IEC 60255-1xx Standards

Relay Protection Applications, Real Time Power


System Simulation Tests
Andrea Bonetti – FMTP POWER AB andrea.bonetti@fmtppower.com

SEMINAR | May 11th, 2017


2013: IEC 1906 Award for the work on Distance Protection Standard
TC 95 – MT4 (Maintenance Team 4)
3
PUBLISHED STANDARDS BY TC 95 – MT4
4
STANDARDS ON THEIR WAY TO GET APPROVED 2017/2018
5
CLOSE LOOK AT IEC 60255-121: DISTANCE PROTECTION
6
WHY?
DISTANCE PROTECTION CHARACTERISTIC… BEFORE
DISTANCE PROTECTION CHARACTERISTIC… IEC 60255-121
9
DISTANCE PROTECTION CHARACTERISTIC… IEC 60255-121
10
DISTANCE PROTECTION CHARACTERISTIC… IEC 60255-121
11
DEFINITION OF OPERATE TIME AND TYPICAL OPERATE TIME
DEFINITION OF OPERATE TIME AND TYPICAL OPERATE TIME
13
DO WE HAVE TOOLS TO PERFORM THE REQUIRED TESTS?
SIR Diagrams
DO WE HAVE TOOLS TO PERFORM THE REQUIRED TESTS?
16
HARMONICS DURING FAULTS
CVT-SIR DIAGRAMS
DO WE HAVE TOOLS TO PERFORM THE REQUIRED TESTS?
19
PLEASE DO NOT FORGET…
20
DOUBLE INFEED TESTS
DOUBLE INFEED TESTS
22
DOUBLE INFEED TESTS
23
DOUBLE INFEED TESTS
24
CT REQUIREMENTS
25
CT REQUIREMENTS
26
CT REQUIREMENTS
27

CT Dimensioning
If
Ealreq   Ktot  I sr  Rct  Rba 
I pr
If is the maximum primary steady-state short-circuit
CT current for the considered fault case Application
Ipr is the CT rated primary current
Isr is the CT rated secondary current
Ktot is the total over-dimensioning factor (including
the transient dimensioning factor and the Provided by the relay manufacturer
remanence dimensioning factor)
Rct is the CT secondary winding resistance CT Dimensioning
Rba is the total resistive burden, including the Application
secondary wires and all relays in the circuit.
CT REQUIREMENTS
CT REQUIREMENTS … BEFORE
CONCLUSION
30
31