PLANT & DESIGN-BUILD CONTRACT FOR CIVIL AND M&E WORKS OF

DEDURUOYA WATER SUPPLY PROJECT

CONTRACT NO-P&D/DOWSP/EDCF/W/DB/2014/01

SUBJECT: Request puddle Pipe for Reservoir and Yard Pipes under Sludge Thickener

This refers to your letter no: Deduru-NWS&DB-303 and dated on 01st August 2018 regarding
above captioned subject. Please attend the below comments before start the welding work

 Need manufacture recommendation for the welding work


 Need method statement for welding and including all details as per ERQ
 The welder need valid welding certificate for pipe welding
 Need Pressure testing method for flange and plain ended pipe
 Need method statement for check the welded fuddle strength
 There should be a method to assure that we receive the same pipe we accept during the
inspection
 Welding should be carried out under NWS & DB engineer supervision
 Welding joint need to be checked according to ERQ
 Welded joint shall receive Field applied cement motor lining accordance AWWA C602
 Pipe need to be pressure tested