SIGNALLING IN RE AREA
(PRECAUTIONARY MEASURES)

1. Introduction

In electrified section, Signalling circuits are affected by


induced voltage. This induced voltage may cause
hazardous effect on working of Signalling equipments as
well as Railway staff dealing with it. It is, therefore,
necessary that suitable protective measures are adopted
to minimise the effect of induced voltage.

This handbook covers signalling in 25 KV-50 cycle AC


electrified section.

2. Effect of A.C. Traction

Any circuit in the vicinity of 25 KV AC electrified


section is likely to be influenced by electrostatic and
electromagnetic induction.

a) Electrostatic induction is practically eliminated by


transferring a circuit into underground cables
protected by a metal sheath.
b) Electro-magnetic induction causes various current
and voltage to develop in conductors parallel to the
track. The value of this induced voltage depends on
various factors such as:
i) Length of parallelism between the cable
conductors and the electrified track.
ii) Soil conductivity

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 2

iii) Screening efficiency of the cable sheath.


iv) Return current through the rails and the return
conductor, where provided.
v) Mutual inductance between catenary and the cable
conductors which depends on separation between the
two.
vi) The current carried by the catenary etc.

3. Precautionary measures

As a high voltage conductor, is provided, induced


voltages may cause effects on the functioning of signal
equipment and may be dangerous to the maintenance and
operating staff, so precautionary measures are adopted
for each signalling gears to minimise the effect of
induced voltage as described below.

3.1 Signal Unit

Electrical clearance required to be provided to safe


guard, is specified as 2000 mm from the live conductor.
Under no circumstances, a signal post or any of its
fittings must be allowed to infringe in this portion. When
the signal have to be so located that they fall with in 2m
from the electrified track, the iron screen of wire mesh
should be provided between the signal post and the OHE
and properly earthed to protect the staff who may have to
work within the infringing portion.

 All signal units and cables connected with it are earthed


near the signal.

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 3

 The screen shall be provided on the side adjacent to the


catenary and for signal post between two wired track, a
screen on either side of the post will be required.

 The screen shall be so fixed that its top edge is 2 meters


above from the catenary and the bottom edge is 2 meters
below from the contact wire.
2
met Protective Screen
ers

Catenary Signal Post


Wire

Contact Wire
2
met
ers

Less than
2 meters

Screen adjacent to catenary

 Screen shall be connected to an earth, not exceeding 10


Ohm in resistance.

 Provision of such screen is mandatory in all cases where


the distance from OHE wire is less then 2 m.

 Signal unit and screen should be connected to earth.

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 4

Protective Screen

2 meters
Signal
Catenary Post
Wire

Contact Wire 2 meters

Less than Less than


2 meters 2 meters

Screen between two wired track

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 5

3.2. Insulation of Rod and Wire Transmission

Traction return current pass through rails and rods/wires


are in contact with the rail at some point. The rod and
wires in AC electrified areas are subject to a certain
amount of induced voltage. To protect the operating staff
from the effects of the voltages, the rod and wires are
provided with insulation both at cabin and the function
end.

3.2.1 Insulation of Rod

 In case there is a large number of rodding in the same


alignment, the insulated joints shall be provided on
each rod run between the same sets of rod roller
guides as shown in figure below.

Roller Guide Rod Insulation

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 6

If this is not done any voltage appearing in one rod will


be transmitted to another rod through the rod roller guide
as in the figure given below:
HIGH VOLTAGE
AFFECTED ROD ROD ROLLER GUIDE
JOINT INSULATION ASSEMBLY

TO CABIN

INSULATION JOINT

Insulation joints wrongly provided


Voltage appears on all rods

 For rod running under the track, the top of the rod
shall not be less than 25 mm below the bottom of the
rail in order to ensure that the rails do not come in
contact with the rod during the passage of the trains.
 Ensure that the rod transmission is more than 300 m.
Additional insulators shall be provided on each rod at
every 300 meters.

3.2.2 Insulation of Wires


The insulation of wires is obtained by provision of hard
rubber wire insulators on the wire transmission at both
cabin and function end.

Rubber Wire Insulator

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 7

 The wire insulators shall be provided on each wire as


close to the cabin as possible or inside the cabin to
ensure that the insulator is not exposed to sun and
rain directly.
 In case the distance between the two insulators at
either end is greater than 300 meters, additional
insulators shall be provided on each wire so that the
distance between two consecutive insulators on the
same wires is not greater than 300 meters.
 Any contact between the wire transmission and the
rails must be avoided.
 A minimum distance of 40 mm shall be maintained
between the wire and nearest edge of the rail or mast.
 The insulators shall be provided with split links or
disconnecting links on either side for easy
replacement.

