METHOD OF STATEMENTS
Website: www.ex-foam.com.my
SECTION A
________________________
COMPANY PROFILE
CORPORATE OVERVIEW / COMPANY INFORMATION
Board of Director
Managing Director
General Manager
Project Manager
Project Engineer /
Quantity Surveyor
Curriculum Vitae
Started in 2009 as project site engineer in Insafoam Insulation (M) Sdn Bhd after
completing his university degree in Chemical Engineering (Gas Technology) from
University Malaysia Pahang. Started as Technical Sales Engineer cum project
engineer at Insafoam. After 1 year working with Insafoam, he was promoting into
Project Manager. Established Ex Foam Insulation Sdn Bhd in December 2011 after
2 years working with Insafoam.
Responsibility:
- To advise architect consultant and contractor on shop drawings
- Direct the activities and productivity of a department or entire organization.
- Provide training and guidance.
- Participate in strategic planning.
- Represent the organization to the public, key stakeholders and business
partner.
- Create presentations for meetings
NAME : Norfarhana binti Ahya Arip
QUALIFICATION : Master in Economic, Universiti of Malaya (UM)
Bachelor in Business Administration (Hons.) (Economic)
University Teknologi Mara (UiTM)
EXPERIENCE : 6 Years
POSITION : Director
Experience
She also experienced in handling some government projects, fully practiced in the
scope of business modus operandi when serves the Base Dve Enterprise.
NAME : Mohd Zaidatull Akmar Bin Che Noh
YEAR OF EXPERIENCE : 2 years
CURRENT POSITION : General Manager
Curriculum Vitae
Started in 2016 as General Manager.
Experience
Curriculum Vitae
Started in 1994 as general worker in Insafoam Insulation (M) Sdn Bhd. He has
been trained as a Polyurethane sprayer for 5 years. He is very skill people as
sprayer and also can be role as maintenance for company. With a great
performance, he has been promoted into Site Supervisor from 1999-2004.
Experience
Involved in project implementation on site, working closely with contractor in the
site coordinator and monitoring. He was presenting company on site
representative. From 2005-Nov, 2011 he was promoted into Senior Site
Supervisor. He has been invited by Mr. Shaiful to join Ex Foam in January 2012.
NAME : Mohd Zulfikri Bin Samuri
YEAR OF EXPERIENCE : 4 years
CURRENT POSITION : Project Manager
Curriculum Vitae
Started in 2012 as admin assistant in Insafoam Insulation (M) Sdn Bhd . Invited to
join Ex Foam Insulation on October 2013 as Project Coordinator.
Experience
Curriculum Vitae
Started in July 2015 as a Project Engineer.
Experience
Curriculum Vitae
Started in July 2017 as a Quantity Surveyor
Experience
Among all insulation material, PU can provide lowest K-factor, only with
0.017~0.023w/m.k (25°C), almost same level as refrigerator, it is best choice for
insulation and energy saving.
a) Spraying the Bituminous compound will only proceed after the above
instruction has been fulfilled
b) A bituminous compound will be spraying as a vapor barrier prior to PU
application.
c) The spray equipment is checked to ensure that the nozzles are cleaned.
d) To check and to ensure the specific area is as marked in the drawing.
e) To make sure that the surface areas which are needed to spray are dry
and free from debris. Wall surface should be evenly plastered.
f) The bituminous compound is mixed with some water at 1:2 ratios to enable
spraying.
g) The bituminous mixture is sprayed onto the surface. One layer of
bituminous compound is sufficient as a vapor barrier application.
h) The vapor barrier is allowed to dry 12hours before spray PU foam.
4.0 SPRAY “EXFOAM” RIGID PU FOAM AT SOFFIT OF SLAB & BEAMS
PU Thickness : 50mm , 25mm (Side of Beams)
PU Density : 35 to 40kg/m3
a) Approval of spray foam material shall be obtained from the consultant.
