SIGNALLING IN RE AREA
(PRECAUTIONARY MEASURES)
1. Introduction
3. Precautionary measures
Contact Wire
2
met
ers
Less than
2 meters
Protective Screen
2 meters
Signal
Catenary Post
Wire
TO CABIN
INSULATION JOINT
For rod running under the track, the top of the rod
shall not be less than 25 mm below the bottom of the
rail in order to ensure that the rails do not come in
contact with the rod during the passage of the trains.
Ensure that the rod transmission is more than 300 m.
Additional insulators shall be provided on each rod at
every 300 meters.
Filter unit
Bell unit
The equipment consist of a transistor oscillator
generator AC at 150 cycle and rectifier for converting
AC impulse received from other station. The rectified
impulse are applied to the block bell through a relay.
clayton) 800 m.
Unscreened
cable
4 Siemens type
i) 5F/3B
K-50 B1 175 V 2 Km.
ii) 4F/4B 130 V 1.4 Km.
iii) 6F/2B 120 V 1.3 Km.
+
HR HPR
24- VDC
DR
+
DPR
24 VDC
-
HR +
HPR
DECPR
DECR
-
DR
+
DPR
HECPR
HECR 24
- V
DR
+
RECPR RECR DC
-
+
HR HPR
DR
+
DPR
+
HR HPR
-
24 V DC
DR
+
DPR
5.1 Stabiliser
8. Insulation of Tools
Screw Drivers
Pliers
Electricians Knives
Spanners
Any other tools whose handles are metallic and
which are required for the above purpose.
Crow Bar
Tommy bar
Spanner
Ratchet
Wrenches
Black-Smith’s tongs
Any other tools which are wholly metallic or whose
handles are metallic.
9. Maintenance
10.1 Do’s
Ensure that for the power cable for feeding the signals.
The voltage drop is with in 5 %
Ensure the rods and wires passing under the track and are
not touching the rail flange.
Don’ts
References
1. RE Manual issued by CORE/Allahabad
4. CAMTECH publications
a) Block instrument
b) Earthing arrangement