3.3 Track circuit

Following type of track circuits are used in RE area.

 DC Single rail track circuit.


 Electronic track circuit.
 Audio frequency track circuit
 AC track circuit.

3.3.1 DC single rail track circuit

 In single rail DC track circuit, one rail is used for


traction return current and other rail is insulated, non-
insulated rail is connected with OHE mast. AC

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 8

induced voltage is 10V per meter. A 9 Ohm AC


immunized relay with chock at both feed and relay
end works up to 350 meters.
 Maximum length permissible is 450 meters with
QABT1. AC immunized relay with wooden sleepers
are provided with train shunt value of 0.5 Ohm.
 Maximum length of track circuit is 350 meters with
concrete sleepers, with train shunt value of 0.25
Ohms.
 At feed end one chock and resistance is provided in
series on – ve side of battery, which is connected to
traction return rail and other chock is provided at
relay end.
 In single rail track circuit, in the event of a break in
the non-insulated rail, very heavy current will flow
through the track relay as well as the equipment at
the feed end as in fig below.

To avoid, the following precaution should be


adopted.

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 9

 The non-insulated rails of adjacent tracks shall be


cross bonded at interval of 100 m.
 If track circuit is less then 100 m, in length, cross
bonding at both end shall be provided.
 If track circuit is more then 100 m. in length than
cross bonding to be provided at every 100 m.
 Staggered polarity is provided for adjacent track
circuits and if return rails are staggered, insulated
joints on both the rails are provided with transverse
rail bond, so that continuous path is available for the
return current as shown in figure below.

As par as possible crossing of point should be



connected to the – ve polarity.
 Closed and open track circuit adjoining each other
shall not be provided.
3.3.2 Electronic track circuit.

Jeumont high voltage Impulse track circuit are used in


railways, which may be either single rail or double rail
type.

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 10

 Maximum length of single rail track circuit is 200 m.


 Maximum length of double rail track circuit is 800
m.

3.3.3 AC Track circuit

In this type of track circuit, 831/3 cycle is used for track


feed and the relays used are either the van type or motor
type. The 831/3 track circuit may be either the single rail
type or the double rail type.

 Impedance bonds are used on the double rail types.


 The length of single rail track circuits shall not
exceed 200 m.
 The length of double rail track circuit shall not
exceed 1000 m.

3.4 Block Instrument

Since the block circuit is very much longer then ordinary


signal circuits, comparatively high voltage will be
developed in the circuit. Protective devices shall be
provided at either end of block circuit for protection. The
principal protective device used is called “Block filter.”

 A relay unit is required for single line block


instruments.

 In single line Neal’s block token Instruments, the rest


contact is substituted by the contacts of a slow
release relay. The relay is energised during the

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 11

operation of the plunger but gets de-energised only


after the condenser has discharged in a 5000 Ohm.

3.4.1 Filter Unit

 A filter of approved design shall be installed between


the block instrument and line wire.
 The filter acts as a low pass filter which allows DC
current to pass through but offers very high
impedance for the induced voltages.

Wiring diagram of filter unit

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 12

Filter unit

 When a block section originates at a station in RE


area and other terminates on non RE area; filter
should be provided with block instruments at both
ends of such a block section.
 Block telephone line should be separate from block
circuit.
 Separate battery set shall be used for each block
instrument.

3.4.2 Block bell unit

 In SGE double line block instrument the bell circuit


is taken separately in another pair of wire, the bell
beats are transmitted by AC through the separate pair
of the block quad. The AC supply is generated by the
block bell equipment, which works on 12 volt DC.

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 13

Bell unit
 The equipment consist of a transistor oscillator
generator AC at 150 cycle and rectifier for converting
AC impulse received from other station. The rectified
impulse are applied to the block bell through a relay.

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 14

Wiring of block bell equipment

3.5 Equipment not immunised

Equipments not immunised for AC shall not be used


directly on line circuits. The following is the list of such
equipments:
 Electrical Key transmitter
 Arm and light repeater
 Telephone type relays
 Lever locks
 Slots indicators
 Color light signal repeating Indicator.
 250 ohms relay.

To make use of these equipments, relays are interposed


so that they are made to work locally through the
contacts of these relays.
The immunisation value of certain relays are as under

S.No. Type of Relay Immunisation Max. length


value of parallelism.
1 Shelf type 300 V 3.5 Km.
relay
BSS-1659
2 Plug-in type 300 V 3.5 Km.
relay.
BRS-930
3 PI-150 A 210-260 V 2.0 Km.
(Sundram Screen cable

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 15

clayton) 800 m.
Unscreened
cable
4 Siemens type
i) 5F/3B
K-50 B1 175 V 2 Km.
ii) 4F/4B 130 V 1.4 Km.
iii) 6F/2B 120 V 1.3 Km.

