(ar a 3¢41)) ST TAA 2 FMEA 3
MINISTRY OF ENVIRONMENT, FORESTS AND CLIMATE CHANGE
NOTIFICATION
New Delhi, the 22nd December, 2014
8.0, 3252(E)—Whereas, a draft notification further to amend the notification number S.0 1535(E), dated the
ath September, 2006 (hereinafter referred to asthe principal netification), was published, as required under sub-rule (3)
of rule $ of the Environinent (Protection) Rules, 1986 in the Gazette of india ,Extraordinary, Patt Il, Section 3, Sub-
‘ection (i) vide nuraber §,0. 2319, (E) dated the Ith September, 2014 (hereinafter refered to as the sai notification),
inviting objections and suggestions from all persons likely 10 be affected thereby within a period of sixty days from the
date on which copies of Gazette containing the said notification were made evailable tothe publics
‘And whereas, copies ofthe said notification were made available to the public on 11th September, 2014;
‘And whereas, no objections or suggestions have been received in response to the said notification within the
specified period of sixty days
Now, therefore, in exercise of the powers conferred by Sub-section (1) and clause (v} of Sub-section (2) of
‘Section 3 of the said Environment (Protection) Act, 1986 (29 of 1986) read with clause (@) of sub-rule (3) of rule 5 of the
Envisoument (Protection) Rules, 1986,. the Central Government hereby makes the following amendments in the sad
‘notification, namely —
In the principal notification, in the Schedule, undor Cofumr (1), for item 8 relating to Builling/Constrstion
Projecs/Area Development Proests and Towships and sub-tems 8 (a) and 8 () end the entries relating thereto,
specified there under, th following item, sub-items and entries shal be substituted, namely:—
@ @ i) @ iz o
% Building or Construction projects or Area Development projects and Townships
Tia | Building end SHDOO sqantis | The term “built up area” forthe purpose of this nobiicabor
Construction nd < 1,80,000 | the built up or covered aren on all floors put together
projects sac mire of | including its basement and other service arpas, which aq
built up area | proposed in the building or construction projects.
Note L- The projects or activities, shall not incl
industrial “shed, school, college, hoste} for educational
‘institution, but such buildings shall ensure sustainable
environmental management, solid and liquid wast
‘management, rein' water harvesting and may use recycled
materials such as fly ash bricks,
[Note 2,-“General Concitions” shall not apply.
S| Townships Coverngan sea [A projet of Township and Area Development Project
and Area of 50a and or | covered ‘under this item shall require aa Environment
Development built up area> | Assessment report and be appraised as Category ‘BI
Projects 1,50,000 sq. mtrs_| Project
Note. “General Concitions” shall not apply.
i (F.No, 19-2/2013-14-IiT]
MANOJ KUMAR SINGH, Jt Seoy.4 ‘THE GAZETTE OF INDIA : EXTRAORDINARY (Part I—Sec. 3(i))
‘Note: The principal rules were published in the Gazette of India, Extraordinary, Part I Séetin 3; Subsection (i) vide
‘Netification Number §,0, 1533(E), dated the 14th September, 2006 and was subsequently amonded as follows:—
1, 8.0. 1737 (B), dated the L1th October, 2007;
2. $.0, 3067 (E), dated the Ist December, 2009;
3.8.0, 695 (B), dated the 4th April, 20115
4, 8.0. 2896 (), dated the 13th December, 2012;
5, $.0.674(E), dated the 13th March, 2013;
6.8.0. 2559 (B), dated the 22nd August, 2013 5
7,8.0.2781 (B), dated the 9th September, 2013;
8, $, 0. 562(8), dated the 26th February 2014; and
9, $0, 1599(8), dated the 25th June, 2014,
“Fred ty he Wacager Goverment of all res, ing Road, Majapur, New Dab-IO0G
‘sd Publsed bythe Contelle of Publis, Dait-110056