwg 3.125 5.150 0.200 2.000 16.09 - HEAVY DUTY HD4 1.000 2.100 2.00 4.20 - 11.89
10 Concrete Wall WC2A Horz Dwg 4.625 5.150 0.200 2.000 23.82 - - - 23.82
11 Concrete Wall WC2A Horz Dwg 3.750 5.150 0.200 2.000 19.31 - - - 19.31
12 Concrete Wall WC2A Horz Dwg 3.400 5.150 0.200 2.000 17.51 FGP DOOR FD4 1.000 2.100 2.00 4.20 - - 13.31
13 Concrete Wall WC2A Horz Dwg 3.000 5.150 0.200 2.000 15.45 FGP DOOR FD4 1.000 2.100 2.00 4.20 - - 11.25
14 Concrete Wall WC2A Horz Dwg 2.800 5.150 0.200 2.000 14.42 FGP DOOR FD2 1.500 2.500 2.00 7.50 - W1 0.600 1.200 2.00 1.44 5.48
15 Concrete Wall WC2A Horz Dwg 6.000 5.150 0.200 2.000 30.90 - - - 30.90
16 Concrete Wall WC2A Horz Dwg 3.180 5.150 0.200 2.000 16.38 - - - 16.38
17 Concrete Wall WC2A Horz Dwg 3.850 5.150 0.200 2.000 19.83 - - - 19.83
18 Concrete Wall WC2A Horz Dwg 3.050 5.150 0.200 2.000 15.71 - - - 15.71
19 Concrete Wall WC2A Horz Dwg 3.400 5.150 0.200 2.000 17.51 - - - 17.51
20 Concrete Wall WC2A Horz Dwg 3.000 5.150 0.200 2.000 15.45 - - - 15.45
21 Concrete Wall WC2A Horz Dwg 3.050 5.150 0.200 2.000 15.71 - - - 15.71
22 Concrete Wall WC2A Horz Dwg 6.000 5.150 0.200 2.000 30.90 - - - 30.90
23 Concrete Wall WC2A Horz Dwg 3.050 5.150 0.200 2.000 15.71 - - - 15.71
24 Concrete Wall WC2A Horz Dwg 3.400 5.150 0.200 2.000 17.51 - - - 17.51
SUB JUMLAH 1 24.00 588.17 15.90 30.10 1.44 540.73
II 1 Concrete Wall WC2A Vert Dwg 12.000 5.150 0.200 2.000 61.80 - - - 61.80
2 Concrete Wall WC2A Vert Dwg 12.000 5.150 0.200 2.000 61.80 - - - 61.80
3 Concrete Wall WC2A Vert Dwg 3.570 5.150 0.200 2.000 18.39 - - - 18.39
4 Concrete Wall WC2A Vert Dwg 3.570 5.150 0.200 2.000 18.39 - - - 18.39
5 Concrete Wall WC2A Vert Dwg 3.570 5.150 0.200 2.000 18.39 - HEAVY DUTY HD2 1.500 2.500 2.00 7.50 - 10.89
6 Concrete Wall WC2A Vert Dwg 8.500 5.150 0.200 2.000 43.78 - - - 43.78
7 Concrete Wall WC2A Vert Dwg 3.570 5.150 0.200 2.000 18.39 - HEAVY DUTY HD2 1.500 2.500 2.00 7.50 - 10.89
8 Concrete Wall WC2A Vert Dwg 2.800 5.150 0.200 2.000 14.42 - HEAVY DUTY HD2 1.500 2.500 2.00 7.50 - 6.92
9 Concrete Wall WC2A Vert Dwg 8.500 5.150 0.200 2.000 43.78 - HEAVY DUTY HD4 1.000 2.100 2.00 4.20 - 39.58
10 Concrete Wall WC2A Vert Dwg 6.000 5.150 0.200 2.000 30.90 - - - 30.90
11 Concrete Wall WC2A Vert Dwg 6.000 5.150 0.200 2.000 30.90 - - - 30.90
12 Concrete Wall WC2A Vert Dwg 6.000 5.150 0.200 2.000 30.90 - - - 30.90
13 Concrete Wall WC2A Vert Dwg 5.000 5.150 0.200 2.000 25.75 - - - 25.75
14 Concrete Wall WC2A Vert Dwg 5.000 5.150 0.200 2.000 25.75 - - - 25.75
15 Concrete Wall WC2A Vert Dwg 5.000 5.150 0.200 2.000 25.75 - - - 25.75
16 Concrete Wall WC2A Vert Dwg 5.000 5.150 0.200 2.000 25.75 - - - 25.75
17 Concrete Wall WC2A Vert Dwg 6.000 5.150 0.200 2.000 30.90 - - - 30.90
18 Concrete Wall WC2A Vert Dwg 2.820 5.150 0.200 2.000 14.52 - - - 14.52
19 Concrete Wall WC2A Vert Dwg 3.180 5.150 0.200 2.000 16.38 - - - 16.38
20 Concrete Wall WC2A Vert Dwg 6.000 5.150 0.200 2.000 30.90 - - - 30.90
