DEMANDA DE AGUA POTABLE EN EL SECTOR DE ESTUDIO

Poblacion Poblacion
Año Cobertura Cnxtot CnxAct Medidores C/M
Total Servida
0 2023 5,075 5,075 100% 1172 1172 1172 1172
1 2024 5,156 5,156 100% 1191 1191 1191 1191
2 2025 5,239 5,239 100% 1210 1210 1210 1210
3 2026 5,323 5,323 100% 1229 1229 1229 1229
4 2027 5,408 5,408 100% 1249 1249 1249 1249
5 2028 5,494 5,494 100% 1269 1269 1269 1269
6 2029 5,582 5,582 100% 1289 1289 1289 1289
7 2030 5,672 5,672 100% 1310 1310 1310 1310
8 2031 5,762 5,762 100% 1331 1331 1331 1331
9 2032 5,855 5,855 100% 1352 1352 1352 1352
10 2033 5,948 5,948 100% 1374 1374 1374 1374
11 2034 6,043 6,043 100% 1396 1396 1396 1396
12 2035 6,140 6,140 100% 1418 1418 1418 1418
13 2036 6,238 6,238 100% 1441 1441 1441 1441
14 2037 6,338 6,338 100% 1464 1464 1464 1464
15 2038 6,440 6,440 100% 1487 1487 1487 1487
16 2039 6,543 6,543 100% 1511 1511 1511 1511
17 2040 6,647 6,647 100% 1535 1535 1535 1535
18 2041 6,754 6,754 100% 1560 1560 1560 1560
19 2042 6,862 6,862 100% 1585 1585 1585 1585
20 2030 6,972 6,972 100% 1611 1611 1611 1611
CTOR DE ESTUDIO

Qp Qmd Qmh PROD


l/s l/s l/s m3/Año
7.39 9.60 18.47 232,961.9
7.51 9.76 18.77 236,738.5
7.63 9.91 19.07 240,515.2
7.75 10.07 19.37 244,291.9
7.87 10.23 19.68 248,267.4
8.00 10.40 20.00 252,242.8
8.12 10.56 20.31 256,218.3
8.26 10.73 20.64 260,392.5
8.39 10.91 20.97 264,566.8
8.52 11.08 21.30 268,741.0
8.66 11.26 21.65 273,114.0
8.80 11.44 22.00 277,487.0
8.94 11.62 22.34 281,860.0
9.08 11.81 22.71 286,431.8
9.23 12.00 23.07 291,003.6
9.37 12.18 23.43 295,575.3
9.52 12.38 23.81 300,345.9
9.68 12.58 24.19 305,116.4
9.83 12.78 24.58 310,085.8
9.99 12.99 24.98 315,055.1
10.15 13.20 25.38 320,138.5
BALANCE OFERTA-DEMANDA SIN PROYECTO RED
DISTRIBUCION AGUA POTABLE Qmh (lt/seg)

AÑO DEMANDA OFERTA OFERTA/DEMANDA


0 2023 18.47 0 -18.47
1 2024 18.77 0 -18.77
2 2025 19.07 0 -19.07
3 2026 19.37 0 -19.37
4 2027 19.68 0 -19.68
5 2028 20.00 0 -20.00
6 2029 20.31 0 -20.31
7 2030 20.64 0 -20.64
8 2031 20.97 0 -20.97
9 2032 21.30 0 -21.30
10 2033 21.65 0 -21.65
11 2034 22.00 0 -22.00
12 2035 22.34 0 -22.34
13 2036 22.71 0 -22.71
14 2037 23.07 0 -23.07
15 2038 23.43 0 -23.43
16 2039 23.81 0 -23.81
17 2040 24.19 0 -24.19
18 2041 24.58 0 -24.58
19 2042 24.98 0 -24.98
20 2030 25.38 0 -25.38
cuadro NO. 3.6.1
BENEFICIOS - NUEVOS USUARIOS DE AGUA POTABLE

LA POBLACION SE ABASTECE CON 2.75


GASTO COMPRA DE
PERSONA RECIPIENTE TIEMPO FRECUENCIA TIEMPO TOTAL COSTO DEL TIEMPO AGUA CONSUMO VALOR
LITROS Minut/viaje Veces/dia Horas/dia S/hora S/dia S/mes/fam S/. m3/mes m3/mes/fam S/m3
ADULTO 20 15 4 1.00 0.33 0.33 9.88 6.60 2.40
0.33 9.88 6.60 2.40 6.86
PRIMER PUNTO

Precio marginal DATOS


SOLES/M3 CONSUMO (M3/MES) 13.07
TARIFA 1.17

6.86

Recursos liberados(RL)

1.17

2.40 13.07 15.25 M3/MES/VIV

BENEFICIOS (SOLES/CONEX/MES) = RL + MC
16.48 44.12 60.59

DETERMINACION DE LA CURVA DE LA DEMANDA


PRIMER PUNTO: Evaluacion de los usuarios sin servicio actual y que acarrean agua potable a su
domicilio

SEGUNDO PUNTO: De los usuarios existentes con medidor, según informacion de base de EPS
SEDALIB SA.

CURVA DE LA DEMANDA DE AGUA POTABLE


CONSUMO(Q) PRECIO(P)
m3/mes soles/m3
PUNTO 1 2.40 6.86
PUNTO 2 13.07 1.17 (EPS SEDALIB SA)

m= -1.87
Qo 15.25

ECUACION DE LA DEMANDA
Q= 15.25 -1.9 P

ANTIGUOS USARIOS
Pantiguos usarios 1.80
Q1= 11.88

BENEFICIOS (SOLES/CONEX/MES) = 3.03


INVERSION EN CONEXIONES, MEDIDORES Y REDES A PRECIOS PRIVADOS

INCREMENTALES COSTO DE INCREMENTALES S/.


AÑO
CONEX. MEDIDORES REDES (ml) CONEX. MEDIDORES
0 1,172 1,172 698,584 109,983
1 19 19 65.39 23,597 1,574
2 19 19 65.39 11,798 1,574
3 19 19 65.39 12,419 1,657
4 20 20 68.84 12,419 1,657
5 20 20 68.84 12,419 1,657
6 20 20 68.84 13,040 1,740
7 21 21 72.28 13,040 1,740
8 21 21 72.28 13,040 1,740
9 21 21 72.28 13,661 1,823
10 22 22 75.72 13,661 1,823
11 22 22 75.72 13,661 1,823
12 22 22 75.72 14,282 1,906
13 23 23 79.16 14,282 1,906
14 23 23 79.16 14,282 1,906
15 23 23 79.16 14,903 1,988
16 24 24 82.60 14,903 1,988
17 24 24 82.60 15,524 2,071
18 25 25 86.04 15,524 2,071
19 25 25 86.04 16,145 2,154
20 26 26 89.49
TOTAL 1,611 1,611 1,510.94 971,187 144,780
Datos:
Costo Unitario 620.96 82.85
Metrado por Conexión 3.44

RESUMEN DE INVERSIONES EN AGUA POTAB

REDES Y CONX SUBTOTAL


AÑO
Soles Soles
0 1,695,039 1,695,039
1 31,535 31,535
2 19,737 19,737
3 20,776 20,776
4 20,776 20,776
5 20,776 20,776
6 21,815 21,815
7 21,815 21,815
8 21,815 21,815
9 22,854 22,854
10 22,854 22,854
11 22,854 22,854
12 23,892 23,892
13 23,892 23,892
14 23,892 23,892
15 24,931 24,931
16 24,931 24,931
17 25,970 25,970
18 25,970 25,970
19 27,009 27,009
20 0 0
TOTAL 2,143,132 2,143,132

COSTOS INCREMENTAL

INVERSIONES

AÑO INVERSION EN OBRAS DE AGUA POTABLE

RED+CX+MED REPOSICION
0 1,805,022.34 0.00
1 33,109.59 0.00
2 21,311.29 0.00
3 22,432.94 0.00
4 22,432.94 0.00
5 22,432.94 97,100.20
6 23,554.58 1,574.15
7 23,554.58 1,574.15
8 23,554.58 1,574.15
9 24,676.23 1,657.00
10 24,676.23 98,757.20
11 24,676.23 3,231.15
12 25,797.88 3,314.00
13 25,797.88 3,314.00
14 25,797.88 3,396.85
15 26,919.52 100,579.90
16 26,919.52 5,053.85
17 28,041.17 5,136.70
18 28,041.17 5,219.55
19 29,162.82 5,302.40
20 0.00 102,485.45
RIVADOS COSTOS DE REPOSICION SISTEMA DE AGUA POTABLE

CREMENTALES S/. COSTO


AÑOS MEDIDORES
REDES 82.85
996,455 0
7,939 1
7,939 2
8,357 3
8,357 4
8,357 5 1,172 97,100
8,775 6 19 1,574
8,775 7 19 1,574
8,775 8 19 1,574
9,192 9 20 1,657
9,192 10 1,192 98,757
9,192 11 39 3,231
9,610 12 40 3,314
9,610 13 40 3,314
9,610 14 41 3,397
10,028 15 1,214 100,580
10,028 16 61 5,054
10,446 17 62 5,137
10,446 18 63 5,220
10,864 19 64 5,302
20 1,237 102,485
1,171,945 TOTAL 439,271

121.40 *SE CONSIDERA LA REPOSICION DE TODOS LOS MEDIDORES CADA 5 AÑOS

ERSIONES EN AGUA POTABLE- PRECIOS PRIVADOS

MEDIDORES REPOSICION TOTAL


Soles Soles Soles
109,983 0 1,805,022
1,574 0 33,110
1,574 0 21,311
1,657 0 22,433
1,657 0 22,433
1,657 97,100 119,533
1,740 1,574 25,129
1,740 1,574 25,129
1,740 1,574 25,129
1,823 1,657 26,333
1,823 98,757 123,433
1,823 3,231 27,907
1,906 3,314 29,112
1,906 3,314 29,112
1,906 3,397 29,195
1,988 100,580 127,499
1,988 5,054 31,973
2,071 5,137 33,178
2,071 5,220 33,261
2,154 5,302 34,465
0 102,485 102,485
144,780 439,271 2,727,183

COSTOS INCREMENTALES DEL SISTEMA DE AGUA POTABLE A PRECIOS PRIVADOS

TOTAL COSTOS DE COSTOS INCREM. DE


O y M con P COSTOS TOTALES CP O y M sin P
INVERSION OyM

1,805,022.34 0.00 1,805,022.34 1,621.46 1,621.46


33,109.59 3,242.91 36,352.50 1,621.46 1,621.46
21,311.29 3,281.20 24,592.49 1,621.46 1,659.74
22,432.94 3,319.48 25,752.42 1,621.46 1,698.03
22,432.94 3,359.79 25,792.72 1,621.46 1,738.33
119,533.14 3,400.09 122,933.23 1,621.46 1,778.63
25,128.73 3,440.39 28,569.13 1,621.46 1,818.94
25,128.73 3,482.71 28,611.44 1,621.46 1,861.25
25,128.73 3,525.03 28,653.76 1,621.46 1,903.57
26,333.23 3,567.34 29,900.57 1,621.46 1,945.89
123,433.43 3,611.68 127,045.11 1,621.46 1,990.22
27,907.38 3,656.01 31,563.39 1,621.46 2,034.55
29,111.88 3,700.34 32,812.22 1,621.46 2,078.89
29,111.88 3,746.69 32,858.57 1,621.46 2,125.23
29,194.73 3,793.04 32,987.76 1,621.46 2,171.58
127,499.42 3,839.38 131,338.81 1,621.46 2,217.93
31,973.37 3,887.75 35,861.12 1,621.46 2,266.29
33,177.87 3,936.11 37,113.98 1,621.46 2,314.65
33,260.72 3,986.49 37,247.21 1,621.46 2,365.03
34,465.22 4,036.87 38,502.08 1,621.46 2,415.41
102,485.45 4,088.40 106,573.85 1,621.46 2,466.94
STEMA DE AGUA POTABLE

TOTAL

0
0
0
0
0
97,100
1,574
1,574
1,574
1,657
98,757
3,231
3,314
3,314
3,397
100,580
5,054
5,137
5,220
5,302
102,485
439,271

S LOS MEDIDORES CADA 5 AÑOS

PROYECCION DE COSTOS DE OPERACIÓN Y MANTENIMIENTO DEL SISTEMA DE AG


PRECIOS PRIVADOS
COSTOS FIJOS
AÑOS
REDES TOTAL

0 0.00 0.00
1 842.91 842.91
2 842.91 842.91
3 842.91 842.91
4 842.91 842.91
5 842.91 842.91
6 842.91 842.91
7 842.91 842.91
8 842.91 842.91
9 842.91 842.91
10 842.91 842.91
11 842.91 842.91
12 842.91 842.91
13 842.91 842.91
14 842.91 842.91
15 842.91 842.91
16 842.91 842.91
17 842.91 842.91
18 842.91 842.91
19 842.91 842.91
20 842.91 842.91

COSTOS INCREM.
TOTALES

1,803,400.89
34,731.05
22,971.03
24,130.97
24,171.27
121,311.77
26,947.67
26,989.99
27,032.31
28,279.12
125,423.65
29,941.93
31,190.76
31,237.11
31,366.31
129,717.35
34,239.67
35,492.53
35,625.75
36,880.63
104,952.39
CCION DE COSTOS DE OPERACIÓN Y MANTENIMIENTO DEL SISTEMA DE AGUA POTABLE -
PRECIOS PRIVADOS

COSTOS
TOTAL
VARIABLES

0.00 0.00
2,400.00 3,242.91
2,438.29 3,281.20
2,476.57 3,319.48
2,516.88 3,359.79
2,557.18 3,400.09
2,597.48 3,440.39
2,639.80 3,482.71
2,682.12 3,525.03
2,724.43 3,567.34
2,768.77 3,611.68
2,813.10 3,656.01
2,857.43 3,700.34
2,903.78 3,746.69
2,950.13 3,793.04
2,996.47 3,839.38
3,044.84 3,887.75
3,093.20 3,936.11
3,143.58 3,986.49
3,193.95 4,036.87
3,245.49 4,088.40
PROYECCION DE COSTOS DE OPERACIÓN Y MANTENIMIENTO DEL SISTEMA DE AGU
POTABLE- PRECIOS SOCIALES

COSTOS FIJOS
AÑO REDES
0.000
0.909 TOTAL
0 0 0
1 766 766
2 766 766
3 766 766
4 766 766
5 766 766
6 766 766
7 766 766
8 766 766
9 766 766
10 766 766
11 766 766
12 766 766
13 766 766
14 766 766
15 766 766
16 766 766
17 766 766
18 766 766
19 766 766
20 766 766

BENEFICIOS A PRECIOS SOCIALES - USUARIOS DEL SISTEMA DE AGUA POTABLE


POBLACION NUMERO DE CONEXIONES
AÑO TOTAL COBERTURA (%) ANTIGUAS NUEVAS TOTAL

0 5,075 80.00% 938 234 1,172


1 5,156 80.00% 938 253 1,191
2 5,239 80.00% 938 272 1,210
3 5,323 80.00% 938 291 1,229
4 5,408 80.00% 938 311 1,249
5 5,494 80.00% 938 331 1,269
6 5,582 80.00% 938 351 1,289
7 5,672 80.00% 938 372 1,310
8 5,762 80.00% 938 393 1,331
9 5,855 80.00% 938 414 1,352
10 5,948 80.00% 938 436 1,374
11 6,043 80.00% 938 458 1,396
12 6,140 80.00% 938 480 1,418
13 6,238 80.00% 938 503 1,441
14 6,338 80.00% 938 526 1,464
15 6,440 80.00% 938 549 1,487
16 6,543 80.00% 938 573 1,511
17 6,647 80.00% 938 597 1,535
18 6,754 80.00% 938 622 1,560
19 6,862 80.00% 938 647 1,585
20 6,972 80.00% 938 673 1,611

