Professional Documents
Culture Documents
Terminal Block Test List
Terminal Block Test List
Page 1 of 10
Dept: Project Date Signature
TERMINAL BLOCK TEST LIST
Created by: Vi Dieu Phong 1/21/2020
Customer Name: Han My viet Start Date: 06/08/2019 Checked by: Huynh Xuan Phuong 1/21/2020
Product Name: Terminal Block Finish Date: Approved by: Nguyen Ngoc Chanh 1/21/2020
Product Code: Duration: FN:
No Main Task Detail Task Test Objective Expressing method Test Description Detail Test Item IEC Test Code EU Test Code JIS Test Code Measuring instrument
1) During the test, clamping units and terminals shall Test of mechanical strength of clamping units 8.2.4.1 and 8.2.4.2 of IEC 60947-7-1:2009
not work loose and there shall be no damage, such as
breakage of screws or damage to the head slots,
Clamping units
The clamping units shall be able threads, washers or stirrups that will impair the further
to withstand the forces that can be use of the screwed connections Mechanical properties of clamping
Standard test equipment
applied through the units Testing for damage to and accidental loosening of
connected conductors 2) At the end of the test, the terminal blocks shall pass 8.2.4.1 and 8.2.4.3 of IEC 60947-7-1:2009
conductors of a terminal block (flexion test)
the voltage drop test according to 8.4.4 of IEC 60947-
7-1 : 2009 with a connected rigid conductor of the rated
cross-section and subsequently
EN 60998-2-2
Pull-out test 8.2.4.4 of IEC 60947-7-1:2009
EN 60999-1
The test shall be made on two clamping units at the
Terminal blocks shall be provided
centre terminal block out of five terminal blocks
with means that allow them to be
Mounting mounted as in normal use on the appropriate support 8.3.2 of IEC 60947-7-1: 2009) EN 60068-2-27
securely attached to a rail
according to the manufacturer´s
or a mounting surface.
instructions
Clearances and creepage distances
For terminal blocks for which the Minimum clearances in air Table 13 of IEC 60947-1:2014 Dial Caliper
manufacturer has stated values of
This electrical test is used to Carrying out a dimensional check of air clearances and rated impulse withstand
demonstrate adequate creepage creepage distances confirms that electrical insulation voltage (Uimp) and rated insulation
distances. To test that the properties are adequate with respect to the following: voltage (Ui) Minimum creepage distances Table 15 of IEC 60947-1:2014
Constructional requirements
The insulation materials of The terminal blocks are considered to have passed the
terminal blocks shall not be test if the duration of burning is <30 s
Resistance to abnormal
adversely affected by abnormal in case of ignition. Moreover, the tissue paper on the 8.5 of IEC 60947-7-1:2009
heat and fire
heat pinewood board shall not ignite if burning or glowing
and fire. particles fall from the terminal block.
section and rated
The rated impulse withstand voltage of an equipment Dielectric properties 7.2.3 of IEC 60947-1:2014 Multimeter
shall be equal to or higher than the Impulse withstand voltage 7.2.3.1 of IEC 60947-1:2014
Rated impulse withstand voltage
values stated for the transient overvoltages occurring in
(Uimp)
the circuit in which the equipment is withstand voltage test 8.4.3.a of IEC 60947-7-1:2009
fitted.
Dielectric properties 7.2.3 of IEC 60947-1:2014
This electrical test is used to The dielectric properties are based on basic safety Power-frequency withstand voltage of the main,
demonstrate adequate creepage publications IEC 60664-1 and IEC 61140. 7.2.3.2 of IEC 60947-1:2014
auxiliary and control circuits
distances. To test that the For reduced clearances and creepage distances
distances between the potentials through the use of coating see IEC 60664-3; the verification of solid insulation Solid insulation 7.2.3.5 of IEC 60947-1:2014
Dielectric properties
of two neighboring terminal blocks for clearances and creepage distances equal to or less
and between a terminal block and than 2 mm see IEC 60664-5 The power frequency withstand voltage test 8.4.3.b of IEC 60947-7-1:2009
the DIN rail are sufficient, an
appropriate test voltage is
applied. Rated insulation voltage The measured values of clearances shall be higher
(Ui) is the r.m.s. or DC voltage than the values given in Table 13 of Clearances 8.4.2.2 of IEC 60947-7-1:2009
value that is permanently IEC 60947-1 for case B The verification of sufficient
acceptable as a maximum when clearances and creepage distances
correctly used. The test voltage The measured creepage distances shall be not less shall
must be applied for over 60 than the values given in table 15 of Creepage distances 8.4.2.3 of IEC 60947-7-1:2009
seconds. IEC 60947-1
2)Before the tests according to a), b), c) and d) above, Verification of the voltage drop
the voltage drop shall not exceed – 3,2 mV, or − 1,6
mV on each individual clamping unit when measured c) before and after the short-time withstand current
separately, only if the overall measured value in Figure 8.4.6 of IEC 60947-7-1:2009
test
Voltage drop
4) During and after the test according to d), the voltage Ageing test
drop measured shall not exceed the (for screwless-type terminal blocks 8.4.7 of IEC 60947-7-1:2009
values specified in 8.4.7. only)
circuits
acceptance criteria given in Table 24.