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 16

3.6 Signal feeding system.

In RE AC electrified area maximum length of direct


feeding of signals shall not exceed 600 m. when screened
cables are used and 240 m. in case of unscreened cables.
If the length exceeds this limit the following two
methods are used:
 Local Feed
 Remote Feed

In RE area current transformers L-type and H-type are


used to enable a 1000 Ohm line relay to be used as ECR.
L-type is used in series with the supply leads where the
signal lamps are directly fed from the cabin.

3.6.1 LOCAL FEED METHOD

For signals located beyond 600 meters, the controlling


relays HR, DR, HHR etc. in relay room are repeated
through AC immunised relays at the location and the
signals are fed locally from these relay contacts.

All circuits which pass through a main cable must have


individual returns and the controlling relay contacts must
be included in both the conductors i.e. double cutting of
contacts is necessary.
More then one route UGPR for all the routes shall be
provided in the location.

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 17

+
HR HPR

24- VDC
DR
+
DPR
24 VDC
-

HR +
HPR
DECPR

DECR
-

DR
+
DPR
HECPR
HECR 24
- V
DR
+
RECPR RECR DC
-

+
HR HPR

DR
+
DPR

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 18

In the local feed method, the following equipments are


provided at the location box.
 2 Nos. `OFF’ aspect controlling relays (HPR, DPR).
 3 Nos. ECR Relays (DECR, HECR,RECR)
 3 Nos. current transformer rectifiers to feed ECR
relays.
 A transformer rectifier set to feed DC voltage to
repeat DECR, HECR, RECR.
 Besides the above, a power cable will be required to
take power to the location to feed the signals and
repeat the ECR(s).
Hence local feed system has become cumbersome.

3.6.2 REMOTE FEED


In this remote feed system, signals are fed directly from
the cabin but in the signal lamp circuit, the “OFF”
aspect
controlling repeat relays are proved as under.

+
HR HPR

-
24 V DC

DR
+
DPR

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 19

3.7 Point machine.

For various types of point machines the parameters are as


under :
Type AC Maximum Permissible Separates
Immunity Between Point Contactor And Point
Value Machine
(Volts) Single track Double track
SIEMENS 60 V 345 mts. 420 mts.
GRS 5 E 90 V 515 mts. 630 mts.
M-5 70 V 400 mts. 490 mts.
M-3 200 V 1150 mts. 1400 mts.

3.8 Lifting Barrier.

As far as possible lifting barrier shall be located at a


minimum distance of the length of boom from the nearest
rail.

4.0 Earthing arrangement.

Any dangerous potential appearing on the exposed part due


to electromagnetic induction is likely to cause injury to the
person and may prove dangerous to the equipments; so
proper earthing of S&T installation is essential.

4.1 Purpose of earthing.

 Safety of the working staff against electric shocks.

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 20

 To ensure safe & reliable operation of equipments by


minimising the effect of induced voltage.
 To protect the equipment from unduly high EMF,
which may cause DI- ELECTRIC break down mostly
due to (insulation) the physical contact with live
OHE equipment such as in case of catenary wire
falling on the track or due to lightening discharge.

4.2 Equipments to be earthed.

Separate earth shall be provided for the following :

 Lever frame and other metallic frames.


 For each Block Instrument.
 In case of signals provided on bracketed posts or
gantries located above contact wire level falling
within 2 meters from the electrified tracks. The
protection screen shall be connected to earth.
 Where the under ground cables enters the location
box or cabins, the cable termination boxes,
(connecting the ends of the cable) the metallic
structures supporting the terminal boxes shall be
connected together to the same earth as the lightening
arrestors.

4.3 Earth lead wire

The following type of earth lead wire should be used

 ACSR wires of size 64 Sq. mm.(19 strands of 2.11


mm dia.)
 GI wire of negligible resistance.

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 21

Care should be taken as under

 The lead wires shall be protected against mechanical


damage.
 In case buried underground, should be painted with anti-
corrosive paint or bitumen or varnish.
 The earthing leads for separate earthing arrangements
should be electrically insulated from each other.
 Earth lead wire should be soldered with earth pipe.

4.4 Earth electrode

 Under ordinary conditions of soil, use of GI or MS


electrode is recommended.

 Where more than one earth pipes are used, the


distance between each other pipes should not be less
than 3 m.