21 Concrete Wall WC2A Vert Dwg 2.550 5.150 0.200 2.000 13.13 - - HD Louvered door HLD1 1.000 2.100 2.00 4.20 8.93
22 Concrete Wall WC2A Vert Dwg 2.550 5.150 0.200 2.000 13.13 - - HD Louvered door HLD1 1.000 2.100 2.00 4.20 8.93
23 Concrete Wall WC2A Vert Dwg 2.100 5.150 0.200 2.000 10.82 - - HD Louvered door HLD1 1.000 2.100 2.00 4.20 6.62
SUB JUMLAH 2 624.62 - - 26.70 12.60 585.32
24 Concrete Wall WC2A Vert Dwg 2.550 5.150 0.200 2.000 13.13 - - - - 13.13
25 Concrete Wall WC2A Vert Dwg 2.100 5.150 0.200 2.000 10.82 - - - - 10.82
26 Concrete Wall WC2A Vert Dwg 6.000 5.150 0.200 2.000 30.90 - - - - 30.90
27 Concrete Wall WC2A Vert Dwg 6.000 5.150 0.200 2.000 30.90 - - - - 30.90
28 Concrete Wall WC2A Vert Dwg 6.000 5.150 0.200 2.000 30.90 - - - - 30.90
29 Concrete Wall WC2A Vert Dwg 6.000 5.150 0.200 2.000 30.90 - - - - 30.90
30 Concrete Wall WC2A Vert Dwg 6.000 5.150 0.200 2.000 30.90 - - - - 30.90
31 Concrete Wall WC2A Vert Dwg 3.320 5.150 0.200 2.000 17.10 FGP DOOR FD1 2.000 2.100 2.00 8.40 - Windows W6 0.600 1.200 4.00 2.88 5.82
SUB JUMLAH 3 195.55 1.00 8.40 - - 2.88 184.27
Dimension (m) Less Amount (m) Less Amount (m) Less Amount (m) Total
Major Number Amount Number Amount Number Amount Number Amount
No Breakdown (CW) Note Node Sketsa Type Wall No Breakdown (BRW) No Breakdown (BRD) No Breakdown (HLD) Amount Note
Number (pcs)/side Sq.m (pcs)/side Sq.m (pcs)/side Sq.m (pcs)/side Sq.m
Wide High Thicknes Node Wide High Thicknes Node Wide High Thicknes Node Wide High Thicknes (sq.m)
I 1 Concrete Wall Exterior WC 3 SIDE 1 6.000 5.150 0.350 2.000 61.80 - - - 61.80
2 Concrete Wall Exterior WC 3 SIDE 1 3.180 5.150 0.350 2.000 32.75 - Blast Resistant Door BRD2 2.000 2.500 2.00 10.00 - 22.75
3 Concrete Wall Exterior WC 3 SIDE 1 2.820 5.150 0.350 2.000 29.05 - - - 29.05
4 Concrete Wall Exterior WC 3 SIDE 1 3.200 5.150 0.350 2.000 32.96 Blast Resistant Window BRW3 1.000 1.200 2.00 2.40 - - 30.56
5 Concrete Wall Exterior WC 3 SIDE 1 2.800 5.150 0.350 2.000 28.84 - Blast Resistant Door BRD3 1.500 2.500 2.00 7.50 - 21.34
6 Concrete Wall Exterior WC 3 SIDE 1 6.000 5.150 0.350 2.000 61.80 - - - 61.80
7 Concrete Wall Exterior WC 3 SIDE 1 6.000 5.150 0.350 2.000 61.80 - - - 61.80
SUB JUMLAH 1 309.00 2.40 17.50 - 289.10
- - - -
II 1 Concrete Wall Exterior WC 3 SIDE 2 3.500 5.150 0.350 2.000 36.05 - - - 36.05
2 Concrete Wall Exterior WC 3 SIDE 2 2.500 5.150 0.350 2.000 25.75 - - - 25.75
3 Concrete Wall Exterior WC 3 SIDE 2 6.000 5.150 0.350 2.000 61.80 Blast Resistant Window BRW2 1.500 1.200 2.00 3.60 - - 58.20
4 Concrete Wall Exterior WC 3 SIDE 2 6.000 5.150 0.350 2.000 61.80 Blast Resistant Window BRW2 1.500 1.200 2.00 3.60 Blast Resistant Door BRD4 1.200 2.500 2.00 6.00 - 52.20
5 Concrete Wall Exterior WC 3 SIDE 2 6.000 5.150 0.350 2.000 61.80 Blast Resistant Window BRW2 1.500 1.200 2.00 3.60 - - 58.20
6 Concrete Wall Exterior WC 3 SIDE 2 1.900 5.150 0.350 2.000 19.57 - - - 19.57
7 Concrete Wall Exterior WC 3 SIDE 2 4.100 5.150 0.350 2.000 42.23 - - - 42.23
