This Earthworks checklist is used by Southern General Limited to inspect excavation work before proceeding. It includes checks for proper staking, foundation dimensions and depths, excavation accuracy, formation quality, and blinding pin elevations. Space is provided for comments from the SGL QA/QC representative, SGL project representative, and client representative to sign off when work meets requirements.
This Earthworks checklist is used by Southern General Limited to inspect excavation work before proceeding. It includes checks for proper staking, foundation dimensions and depths, excavation accuracy, formation quality, and blinding pin elevations. Space is provided for comments from the SGL QA/QC representative, SGL project representative, and client representative to sign off when work meets requirements.
This Earthworks checklist is used by Southern General Limited to inspect excavation work before proceeding. It includes checks for proper staking, foundation dimensions and depths, excavation accuracy, formation quality, and blinding pin elevations. Space is provided for comments from the SGL QA/QC representative, SGL project representative, and client representative to sign off when work meets requirements.
This Earthworks checklist is used by Southern General Limited to inspect excavation work before proceeding. It includes checks for proper staking, foundation dimensions and depths, excavation accuracy, formation quality, and blinding pin elevations. Space is provided for comments from the SGL QA/QC representative, SGL project representative, and client representative to sign off when work meets requirements.
1. Area is clearly staked/ Marked out by Surveyor. N/A YES NO
2. Foundation Base confirm size and depth are correct to approved N/A YES NO drawings/ Surveyor Report N/A YES NO 3. Accuracy of excavation levels and dimensions. N/A YES NO 4. Formation quality within acceptable criteria. N/A YES NO 5. Blinding pins at acceptable elevation.
Comments plus additional information.
Client Representative Comments.
SIGN OFF WILL CONFIRM RELEASE TO GO AHEAD
SGL QA/ QC SGL Representative Client Representative Name Position Signature Date