1 s the short-time withstand current which corresponds Short-time withstand current 7.2.3 of IEC 60947-7-1:2009
4 to 120 A/mm2 of its rated cross-section
The purpose of this test is to verify
current
the ability to withstand a thermal At the end of the test, continuity shall exist on the test
shock. sample assembly and the terminal
blocks shall not show any cracking, breakage or other
Short-time withstand current test 8.4.6 of IEC 60947-7-1:2009
critical damage. After cooling down to
ambient temperature and without any change in the
arrangement
The standard values of cross-sections of round copper
Standard cross-sections conductors to be used are contained in Table 1 of IEC 60947-7-1:2009
Standard cross-sections of round Table 1.
copper conductors
The rated cross-section shall be selected from the
Rated cross-section Table 1 of IEC 60947-7-1:2009
standard cross-sections given in Table 1.
Relationship between rated cross-
The terminal blocks with a rated cross-section between
section
Rated connecting capacity 0,2 mm2 and 35 mm2 inclusive, the Table 2 of IEC 60947-7-1:2009
and rated connecting capacity of
minimum range contained in Table 2 applies.
terminal blocks
Page 2 of 10
Univentec Company Department Name Signature Date
Revision No: 1 1/21/2020
R&D Department: Vi Diệu phong 1/21/2020
Production Department: Huỳnh Xuân Phương 1/21/2020
Test purpose Test condition Measuring Instrument Instruction for Testing Acceptable condition Test Result TROUBLE SHOOTING
Figure Actual Error Comments Tester Checker
( Mục đích Kiểm tra ) ( Điều kiện kiểm tra ) ( Dụng cụ đo lường) ( Hướng dẫn kiểm tra) ( Điều kiện chấp nhận được )
Good Bad Probable Cause Remedy
1) The test is performed on one terminal block 1) The terminal block can withstand
for 1 second briefly withstand the
2) The tightening torque shall be in accordance with Table 4 of IEC 60947-1 or time corresponding to 120 A / mm2
alternatively in accordance with the higher torque value stated by the of its rated cross section.
manufacturer. 1) After verifying the voltage drop according 2) At the end of the test, continuity
1) The purpose of this test is to to (Verification of the voltage drop => Test Method ''1 ''). shall exist on the test sample
verify the ability to withstand a 3) The rated cross-section is below 10 mm2 (AWG 8), the conductors shall be solid. Multimeter The value and duration of the test current must comply assembly and the terminal blocks
thermal shock.
with " Test condition 5 " ' shall not show any cracking, breakage
4) For rated cross-sections equal to or higher than 10 mm2 (AWG 8), the conductors or other critical damage. After cooling
shall be rigid stranded. down toambient temperature and
without any change in
5) A terminal block shall be capable of withstanding for 1 s the short-time withstand
thearrangement
current which corresponds to 120 A/mm2 of its rated cross-section
Univentec Company Department Name Signature Date
Revision No: 1 1/21/2020
R&D Department: Vi Diệu phong 1/21/2020
Production Department: Huỳnh Xuân Phương 1/21/2020
Test Method Test condition Measuring Instrument Instruction for Testing Acceptable condition Test Result TROUBLE SHOOTING
Figure ( phương pháp kiểm tra ) ( Điều kiện kiểm tra ) ( Dụng cụ đo lường) ( Hướng dẫn kiểm tra) ( Điều kiện chấp nhận được ) Actual Error Comments Tester Checker
Good Bad Probable Cause Remedy
1) The voltage drop shall not exceed – 3,2 mV, or − 1,6 mV on each individual clamping unit
when measured separately, only if the overall
1) Before and after the short- measured value in Figure 2 exceeds 3,2 mV 1) The measurement is made with a direct current of 0,1 times the After the test according, the voltage drop shall not exceed 150 % of the values measured before the
Multimeter
time withstand current test value given in Table 4 or Table 5. test.
2) If the measured value exceeds 3,2 mV, the voltage drop is determined on each individual
clamping unit separately, which shall not exceed 1,6 mV
Univentec Company
Resistance to abnormal
heat and fire
Customer Name: HAN MY VIET Product Name: TERMINAL BLOCK Product code:
1) The thermal characteristics are checked by the needle flame test.The test is
carried out according to IEC 60695-11-5 successively in the area of one
clamping unit of three terminal blocks.
3) Before the test, the terminal blocks are stored for 24 h in an atmosphere
3 having a temperature between 15 °C and 35 °C and a relative humidity
between 45 % and 75 %.
