Sierra Gorda Background
• 55% KGHM Polska Miedz S.A.
• 45% Sumitomo
• Operated by KGHM International
• Mine pre-stripping started in Mar 2013
• Rarely does one mine become the game
changer for an entire industry. Sierra Gorda is
that once-in-a century supply source that will
redefine the molybdenum industry
• Now under construction and scheduled for
production in 2014
Concentrator Plant OpEx Model
“Show the world how it can be done”
”
Consistent and Sustainable Results
Gradual and Progressive Change
Process
Accountability
Strategic
Management
Discipline &
Performance
Standard
Problem
Process
Solving
Deployment
Visual
Management
Driven Results
through the
Teamwork
Zero Harm
Work Teams
Courage
Success
• Kaizen Excellence
• Operational Process
Reliability
Deployment
Strategic Basis
Aggressive Grown Technical Capacity Take Risks
(Technical, instead Political)
Value Definition
Sale Price – Cost = Profit
External Forces
Value Added Activities No Value Added Activities
Essentials No Essentials
Copper
Molybdenum
Energy
Reduce Variability Reduce Eliminate
Diesel
Eliminate Waste
Material Raw
Identify Std. Practices
Etc.
Simplify the Process
Define Scope
Sierra Gorda VSM Methodology
Team Training on
& Cross-Funcional Change Needs based Lean Mining & VSM
Mgmt. Team Foundation on Market Treaths Methodology
Approval
Develop Material
Flow Mapping
VSM
Gap Analysis &
Conclusions & Estado Future
Opportunities Finantial Analysis Recommendations & Value Chain
Identification
Alignment
Concentrator Plant VSM Scope
• Identify bottlenecks and action plan to guarantee the Ramp-
Up will be achieved successfully
• Define an integrated action plan from Mine-to-Market, and
supporting areas to ensure the 2 year production budget is
achieved with minimal variation
• Increase grinding performance / average throughput from 110
to 115 ktpd
Stochastic Simulations
ROM Fragmentation Improvement
Parameter Design Current
Top size, inches 48 24
Size F80, inches 20 11
Coarse size > 3.5" 75% 58%
3.5" > Middle size > 1" 12% 17%
Fine size < 1" 13% 25%