SUB JUMLAH 2 309.00 10.80 6.00 - 292.20
-
III 1 Concrete Wall Exterior WC 3 SIDE 3 6.000 5.150 0.350 2.000 61.80 - - - 61.80
2 Concrete Wall Exterior WC 3 SIDE 3 6.000 5.150 0.350 2.000 61.80 Blast Resistant Window BRW4 2.000 0.600 2.00 2.40 - - 59.40
3 Concrete Wall Exterior WC 3 SIDE 3 3.850 5.150 0.350 2.000 39.66 Blast Resistant Window BRW4 2.000 0.600 2.00 2.40 - - 37.26
4 Concrete Wall Exterior WC 3 SIDE 3 2.150 5.150 0.350 2.000 22.15 Blast Resistant Window BRW4 2.000 0.600 2.00 2.40 - - 19.75
5 Concrete Wall Exterior WC 3 SIDE 3 2.825 5.150 0.350 2.000 29.10 Blast Resistant Window BRW4 2.000 0.600 2.00 2.40 - - 26.70
6 Concrete Wall Exterior WC 3 SIDE 3 3.175 5.150 0.350 2.000 32.70 Blast Resistant Window BRW1 2.000 1.200 2.00 4.80 - - 27.90
7 Concrete Wall Exterior WC 3 SIDE 3 6.000 5.150 0.350 2.000 61.80 - Blast Resistant Door BRD2 2.000 2.500 2.00 10.00 - 51.80
8 Concrete Wall Exterior WC 3 SIDE 3 3.850 5.150 0.350 2.000 39.66 Blast Resistant Window BRW3 1.000 1.200 2.00 2.40 - - 37.26
9 Concrete Wall Exterior WC 3 SIDE 3 2.150 5.150 0.350 2.000 22.15 - - - 22.15
10 Concrete Wall Exterior WC 3 SIDE 3 3.050 5.150 0.350 2.000 31.42 Blast Resistant Window BRW3 1.000 1.200 2.00 2.40 - - 29.02
11 Concrete Wall Exterior WC 3 SIDE 3 2.950 5.150 0.350 2.000 30.39 Blast Resistant Window BRW3 1.000 1.200 2.00 2.40 - - 27.99
12 Concrete Wall Exterior WC 3 SIDE 3 1.550 5.150 0.350 2.000 15.97 - - - 15.97
13 Concrete Wall Exterior WC 3 SIDE 3 4.450 5.150 0.350 2.000 45.84 Blast Resistant Window BRW3 1.000 1.200 2.00 2.40 - - 43.44
SUB JUMLAH 3 494.44 24.00 10.00 - 460.44
-
IV 1 Concrete Wall Exterior WC 3 SIDE 4 6.000 5.150 0.350 2.000 61.80 - - 61.80
2 Concrete Wall Exterior WC 3 SIDE 4 3.550 5.150 0.350 2.000 36.57 Blast Resistant Door BRD1 2.500 2.500 2.00 12.50 - 24.07
3 Concrete Wall Exterior WC 3 SIDE 4 2.450 5.150 0.350 2.000 25.24 Blast Resistant Door BRD4 1.200 2.500 2.00 6.00 - 19.24
4 Concrete Wall Exterior WC 3 SIDE 4 6.000 5.150 0.350 2.000 61.80 Blast Resistant Window BRW3 1.000 1.200 4.00 4.80 - - 57.00
5 Concrete Wall Exterior WC 3 SIDE 4 2.320 5.150 0.350 2.000 23.90 Blast Resistant Door BRD4 1.200 2.500 2.00 6.00 - 17.90
6 Concrete Wall Exterior WC 3 SIDE 4 3.680 5.150 0.350 2.000 37.90 - - 37.90
7 Concrete Wall Exterior WC 3 SIDE 4 2.250 5.150 0.350 2.000 23.18 Blast Resistant Door BRD4 1.200 2.500 2.00 6.00 - 17.18
8 Concrete Wall Exterior WC 3 SIDE 4 3.750 5.150 0.350 2.000 38.63 Blast Resistant Door BRD2 2.000 2.500 2.00 10.00 - 28.63
9 Concrete Wall Exterior WC 3 SIDE 4 3.500 5.150 0.350 2.000 36.05 - HD Louvered door HLD2 1.500 2.100 4.00 12.60 23.45
10 Concrete Wall Exterior WC 3 SIDE 4 2.500 5.150 0.350 2.000 25.75 Blast Resistant Door BRD3 1.500 2.500 2.00 7.50 - 18.25
11 Concrete Wall Exterior WC 3 SIDE 4 6.000 5.150 0.350 2.000 61.80 Blast Resistant Window BRW3 1.000 1.200 4.00 4.80 - - 57.00
SUB JUMLAH 3 432.62 9.60 48.00 12.60 362.42