Beneficio de los Nuevos Usuarios ( S/./mes/Conexión) x 12 meses


Beneficio de los Antiguos Usuarios ( S/./mes/Conexión) x 12 meses
CIÓN Y MANTENIMIENTO DEL SISTEMA DE AGUA
- PRECIOS SOCIALES COSTOS INCREMENTALES DEL S

COST.VARIABLES INVERSIONES
FC INVERSION EN
TOTAL AÑOS RE+CX+ REPOSI
OBRAS
0.840
M C
0.840 0.840 0.840
0 0 0 ### 0.00
2,016 2,782 1 ### 0.00
2,048 2,814 2 ### 0.00
2,080 2,847 3 ### 0.00
2,114 2,880 4 ### 0.00
2,148 2,914 5 ### ###
2,182 2,948 6 ### 1,322.29
2,217 2,984 7 ### 1,322.29
2,253 3,019 8 ### 1,322.29
2,289 3,055 9 ### 1,391.88
2,326 3,092 10 ### ###
2,363 3,129 11 ### 2,714.17
2,400 3,166 12 ### 2,783.76
2,439 3,205 13 ### 2,783.76
2,478 3,244 14 ### 2,853.35
2,517 3,283 15 ### ###
2,558 3,324 16 ### 4,245.23
2,598 3,364 17 ### 4,314.83
2,641 3,407 18 ### 4,384.42
2,683 3,449 19 ### 4,454.02
2,726 3,492 20 0.00 ###

EVALUACIO

L SISTEMA DE AGUA POTABLE No de Familias conectadas al


BENEFICIOS A PRECIOS SOCIALES servicio Beneficios Brutos (S/.
ANTIGUOS NUEVOS TOTAL AÑO Antiguas Nuevas Total Antiguas
0 938 5,075 6,013 -
34,128.64 170,430 204,559 1 938 5,156 6,094 34,129
34,128.64 184,245 218,373 2 938 5,239 6,177 34,129
34,128.64 198,059 232,188 3 938 5,323 6,260 34,129
34,128.64 211,874 246,003 4 938 5,408 6,346 34,129
34,128.64 226,416 260,544 5 938 5,494 6,432 34,129
34,128.64 240,958 275,086 6 938 5,582 6,520 34,129
34,128.64 255,499 289,628 7 938 5,672 6,609 34,129
34,128.64 270,768 304,897 8 938 5,762 6,700 34,129
34,128.64 286,037 320,166 9 938 5,855 6,792 34,129
34,128.64 301,306 335,435 10 938 5,948 6,886 34,129
34,128.64 317,302 351,431 11 938 6,043 6,981 34,129
34,128.64 333,298 367,427 12 938 6,140 7,078 34,129
34,128.64 349,294 383,423 13 938 6,238 7,176 34,129
34,128.64 366,017 400,146 14 938 6,338 7,276 34,129
34,128.64 382,740 416,869 15 938 6,440 7,377 34,129
34,128.64 399,463 433,592 16 938 6,543 7,480 34,129
34,128.64 416,913 451,042 17 938 6,647 7,585 34,129
34,128.64 434,364 468,492 18 938 6,754 7,691 34,129
34,128.64 452,541 486,669 19 938 6,862 7,799 34,129
34,128.64 470,718 504,847 20 938 6,972 7,909 34,129
34,128.64 489,622 523,751
TOTAL 7,270,008

727.09
36.40
REMENTALES DEL SISTEMA DE AGUA POTABLE A PRECIOS SOCIALES

TOTAL
COSTOS COSTOS COST
OyM COSTOS
DE O y M sin P INCREM INCREM
con P TOTALES C/P
INVERSI DE O y M TOTALES
ON
### 0.00 1,516,218.77 1,391.10 1,391.10 1,514,827.66
27,812.06 2,782.21 30,594.26 1,391.10 1,391.10 29,203.16
17,901.48 2,814.37 20,715.85 1,391.10 1,423.26 19,324.75
18,843.67 2,846.53 21,690.20 1,391.10 1,455.43 20,299.09
18,843.67 2,880.38 21,724.05 1,391.10 1,489.28 20,332.95
### 2,914.24 103,322.07 1,391.10 1,523.13 101,930.97
21,108.14 2,948.09 24,056.23 1,391.10 1,556.99 22,665.12
21,108.14 2,983.64 24,091.77 1,391.10 1,592.53 22,700.67
21,108.14 3,019.18 24,127.32 1,391.10 1,628.08 22,736.22
22,119.91 3,054.73 25,174.64 1,391.10 1,663.63 23,783.54
### 3,091.97 106,776.05 1,391.10 1,700.87 105,384.95
23,442.20 3,129.21 26,571.41 1,391.10 1,738.11 25,180.31
24,453.98 3,166.45 27,620.42 1,391.10 1,775.34 26,229.32
24,453.98 3,205.38 27,659.36 1,391.10 1,814.28 26,268.25
24,523.57 3,244.31 27,767.88 1,391.10 1,853.21 26,376.78
### 3,283.24 110,382.76 1,391.10 1,892.14 108,991.66
26,857.63 3,323.87 30,181.50 1,391.10 1,932.77 28,790.40
27,869.41 3,364.49 31,233.90 1,391.10 1,973.39 29,842.80
27,939.01 3,406.81 31,345.82 1,391.10 2,015.71 29,954.71
28,950.78 3,449.13 32,399.91 1,391.10 2,058.02 31,008.81
86,087.78 3,492.42 89,580.19 1,391.10 2,101.31 88,189.09

EVALUACION SOCIAL SISTEMA DE AGUA POTABLE

Inversión Total a Producción de Factor de


Beneficios Brutos (S/. Año) Precios Sociales agua potable Costos de Descuento Valor Actual
Nuevas Total (S/.) (m3/año) OyM Increm. Flujo Neto a PS 11% de los Flujos
170,430 170,430 1,516,219 - (1,345,789) 1.00 (1,345,789)
184,245 218,373 27,812 236,739 2,782 187,779 0.90 169,170
198,059 232,188 17,901 240,515 2,814 211,472 0.81 171,636
211,874 246,003 18,844 244,292 2,847 224,312 0.73 164,015
226,416 260,544 18,844 248,267 2,880 238,820 0.66 157,318
240,958 275,086 100,408 252,243 2,914 171,764 0.59 101,934
255,499 289,628 21,108 256,218 2,948 265,572 0.53 141,986
270,768 304,897 21,108 260,393 2,984 280,805 0.48 135,252
286,037 320,166 21,108 264,567 3,019 296,039 0.43 128,459
301,306 335,435 22,120 268,741 3,055 310,260 0.39 121,288
317,302 351,431 103,684 273,114 3,092 244,655 0.35 86,164
333,298 367,427 23,442 277,487 3,129 340,855 0.32 108,148
349,294 383,423 24,454 281,860 3,166 355,802 0.29 101,703
366,017 400,146 24,454 286,432 3,205 372,486 0.26 95,921
382,740 416,869 24,524 291,004 3,244 389,101 0.23 90,269
399,463 433,592 107,100 295,575 3,283 323,209 0.21 67,552
416,913 451,042 26,858 300,346 3,324 420,861 0.19 79,245
434,364 468,492 27,869 305,116 3,364 437,258 0.17 74,173
452,541 486,669 27,939 310,086 3,407 455,324 0.15 69,584
470,718 504,847 28,951 315,055 3,449 472,447 0.14 65,045
489,622 523,751 86,088 320,138 3,492 434,171 0.12 53,852

VAN SOCIAL 836,924


TIR SOCIAL 18.13%
SENSIBLIDAD

No de Familias conectadas al Inversión Total


servicio Beneficios Brutos (S/. Año) a Precios
AÑO Antiguas Nuevas Total Antiguas Nuevas Total Sociales (S/.)
0 938 5,075 6,013 0 170,430 153,387 1,819,463
1 938 5,156 6,094 34,129 184,245 196,536 33,374
2 938 5,239 6,177 34,129 198,059 208,969 21,482
3 938 5,323 6,260 34,129 211,874 221,402 22,612
4 938 5,408 6,346 34,129 226,416 234,490 22,612
5 938 5,494 6,432 34,129 240,958 247,578 120,489
6 938 5,582 6,520 34,129 255,499 260,665 25,330
7 938 5,672 6,609 34,129 270,768 274,407 25,330
8 938 5,762 6,700 34,129 286,037 288,149 25,330
9 938 5,855 6,792 34,129 301,306 301,891 26,544
10 938 5,948 6,886 34,129 317,302 316,288 124,421
11 938 6,043 6,981 34,129 333,298 330,684 28,131
12 938 6,140 7,078 34,129 349,294 345,080 29,345
13 938 6,238 7,176 34,129 366,017 360,131 29,345
14 938 6,338 7,276 34,129 382,740 375,182 29,428
15 938 6,440 7,377 34,129 399,463 390,233 128,519
16 938 6,543 7,480 34,129 416,913 405,938 32,229
17 938 6,647 7,585 34,129 434,364 421,643 33,443
18 938 6,754 7,691 34,129 452,541 438,003 33,527
19 938 6,862 7,799 34,129 470,718 454,362 34,741
20 938 6,972 7,909 34,129 489,622 471,376 103,305
BENEFICIOS -10.00%
COSTOS INVERSION 20.00%
OYM 360.00%
IDAD

Producción de Factor de
agua potable Costos de OyM Descuento Valor Actual de
(m3/año) Increm. Flujo Neto a PS 11% los Flujos
0 0 -1,666,076 1.00 -1,666,076
236,739 12,798 150,363 0.90 135,462
240,515 12,946 174,541 0.81 141,662
244,292 13,094 185,696 0.73 135,779
248,267 13,250 198,628 0.66 130,842
252,243 13,405 113,683 0.59 67,465
256,218 13,561 221,774 0.53 118,570
260,393 13,725 235,353 0.48 113,360
264,567 13,888 248,931 0.43 108,018
268,741 14,052 261,296 0.39 102,147
273,114 14,223 177,644 0.35 62,563
277,487 14,394 288,159 0.32 91,428
281,860 14,566 301,170 0.29 86,087
286,432 14,745 316,042 0.26 81,385
291,004 14,924 330,830 0.23 76,751
295,575 15,103 246,610 0.21 51,543
300,346 15,290 358,419 0.19 67,487
305,116 15,477 372,723 0.17 63,226
310,086 15,671 388,804 0.15 59,418
315,055 15,866 403,755 0.14 55,588
320,138 16,065 352,005 0.12 43,661

VAN SOCIAL 126,366


TIR SOCIAL 11.94%
POBLACION Y CAUDAL DE APORTE A RED DE ALCANTARILLADO SANITARIO

CONEX Qmdd Qmhd


Año POBLACION COBERTURA Qpd
TOTAL 1.3 2.5
0 5,075 100.0% 1,172 4.73 6.15 11.82
1 5,156 100.0% 1,191 4.80 6.25 12.01
2 5,239 100.0% 1,210 4.88 6.35 12.20
3 5,323 100.0% 1,229 4.96 6.45 12.39
4 5,408 100.0% 1,249 5.04 6.55 12.60
5 5,494 100.0% 1,269 5.12 6.65 12.80
6 5,582 100.0% 1,289 5.20 6.76 13.00
7 5,672 100.0% 1,310 5.28 6.87 13.21
8 5,762 100.0% 1,331 5.37 6.98 13.42
9 5,855 100.0% 1,352 5.45 7.09 13.63
10 5,948 100.0% 1,374 5.54 7.21 13.86
11 6,043 100.0% 1,396 5.63 7.32 14.08
12 6,140 100.0% 1,418 5.72 7.44 14.30
13 6,238 100.0% 1,441 5.81 7.56 14.53
14 6,338 100.0% 1,464 5.91 7.68 14.76
15 6,440 100.0% 1,487 6.00 7.80 15.00
16 6,543 100.0% 1,511 6.10 7.92 15.24
17 6,647 100.0% 1,535 6.19 8.05 15.48
18 6,754 100.0% 1,560 6.29 8.18 15.73
19 6,862 100.0% 1,585 6.39 8.31 15.98
20 6,972 100.0% 1,611 6.49 8.44 16.24
TARIO

APORTE
m3/año
149,096
151,513
153,930
156,347
158,891
161,435
163,980
166,651
169,323
171,994
174,793
177,592
180,390
183,316
186,242
189,168
192,221
195,275
198,455
201,635
204,816
BALANCE OFERTA-DEMANDA SIN PROYECTO RED DE ALCANTARILLADO
Qmhd (lt/seg)

HORIZONTE AÑO DEMANDA OFERTA OFERTA/DEMANDA


0 2023 11.82 0 -11.82
1 2024 12.01 0 -12.01
2 2025 12.20 0 -12.20
3 2026 12.39 0 -12.39
4 2027 12.60 0 -12.60
5 2028 12.80 0 -12.80
6 2029 13.00 0 -13.00
7 2030 13.21 0 -13.21
8 2031 13.42 0 -13.42
9 2032 13.63 0 -13.63
10 2033 13.86 0 -13.86
11 2034 14.08 0 -14.08
12 2035 14.30 0 -14.30
13 2036 14.53 0 -14.53
14 2037 14.76 0 -14.76
15 2038 15.00 0 -15.00
16 2039 15.24 0 -15.24
17 2040 15.48 0 -15.48
18 2041 15.73 0 -15.73
19 2042 15.98 0 -15.98
20 2030 16.24 0 -16.24
INVERSION EN CONEXIONES Y REDES DE ALCANTARILLADO

INCREMENTALES Costo de Incrementales S/.

