PROJECT:- CHINMAYA MISSION GURUDHAM, DELHI Date:- 2/25/2020

1ST FLOOR

Strand
No of Length of Strand Duct No of
Anchor Anchors Stressing cutting Weight of
Tendon no Size Tendon in Mtr.(outer to Length in wedges in Remarks
Type Nos. End Length in strand
s outer) Mtr. pairs
Mtr.
PT SLAB x -dir 350 3 S 13 2 1 6 11.000 11.500 21.780 54.165 6.000
5 S 13 6 1 30 11.000 11.500 65.340 270.825 30.000
3 S 13 2 1 6 11.000 11.500 21.780 54.165 6.000
5 S 13 9 1 45 11.800 12.300 105.138 434.498 45.000
3 S 13 2 1 6 11.800 12.300 23.364 57.933 6.000
y-dir 3 S 13 4 1 12 17.200 17.700 68.112 166.734 12.000
3 S 13 4 1 12 13.000 13.500 51.480 127.170 12.000

TOTAL 29 7 117 87 90 357 1165 117


AREA= 165.73 0.17 2.2 7.03