Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PROFORMA- B

PRADHANMANTRI GRAM SADAK YOJANA


PROFORMA- B
Package No. :- OR-30-674 State:- ODISHA Sundargarh Cost Rs. In Lakh
Type of Total Estimated cost Average cost per Km
Sl. Name of the Name of the Road Porposed Lengh In Km Cost of Cost of CD
proposal Others in Lakhs in Lakhs.
No. Block Pavement Works
From To *N/U BT CC Total Constn. Maintaince Constn. Maintaince

to Halma via Kinjrikela


1. Balisankara Khamarimunda N/U 14.00 0 14.000 637.68 167.74 141.29 946.71 441.54 67.62 31.54
Sikajore
GST-12% * 76.52 20.13 16.96 113.61 52.98 8.11 3.78
Cost In Including GST-12% TOTAL 14.000 714.20 187.87 158.25 1060.32 494.52 75.74 35.32
Total Estimated Cost of the Package:- Rs. 1554.84 Lakhs
*U-Upgradation (UG)

Prepared by:- Signature Technical scrutiny STA:- Signature


Name 0 done by; Name
Designation Assistant Executive Engineer (P.I.U)
Rural Works Sub Division,Hemgir

Checked by:- Signature


Name Co-ordinator STA:- Signature
Designation Excutive Engineer (P.I.U) done by; Name
R.W Division, Sundargarh

Scrutinised by:- Signature


Name
Designation Superintending Engineer
R.W.Circle Sundargarh

You might also like