AÑO

CONEXIONES RED COL (ml) Conexiones Redes


0 769,993 1,782,553
1 19 201 26,009 30,105
2 19 201 13,004 30,105
3 19 201 13,689 31,690
4 20 212 13,689 31,690
5 20 212 13,689 31,690
6 20 212 14,373 33,274
7 21 222 14,373 33,274
8 21 222 14,373 33,274
9 21 222 15,058 34,859
10 22 233 15,058 34,859
11 22 233 15,058 34,859
12 22 233 15,742 36,443
13 23 243 15,742 36,443
14 23 243 15,742 36,443
15 23 243 16,427 38,028
16 24 254 16,427 38,028
17 24 254 17,111 39,612
18 25 264 17,111 39,612
19 25 264 17,795 41,197
20 26 275 300,468 695,592
TOTAL 439 4,643 1,370,929 3,143,631
Costo Unitario Conex y redes (ml) 684.44 149.81
Mt por Conex 10.58
COSTOS INCRE
COSTOS DE OPERACIÓN Y MANTENIMIENTO DE ALCANTARILLADO - PRECIOS PRIVADOS
COSTOS
COSTOS FIJOS

AÑO Año
TOTAL COSTOS DE O
RED COL CONEXIONES VARIABLES yM
0 0 0 0 0 0
1 2,770.35 0.00 11,042.20 13,812.55 1
2 2,770.35 0.00 11,218.36 13,988.71 2
3 2,770.35 0.00 11,394.51 14,164.86 3
4 2,770.35 0.00 11,579.94 14,350.29 4
5 2,770.35 0.00 11,765.37 14,535.72 5
6 2,770.35 0.00 11,950.79 14,721.14 6
7 2,770.35 0.00 12,145.49 14,915.84 7
8 2,770.35 0.00 12,340.19 15,110.54 8
9 2,770.35 0.00 12,534.89 15,305.24 9
10 2,770.35 0.00 12,738.86 15,509.21 10
11 2,770.35 0.00 12,942.83 15,713.18 11
12 2,770.35 0.00 13,146.80 15,917.15 12
13 2,770.35 0.00 13,360.04 16,130.39 13
14 2,770.35 0.00 13,573.28 16,343.63 14
15 2,770.35 0.00 13,786.53 16,556.88 15
16 2,770.35 0.00 14,009.04 16,779.39 16
17 2,770.35 0.00 14,231.55 17,001.90 17
18 2,770.35 0.00 14,463.34 17,233.69 18
19 2,770.35 0.00 14,695.12 17,465.47 19
20 2,770.35 0.00 14,926.90 17,697.25 20
Costo variable Unitario por m3 evacuado 0.0729

COSTOS INCREMEN
COSTOS DE OPERACIÓN Y MANTENIMIENTO DE ALCANTARILLADO - PRECIOS SOCIALES
COSTOS FIJOS
COSTOS
COLECTORES CONEXIONES VARIABLES
TOTAL COSTOS DE
AÑOS
OYM
Años
0.909 0.909 0.84
0 0 0 0 0 0
1 2,518.25 0.00 9,275.45 11,793.70 1
2 2,518.25 0.00 9,423.42 11,941.67 2
3 2,518.25 0.00 9,571.39 12,089.64 3
4 2,518.25 0.00 9,727.15 12,245.40 4
5 2,518.25 0.00 9,882.91 12,401.16 5
6 2,518.25 0.00 10,038.67 12,556.92 6
7 2,518.25 0.00 10,202.21 12,720.46 7
8 2,518.25 0.00 10,365.76 12,884.01 8
9 2,518.25 0.00 10,529.31 13,047.56 9
10 2,518.25 0.00 10,700.64 13,218.89 10
11 2,518.25 0.00 10,871.98 13,390.23 11
12 2,518.25 0.00 11,043.31 13,561.56 12
13 2,518.25 0.00 11,222.44 13,740.68 13
14 2,518.25 0.00 11,401.56 13,919.81 14
15 2,518.25 0.00 11,580.68 14,098.93 15
16 2,518.25 0.00 11,767.59 14,285.84 16
17 2,518.25 0.00 11,954.50 14,472.75 17
18 2,518.25 0.00 12,149.20 14,667.45 18
19 2,518.25 0.00 12,343.90 14,862.15 19
20 2,518.25 0.00 12,538.60 15,056.85 20
COSTOS INCREMENTALES DEL SISTEMA DE ALCANTARILLADO- A PRECIOS PRIVADOS

COSTOS CON PROYECTO


Costos Sin Costos
Conexiones Proyecto Incrementales
Total O y M PP Total Costos
Redes Inversión PP con Proyecto Con Proyeto
769,993 1,782,553 2,552,546 0 2,552,546 6,906 2,545,639
26,009 30,105 56,114 13,813 69,927 6,906 63,020
13,004 30,105 43,110 13,989 57,098 6,906 50,192
13,689 31,690 45,379 14,165 59,543 6,906 52,637
13,689 31,690 45,379 14,350 59,729 6,906 52,823
13,689 31,690 45,379 14,536 59,914 6,906 53,008
14,373 33,274 47,648 14,721 62,369 6,906 55,462
14,373 33,274 47,648 14,916 62,563 6,906 55,657
14,373 33,274 47,648 15,111 62,758 6,906 55,852
15,058 34,859 49,916 15,305 65,222 6,906 58,315
15,058 34,859 49,916 15,509 65,426 6,906 58,519
15,058 34,859 49,916 15,713 65,630 6,906 58,723
15,742 36,443 52,185 15,917 68,103 6,906 61,196
15,742 36,443 52,185 16,130 68,316 6,906 61,409
15,742 36,443 52,185 16,344 68,529 6,906 61,623
16,427 38,028 54,454 16,557 71,011 6,906 64,105
16,427 38,028 54,454 16,779 71,234 6,906 64,327
17,111 39,612 56,723 17,002 73,725 6,906 66,819
17,111 39,612 56,723 17,234 73,957 6,906 67,051
17,795 41,197 58,992 17,465 76,458 6,906 69,551
300,468 695,592 996,060 17,697 1,013,757 6,906 1,006,851

2144138.426

COSTOS INCREMENTALES DEL SISTEMA DE ALCANTARILLADO- A PRECIOS SOCIALES

COSTOS CON PROYECTO A PRECIOS SOCIALES

Conexiones redes

Total Costos Costos


Total O y M con Con Costos Sin Incrementales A
0.840 0.840 Inversión PS Proyecto PS Proyecto Proyecto Precios Sociales
646,794 1,497,344 2,144,138 0 2,144,138 5,897 2,138,242
21,847 25,288 47,136 11,794 58,929 5,897 53,033
10,924 25,288 36,212 11,942 48,154 5,897 42,257
11,499 26,619 38,118 12,090 50,208 5,897 44,311
11,499 26,619 38,118 12,245 50,363 5,897 44,467
11,499 26,619 38,118 12,401 50,519 5,897 44,622
12,073 27,950 40,024 12,557 52,581 5,897 46,684
12,073 27,950 40,024 12,720 52,744 5,897 46,848
12,073 27,950 40,024 12,884 52,908 5,897 47,011
12,648 29,281 41,930 13,048 54,977 5,897 49,081
12,648 29,281 41,930 13,219 55,149 5,897 49,252
12,648 29,281 41,930 13,390 55,320 5,897 49,423
13,223 30,612 43,836 13,562 57,397 5,897 51,500
13,223 30,612 43,836 13,741 57,576 5,897 51,680
13,223 30,612 43,836 13,920 57,756 5,897 51,859
13,798 31,943 45,742 14,099 59,841 5,897 53,944
13,798 31,943 45,742 14,286 60,027 5,897 54,131
14,373 33,274 47,648 14,473 62,120 5,897 56,223
14,373 33,274 47,648 14,667 62,315 5,897 56,418
14,948 34,605 49,553 14,862 64,416 5,897 58,519
252,393 584,297 836,690 15,057 851,747 5,897 845,850
EVALUACION SOCIAL DE ALCANTARILLADO

Población Población Operación y


Nuevas Inversión a
Año beneficiaria beneficiaria mantenimient
Conexiones PS
Incremental Total o -PS
0 0 5,075 2,144,138 -
1 19 0 5,156 47,136 11,794
2 19 83 5,239 36,212 11,942
3 19 166 5,323 38,118 12,090
4 20 251 5,408 38,118 12,245
5 20 338 5,494 38,118 12,401
6 20 426 5,582 40,024 12,557
7 21 515 5,672 40,024 12,720
8 21 606 5,762 40,024 12,884
9 21 698 5,855 41,930 13,048
10 22 792 5,948 41,930 13,219
11 22 887 6,043 41,930 13,390
12 22 984 6,140 43,836 13,562
13 23 1,082 6,238 43,836 13,741
14 23 1,182 6,338 43,836 13,920
15 23 1,283 6,440 45,742 14,099
16 24 1,386 6,543 45,742 14,286
17 24 1,491 6,647 47,648 14,473
18 25 1,597 6,754 47,648 14,667
19 25 1,705 6,862 49,553 14,862
20 26 1,815 6,972 836,690 15,057

VAC
Población Beneficiada Promedio
ICE
ANTARILLADO ANALISIS DE SENSIBILIDAD - CUAN

11%

Valor Actual
Factor de Población
Total Costos del Flujo de Año
Descuento Nuevas beneficiaria
Costos
Conexiones Incremental
2,144,138 1.00 2,144,138 0 0 0
58,929 0.90 53,090 1 19 0
48,154 0.81 39,083 2 19 83
50,208 0.73 36,711 3 19 166
50,363 0.66 33,176 4 20 251
50,519 0.59 29,981 5 20 338
52,581 0.53 28,112 6 20 426
52,744 0.48 25,405 7 21 515
52,908 0.43 22,958 8 21 606
54,977 0.39 21,492 9 21 698
55,149 0.35 19,423 10 22 792
55,320 0.32 17,552 11 22 887
57,397 0.29 16,406 12 22 984
57,576 0.26 14,827 13 23 1,082
57,756 0.23 13,399 14 23 1,182
59,841 0.21 12,507 15 23 1,283
60,027 0.19 11,303 16 24 1,386
62,120 0.17 10,538 17 24 1,491
62,315 0.15 9,523 18 25 1,597
64,416 0.14 8,869 19 25 1,705
851,747 0.12 105,646 20 26 1,815

2,674,137
oblación Beneficiada Promedio 6,064
441
5%
SIS DE SENSIBILIDAD - CUANDO INVERSIONES AUMENTAN

11%

Población Operación y Valor Actual


beneficiaria Inversión a mantenimient Factor de del Flujo de
Total PS o -PS Total Costos Descuento Costos
5,075 2,240,625 0 2,240,625 1.00 2,240,625
5,156 49,257 11,794 61,051 0.90 55,000
5,239 37,842 11,942 49,783 0.81 40,405
5,323 39,833 12,090 51,923 0.73 37,966
5,408 39,833 12,245 52,079 0.66 34,306
5,494 39,833 12,401 52,234 0.59 30,999
5,582 41,825 12,557 54,382 0.53 29,075
5,672 41,825 12,720 54,545 0.48 26,272
5,762 41,825 12,884 54,709 0.43 23,740
5,855 43,817 13,048 56,864 0.39 22,230
5,948 43,817 13,219 57,036 0.35 20,087
6,043 43,817 13,390 57,207 0.32 18,151
6,140 45,808 13,562 59,370 0.29 16,970
6,238 45,808 13,741 59,549 0.26 15,335
6,338 45,808 13,920 59,728 0.23 13,857
6,440 47,800 14,099 61,899 0.21 12,937
6,543 47,800 14,286 62,086 0.19 11,690
6,647 49,792 14,473 64,264 0.17 10,901
6,754 49,792 14,667 64,459 0.15 9,851
6,862 51,783 14,862 66,645 0.14 9,176
6,972 874,342 15,057 889,398 0.12 110,316

VAC 2,789,887
Población Beneficiada Promedio 6,064
ICE 460
PARA EL TOTAL DE LOS SISTEMAS DEL PROYECTO : AGUA POTABLE, ALCANTARILLADO

Inversiones a Costo de O y M Privado (S/.) Consumo (m3/año)


AÑO Precios
Privados (s/.) Total (con proyecto) Incremental Total ( Con Proyecto) Incremental
0 4,350,662 0 0 0
1 89,224 17,055 17,055 236,739 236,739
2 64,421 17,270 17,270 240,515 240,515
3 67,812 17,484 17,484 244,292 244,292
4 67,812 17,710 17,710 248,267 248,267
5 164,912 17,936 17,936 252,243 252,243
6 72,776 18,162 18,162 256,218 256,218
7 72,776 18,399 18,399 260,393 260,393
8 72,776 18,636 18,636 264,567 264,567
9 76,250 18,873 18,873 268,741 268,741
10 173,350 19,121 19,121 273,114 273,114
11 77,824 19,369 19,369 277,487 277,487
12 81,297 19,617 19,617 281,860 281,860
13 81,297 19,877 19,877 286,432 286,432
14 81,380 20,137 20,137 291,004 291,004
15 181,954 20,396 20,396 295,575 295,575
16 86,428 20,667 20,667 300,346 300,346
17 89,901 20,938 20,938 305,116 305,116
18 89,984 21,220 21,220 310,086 310,086
19 93,457 21,502 21,502 315,055 315,055
20 1,098,546 21,786 21,786 320,138 320,138
CALCULO DE LA TARIFA INCREMENTAL PROMEDIO DE LARG

Costos
Incremntales OyM
Inversión a Precios a precios Privados Total Costos
AÑO Privados ( S/.) (S/.) Incrementales ( S/.)
( a) (b) ( c) d= (b)+C
0 8,538,658 0 8,538,658
1 89,224 17,055 106,279
2 64,421 17,270 81,691
3 67,812 17,484 85,296
4 67,812 17,710 85,522
5 164,912 17,936 182,848
6 72,776 18,162 90,938
7 72,776 18,399 91,175
8 72,776 18,636 91,412
9 76,250 18,873 95,122
10 173,350 19,121 192,471
11 77,824 19,369 97,193
12 81,297 19,617 100,915
13 81,297 19,877 101,174
14 81,380 20,137 101,517
15 181,954 20,396 202,350
16 86,428 20,667 107,095
17 89,901 20,938 110,839
18 89,984 21,220 111,204
19 93,457 21,502 114,960
20 1,098,546 21,786 1,120,331

Tarifa de OyM+Inversión ( S/. M3) = Valor Actual de los Costos de I + O y M


Valor Actual de los Consumos

Tarifa de OyM ( S/. M3) Valor Actual de los Costos de O y M


Valor Actual de los Consumos

ANALISIS DE SOSTENIBILIDAD

COSTO MARGINAL TARIFA


SOLES/M3
DE LARGO PLAZO SOLES/CONEX/MES

COSTO MARGINAL
POR M3 CONSUMIDO 4.02 73.32

INVERSION PROMEDIO
POR M3 CONSUMIDO 3.95 72.05

COSTO DE OPER. Y MANT.


POR M3 CONSUMIDO 0.07 1.10

CONSUMO PROMEDIO MENSUAL 13.07


DE LA TARIFA INCREMENTAL PROMEDIO DE LARGO PLAZO

Valor Actual
Consumo Incremental Costos de Inv.
( m3/año) Factor de Actualización +OyM Costos O y M Consumos M3)
( e) 9% (d) * (f) ( c) * ( f) ( e ) * (f)
0 1.00000 8,538,658 0 -
236,739 0.91743 97,504 15,647 217,191
240,515 0.84168 68,758 14,536 202,437
244,292 0.77218 65,864 13,501 188,638
248,267 0.70843 60,586 12,546 175,879
252,243 0.64993 118,838 11,657 163,941
256,218 0.59627 54,223 10,829 152,775
260,393 0.54703 49,876 10,065 142,444
264,567 0.50187 45,877 9,353 132,777
268,741 0.46043 43,797 8,689 123,736
273,114 0.42241 81,302 8,077 115,366
277,487 0.38753 37,665 7,506 107,535
281,860 0.35553 35,879 6,975 100,211
286,432 0.32618 33,001 6,483 93,428
291,004 0.29925 30,379 6,026 87,082
295,575 0.27454 55,553 5,600 81,147
300,346 0.25187 26,974 5,205 75,648
305,116 0.23107 25,612 4,838 70,504
310,086 0.21199 23,575 4,499 65,736
315,055 0.19449 22,358 4,182 61,275
320,138 0.17843 199,902 3,887 57,123
Valor Actual 9,716,178 170,101 2,414,873