Spray foam shall only proceed once the approval from the consultant is
obtained.
b) The spray foam equipment is checked to ensure that the nozzles are
cleaned and that the spray profile is even.
c) Make sure that the surface is dry before spray PU foam.
d) PU will be spraying layer by layer until the desired thickness 50mm attained.
During spray, our sprayer will be check PU thickness by using nails which
is length has been marking 25/50mm.
e) Due to sensitivity of density test equipment, PU density will be check using
manual calculation by taken PU weight and divided by volume. Our
materials already blend to achieved 35-40kg/m3 as stated in Technical
Safety Data Sheet.
f) In order to achieve the desired evenness, the sprayer desired competently
spray so that the mixture do not run-off or drip. Theoretically, any desired
thickness of insulation foam can be obtained by repeated application of
layer-by-layer spraying.
g) Random sample will be collected for k-value testing
5.0 INJECT “EXFOAM” RIGID PU FOAM AT BRICK WALL
PU Thickness : 25 mm / 30 mm
PU Density : 35kg/m3 (Free rise density)
a) Cavity wall should be constructing 1st before injection of PU Foam.
b) For clay brickwall Internal and external surface should be plastering
before PU injection, skim coat on block wall should be done after PU
Injection.
c) By using drill, Injection holes size ½” should be made for every 3ft to
4ft.
d) Next steps involved injection of PU foam step by steps from bottom
up to the top. PU slowly will infill cavity wall and produce some heat.
e) When PU foam full inside cavity wall, PU will overflow out of the wall.
f) Step (d) repeated until full height wall infill with PU foam
g) Inspection of thickness and density are not applicable for this
injection method.
h) Injection hole will be sealed using cement mortar same as
plastering.
6.0 RECTIFICATION WORKS
a) 1st inspection of defect will be done by our site supervisor, photo
should be taken as a proof and number of holes will be counting and
marking on drawing.
b) RFI form will be submitted with checklist for consultant and contractor
to approve and verify defect before we precede repairing works.
c) The spray foam equipment is checked to ensure that the nozzles are
cleaned and that the spray profile is even.
d) Next step is spraying PU foam into defect area by using low pressure
machine to maintain the same density as per earlier.
e) Inspection of work done after rectification works.
During spray PU foam, our sprayer will be checked randomly by using nail.
Nail already marking for desired thickness either 25mm or 50mm.
a) Nail already set for desired b) If desired thickness achieved, nail will go
thickness. into PU.
8.0 QAQC
All inspection and test activities shall be undertaken in accordance with
Technical Specification requirements. We will conduct a few testing’s at
SIRIM QAS International & Malaysian Palm Oil Board (MPOB). Below is
list of testing:
a) ASTM C 518, ISO 8301, JIS A1412 and DIN EN 12667 : Standard Test
Method For Thermal Conductivity test by MPOB
Remark:
Test Report Result may be different from original specification, it’s
depend on air factor during spray, workers skills and surfaces of area
to spray (wall/slab/floor). We will provide 5 Years Warranty for our
material and workmanship.
9.0 HEALTH, SAFETY, SECURITY & ENVIRONMENT (HSSE) & PPE LIST
a) Workmen are competent with the work and well versed with
good safety practice.
b) All safety equipment and precaution shall be practice during
work.
c) Be as accurate as possible when measuring quantities to ensure
a more consistent mixture and density.
d) Wear a goggle and respirator in confined areas. Don't get the
chemicals in your eyes and mouth.
e) Know decontamination and first-aid procedures.
f) Don't breathe the vapor in confined areas.
g) Don't keep the chemicals longer than 3 months.
h) Don’t let any water penetrate into the chemicals
i) For others precaution, please refers to material safety data sheet
b) Safety Shoes
c) Hand Gloves
d) Safety Mask
e) Goggle
f) Respirator
SECTION C
________________________
MATERIAL SUBMISSION
PROPOSED MATERIAL