1) The flame is applied for 10 s. For insulation walls <1 mm
7) The test flame, is guided under an angle of 45° to the lateral insulation wall.
The tip of the flame shall make contact with the insulation wall in the area of
the clamping unit (see Figure 4).
4
Univentec Company Department Name Signature Date
Revision No: 1 1/21/2020
R&D Department: Vi Diệu phong 1/21/2020
Production Department: Huỳnh Xuân Phương 1/21/2020
Approved by: Nguyễn Ngọc Chánh
Customer Engineering Approval:
Customer Quality Approval:
Other Approval:
ATB-5003 Page: FN:
Test Method Test condition Measuring Instrument Instruction for Testing Acceptable condition Test Result TROUBLE SHOOTING
Figure Actual Error Comments Tester Checker
( phương pháp kiểm tra ) ( Điều kiện kiểm tra ) ( Dụng cụ đo lường) ( Hướng dẫn kiểm tra) ( Điều kiện chấp nhận được )
Good Bad Probable Cause Remedy
Test Method Test condition Measuring Instrument Instruction for Testing Acceptable condition Test Result TROUBLE SHOOTING
Figure ( phương pháp kiểm tra ) ( Điều kiện kiểm tra ) ( Dụng cụ đo lường) ( Hướng dẫn kiểm tra) ( Điều kiện chấp nhận được ) Actual Error Comments Tester Checker
Good Bad Probable Cause Remedy
a) Clearances from live parts to parts intended to be earthed and between poles shall 1) The verification of the insulation is made by a test at the rated
withstand the test voltage given in Table 12 appropriate to the rated impulse withstand impulse withstand voltage. If equipment contains any part for 1) There shall be no unintentional disruptive discharge during the tests.
voltage. which the dielectric properties are not sensitive toaltitude (e.g. NOTE 1 An exception is an intentional disruptive discharge, for example by transient overvoltage
optocouplers, encapsulated parts), then the verification of the
b) Clearances across the open contacts shall withstand: insulation suppressing means.
– the impulse withstand voltage specified, where applicable, in the relevant productstandard; NOTE 2 The term "disruptive dicharge" related to phenomena associated with the failure of insulation
may be alternatively performed by a test at the rated impulse
– for equipment designated as suitable for isolation, the test voltage given in Table 14 withstand voltage without application of the altitude correction under electrical stress, in which the discharge completely bridges the insulation under test, reducing
appropriate to the rated impulse withstand voltage. factor. These parts shall then be disconnected and the remainder the voltage between the electrodes to zero or nearly to zero.
1) Main circuit NOTE Solid insulation of equipment associated with clearances a) and/or b) above should be of the equipment shall be tested with the rated impulse withstand NOTE 3 The term "sparkover" is used when a disruptive discharge occurs in a gaseous or liquid
subjected to the impulse voltage specified in a) and/or b), as applicable. Multimeter voltage dielectric.
NOTE 4 The term "flashover" is used when a disruptive discharge occurs over the surface of a
2) Auxiliary and control circuits c) For auxiliary and control circuits which operate directly from the main circuit at their rated using the altitude correction factor. Clearances equal to or larger dielectric in a gaseous or liquid medium.
voltage, clearances from live parts to parts intended to be earthed and between poles shall than the values of case A of Table 13 may be verified by NOTE 5 The term "puncture" is used when a disruptive discharge occurs through a solid dielectric.
withstand the test voltage given in Table 12 appropriate to the rated impulse withstand voltage measurement, according to the method described in Annex G. NOTE 6 A disruptive discharge in a solid dielectric produces permanent loss of dielectric strength, in a
of the auxiliary/control circuit and to the appropriate overvoltage category of the main circuit liquid or gaseous dielectric, the loss may be only temporary.
2) Test voltage
d) Auxiliary and control circuits which do not operate directly from the main circuit may have an For equipment incorporating overvoltage suppressing means, the
overvoltage withstand capacity different from that of the main circuit. Clearances and associated 2) The following reference voltage shall be applied in the standard waveform (1.2 / 50 μs)
energy content of the test current shall not exceed the energy
solid insulation of such circuits, whether a.c. or d.c., shall rating of the overvoltage suppressing means. The latter shall be each 3 times for positive and negative.
withstand the appropriate voltage in accordance with Annex H. suitable for the application.
Test Method Test condition Measuring Instrument Instruction for Testing Acceptable condition Test Result TROUBLE SHOOTING
Figure Actual Error Comments Tester Checker
( phương pháp kiểm tra ) ( Điều kiện kiểm tra ) ( Dụng cụ đo lường) ( Hướng dẫn kiểm tra) ( Điều kiện chấp nhận được )
Good Bad Probable Cause Remedy
Test method: The test is carried out from the lowest rotation speed to maximum rotation speed of top ram spindle. For each step, continous running for 30 to 60 minutes and measure each item as fllowing table:
Page 10 of 10