BY-timelines For House Construction
BY-timelines For House Construction
BY-timelines For House Construction
o Permits
o Government approvals
• Plans
o Building plan sanctions (govt)
§ floor plan,
§ site plan,
§ cross sections,
§ elevations,
§ plumbing,
§ electrical
Site preparation
Floor slab
External finishes
Plumbing
Electrical
The electricians and plumbers will start on the wires, cables and pipes. They will still all be protruding
and will not be connected to the source yet. This stage is also called “roughing in” because it will be
completed later. This process should roughly take a month or two.
Interiors
work starts on the internal walls, finishes and floors. This stage involves all the plastering and painting.
Carpentry
If there’s any built-in furniture like storage or kitchen cabinets, now is the time when that is done. This
can even be done along with the interiors. The entire thing shouldn’t take more than two months.
Bismillah Yaseen
Finishing
lights, fans, switches and power outlets. The plumber will install the sinks, showers and faucets.
Inspection
Handing over
………………
Bismillah Yaseen
Foundation
Earthwork and Excavation (Labour) ₹ 24,024
Providing and laying Concrete ((Material + Labour for footing, column and
plinth beam) ₹ 1,05,534
Roofing
Providing and laying Base (Material + Labour) ₹ 1,31,040
Super Structure
Column (Material + Labour) ₹ 85,280
Staircase ₹ 1,27,920
Wall Construction
6inch Thick Cement Block (Material + Labour) ₹ 2,85,285
Flooring Cost
Material + Labour Rs 3,60,360
Wall Tiles
Kitchen (Material + Labour) ₹ 14,089
Washroom ₹ 65,739
Utility ₹ 15,562
Wood Work
Doors (Material + Labour) ₹ 4,29,975
Painting
Internal (Material + Labour) ₹ 2,29,320
Plastering
Ceiling (Material + Labour) ₹ 1,09,200
Plumbing ₹ 4,09,500
Approvals Required:
• Construction License: This is to ensure the compliance of all instructions set for a construction
project
• Building Plan Approval: This approval is given only if the construction plan abides by all the building
laws.
• Utility Approval: For a construction project to go smoothly, you need Electricity & Water connection
which also needs approval.
Bismillah Yaseen
Excavation
10. Is the EXCAVATED AREA cleared of all obstructions?
11. Is the LAYOUT, ALIGNMENT & SIZE of excavation marked on the ground as per plan?
12. Have adequate WORKING SPACES been provided all around?
13. Is the FOUNDING STRATA suitable for laying PCC (i.e. is it free from any soft pockets. If not,
remove and fill with lean concrete/sand)?
14. Is the DRESSING of the excavated area acceptable?
15. Is the STABILITY of side slopes acceptable?
16. Is the DEWATERING of the waterlogged area acceptable?
17. Has the DISPOSAL of excavated soil to the specified area been done?
18. Have the BARRICADING & CAUTION SIGNS been provided for deep excavations?
19. Are the JOINT INSPECTION RECORDS complete?
Backfilling
20. Is only QUALITY APPROVED SOIL being used for backfilling?
21. Is the backfilling being done in LAYERS, as specified?
22. Is the backfilled area being WATERED sufficiently?
23. Has the COMPACTION been done as specified?
24. Is the backfilling done up to the SPECIFIED LEVEL?
25. Has the BACKFILLED LEVEL BEEN RECORDED?
26. Has the DISPOSAL of surplus soil from the worksite been completed?
Anti-Termite Treatment
27. Is the treatment of the earthworks for the area COMPLETE?
28. Has the loose soil been removed from the area and CLEANED?
29. Has RODING or CHANNELING been completed as specified (wherever applicable)?
30. Is the CHEMICAL being used as per specifications?
31. Is the CONCENTRATION of chemical emulsion acceptable?
32. Is the spraying equipment (pumps & more) in GOOD WORKING CONDITION?
33. Is the RATE OF APPLICATION of the chemical emulsion as specified?
34. Check for UNIFORM APPLICATION of chemical emulsion PCC
35. Have the preceding activities for the area been completed?
36. Is the FORMWORK & DIMENSIONS acceptable?
37. Is the MIX PROPORTION as specified?
38. Is the PLACEMENT & COMPACTION acceptable?
39. Is the FINISHED LEVEL as specified?
40. Is the SURFACE FINISH acceptable?
41. Is the CURING acceptable?
Bismillah Yaseen
MEP
Electrical
195. Is the FFL given from the PROJECT’S TEAM correct & verified?
196. Is BUTTON MARK LEVEL on the wall for plastering correct?
197. Have the BOXES been fixed according to the button mark?
198. Are all of the FIXED BOXES in one level?
199. Is the SPACING between adjacent BOXES correct?
200. Are the required TOOLS for CHIPPING available?
201. Has the RIGHT ANGLED CHIPPING been ensured at the corner of the chipped area? 202. Have
the CONDUITS been inserted into the box?
203. Is the PROPER SIZED BOX fixed?
204. Check for completion of PROPER CURING for all the places where chasing/chipping has been
done. Is it filled with CONCRETE/CEMENT MORTAR?
Plumbing
205. Are the latest GFC drawings for the activity available?
206. Are all the REQUIRED TOOLS available?
207. Has the necessary CLEARANCE from CIVIL EXECUTION TEAM been given to start the
plumbing work?
208. Has the CUTOUT been provided as per the approved drawings?
209. Has the BLOCK WORK PLASTERING & WATERPROOFING been completed?
210. Has the MARKING of INTERNAL PLUMBING LINES on the walls been done accurately
according to the meter marking?
211. Have the THREADED JOINTS been properly covered with teflon tape?
212. Has the CONCRETE PACKING been done properly wherever required?
213. Have the OUTLET LEVELS been levelled properly using spirit level?
214. Is the height of PLUMBING FIXTURES as per drawings?
215. Check for PROPER CURING for the concrete that has been packed
216. As per requirement, is the PROPER SLOPE being maintained for sewage and wastewater
lines?
217. Are the SHAFTS for TOILETS, fixing of CLAMS using ANCHOR BOLTS for holding pipes in
position been fixed away from the bore packing area?
218. Is PROPER SLOPE being maintained for the same as prescribed in the drawings?
Bismillah Yaseen
219. Check for the SOIL LINES connection to the inspection chambers at the ground level
or at the basement
220. Check if the WASTE WATER LINES are connected to the gully traps at the ground level or at
the basement and then connected to the inspection chambers
221. Check if all the TRAPS are sealed with a gunny bag & a layer of PLASTER OF PARIS at the top
to minimise the choke up problem
222. Check for the COMPLETION of PROJECT as per the floor plan & elevation
Project Management
223. Ensure HIGH QUALITY MATERIAL management
224. Check for ADHERENCE of project schedule at every stage
225. Check for PROCESS ADHERENCE at every stage
226. Check if QUALITY CHECKS are being done at every stage of the construction project