 The resistance of each earth should not exceed 10


ohm.

5.0 Power supply for signal circuit

5.1 Stabiliser

To ensure that correct voltage is available at all times for


signalling lamps, relays sensitive to voltage variations
(ECR’S relays), voltage stabilizers of adequate capacity
should be used.

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 22

5.2 Transformers (220/110 V AC )

The location of transformers 220/110 V AC of adequate


capacity, at the controlling point depend, upon the
distance of signal from point of control. Separate
transformers should be used as under.

 Transformer for all signals located with in a distance


of 600 m.
 Transformer for all signals beyond 600 m. It must be
ensured that the combined length of parallelism shall
not exceed 2 Km.
 Transformer for signals where length of parallelism
is more then 2 Km.
 Each distance shall be provided with separate
transformer.

6.0 Battery arrangement

Separate battery set should be used for signalling circuit


as under.

 Separate battery set for external circuits.


 Separate battery set for internal circuits.
 Separate line battery for block instrument.
 Separate battery set for local circuit of block
equipment (i.e. block bell & commutator lock circuit)
for both block instruments.
 Separate battery set for each track circuit.

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 23

7 Protection of Railway Staff

These instructions lay down the precautionary measures


to be observed by railway personnel working on
Signalling. Installation on lines equipped with 25 KV, 50
Cycles AC traction.

Precautions are required to be taken on account of the


following.

 Proximity of a live conductor


 Pressure of return current in rails.
 Induction in all metallic bodies situated close to
overhead equipment.
7.1 Proximity of a live conductor

 Any contact, direct or indirect, with the 25 KV live


conductors is dangerous and shall be strictly avoided.
 If any portion of a signal post or its fittings where a
lampman has to work falls within 2 m. of a 25 KV live
conductor or metal part electrically connected to this
conductor, such portion shall be protected with an iron
screen of approved design solidly connected to the
structural work.

 In case of signals provided on bracketed posts or


gantries located above contact wire level and falling
within 2 m. for the electrical connection to this
conductor, then such portion shall be protected with an

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 24

iron screen of approved design solidly connected to the


structural work.

 If any portion of a signal post or its fittings where


lampman have to work, falls within 2 meters of a live
conductor, such portion shall, as far as practicable, be
protected with an iron screening of approved design
solidly connected to the structural work.
 If for any reason, the protective iron screening is not
provided as above, the railway staff shall not undertake
any work on those portions of the signal or its fittings
falling within the 2 meter zone from a 25 KV live part
unless the power has been switched off of this 25 KV
live part and a permission to work has been obtained.

7.2 Pressure of return current

The flow of return current in the rails may cause a


potential difference :

 Between two rails at an insulated joint of the track


circuit or at an ordinary joint, in case, the fish plates
are broken.
 Between two ends of a fractured rail.
 Between an insulated rail and the rail used for the
traction return current.
 Between the rail and the surrounding mass of earth.

7.3 Induction in all metallic bodies situated close to


overhead electrical equipment

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 25

Precautionary measures listed below shall necessarily be


taken, as induced voltages may appear at any time on
account of a sudden short circuit in the traction overhead
equipment.

 They shall as a general rule, wear rubber gloves and use


tools with insulated handles.
 When the work to be done is of such a nature that
rubber gloves cannot be used conveniently, staff must
insulate themselves from the ground by using rubber
mats, etc.
 Before cutting the armour or the lead sheath of the cable
or the wires in the cables, an electrical connection of
low resistance shall be established between the two
parts of the armour, the sheathing or wires that are to be
separated by cutting.

8. Insulation of Tools

The handles of the tools shall be provided with an


insulating sleeve of rubber/plastic material of an
approved type sufficient to with stand 3000 Volt.

8.1 Tools to be insulated

 Screw Drivers
 Pliers
 Electricians Knives
 Spanners
 Any other tools whose handles are metallic and
which are required for the above purpose.

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 26

8.2 Tools to be provided with insulating paints

Some of the tools which are used in Signalling are required


to be insulated as a precautionary measure to avoid
bridging of rails and earth through the tools and body of the
workman as a difference of potential may exist due to
traction return current and electromagnetic or electrostatic
induction.

It is considered that painting of the below mentioned


S&T tools with suitable rubber based insulating paints
should adequately meet the requirements of insulation.

 Crow Bar
 Tommy bar
 Spanner
 Ratchet
 Wrenches
 Black-Smith’s tongs
 Any other tools which are wholly metallic or whose
handles are metallic.