9,716,178.10 = S/. 4.02 por M3


2,414,873.00

170,101.19 = S/. 0.07 por M3


2,414,873

TENIBILIDAD

EXISTE
CAPACIDAD PAGO
CAPACIDAD
SOLES/FAM/MES
DE PAGO

600 SI

600 SI

600 SI

m3/conexión/mes
¤ Item Descripción Und.Metrado Precio (S/.)
0 01 OBRAS PROVISIONALES
0 01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40M X 4.80M. und 2.00 1,400.00
0 01.02 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 1.00 4,500.00
0 01.03 OFICINA PARA SUPERVISOR GLB 1.00 1,400.00
0 01.04 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS GLB 1.00 7,500.00
0 01.05 FLETE GLB 1.00 14,500.00
0 01.06 LIMPIEZA GENERAL DE OBRA GLB 1.00 9,088.97
0 02 CAPTACION DE MANANTIAL
0 02.01 CAPTACION LA PEÑA (CA - 01)
0 02.01.01 TRABAJOS PRELIMINARES
0 02.01.01.0 LIMPIEZA DE TERRENO MANUAL m2 52.25 0.76
0 02.01.01.0 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS. m2 52.25 1.58
0 02.01.01.0 REPLANTEO FINAL ESTRUCTURAS. m2 52.25 0.83
0 02.01.02 MOVIMIENTO DE TIERRAS
0 02.01.02.0 DEMOLICION DE MUROS DE CONCRETO ARMADO m3 11.00 213.00
0 02.01.02.0 EXCAV. MANUAL EN TERRENO CON BOLONERIA m3 19.58 59.98
0 02.01.02.0 ELIMINACION DE MATERIAL EXCEDENTE m3 36.69 4.58
0 02.01.03 CONCRETO SIMPLE
0 02.01.03.0 SOLADO DE E=4" MEZCLA 1:12 (C:H) m2 13.07 44.56
0 02.01.03.0 DADOS DE CONCRETO F'C = 140 KG/CM2 m3 0.07 260.69
0 02.01.04 OBRAS DE CONCRETO ARMADO
0 02.01.04.0 CONCRETO FC=210 KG/CM2 m3 26.48 430.71
0 02.01.04.0 ENCOFRADO Y DESENCOFRADO m2 158.15 42.33
0 02.01.04.0 ACERO FY= 4200 KG/CM2 kg 1,300.00 6.04
0 02.01.05 REVOQUES Y ENLUCIDOS
0 02.01.05.0 TARRAJEO CON IMPERMEABILIZANTE 1:2 e=1.5CM EN INTERIORE m2 101.95 31.13
0 02.01.05.0 TARRAJEO EXTERIOR FOTACHADO C/MORTERO 1:5 X1.5 CM. m2 105.01 19.58
0 02.01.06 INSTALACIONES SANITARIAS
0 02.01.06.0 SUMINISTRO E INSTALACION DE TUBERIA PVC SCH - 40 DN=110 m 2.19 414.15
0 02.01.06.0 SUMINISTRO E INSTALACION DE TUBERIA PVC SCH - 40 DN=160 m 2.44 492.45
0 02.01.06.0 CODO DE F. F. 90º x 160mm und 1.00 209.86
0 02.01.06.0 VALVULA COMPUERTA DE FºFº UF DE DN=160mm und 1.00 590.68
0 02.01.06.0 VALVULA COMPUERTA DE FºFº UF DE DN=110mm und 2.00 394.47
0 02.01.06.0 SUMINISTRO E INSTALACION DE TEE HD BB PN-10 DN=150mm und 1.00 511.80
0 02.01.06.0 CANASTILLA DE BRONCE DN=110mm und 2.00 360.90
0 02.01.06.0 UNION FLEXIBLE TIPO DRESSER DE DN=110mm und 2.00 327.45
0 02.01.06.0 ADAPTADOR BRIDA CAMPANA DN=110mm und 2.00 317.23
0 02.01.06.1 PRUEBA HIDRAULICA+DESINFECCION TUB. PVC m 4.63 0.92
0 02.01.06.1 CAJA PARA VALVULA und 1.00 555.86
0 02.01.07 VARIOS
0 02.01.07.0 TAPA METALICA DE INSPECCIÓN und 2.00 278.35
0 02.01.07.0 SUMINISTRO E INSTALACION DE GRAVA SELECCIONADA m3 42.85 125.52
PRUEBA DE CALIDAD DE CONCRETO (COMPRESION)
0 02.01.07.0 und 2.00 34.14
0 02.01.07.0 ESCALIN DE FIERRO CORRUGADO 3/4"@0.30 und 8.00 17.86
0 02.02 CAPTACION CHIMBILES (CA - 02)
0 02.02.01 TRABAJOS PRELIMINARES
0 02.02.01.0 LIMPIEZA DE TERRENO MANUAL m2 4.65 0.76
0 02.02.01.0 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS. m2 4.65 1.58
0 02.02.01.0 REPLANTEO FINAL ESTRUCTURAS. m2 4.65 0.83
0 02.02.02 MOVIMIENTO DE TIERRAS
0 02.02.02.0 DEMOLICION DE MUROS DE CONCRETO ARMADO m3 7.56 213.00
0 02.02.02.0 EXCAV. MANUAL EN TERRENO CON BOLONERIA m3 7.19 59.98
0 02.02.02.0 ELIMINACION DE MATERIAL EXCEDENTE m3 17.70 4.58
0 02.02.03 CONCRETO SIMPLE
0 02.02.03.0 SOLADO DE E=4" MEZCLA 1:12 (C:H) m2 1.80 44.56
0 02.02.03.0 DADOS DE CONCRETO F'C = 140 KG/CM2 m3 0.02 260.69
0 02.02.04 OBRAS DE CONCRETO ARMADO
0 02.02.04.0 CONCRETO FC=210 KG/CM2 m3 8.22 430.71
0 02.02.04.0 ENCOFRADO Y DESENCOFRADO m2 28.92 42.33
0 02.02.04.0 ACERO FY= 4200 KG/CM2 kg 735.63 6.04
0 02.02.05 REVOQUES Y ENLUCIDOS
0 02.02.05.0 TARRAJEO CON IMPERMEABILIZANTE 1:2 e=1.5CM EN INTERIORE m2 12.32 31.13
0 02.02.06 INSTALACIONES SANITARIAS
0 02.02.06.0 TUBERIA PVC SAP CLASE 7.5 NORMA ISO 4422 DN=160MM m 18.00 55.98
0 02.02.06.0 SUMINISTRO E INSTALACION DE TUBERIA PVC SCH - 40 DN=160 m 4.33 492.45
0 02.02.06.0 CODO DE F. F. 90º x 160mm und 1.00 209.86
0 02.02.06.0 VALVULA COMPUERTA DE FºFº UF DE DN=160mm und 2.00 590.68
0 02.02.06.0 SUMINISTRO E INSTALACION DE TEE HD BB PN-10 DN=150mm und 1.00 511.80
0 02.02.06.0 CANASTILLA DE BRONCE DN=160mm und 1.00 390.90
0 02.02.06.0 UNION FLEXIBLE TIPO DRESSER DE DN=160mm und 1.00 230.45
0 02.02.06.0 ADAPTADOR BRIDA CAMPANA DN=160mm und 1.00 377.23
0 02.02.06.0 PRUEBA HIDRAULICA+DESINFECCION TUB. PVC m 22.33 0.92
0 02.02.06.1 CAJA PARA VALVULA und 1.00 555.86
0 02.02.07 VARIOS
0 02.02.07.0 SUMINISTRO E INSTALACION DE GRAVA SELECCIONADA m3 2.43 125.52
0 02.02.07.0 ARCILLA COMPACTADA m3 2.43 33.14
0 02.02.07.0 TAPA METALICA DE INSPECCIÓN und 1.00 278.35
PRUEBA DE CALIDAD DE CONCRETO (COMPRESION)
0 02.02.07.0 und 2.00 34.14
0 02.02.07.0 ESCALIN DE FIERRO CORRUGADO 3/4"@0.30 und 12.00 17.86
0 03 LINEA DE CONDUCCION
0 03.01 LINEA DE CONDUCCION (CA - 01)
0 03.01.01 TRABAJOS PRELIMINARES
0 03.01.01.0 LIMPIEZA DE TERRENO MANUAL. m 3,713.00 0.76
0 03.01.01.0 TRAZO, NIVELES Y REPLANTEO DE ZANJAS m 3,713.00 0.58
0 03.01.02 MOVIMIENTO DE TIERRAS
0 03.01.02.0 EXCAV. MANUAL DE ZANJAS PARA TUB. DN=110 mm - 200 mm, H ML 3,213.00 34.85
0 03.01.02.0 REFINE Y NIVELACION ZANJA TERR.CON BOLONERIAS m 3,213.00 5.55
0 03.01.02.0 PREPARACION Y COLOCACION DE CAMA DE APOYO E=0.10M m 3,213.00 1.94
0 03.01.02.0 PRIMER RELLENO H=0.30M MATERIAL SELECCIONADO A=0.70M m 3,213.00 4.89
0 03.01.02.0 SEGUNDO RELLENO MATERIAL DE PROPIO A=0.70M @ 0.30 M. HA m 3,213.00 4.21
0 03.01.02.0 SEGUNDO RELLENO C/ MATERIAL PRESTAMO A=0.70m HASTA 0. ML 3,213.00 4.01
0 03.01.02.0 ELIMINACION DE MATERIAL EXCEDENTE m3 809.68 4.58
0 03.01.03 SUMINISTRO E INSTALACION DE TUBERIAS
0 03.01.03.0 TUBERIA DE POLIETILENO S-10/PN6 DN=110MM m 500.00 245.13
0 03.01.03.0 TUBERIA PVC SAP CLASE 7.5 NORMA ISO 4422 DN=110MM. m 3,213.00 31.35
0 03.01.04 SUMINISTRO E INSTALACION DE ACCESORIOS
0 03.01.04.0 CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 110mmXund 28.00 48.63
0 03.01.04.0 CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 110mmXund 28.00 48.63
0 03.01.04.0 CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 110mmXund 18.00 48.63
0 03.01.04.0 CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 110mmXund 1.00 48.63
0 03.01.05 VALVULA DE PURGA
0 03.01.05.0 CAMARA P/VALV.PURGA T-NORMAL"C" E.D.CARG+VOL.P/MATRIZ und 8.00 1,993.33
0 03.01.05.0 SUMINISTRO Y COLOCACION DE VALVULA DE PURGA und 8.00 532.33
0 03.01.06 VALVULA DE AIRE
0 03.01.06.0 CAMARA P/VALV.AIRE TERR.NORMAL E.D.CARG.+VOL.P/MATRIZ und 5.00 1,993.33
0 03.01.06.0 SUMINISTRO Y COLOCACION DE VALVULA DE AIRE und 5.00 932.87
0 03.01.07 CAMARA ROMPEPRESION TIPO-06
0 03.01.07.0 CAMARA P/VALV.AIRE TERR.NORMAL E.D.CARG.+VOL.P/MATRIZ und 2.00 1,993.33
0 03.01.07.0 SUMINISTRO Y COLOCACION DE ACCESORIOS EN C.R.P. T-06 und 2.00 382.33
0 03.01.08 CARPINTERIA METALICA
0 03.01.08.0 MARCO Y TAPA PLANCHA LAC 1/4" C/MECANISM. DE SEG. S/DISE und 15.00 179.03
0 03.01.09 PINTURA
0 03.01.09.0 PINTADO DE MURO EXTERIOR C/LATEX ACRILICO (SUPERLATEX und 15.00 21.15
0 03.01.10 PRUEBA HIDRAULICA Y DESINFECCION
0 03.01.10.0 PRUEBA HIDRAULICA+DESINFECCION TUB. PVC m 3,713.00 0.92
0 03.02 LINEA DE CONDUCCION (CA - 02)
0 03.02.01 TRABAJOS PRELIMINARES
0 03.02.01.0 LIMPIEZA DE TERRENO MANUAL. m 1,392.00 0.76
0 03.02.01.0 TRAZO, NIVELES Y REPLANTEO DE ZANJAS m 1,392.00 0.58
0 03.02.02 MOVIMIENTO DE TIERRAS
0 03.02.02.0 EXCAV. MANUAL DE ZANJAS PARA TUB. DN=160 mm - 200 mm, H ML 1,092.00 50.13
0 03.02.02.0 REFINE Y NIVELACION ZANJA TERR.CON BOLONERIAS m 1,092.00 5.55
0 03.02.02.0 PREPARACION Y COLOCACION DE CAMA DE APOYO E=0.10M m 1,092.00 1.94
0 03.02.02.0 PRIMER RELLENO H=0.30M MATERIAL SELECCIONADO A=0.70M m 1,092.00 4.89
0 03.02.02.0 SEGUNDO RELLENO MATERIAL DE PROPIO A=0.70M HASTA 0.45 m 1,092.00 2.79
0 03.02.02.0 SEGUNDO RELLENO C/ MATERIAL PRESTAMO A=0.70m HASTA 0. ML 1,092.00 4.01
0 03.02.02.0 ELIMINACION DE MATERIAL EXCEDENTE m3 275.19 4.58
0 03.02.03 SUMINISTRO E INSTALACION DE TUBERIAS
0 03.02.03.0 TUBERIA DE POLIETILENO S-10/PN6 DN=160MM m 300.00 280.15
0 03.02.03.0 TUBERIA PVC SAP CLASE 7.5 NORMA ISO 4422 DN=160MM m 1,092.00 55.98
0 03.02.04 SUMINISTRO E INSTALACION DE ACCESORIOS
0 03.02.04.0 CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 160mmXund 3.00 129.64
0 03.02.04.0 CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 160mmXund 5.00 129.64
0 03.02.04.0 CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 160mmXund 7.00 129.64
0 03.02.05 VALVULA DE PURGA
0 03.02.05.0 CAMARA P/VALV.PURGA T-NORMAL"C" E.D.CARG+VOL.P/MATRIZ und 1.00 1,993.33
0 03.02.05.0 SUMINISTRO Y COLOCACION DE VALVULA DE PURGA und 1.00 532.33
0 03.02.06 VALVULA DE AIRE
0 03.02.06.0 CAMARA P/VALV.AIRE TERR.NORMAL E.D.CARG.+VOL.P/MATRIZ und 2.00 1,993.33
0 03.02.06.0 SUMINISTRO Y COLOCACION DE VALVULA DE AIRE und 2.00 932.87
0 03.02.07 CAMARA ROMPEPRESION TIPO-06
0 03.02.07.0 CAMARA P/VALV.AIRE TERR.NORMAL E.D.CARG.+VOL.P/MATRIZ und 2.00 1,993.33
0 03.02.07.0 SUMINISTRO Y COLOCACION DE ACCESORIOS EN C.R.P. T-06 und 2.00 382.33
0 03.02.08 CARPINTERIA METALICA
0 03.02.08.0 MARCO Y TAPA PLANCHA LAC 1/4" C/MECANISM. DE SEG. S/DISE und 5.00 179.03
0 03.02.09 PINTURA
0 03.02.09.0 PINTADO DE MURO EXTERIOR C/LATEX ACRILICO (SUPERLATEX und 5.00 21.15
0 03.02.10 PRUEBA HIDRAULICA Y DESINFECCION
0 03.02.10.0 PRUEBA HIDRAULICA+DESINFECCION TUB. PVC m 1,392.00 0.92
0 04 RESERVORIO PROYECTADO DE 200M3 (RP-01)
0 04.01 TRABAJOS PRELIMINARES
0 04.01.01 LIMPIEZA DE TERRENO MANUAL m2 147.78 0.76
0 04.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS. m2 147.78 1.58
0 04.01.03 REFINE Y NIVELACION Y COMPACTACION m2 147.78 0.79
0 04.01.04 REPLANTEO FINAL ESTRUCTURAS. m2 147.78 0.83
0 04.02 MOVIMIENTO DE TIERRAS
0 04.02.01 EXCAV. MANUAL EN TERRENO CON BOLONERIA m3 190.79 59.98
0 04.02.02 REFINE DE TALUD EN RESERVORIO m2 69.17 0.50
0 04.02.03 RELLENO CON MATERIAL PROPIO m3 22.99 24.48
0 04.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 218.14 16.88
0 04.03 OBRAS DE CONCRETO SIMPLE
0 04.03.01 SOLADO DE E=4" MEZCLA 1:12 (C:H) m2 83.32 44.56
0 04.04 OBRAS DE CONCRETO ARMADO
0 04.04.01 ZAPATA DE RESERVORIO
0 04.04.01.0 CONCRETO FC=210 KG/CM2 m3 14.02 430.71
0 04.04.01.0 ACERO FY= 4200 KG/CM2 kg 774.77 6.04
0 04.04.02 LOSAS
0 04.04.02.0 CONCRETO FC=210 KG/CM2 m3 20.83 430.71
0 04.04.02.0 ACERO FY= 4200 KG/CM2 kg 1,133.95 6.04
0 04.04.03 CUPULA DE RESERVORIO
0 04.04.03.0 CONCRETO FC=210 KG/CM2 m3 0.51 430.71
0 04.04.03.0 ENCOFRADO Y DESENCOFRADO m2 73.17 42.33
0 04.04.03.0 ACERO FY= 4200 KG/CM2 kg 1,104.20 6.04
0 04.04.04 MUROS REFORZADOS
0 04.04.04.0 CONCRETO FC=210 KG/CM2 m3 28.49 430.71
0 04.04.04.0 ENCOFRADO Y DESENCOFRADO m2 189.91 42.33