9. Maintenance

 Check that wire mesh screen provided between the signal


post and OHE to protect the staff is held properly with
nut and bolt.
 Check caution board provided on the signal post to warn
the staff. The caution board should be cleaned and
varnished so that precautions are clearly readable from
the foot of the signal ladder.
 Check that wire mesh screen is not broken due to dust
and rust.

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 27

 Check that rod and wire insulation once in six months or


as per the instructions issued by the Railway authorities.
 Check that structure bonding, cross bonding and
longitudinal bonding are intact and make arrangements
for joint inspection with OHE staff once in six months or
as per the instructions issued.

 Check no load current of signal transformer once in a six


months. Voltage stabliser should be of adequate capacity.

 Ensure that correct voltage is available at all times.

 Check that separate power cables for feeding all signals


are installed, provided the conductors are of adequate
cross sectional area.

 Ensure that the combined parallelism of circuits does not


exceed 600 meters. In case it is more than two
transformers shall be provided to isolate the feed.

 Ensure that no rectifier for polarisation or any other


purpose (such as making the relay slow to operate), shall
be included in any external circuit as the rectifier will act
as half wave rectifiers on application of AC and will
effect the relay operations.

 Check that earth lead wires are protected against


mechanical damage.

 Check that the earthing lead is provided for separate


earthing arrangements ensure that these are electrically
insulated from each other through out and also from the

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 28

metallic structure in contact with different earthing


arrangements.
 Refer maintenance handbook on earthing No.
CAMTECH/2000/S/ETH/1.0 prepared by CAMTECH/
Gwalior for maintenance of earth.

 Ensure that the staff working on tracks equipped with 25


KV-50cycles AC traction are familiar with the
instructions for treatment of persons suffering from
electric shock.

 Ensure that the instruction board in English and in the


regional language describing the methods to be adopted
for treatment of electric shock must be clearly displayed
in all inspector’s office.

10. Do’s & Don’ts

10.1 Do’s

 Ensure the proper earthing of battery charger after


replacing the defective charger.

 Ensure that transfer and longitudinal bonding are


provided after replacement of defective glued joint on
track circuited portion.

 Always use tools, which are provided with insulated


sleeves.

 Always arrange for power block before taking the work


on hand for replacement of signal unit or any other work

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 29

on the signal, which is infringing within two meter from


the live parts of the OHE.

 Always use surge arrester on cable, terminated between


junction box and EV of axle counter.

 Ensure that no portion of signal fitting lies within 2m.


from OHE live conductor.

 Ensure that for the power cable for feeding the signals.
The voltage drop is with in 5 %

 Ensure that individual earth must be in good condition


for each signal.

 Ensure that a caution board is provided on signal post at


the height of 3.0 meter above the rail level, if protective
screen is not provided on the signal post.

 Ensure that the protective screen of signal post is earthed


properly.

 Ensure that separate earth is provided for each block


instrument.

 Ensure that each block instrument have separate line


battery set, to feed block instruments individually.

 Insist P-way staff to inform S&T officials before


replacing the crossing and rail to ensure continuity of RE
bonds.

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 30

 Ensure continuity of earth bonds before opening any


insulation joint.
 Do inform to the OHE staff immediately if any OHE
bond like longitudinal bond, structural bond, and cross
bond is found open or loose.

 Ensure continuity of armour while joints provided in the


cable.

 Ensure that rod insulation joint is in the same span while


changing the broken rod.

 Ensure the rods and wires passing under the track and are
not touching the rail flange.

Don’ts

 Don’t remove/disconnect screen of wire mesh provided


between the signal post and OHE live conductor.

 Don’t remove warning board fitted on signal post.

 Don’t open the earthing of signalling and other metallic


fittings concerned with the signalling gears.

 Don’t energize any circuit on overhead line.

 Don’t make through wire insulator with wire or wire


rope.

 Don’t bypass any lightning arrester.

Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 31

 Don’t remove any earthing wire from cable armour or


metallic sheath of underground main cable.

 Don’t combine earth with each other.

 Don’t remove any OHE bonds provided for traction


bond.

 Don’t by pass choke terminals.

 Do not keep the track circuit in working condition only


on the battery charger.

 Don’t combined internal and external battery cell with


each other.

 Don’t replace any immunised relay with non immunised


relay.

 Do not open the earthing and connections of any part of


the block filter unit.



Signalling in RE area October’ 2001


CAMTECH/2001/SRE/1.0 32

References
1. RE Manual issued by CORE/Allahabad

2. Various instructions issued by IRISET / Secundrabad

3. Various instructions issued by RDSO/ Lucknow

4. CAMTECH publications

a) Block instrument
b) Earthing arrangement



Signalling in RE area October’ 2001