0 04.04.04.0 ACERO FY= 4200 KG/CM2 kg 3,147.69 6.04
0 04.04.05 VIGA CIRCULAR
0 04.04.05.0 CONCRETO FC=210 KG/CM2 m3 3.60 430.71
0 04.04.05.0 ENCOFRADO Y DESENCOFRADO m2 22.08 42.33
0 04.04.05.0 ACERO FY= 4200 KG/CM2 kg 284.04 6.04
0 04.04.06 ARTESA DE REBOSE
0 04.04.06.0 CONCRETO FC=210 KG/CM2 m3 0.20 430.71
0 04.04.06.0 ENCOFRADO Y DESENCOFRADO m2 1.13 42.33
0 04.04.06.0 ACERO FY= 4200 KG/CM2 kg 14.80 6.04
0 04.05 CASETA DE VALVULAS
0 04.05.01 CIMIENTOS
0 04.05.01.0 CONCRETO EN CIMIENTOS CORRIDOS F´C=175 KG/CM2 m3 2.19 402.34
0 04.05.01.0 SOLADO DE E=4" MEZCLA 1:12 (C:H) m2 5.47 231.87
0 04.05.02 SOBRECIMIENTO
0 04.05.02.0 SOBRECIMIENTO CONCRETO 1:8 + 25% P.M. m3 0.55 304.42
0 04.05.02.0 ENCOFRADO Y DESENCOFRADO m2 7.38 42.33
0 04.05.03 COLUMNAS
0 04.05.03.0 CONCRETO FC=210 KG/CM2 m3 0.75 430.71
0 04.05.03.0 ENCOFRADO Y DESENCOFRADO m2 7.56 42.33
0 04.05.03.0 ACERO FY= 4200 KG/CM2 kg 69.91 6.04
0 04.05.04 VIGAS
0 04.05.04.0 CONCRETO FC=210 KG/CM2 m3 0.71 430.71
0 04.05.04.0 ENCOFRADO Y DESENCOFRADO m2 4.17 42.33
0 04.05.04.0 ACERO FY= 4200 KG/CM2 kg 79.17 6.04
0 04.05.05 LOSAS ALIGERADAS
0 04.05.05.0 CONCRETO FC=210 KG/CM2 m3 0.85 430.71
0 04.05.05.0 LADRILLO HUECO DE ARCILLA 12X30X30 CM PARA TECHO ALIG und 80.98 3.16
0 04.05.05.0 ENCOFRADO Y DESENCOFRADO m2 9.72 42.33
0 04.05.05.0 ACERO FY= 4200 KG/CM2 kg 27.86 6.04
0 04.05.06 ALBAÑILERIA
0 04.05.06.0 MURO DE SOGA LADRILLO CORRIENTE CON CEMENTO-CAL-ARE m2 21.53 92.66
0 04.05.07 PISOS
0 04.05.07.0 FALSO PISO DE 4" DE CONCRETO 1:10 m2 11.34 28.57
0 04.05.07.0 PISO DE 2" CONCRETO F'C 140 KG/CM2 X 4 CM.+ PULIDO 1:2 X 1C m2 11.34 35.98
0 04.06 REVOQUES Y ENLUCIDOS
0 04.06.01 TARRAJEO INTERIOR C/MORTERO 1:5 X1.5 CM. m2 37.29 21.05
0 04.06.02 TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM. m2 222.69 35.90
0 04.06.03 TARRAJEO CON IMPERMEABILIZANTE 1:2 e=1.5CM EN INTERIORES m2 93.68 31.13
0 04.07 CARPINTERIA METALICA
0 04.07.01 TAPA METALICA DE RESERVORIO S/DISEÑO und 1.00 220.00
0 04.07.02 VENTILACION C/TUBERIA DE ACERO S/DISEÑO DE 6" und 1.00 92.42
0 04.07.03 PUERTA METALICADE PLANCHA LAC 1/16" C/MARCO 2"X2"X1/4" Y und 1.00 1,319.55
0 04.07.04 VENTANA METALICA und 1.00 121.26
0 04.07.05 ESCALIN DE FIERRO CORRUGADO 3/4"@0.30 und 18.00 18.10
0 04.08 PINTURA
0 04.08.01 PINTURA EXTERIORES m2 196.70 4.20
0 04.08.02 PINTURA ANTICORROSIVA m2 15.00 15.61
0 04.09 VARIOS
0 04.09.01 WATER STOP DE NEOPRENE DE 6". PROVISION Y COLOCADO DE J m 58.44 22.14
PRUEBA DE CALIDAD DE CONCRETO (COMPRESION)
0 04.09.02 und 10.00 30.00
0 04.09.03 HIPOCLORADOR und 1.00 104.85
0 04.10 PRUEBA HIDRAULICA Y DESINFECCION
0 04.10.01 PRUEBA HIDRAULICA C/EMPLEO DE LA LINEA DE INGRESO m3 200.00 25.66
0 04.10.02 DESINFECCION C/EMPLEO DE RESERVORIO CON EQUIPO DE LINE m3 200.00 12.56
0 04.11 SUMINISTRO E INSTALACION DE ACCESORIOS
0 04.11.01 CANASTILLA DE BRONCE DN=110mm und 1.00 360.90
0 04.11.02 UNION FLEXIBLE TIPO DRESSER DE DN=90mm und 1.00 324.32
0 04.11.03 TEE DE PVC PARA RED DE AGUA POTABLE DE 90MM und 1.00 11.28
0 04.11.04 CODO DE PVC PARA RED DE AGUA POTABLE DE 90MM*45º und 1.00 33.50
0 04.11.05 UNION FLEXIBLE TIPO DRESSER DE DN=110mm und 2.00 327.45
0 04.11.06 CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 90mmX90 und 1.00 33.63
0 04.11.07 TEE DE PVC PARA RED DE AGUA POTABLE DE 110MM und 1.00 24.19
0 04.11.08 CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 110mmX9 und 2.00 48.63
0 04.11.09 CODO DE PVC PARA RED AGUA POTABLE DE 110MM*45º und 2.00 25.88
0 04.11.10 TRANSICION Fº Fº AH. DUCTIL und 2.00 153.43
0 04.11.11 BRIDA P/ANCLAJE DE SECCION CUADRADA DN=110mm und 1.00 66.49
0 04.11.12 BRIDA P/ANCLAJE DE SECCION CUADRADA DN=90mm und 1.00 152.45
0 04.11.13 BRIDA P/ANCLAJE DE SECCION CUADRADA DN=75mm und 1.00 152.45
0 04.11.14 BRIDA ROMPE AGUA DN=110MM und 1.00 71.86
0 04.11.15 BRIDA ROMPE AGUA DN=90MM und 1.00 71.86
0 04.11.16 VALVULA COMPUERTA DE BRONCE DN=110mm und 2.00 362.03
0 04.11.17 VALVULA COMPUERTA DE BRONCE DE DN=90mm und 1.00 1,011.79
0 04.11.18 VALVULA DE AIRE DE 1/2" und 1.00 557.45
0 04.12 PISOS Y PAVIMENTOS
0 04.12.01 VEREDAS
0 04.12.01.0 CONCRETO SIMPLE 1:10 CEMENTO-HORMIGON m3 6.10 281.18
0 04.12.01.0 ENCOFRADO Y DESENCOFRADO m2 14.50 42.33
0 04.12.02 GRADAS
0 04.12.02.0 CONCRETO SIMPLE 1:10 CEMENTO-HORMIGON m3 0.18 281.18
0 04.12.02.0 ENCOFRADO Y DESENCOFRADO m2 0.83 42.33
0 04.13 CERCO PERIMETRICO
0 04.13.01 EXCAV. MANUAL EN TERRENO CON BOLONERIA m3 0.86 59.98
0 04.13.02 CONCRETO F'C=140 KG/CM2 m3 0.86 281.64
0 04.13.03 PARANTES DE ROLLIZO (h:2.6M) und 19.00 14.45
0 04.13.04 ALAMBRE DE PUAS m 258.70 2.61
0 04.13.05 PUERTA DE INGRESO und 1.00 1,940.24
0 05 MEJORAMIENTO DE RESERVORIO EXISTENTE (RE-01)
0 05.01 TRABAJOS PRELIMINARES
0 05.01.01 LIMPIEZA DE RESERVORIO m2 200.69 10.64
0 05.02 REVOQUES Y ENLUCIDOS
0 05.02.01 LIMPIEZA Y RETIRO DE TARRAJEO DETERIORADO EN RESERVORI m2 200.69 17.95
0 05.02.02 TARRAJEO CON IMPERMEABILIZANTE 1:2 e=1.5CM EN INTERIORES m2 200.69 31.13
0 05.03 CARPINTERIA METALICA
0 05.03.01 TAPA METALICA DE RESERVORIO S/DISEÑO und 1.00 220.00
0 05.03.02 PUERTA METALICADE PLANCHA LAC 1/16" C/MARCO 2"X2"X1/4" Y und 1.00 1,319.55
0 05.03.03 VENTANA METALICA und 1.00 121.26
0 05.03.04 ESCALIN DE FIERRO CORRUGADO 3/4"@0.30 und 18.00 18.10
0 05.04 PRUEBA HIDRAULICA Y DESINFECCION
0 05.04.01 PRUEBA HIDRAULICA C/EMPLEO DE LA LINEA DE INGRESO m3 250.00 25.66
0 05.04.02 DESINFECCION C/EMPLEO DE RESERVORIO CON EQUIPO DE LINE m3 250.00 12.56
0 05.04.03 EVACUACION AGUA DE PRUEBA C/EMPLEO DE LINEA DE SALIDA m3 250.00 1.92
0 05.05 PINTURA
0 05.05.01 PINTURA EXTERIORES m2 271.06 4.20
0 05.05.02 PINTURA ANTICORROSIVA m2 15.00 15.61
0 05.06 PISOS Y PAVIMENTOS
0 05.06.01 VEREDAS
0 05.06.01.0 CONCRETO SIMPLE 1:10 CEMENTO-HORMIGON m3 7.44 281.18
0 05.06.01.0 ENCOFRADO Y DESENCOFRADO m2 1.00 42.33
0 05.07 CERCO PERIMETRICO
0 05.07.01 EXCAV. MANUAL EN TERRENO CON BOLONERIA m3 0.90 59.98
0 05.07.02 CONCRETO F'C=140 KG/CM2 m3 0.90 281.64
0 05.07.03 PARANTES DE ROLLIZO (h:2.6M) und 20.00 14.45
0 05.07.04 ALAMBRE DE PUAS m 100.00 2.61
0 05.07.05 PUERTA DE INGRESO und 1.00 1,940.24
0 06 LINEA DE ADUCCION Y RED DE DISTRIBUCION (RD-01) desde (RP-01)
0 06.01 TRABAJOS PRELIMINARES
0 06.01.01 TRAZO, NIVELES Y REPLANTEO DE ZANJAS m 5,386.00 0.58
0 06.01.02 TRAZO Y REPLANTEO FINAL DE OBRA m 5,386.00 0.65
0 06.02 MOVIMIENTO DE TIERRAS
0 06.02.01 EXCAVACION C/I(MAQUINAS)TERRENO CON BOLONERIAS P/TUB. m 5,386.00 6.51
0 06.02.02 REFINE Y NIVELACION ZANJA TERR.CON BOLONERIAS m 5,386.00 5.55
0 06.02.03 PREPARACION Y COLOCACION DE CAMA DE APOYO E=0.10M m 5,386.00 1.94
0 06.02.04 PRIMER RELLENO H=0.30M MATERIAL SELECCIONADO A=0.70M m 5,386.00 4.89
0 06.02.05 SEGUNDO RELLENO MATERIAL DE PROPIO A=0.70M @ 0.30 M. HAS m 5,386.00 4.21
0 06.02.06 SEGUNDO RELLENO C/ MATERIAL PRESTAMO A=0.70m HASTA 0.35 ML 5,386.00 4.01
0 06.02.07 ELIMINACION DE MATERIAL EXCEDENTE m3 2,058.53 13.53
0 06.03 ROTURA DE PAVIMENTOS
0 06.03.01 ROTURA DE PAVIMENTOS ML 1,540.00 28.16
0 06.03.02 REPOSICION DE PAVIMENTOS ML 1,540.00 63.55
0 06.04 SUMINISTRO E INSTALACION DE TUBERIAS
0 06.04.01 TUBERIA PVC SAP CLASE 7.5 NORMA ISO 4422 DN=90MM m 4,827.00 13.47
0 06.04.02 TUBERIA PVC SAP CLASE 7.5 NORMA ISO 4422 DN=110MM m 559.00 24.65
0 06.04.03 PRUEBA HIDRAULICA+DESINFECCION TUB. PVC m 5,386.00 0.92
0 06.05 SUMINISTRO E INSTALACION DE ACCESORIOS
0 06.05.01 CODO DE PVC PARA RED DE AGUA POTABLE DE 90MM*22.5º und 7.00 33.50
0 06.05.02 CODO DE PVC PARA RED DE AGUA POTABLE DE 90MM*45º und 2.00 33.50
0 06.05.03 CODO DE PVC PARA RED DE AGUA POTABLE DE 90MM*90º und 9.00 40.90
0 06.05.04 TEE DE PVC PARA RED DE AGUA POTABLE DE 90MM und 43.00 11.28
0 06.05.05 TEE DE PVC PARA RED DE AGUA POTABLE DE 110MM und 14.00 24.19
0 06.05.06 TAPON DE PVC PARA RED AGUA POTABLE TUBERIA DE 90MM und 16.00 20.42
0 06.05.07 REDUCCION DE DN=110 mm a 90 mm" und 14.00 16.45
0 06.05.08 VALVULA COMPUERTA DE BRONCE DE DN=90mm und 18.00 1,011.79
0 06.05.09 VALVULA DE PURGA (INCL. CAJA, ACCESORIOS Y COLOCACION) GLB 16.00 1,011.79
0 06.05.10 MARCO Y TAPA PLANCHA LAC 1/4" C/MECANISM. DE SEG. S/DISEÑ und 34.00 179.03
0 06.05.11 SUMINISTRO DE GRIFO CONTRA INCENDIO-POSTE DE 2 BOCAS. und 13.00 906.53
0 07 LINEA DE ADUCCION Y RED DE DISTRIBUCION (RD-02)
0 07.01 TRABAJOS PRELIMINARES
0 07.01.01 TRAZO, NIVELES Y REPLANTEO DE ZANJAS m 2,822.00 0.58
0 07.01.02 TRAZO Y REPLANTEO FINAL DE OBRA m 2,822.00 0.65
0 07.02 MOVIMIENTO DE TIERRAS
0 07.02.01 EXCAVACION C/I(MAQUINAS)TERRENO CON BOLONERIAS P/TUB. m 2,822.00 6.51
0 07.02.02 REFINE Y NIVELACION ZANJA TERR.NORMAL m 2,822.00 1.52
0 07.02.03 REFINE Y NIVELACION ZANJA TERR.CON BOLONERIAS m 2,822.00 5.55
0 07.02.04 PREPARACION Y COLOCACION DE CAMA DE APOYO E=0.10M m 2,822.00 1.94
0 07.02.05 PRIMER RELLENO H=0.30M MATERIAL SELECCIONADO A=0.70M m 2,822.00 4.89
0 07.02.06 SEGUNDO RELLENO MATERIAL DE PROPIO A=0.70M @ 0.30 M. HAS m 2,822.00 4.21
0 07.02.07 SEGUNDO RELLENO C/ MATERIAL PRESTAMO A=0.70m HASTA 0.35 ML 2,822.00 4.01
0 07.02.08 ELIMINACION DE MATERIAL EXCEDENTE m3 1,078.57 13.53
0 07.03 ROTURA DE PAVIMENTOS
0 07.03.01 ROTURA DE PAVIMENTOS ML 2,144.00 28.16
0 07.03.02 REPOSICION DE PAVIMENTOS ML 2,144.00 63.55
0 07.04 SUMINISTRO E INSTALACION DE TUBERIAS
0 07.04.01 TUBERIA PVC SAP CLASE 7.5 NORMA ISO 4422 DN=90MM m 2,171.00 13.47
0 07.04.02 TUBERIA PVC SAP CLASE 7.5 NORMA ISO 4422 DN=110MM m 651.00 24.65
0 07.04.03 PRUEBA HIDRAULICA+DESINFECCION TUB. PVC m 2,822.00 0.92
0 07.05 SUMINISTRO E INSTALACION DE ACCESORIOS
0 07.05.01 CODO DE PVC PARA RED DE AGUA POTABLE DE 90MM*22.5º und 6.00 33.50
0 07.05.02 CODO DE PVC PARA RED DE AGUA POTABLE DE 90MM*45º und 1.00 33.50
0 07.05.03 CODO DE PVC PARA RED DE AGUA POTABLE DE 90MM*90º und 3.00 40.90
0 07.05.04 CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 110mmX22und 3.00 48.63
0 07.05.05 TEE DE PVC PARA RED DE AGUA POTABLE DE 90MM und 37.00 11.28
0 07.05.06 TEE DE PVC PARA RED DE AGUA POTABLE DE 110MM und 11.00 24.19
0 07.05.07 TAPON DE PVC PARA RED AGUA POTABLE TUBERIA DE 90MM und 11.00 20.42
0 07.05.08 REDUCCION DE DN=110 mm a 90 mm" und 11.00 16.45
0 07.05.09 VALVULA COMPUERTA DE BRONCE DE DN=90mm und 17.00 1,011.79
0 07.05.10 VALVULA DE PURGA (INCL. CAJA, ACCESORIOS Y COLOCACION) GLB 11.00 1,011.79
0 07.05.11 MARCO Y TAPA PLANCHA LAC 1/4" C/MECANISM. DE SEG. S/DISEÑ und 28.00 179.03
0 07.05.12 SUMINISTRO DE GRIFO CONTRA INCENDIO-POSTE DE 2 BOCAS. und 7.00 906.53
0 08 CONEXIONES DOMICILIARIAS
0 08.01 ROTURA DE PAVIMENTOS ML 3,872.00 28.16
0 08.02 ROTURA DE VEREDAS ML 1,161.60 18.63
0 08.03 REPOSICION DE PAVIMENTOS ML 3,872.00 63.55
0 08.04 REPOSICION DE VEREDAS ML 1,161.60 29.17
0 08.05 EXCAVACION C/I(MAQUINAS)TERRENO NORMAL P/TUB. DE AGUA PO m 6,750.00 5.41
0 08.06 CONEXIONES DOMICILIARIAS DE AGUA und 1,125.00 86.62
0 08.07 RELLENO Y COMP.MAT.PROPIO EN ZANJAS m3 3,307.50 14.34
08.08 MEDIDORES DE AGUA und 1,125.00 82.85
0 09 ESTACIONES REDUCTORAS DE PRESION
0 09.01 VALVULA DE REDUCTORA DE PRESION und 6.00 9,962.24
0 09.02 CAMARA P/VALV.PURGA T-NORMAL"C" E.D.CARG+VOL.P/MATRIZ 63- und 6.00 1,993.33
0 09.03 MARCO Y TAPA PLANCHA LAC 1/4" C/MECANISM. DE SEG. S/DISEÑO und 6.00 179.03
0 10 RED COLECTORA DE ALCANTARILLADO Y EMISOR
0 10.01 OBRAS PROVISIONALES
0 10.01.01 TRAZO Y REPLANTEO INICIAL DE OBRA m 11,898.58 0.98
0 10.01.02 TRAZO Y REPLANTEO FINAL DE OBRA m 11,898.58 0.65
0 10.02 MOVIMIENTO DE TIERRAS
0 10.02.01 EXCAVACION MANUAL PARA BUZONES
0 10.02.01.0 EXCAV. MANUAL EN T/CON BOLONERIAS P/BUZONES DE 1.00M-2 m3 182.78 32.62
0 10.02.02 EXCAVACION C/MAQUINARIA PARA ZANJAS
0 10.02.02.0 EXCV. C/MAQUINARIA DE ZANJA PARA TUB. DN=160MM - 200MM ML 10,478.08 8.20
0 10.02.03 EXCAVACION MANUAL DE ZANJAS
0 10.02.03.0 EXCAV. MANUAL DE ZANJAS PARA TUB. DN=160 mm - 200 mm, H ML 1,420.50 50.13
0 10.02.04 REFINE, NIVEL. Y FONDOS P/TUB. PVC
0 10.02.04.0 REFINE, NIVEL. Y FONDOS P/TUB PVC EN TERRENO CON BOLO M 11,898.58 2.19
0 10.02.05 PREPARACION CAMA DE APOYO P/FONDOS TUB.PVC H=0.10M
0 10.02.05.0 PREPARACION Y COLOCACION DE CAMA DE APOYO E=10CM M 11,898.58 3.24
0 10.02.06 RELLENO DE ZANJA
0 10.02.06.0 PRIMER RELLENO H=0.30M MATERIAL SELECCIONADO A=0.70M m 11,898.58 4.89
0 10.02.06.0 SEGUNDO RELLENO MATERIAL DE PROPIO A=0.70M @ 0.30 M. HA m 11,898.58 4.21
0 10.02.06.0 SEGUNDO RELLENO C/ MATERIAL PRESTAMO A=0.70m HASTA 0. ML 11,898.58 4.01
0 10.02.07 ROTURA DE PAVIMENTOS Y VEREDAS
0 10.02.07.0 ROTURA DE PAVIMENTOS ML 4,482.05 28.16
0 10.02.07.0 REPOSICION DE PAVIMENTOS ML 4,482.05 63.55
0 10.02.08 DEMOLICIONES
0 10.02.08.0 DEMOLICION DE BUZON EXISTENTE und 95.00 159.61
0 10.02.09 ELIMINACION DE MATERIAL EXCEDENTE
0 10.02.09.0 ELIMINACION DE MATERIAL EXCEDENTE, DIST. PROM. 2.0 KM, M3 5,146.22 4.67
0 10.02.10 SUMINISTRO E INSTALACION DE TUBERIAS
0 10.02.10.0 SUMINISTRO E INSTALACION DE TUBERIA PVC NORMA ISO 4435 m 9,529.08 25.18
0 10.02.10.0 SUMINISTRO E INSTALACION DE TUBERIA PVC NORMA ISO 4435 m 2,369.50 33.07
0 10.02.10.0 ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO 4435 m 11,898.58 0.52
0 10.02.11 PRUEBA HIDRAULICA
0 10.02.11.0 PRUEBA HIDRAULICA+DESINFECCION TUB. PVC m 11,898.58 1.27
0 10.02.12 CONSTRUCCION DE BUZONES
0 10.02.12.0 SOLADO 4" PARA BUZONES (MEZCLA 1:12 CEMENTO:HORMIGON) M2 299.13 41.19
0 10.02.12.0 CONST. DE BUZON ESTANDAR TIPO I F´C=210KG/CM2, H=1.01M - und 169.00 1,693.50
0 10.02.12.0 DADOS DE CONCRETO F'C = 140 KG/CM2 m3 42.25 260.69
0 10.02.13 CONEXIONES DOMICILIARIAS
0 10.02.13.0 ROTURA DE PAVIMENTOS ML 2,836.00 28.16
0 10.02.13.0 REPOSICION DE PAVIMENTOS ML 2,836.00 63.55
0 10.02.13.0 ROTURA DE VEREDAS ML 850.80 18.63
0 10.02.13.0 REPOSICION DE VEREDAS ML 850.80 29.17
0 10.02.13.0 EXCAVACION C/I(MAQUINAS)TERRENO C/BOLONERIAS P/CONEX m 6,750.00 7.65
0 10.02.13.0 CONEX. DOMICILIARIA DN 160MM ISO 4435 S-20, L=6.00M UND 1,125.00 254.15
0 10.02.13.0 RELLENO Y COMP.MAT.PROPIO EN ZANJAS m3 3,307.50 4.30
0 10.02.14 VARIOS
PRUEBA DE CALIDAD DE CONCRETO (COMPRESION)
0 10.02.14.0 und 21.00 30.00
0 10.02.14.0 DISEÑO DE MEZCLA DE CONCRETO und 25.00 220.00
0 10.02.14.0 PRUEBA DE DENSIDAD CAMPO und 120.00 17.00
0 11 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
0 11.01 CAMARA DE REJAS
0 11.01.01 TRABAJOS PRELIMINARES
0 11.01.01.0 TRAZO Y REPLANTEO m2 7.55 1.37
0 11.01.01.0 LIMPIEZA DE TERRENO MANUAL m2 7.55 0.76
0 11.01.02 MOVIMIENTO DE TIERRAS
0 11.01.02.0 EXCAVACION MASIVA A MAQUINA EN TERRENO C/BOLONERIA m3 5.76 8.52
0 11.01.02.0 REFINE Y NIVELACION Y COMPACTACION m2 7.55 1.33
0 11.01.02.0 ELIMINACION DE MATERIAL EXCEDENTE m3 7.49 5.03
0 11.01.03 CONCRETO SIMPLE
0 11.01.03.0 DADOS DE CONCRETO F'C = 140 KG/CM2 m3 0.14 260.69
0 11.01.04 OBRAS DE CONCRETO ARMADO
0 11.01.04.0 LOSAS
0 11.01.04.0 CONCRETO FC=210 KG/CM2 EN LOSAS m3 1.13 403.20
0 11.01.04.0 ENCOFRADO Y DESENCOFRADO EN LOSAS m2 2.43 25.59
0 11.01.04.0 ACERO FY= 4200 KG/CM2 EN LOSAS kg 121.50 5.83
0 11.01.04.0 MUROS REFORZADOS
0 11.01.04.0 CONCRETO FC=210 KG/CM2 EN MUROS m3 1.82 403.20
0 11.01.04.0 ENCOFRADO Y DESENCOFRADO EN MUROS m2 20.86 28.95
0 11.01.04.0 ACERO FY= 4200 KG/CM2 EN MUROS kg 163.80 5.83
0 11.01.05 REVOQUES Y ENLUCIDOS
0 11.01.05.0 TARRAJEO CON IMPERMEABILIZANTE 1:2 e=1.5CM m2 26.91 21.00
0 11.01.06 EQUIPAMIENTO
0 11.01.06.0 VERTEDERO REGULABLE METALICO und 1.00 127.12
0 11.01.06.0 REJA PARA RETENCION DE SOLIDOS Fº 1/4" C/MARCO L 1/2"x1/2" 1und 1.00 232.80
0 11.01.06.0 LOSA SUMIDERO DE CONCRETO CON ORIFICIOS DE 3/4" und 1.00 106.89
0 11.02 TANQUE IMHOFF
0 11.02.01 TRABAJOS PRELIMINARES
0 11.02.01.0 TRAZO Y REPLANTEO m2 90.71 1.37
0 11.02.01.0 LIMPIEZA DE TERRENO MANUAL m2 90.71 0.76
0 11.02.02 MOVIMIENTO DE TIERRAS
0 11.02.02.0 EXCAVACION MASIVA A MAQUINA EN TERRENO C/BOLONERIA m3 2,015.67 8.52
0 11.02.02.0 REFINE Y NIVELACION Y COMPACTACION m2 128.69 1.33
0 11.02.02.0 RELLENO COMPACATADO PARA ESTRUCTURAS CON MATERIAL m3 975.43 23.81
0 11.02.02.0 ELIMINACION DE MATERIAL EXCEDENTE m3 1,300.31 5.03
0 11.02.03 OBRAS DE CONCRETO SIMPLE
0 11.02.03.0 SOLADO DE E=4" MEZCLA 1:12 (C:H) m2 128.75 35.31
0 11.02.03.0 DADOS DE CONCRETO F'C = 140 KG/CM2 m3 0.80 260.69
0 11.02.04 OBRAS DE CONCRETO ARMADO
0 11.02.04.0 CONCRETO F'C=245 KG/CM2 m3 178.86 462.11
0 11.02.04.0 ENCOFRADO Y DESENCOFRADO m2 909.07 42.33
0 11.02.04.0 ACERO FY= 4200 KG/CM2 kg 12,944.24 6.04
0 11.02.05 CAMARA DE SEDIMENTACION
0 11.02.05.0 CONCRETO F'C=245 KG/CM2 EN CAMARA DE SEDIMENTACION m3 59.37 468.64
0 11.02.05.0 ENCOFRADO Y DESENCOFRADO EN CAMARA DE SEDIMENTACIO m2 426.34 29.73
0 11.02.05.0 ACERO FY= 4200 KG/CM2 EN CAMARA DE SEDIMENTACION kg 5,343.29 5.83
0 11.02.06 REVOQUES Y ENLUCIDOS
0 11.02.06.0 TARRAJEO CON IMPERMEABILIZANTE 1:2 e=1.5CM m2 817.18 21.00
0 11.02.06.0 SOLAQUEADO MEZCLA 1:4 m2 390.84 17.96
0 11.02.07 INSTALACIONES SANITARIAS
0 11.02.07.0 TUBERIA PVC ISO 4435 DN=200mm INCLUIDO ANILLO Y PRUEBA m 47.74 28.26
0 11.02.07.0 UNION CORREDIZA PVC-UF DN=200mm und 8.00 513.82
0 11.02.07.0 ADAPTADOR UF-UR DN=160mm/250mm P/ CANASTILLA DE BRON und 4.00 27.24
0 11.02.07.0 CODO PVC SAL SP 200"X45° und 6.00 32.09
0 11.02.07.0 YEE PVC-SAL DN=200mm und 8.00 56.09
0 11.02.07.0 VALVULA COMPUERTA DE FºFº UF DE DN=200mm und 4.00 696.69
0 11.02.07.0 CANASTILLA DE BRONCE DN=250mm und 4.00 220.98
0 11.02.08 VARIOS
0 11.02.08.0 BAFLE DE MADERA TRATADA e=2" und 4.00 55.35
0 11.02.08.0 WATER STOP DE P.V.C. m 50.53 17.38
0 11.02.08.0 TAPA DE CONCRETO PRE-FABRICADA und 4.00 131.74
0 11.03 FILTRO BIOLOGICO
0 11.03.01 TRABAJOS PRELIMINARES
0 11.03.01.0 TRAZO Y REPLANTEO m2 54.88 1.37
0 11.03.01.0 LIMPIEZA DE TERRENO MANUAL m2 54.88 0.76
0 11.03.02 MOVIMIENTO DE TIERRAS
0 11.03.02.0 EXCAVACION MASIVA A MAQUINA EN TERRENO C/BOLONERIA m3 256.29 8.52
0 11.03.02.0 REFINE Y NIVELACION Y COMPACTACION m2 54.88 0.79
0 11.03.02.0 RELLENO COMPACATADO PARA ESTRUCTURAS CON MATERIAL m3 13.80 23.81
0 11.03.02.0 ELIMINACION DE MATERILA EXCEDENTE m3 157.64 5.03
0 11.03.03 OBRAS DE CONCRETO SIMPLE
0 11.03.03.0 SOLADO DE E=4" MEZCLA 1:12 (C:H) m2 50.40 44.56
0 11.03.03.0 DADOS DE CONCRETO F'C = 140 KG/CM2 m3 3.33 260.69
0 11.03.04 OBRAS DE CONCRETO ARMADO
0 11.03.04.0 CONCRETO F'C=245 KG/CM2 m3 33.24 462.11
0 11.03.04.0 ENCOFRADO Y DESENCOFRADO m2 238.39 42.33
0 11.03.04.0 ACERO FY= 4200 KG/CM2 kg 2,326.80 6.04
0 11.03.05 REVOQUES Y ENLUCIDOS
0 11.03.05.0 TARRAJEO CON IMPERMEABILIZANTE 1:2 e=1.5CM m2 104.84 21.00
0 11.03.06 INSTALACIONES SANITARIAS
0 11.03.06.0 TUBERIA PVC ISO 4435 DN=100mm INCLUIDO ANILLO Y PRUEBA m 42.70 19.02
0 11.03.06.0 TUBERIA PVC ISO 4435 DN=160mm INCLUIDO ANILLO Y PRUEBA m 111.55 20.22
0 11.03.06.0 CODO PVC SAL SP 110"X90° und 28.00 39.87
0 11.03.06.0 CODO PVC SAL SP 160"X90° und 3.00 26.84
0 11.03.06.0 TEE PVC-SAL SP DE 110mm x 160mm und 14.00 73.52
0 11.03.06.0 TEE PVC-SAL SP DE 160mm x 160mm und 6.00 73.52
0 11.03.06.0 TAPON DE PVC UF ISO 4435 DN=160mm und 14.00 49.41
0 11.03.06.0 UNION CORREDIZA PVC-UF DN=160mm und 23.00 32.70
0 11.03.06.0 CRUZ PVC-SAL SP DE 160mm x 160mm und 1.00 133.36
0 11.03.06.1 VALVULA COMPUERTA DE FºFº UF DE DN=200mm und 1.00 696.69
0 11.03.06.1 VERTEDERO REGULABLE METALICO und 1.00 127.12
0 11.03.07 FILTROS
0 11.03.07.0 FILTROS DE GRAVA ZARANDEADA Ø = 1/8" a 1/4" m3 40.18 125.52
0 11.03.07.0 FILTROS DE GRAVA ZARANDEADA Ø=1/2" a 3/4" m3 26.78 125.52
0 11.03.07.0 FILTROS DE GRAVA ZARANDEADA Ø=1" a 1 1/2" m3 10.04 125.52
0 11.03.07.0 FILTROS DE GRAVA ZARANDEADA Ø=2" - 2 1/2" m3 11.38 125.52
0 11.03.08 VARIOS
0 11.03.08.0 WATER STOP DE P.V.C. m 49.60 17.38
0 11.04 LECHO DE SECADOS
0 11.04.01 TRABAJOS PRELIMINARES
0 11.04.01.0 TRAZO Y REPLANTEO m2 610.09 1.37
0 11.04.01.0 LIMPIEZA DE TERRENO MANUAL m2 610.09 0.76
0 11.04.02 MOVIMIENTO DE TIERRAS
0 11.04.02.0 EXCAVACION MASIVA A MAQUINA EN TERRENO C/BOLONERIA m3 1,537.43 8.52
0 11.04.02.0 REFINE Y NIVELACION Y COMPACTACION m2 610.09 1.33
0 11.04.02.0 ELIMINACION DE MATERIAL EXCEDENTE m3 1,998.66 5.03
0 11.04.03 CONCRETO SIMPLE
0 11.04.03.0 SOLADO DE E=4" MEZCLA 1:12 (C:H) m2 165.08 35.31
0 11.04.03.0 DADOS DE CONCRETO F'C = 140 KG/CM2 m3 352.69 260.69
0 11.04.04 OBRAS DE CONCRETO ARMADO
0 11.04.04.0 ZAPATAS
0 11.04.04.0 CONCRETO FC=210 KG/CM2 EN ZAPATAS m3 4.32 403.20
0 11.04.04.0 ACERO FY= 4200 KG/CM2 EN ZAPATAS kg 388.80 5.83
0 11.04.04.0 COLUMNAS
0 11.04.04.0 CONCRETO F'C=210 KG/CM2 EN COLUMNAS m3 6.80 403.20
0 11.04.04.0 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 74.34 34.51
0 11.04.04.0 ACERO FY= 4200 KG/CM2 EN COLUMNAS kg 612.00 5.83
0 11.04.04.0 CANALETAS
0 11.04.04.0 CONCRETO F'C=245 KG/CM2 EN CANALETAS m3 5.38 462.11
0 11.04.04.0 ENCOFRADO Y DESENCOFRADO EN CANALETAS m2 107.64 33.28
0 11.04.04.0 ACERO FY= 4200 KG/CM2 EN CANALETAS kg 484.20 5.83
0 11.04.04.0 LOSA PRE FABRICADAS EN CANALETAS und 40.93 60.63
0 11.04.04.0 LOSA SALPICADOR
0 11.04.04.0 CONCRETO F'C=245 KG/CM2 EN LOSA SALPICADOR m3 1.15 403.20
0 11.04.04.0 ENCOFRADO Y DESENCOFRADO EN LOSA SALPICADOR m2 21.12 33.28
0 11.04.04.0 ACERO FY= 4200 KG/CM2 EN LOSA SALPICADORA kg 103.50 5.83
0 11.04.04.0 APOYOS
0 11.04.04.0 CONCRETO F'C=210 KG/CM2 EN APOYOS m3 0.79 462.11
0 11.04.04.0 ENCOFRADO Y DESENCOFRADO EN APOYOS m2 1.87 33.28
0 11.04.04.0 ACERO FY= 4200 KG/CM2 EN APOYOS kg 71.10 5.83
0 11.04.04.0 MUROS REFORZADOS
0 11.04.04.0 CONCRETO F'C=245 KG/CM2 EN MUROS REFORZADOS m3 73.50 468.64
0 11.04.04.0 ENCOFRADO Y DESENCOFRADO EN MUROS REFORZADOS m2 944.00 33.28
0 11.04.04.0 ACERO FY= 4200 KG/CM2 EN MUROS REFORZADOS kg 6,615.00 5.83
0 11.04.04.0 VIGAS
0 11.04.04.0 CONCRETO F'C=210 KG/CM2 EN VIGAS m3 7.02 462.11
0 11.04.04.0 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 98.28 33.28
0 11.04.04.0 ACERO FY= 4200 KG/CM2 EN VIGAS kg 631.80 5.83
0 11.04.05 REVOQUES Y ENLUCIDOS
0 11.04.05.0 TARRAJEO CON IMPERMEABILIZANTE - COLUMNAS 1:2 e=1.5CM m2 74.34 21.00
0 11.04.05.0 TARRAJEO CON IMPERMEABILIZANTE - VIGAS 1:2 e=1.5CM m2 126.36 21.00
0 11.04.05.0 TARRAJEO CON IMPERMEABILIZANTE - LOSA SALPICADOR 1:2 e= m2 21.50 21.00
0 11.04.05.0 TARRAJEO CON IMPERMEABILIZANTE - APOYOS 1:2 e=1.5CM m2 1.87 21.00
0 11.04.05.0 TARRAJEO CON IMPERMEABILIZANTE - MUROS 1:2 e=1.5CM m2 632.14 21.00
0 11.04.06 ESTRUCTURA DE MADERA
0 11.04.06.0 LISTONES DE MADERA DE 4"x2" m 301.18 33.70
0 11.04.06.0 LISTONES DE MADERA DE 5"x2" m 511.40 39.20
0 11.04.06.0 CORREAS Y TIRANTES DE MADERA m 1,431.60 17.58
0 11.04.07 COBERTURAS
0 11.04.07.0 COBERTURA DE CALAMINA m2 690.66 35.86
0 11.04.08 INSTALACIONES SANITARIAS
0 11.04.08.0 TUBERIA PVC ISO 4435 DN=250mm INCLUIDO ANILLO m 150.56 38.17
0 11.04.08.0 CODO PVC 250MMX90° und 40.00 50.75
0 11.04.08.0 TEE PVC-SAP 250MMx250MM und 20.00 54.47
0 11.04.09 FILTROS
0 11.04.09.0 FILTROS DE GRAVA GRUESA m3 140.40 97.81
0 11.04.09.0 FILTROS DE ARENA m3 155.85 132.11
0 11.04.09.0 ARCILLA EN FONDO DE LECHO m3 60.84 200.66
0 11.05 LAGUNA DE ESTABILIZACION SECUNDARIA
0 11.05.01 OBRAS PRELIMINARES
0 11.05.01.0 LIMPIEZA DE TERRENO MANUAL m2 3,100.00 0.76
0 11.05.02 TRABAJOS PRELIMINARES
0 11.05.02.0 TRAZO Y REPLANTEO PRELIMINAR m2 3,100.00 0.61
0 11.05.02.0 TRAZO Y REPLANTEO DURANTE LA EJECUCION m2 3,100.00 0.66
0 11.05.03 LAGUNAS FACULTATIVAS
0 11.05.03.0 EXCAVACION MASIVA A MAQUINA EN TERRENO C/BOLONERIA m3 12,615.46 8.52
0 11.05.03.0 REFINE DE TALUD Y FONDO DE LAGUNA DE ESTABILIZACION m2 2,684.41 0.90
0 11.05.03.0 IMPERMEABILIZACION CON ARCILLA EN TALUD Y FONDO DE LAG m2 2,684.41 48.93
0 11.05.03.0 REVESTIMIENTO Y PROTECCION DE TALUDES (EMBOQUILLADO m2 74.88 25.94
0 11.05.03.0 ACOMODO DE MATERIAL EXCEDENTE m3 8,200.00 1.59
0 11.05.04 CONCRETO SIMPLE
0 11.05.04.0 DADOS DE CONCRETO F'C = 140 KG/CM2 m3 0.85 260.69
0 11.05.05 CAMARAS Y CAJAS EN LAGUNAS DE ESTABILIZACION
0 11.05.05.0 CAMARA DE DISTRIBUCION DE CAUDAL und 1.00 1,200.00
0 11.05.05.0 CAMARA DE REUNION und 1.00 1,200.00
0 11.06 REDES EXTERIORES DE DESAGUE
0 11.06.01 TRABAJOS PRELIMINARES
0 11.06.01.0 TRAZO Y REPLANTEO DURANTE LA OBRA m 48.60 0.89
0 11.06.02 MOVIMIENTO DE TIERRAS
0 11.06.02.0 EXCAVACION MANUAL PARA BUZONES
0 11.06.02.0 EXCAV. MANUAL EN T/CON BOLONERIAS P/BUZONES DE 1.00M- m3 12.20 32.62
0 11.06.02.0 EXCAVACION C/MAQUINARIA PARA ZANJAS
0 11.06.02.0 EXCAV. MANUAL DE ZANJAS PARA TUB. DN=110 mm - 200 mm, ML 18.20 34.85
0 11.06.02.0 REFINE, NIVEL. Y FONDOS P/TUB. PVC
0 11.06.02.0 REFINE Y NIVELACION ZANJA TERR.CON BOLONERIAS m 18.20 5.55
0 11.06.02.0 PREPARACION CAMA DE APOYO P/FONDOS TUB.PVC H=0.10M
0 11.06.02.0 PREPARACION Y COLOCACION DE CAMA DE APOYO E=10CM M 18.20 3.24
0 11.06.02.0 RELLENO DE ZANJA
0 11.06.02.0 PRIMER RELLENO H=0.30M MATERIAL SELECCIONADO A=0.70M m 18.20 4.89
0 11.06.02.0 SEGUNDO RELLENO MATERIAL DE PROPIO A=0.70M @ 0.30 M. Z m 18.20 2.79
0 11.06.02.0 ELIMINACION DE MATERIAL EXCEDENTE
0 11.06.02.0 ELIMINACION DEL MATERIAL EXCEDENTE CON EQUIPO m3 12.20 4.67
0 11.06.03 SUMINISTRO E INSTALACION DE TUBERIAS
0 11.06.03.0 SUMINISTRO E INSTALACION DE TUBERIA PVC NORMA ISO 4435 m 18.20 25.18
0 11.06.03.0 ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO 4435 m 18.20 0.52
0 11.06.04 CONSTRUCCION DE BUZONES
0 11.06.04.0 SOLADO 4" PARA BUZONES (MEZCLA 1:12 CEMENTO:HORMIGON) M2 10.17 41.19
0 11.06.04.0 CONST. DE BUZON ESTANDAR TIPO I F´C=175KG/CM2, H=0.80M - und 9.00 1,483.55
0 11.06.04.0 DADOS DE CONCRETO F'C = 140 KG/CM2 ING/SAL. BUZÓN m3 0.49 268.84
0 11.07 CERCO PERIMETRICO
0 11.07.01 TRAZO Y REPLANTEO INICIAL DE OBRA m 76.50 0.98
0 11.07.02 EXCAVACION MANUAL PARA CIMENTACIONES DE PARANTE m3 0.77 33.14
0 11.07.03 CONCRETO F'C=140 KG/CM2 m3 0.77 281.64
0 11.07.04 PARANTES DE ROLLIZO (h:2.6M) und 12.00 14.45
0 11.07.05 ALAMBRE DE PUAS m 387.00 2.61
0 11.07.06 PUERTA DE INGRESO und 1.00 1,940.24
0 11.08 PLAN DE MANEJO AMBIENTAL
0 11.08.01 EXCAVACION MANUAL DE HOYOS 0.60X0.60X0.60M und 5.00 9.94
0 11.08.02 SUMINISTRO Y COLOCACION DE PLANTON EUCALIPTO und 25.00 23.68
Parcial (S/.)
39,788.97
2,800.00
4,500.00
1,400.00
7,500.00
14,500.00
9,088.97
67,939.31
48,560.75
165.64
39.71
82.56
43.37
3,685.45
2,343.00
1,174.41
168.04
600.65
582.40
18.25
25,951.69
11,405.20
6,694.49
7,852.00
5,229.80
3,173.70
2,056.10
6,781.13
906.99
1,201.58
209.86
590.68
788.94
511.80
721.80
654.90
634.46
4.26
555.86
6,146.39
556.70
5,378.53
68.28
142.88
19,378.56
14.74
3.53
7.35
3.86
2,122.61
1,610.28
431.26
81.07
85.42
80.21
5.21
9,207.83
3,540.44
1,224.18
4,443.21
383.52
383.52
6,617.95
1,007.64
2,132.31
209.86
1,181.36
511.80
390.90
230.45
377.23
20.54
555.86
946.49
305.01
80.53
278.35
68.28
214.32
701,133.51
459,790.66
4,975.42
2,821.88
2,153.54
181,869.18
111,973.05
17,832.15
6,233.22
15,711.57
13,526.73
12,884.13
3,708.33
223,292.55
122,565.00
100,727.55
3,647.25
1,361.64
1,361.64
875.34
48.63
20,205.28
15,946.64
4,258.64
14,631.00
9,966.65
4,664.35
4,751.32
3,986.66
764.66
2,685.45
2,685.45
317.25
317.25
3,415.96
3,415.96
241,342.85
1,865.28
1,057.92
807.36
76,946.89
54,741.96
6,060.60
2,118.48
5,339.88
3,046.68
4,378.92
1,260.37
145,175.16
84,045.00
61,130.16
1,944.60
388.92
648.20
907.48
2,525.66
1,993.33
532.33
5,852.40
3,986.66
1,865.74
4,751.32
3,986.66
764.66
895.15
895.15
105.75
105.75
1,280.64
1,280.64
143,359.50
585.21
112.31
233.49
116.75
122.66
15,723.17
11,443.58
34.59
562.80
3,682.20
3,712.74
3,712.74
80,271.27
10,718.16
6,038.55
4,679.61
15,820.75
8,971.69
6,849.06
9,986.32
219.66
3,097.29
6,669.37
39,321.87
12,270.93
8,038.89
19,012.05
4,200.81
1,550.56
934.65
1,715.60
223.36
86.14
47.83
89.39
8,583.77
2,149.45
881.12
1,268.33
479.83
167.43
312.40
1,065.30
323.03
320.01
422.26
960.51
305.80
176.52
478.19
1,201.72
366.10
255.90
411.45
168.27
1,994.97
1,994.97
731.99
323.98
408.01
11,695.78
784.95
7,994.57
2,916.26
2,079.03
220.00
92.42
1,319.55
121.26
325.80
1,060.29
826.14
234.15
1,698.71
1,293.86
300.00
104.85
7,644.00
5,132.00
2,512.00
4,707.01
360.90
324.32
11.28
33.50
654.90
33.63
24.19
97.26
51.76
306.86
66.49
152.45
152.45
71.86
71.86
724.06
1,011.79
557.45
2,414.73
2,328.99
1,715.20
613.79
85.74
50.61
35.13
3,183.79
51.58
242.21
274.55
675.21
1,940.24
30,311.43
2,135.34
2,135.34
9,849.87
3,602.39
6,247.48
1,986.61
220.00
1,319.55
121.26
325.80
10,035.00
6,415.00
3,140.00
480.00
1,372.60
1,138.45
234.15
2,134.31
2,134.31
2,091.98
42.33
2,797.70
53.98
253.48
289.00
261.00
1,940.24
459,801.80
6,624.78
3,123.88
3,500.90
173,866.37
35,062.86
29,892.30
10,448.84
26,337.54
22,675.06
21,597.86
27,851.91
141,233.40
43,366.40
97,867.00
83,754.16
65,019.69
13,779.35
4,955.12
54,323.09
234.50
67.00
368.10
485.04
338.66
326.72
230.30
18,212.22
16,188.64
6,087.02
11,784.89
384,651.75
3,471.06
1,636.76
1,834.30
95,386.91
18,371.22
4,289.44
15,662.10
5,474.68
13,799.58
11,880.62
11,316.22
14,593.05
196,626.24
60,375.04
136,251.20
47,886.76
29,243.37
16,047.15
2,596.24
41,280.78
201.00
33.50
122.70
145.89
417.36
266.09
224.62
180.95
17,200.43
11,129.69
5,012.84
6,345.71
592,020.15
109,035.52
21,640.61
246,065.60
33,883.87
36,517.50
97,447.50
47,429.55
93,206.25
72,807.60
59,773.44
11,959.98
1,074.18
2,163,174.36
19,394.69
11,660.61
7,734.08
2,143,779.67
5,962.28
5,962.28
85,920.26
85,920.26
71,209.67
71,209.67
26,057.89
26,057.89
38,551.40
38,551.40
155,990.39
58,184.06
50,093.02
47,713.31
411,048.81
126,214.53
284,834.28
15,162.95
15,162.95
24,032.85
24,032.85
324,488.86
239,942.23
78,359.37
6,187.26
15,111.20
15,111.20
309,536.81
12,321.16
286,201.50
11,014.15
652,536.30
79,861.76
180,227.80
15,850.40
24,817.84
51,637.50
285,918.75
14,222.25
8,170.00
630.00
5,500.00
2,040.00
1,134,854.54
4,700.11
16.08
10.34
5.74
96.79
49.08
10.04
37.67
36.50
36.50
3,518.82
1,226.15
455.62
62.18
708.35
2,292.67
733.82
603.90
954.95
565.11
565.11
466.81
127.12
232.80
106.89
358,712.33
193.21
124.27
68.94
47,110.22
17,173.51
171.16
23,224.99
6,540.56
4,754.71
4,546.16
208.55
199,317.13
82,652.99
38,480.93
78,183.21
71,649.63
27,823.16
12,675.09
31,151.38
24,180.27
17,160.78
7,019.49
9,880.59
1,349.13
4,110.56
108.96
192.54
448.72
2,786.76
883.92
1,626.57
221.40
878.21
526.96
68,377.87
116.90
75.19
41.71
3,348.46
2,183.59
43.36
328.58
792.93
3,113.92
2,245.82
868.10
39,505.46
15,360.54
10,091.05
14,053.87
2,201.64
2,201.64
8,135.98
812.15
2,255.54
1,116.36
80.52
1,029.28
441.12
691.74
752.10
133.36
696.69
127.12
11,093.46
5,043.39
3,361.43
1,260.22
1,428.42
862.05
862.05
418,036.09
1,299.49
835.82
463.67
23,963.58
13,098.90
811.42
10,053.26
97,771.73
5,828.97
91,942.76
141,493.34
4,008.52
1,741.82
2,266.70
8,875.19
2,741.76
2,565.47
3,567.96
11,372.89
2,486.15
3,582.26
2,822.89
2,481.59
1,769.96
463.68
702.87
603.41
841.81
365.07
62.23
414.51
104,426.81
34,445.04
31,416.32
38,565.45
10,198.16
3,244.01
3,270.76
3,683.39
17,980.41
1,561.14
2,653.56
451.50
39.27
13,274.94
55,364.18
10,149.77
20,046.88
25,167.53
24,767.07
24,767.07
8,866.28
5,746.88
2,030.00
1,089.40
46,530.01
13,732.52
20,589.34
12,208.15
265,142.85
2,356.00
2,356.00
3,937.00
1,891.00
2,046.00
256,228.26
107,483.72
2,415.97
131,348.18
1,942.39
13,038.00
221.59
221.59
2,400.00
1,200.00
1,200.00
15,802.53
43.25
43.25
1,388.96
397.96
397.96
634.27
634.27
101.01
101.01
58.97
58.97
139.78
89.00
50.78
56.97
56.97
467.74
458.28
9.46
13,902.58
418.90
13,351.95
131.73
3,441.06
74.97
25.52
216.86
173.40
1,010.07
1,940.24
641.70
49.70
592.00
RESUMEN PRESUPUESTO
ITEM DESCRIPCION DE COMPONENTES PRECIO UNITARIO METRADO COSTO PARCIAL
SISTEMA DE AGUA POTABLE
01 OBRAS PROVISIONALES 39,788.97 1.00 39,788.97
02 CAPTACION DE MANANTIAL 67,939.31 1.00 67,939.31
03 LINEA DE CONDUCCION 701,133.51 1.00 701,133.51
04 RESERVORIO PROYECTADO DE 200M3 (RP-01) 143,359.50 1.00 143,359.50
05 MEJORAMIENTO DE RESERVORIO EXISTENTE (RE-01) 30,311.43 1.00 30,311.43
06 LINEA DE ADUCCION Y RED DE DISTRIBUCION (RD-01) desde (RP-01) 459,801.80 1.00 459,801.80
07 LINEA DE ADUCCION Y RED DE DISTRIBUCION (RD-02) 384,651.75 1.00 384,651.75
08 CONEXIONES DOMICILIARIAS 685,226.40 1.00 685,226.40
09 ESTACIONES REDUCTORAS DE PRESION 72,807.60 1.00 72,807.60
SISTEMA DE ALCANTARILLADO SANITARIO
10 RED COLECTORA DE ALCANTARILLADO Y EMISOR 2,163,174.36 1.00 2,163,174.36
11 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES 1,134,854.54 1.00 1,134,854.54

COSTO DIRECTO 5,883,049.17


GASTOS GENERALES (10%) 588,304.92
UTILIDAD (5%) 294,152.46
EXPEDIENTE TECNICO (2%) 117,660.98
SUPERVISION DE OBRA (5%) 294,152.46
LIQUIDACION DE OBRA (1%) 58,830.49
SUB_TOTAL 7,236,150.48
IMPUESTO IGV (18%) 1,302,507.09
PRESUPUESTO TOTAL 8,538,657.57
2,585,020.27 0.84 2171417.027

3,298,028.90
COSTOS DE OPERACIÓN Y MANTENIMIENTO ANUALES A PRECIOS PRIVADOS - SITUACION " CON PROYECTO"
POR PRINCIPALES COMPONENTES DEL SISTEMA DE AGUA POTABLE
LOCALIDAD "CASCAS"
REDES CONEXIONES
Detalle Unid TOTAL AP
Total Total
COSTOS DE OPERACIÓN
Costos de Operación Fijos 733 - 733
Mano de obra calificada 733 - 733
Jefe de Turno Ing. Sanitario
Jefe de Operaciones Ing Quimico
Dosificadores Tècnicos
Operador de filtros/Bomba tècnicos
Operador de valvulas
Jefe Laboratorio Ing Quimico
Microbiologo Microbiologos
Analistas Ing Quimicos
Operador Sistema Scada Ing. Sanitario
Supervisor Ingeniero
Mano de obra no calificada - -
Chofer Auxiliar
Costos de Operación Variables 2,400 - 2,400
Insumos - -
Sulfato de alumina grado B (Trans) Kilogramos
Cal hidratada (Trans) Kilogramos
Hipoclorito de Calcio (Trans) Kilogramos
Polielectrolitos (Trans) Kilogramos
Cloro gaseoso ( Trans) Kilogramos
Reactivos quimicos laboratorio ( Trans) Kilogramos
Materiales
Lubricantes Glob - -
Energía Eleéctrica Glob - -
Mantenimiento de camioneta Glob 2,400 - 2,400
Combustible Glob - -
COSTOS DE MANTENIMIENTO
Costos de Mantenimeinto Fijos - -
Mano de obra calificada - -
Electricos Tecnico
Electromecánico Ingeniero
Mecanicos tecnico
Mano de obra no calificada - -
Mantenimiento de local Auxiliar
Costos de mantenimiento variables - 0
Repuestos Electromecanicos Glob
Limpieza Glob
Mantenimiento de lineas electricas/valvulas Glob
Mantenimiento de jardines Glob
Mantenim de Conex ( Servis) Glob 0

ADMINISTRACION
Costos de Administración Fijos 110 0 110
Planilla Global 110 0 110
Servicios
Costos de Administración Variables - -
Mantto. Catastral
Facturación y Emisión
Distribución CP
Cobranza CP
Lectura Medidor
Total Costos Fijos de O y M 842.91 0.10 843.01
Total Costos Variables Operacionales 2,400.00 - 2,400.00
Total Costos variables Comerciales -
Costo Anual de Operación y Mantenimiento 3,242.91 0.10 3,243.01
Costo Var. de Producción por m3 de agua 0.01 - 0.01
Costo Var.total por m3 de agua ( operac +com) -
Costo de O y M Total por m3 de agua 0.09 0.00 0.09
M3 Agua de Producción/Año 236,738.54 236,738.54 236,738.54
Qp(l/s)
conex

CUADRO No.3.5.11 ALTERNATIVA 1


RESUMEN DE GASTOS DE OPERACIÓN Y MANTENIMIENTO DE AGUA POTABLE POR COMPONENTES PRECIOS PRIVADOS- AÑO 1

DETALLE TOTAL

Mano de Obra Calificada 842.91 0.10 843.01


Mano de Obra No calificada 0.00 0.00 0.00
Bienes Transables 0.00 0.00 0.00
Bienes No transables 2,400.00 0.07 2,400.07
Combustibles 0.00 0.00 0.00
Total Costos de OyP a PP "Con Proyecto" 3,242.91 0.17 3,243.08

CONVERSION A PRECIOS SOCIALES

DETALLE FC TOTAL
Mano de Obra Calificada 0.91 766.21 0.09 766.30
Mano de Obra No calificada 0.68 0.00 0.00 0.00
Bienes Transables 0.86 0.00 0.00 0.00
Bienes No transables 0.84 2016.00 0.06 2016.06
Combustibles 0.66 0.00 0.00 0.00
Total Costos de OyP a Ps "Con Proyecto" 2782.21 0.15 2782.36

Factor de Corección Ponderado de CF 0.91 0.91 0.91


Factor de Corección Ponderado de CV 0.84

G. Variables de Prod. a precios Privados 2400.00 0.07 9059.96


0.26 0.00 1.00
Costo Adm anual estimado para el proyecto 5298.00 0.00 20000.00
COSTOS DE OPERACIÓN Y MANT. ANUALES A PRECIOS PRIVADOS - SITUACION "CON PROYECTO"
COMPONENTES DEL SISTEMA DE ALCANTARILLADO
LOCALIDAD "CASCAS"
COLECTORES CONEXIONES
DETALLE UND TOTAL ALC
Total Total
COSTODE OPERACIÓN
Costos de Operación Fijos
Mano de obra calificada
Mano de obra no calificada
Costos de Operación Variables
Insumos

COSTO DE MANTENIMIENTO
Costos de Mantenimiento Fijos 2,409 - 2,409
Mano de obra calificada 2,409 - 2,409
Operario Tecnico

Mano de obra no calificada - - 0


Ayudantes Auxiliar
Chofer Auxiliar
Costos de mantenimiento variables 10,118 925 11042
Varillas Glob 1237.5
Limpieza c/máquina de baldes Glob 4500
Repuestos Glob 3000
Materiales Glob 1080
Waipe Glob 150
Mantenimiento de conexiones (Servis) Glob 925
Grasa Glob 150

ADMINISTRACION
Costos de Administración Fijos 361 - 361
Planilla Global 361 - 361.35
Servicios
Costos de Administración Variables

Total Costos Fijos de O y M 2,770 - 2,770


Total Costos Variables de O y M 10,118 925 11,042
Costo Anual de Operación y Mantenimiento 12,888 925 13,813
Costo de O y M Variable por M3 evacuado 0.06678 0.00610 0.07288
Costo de O y M Total por M3 evacuado 0.08506 0.00610 0.09116
M3 EVACUADOS VLR 151,513 151,513 151,513

CUADRO No.3.5.12 ALTERNATIVA 1


RESUMEN DE GASTOS DE OPERACIÓN Y MANTENIMIENTO DE ALCANTARILLADO- PRECIOS PRIVADOS AÑO 1

DETALLE TOTAL

Mano de Obra Calificada 2,770.35 0.00 2,770.35


Mano de Obra No calificada 0.00 0.00 0.00
Bienes Transables 0.00 0.00 0.00
Bienes No transables 10,117.50 924.70 11,042.20
Combustibles 0.00 0.00 0.00
Total Costos de OyP a PP "Con Proyecto" 12,887.85 924.70 13,812.55
CONVERSION A PRECIOS SOCIALES

DETALLE FC TOTAL
Mano de Obra Calificada 0.909 2,518.25 0.00 2,518.25
Mano de Obra No calificada 0.680 0.00 0.00 0.00
Bienes Transables 0.860 0.00 0.00 0.00
Bienes No transables 0.840 8,498.70 776.75 9,275.45
Combustibles 0.660 0.00 0.00 0.00
Total Costos de OyP a Ps "Con Proyecto" 11,016.95 776.75 11,793.70

Factor de Corección Ponderado de CF 0.91 0.91 0.91


Factor de Corección Ponderado de CV 0.84 0.84 0.84
Resumen de Costos de Operación y Mantenimiento de Agua Potable a Precios Privados- Año 1

Detalle Líneas Cámaras Reservorios


Costos Fijos
Mano de Obra Calificada 1,873 820 1,686
Mano de Obra No calificada - - -
Total Costos Fijos 1,873 820 1,686
Gasto variable
Total
Producción en M3
Costo variable Unitario por m3 producido

Factor de corrección Ponderado CF 0.909 0.909 0.909


Factor de corrección Ponderado CV

Resumen de Costos de Operación y Mantenimiento de Alcantarillado a Precios Privados- Año 1

Detalle Colectores Conexiones Total


Costos Fijos
Mano de Obra Calificada 2,770 - 2,770
Mano de Obra No calificada - - -
Total Costos Fijos 2,770 - 2,770
Gasto variable 10,118 925 11,042
Total 12,888 925 13,813
Producción en M3 ( evacuado) 151,513 151,513
Costo variable Unitario por m3 0.06678 0.00610

Factor de corrección Ponderado CF 0.9090 0.9090


Factor de corrección Ponderado CV 0.8400 0.8400 0.84000
Redes Conexiones Total

843 0 5,222
- - -
843 0 5,222
15,398.2
20,620.5
35,186.0
0.4

0.909 0.909
0.84