REQUEST FOR INSPECTION

Project: SWRO DESALINATION PLANT AL DUR PHASE II Ref No: SPML/ALD/RFI-C-

Contract: Date: FEB 16 ,2020


Location/Grid: GENERAL AREA Level:
SPML Representative on Site: MR. SANYASAYYA ITP no: 6040Q403

Architectural Electrical Firefighting civil


Department:
Mechanical Plumbing Structural Others (Specify)
Element(s) to be Inspected: Checklist Yes No N/A

Location & Reason For Inspection:

INSPECTION REQUEST FOR ELECTRICAL CABLE DUCT MAN HOLE BLINDING CONCRETE
IN BETWEEN DAF-1 & DAF- 2 SOUTH SIDE MH-C1A AT GENERAL AREA
3.3 check blinding /waterproofing

Request for Inspection time: 9.00 A.M


17-2-2020
Main Contractor:

Name: Signature: Date:


MEP Engineering:

Name: Signature: Date:


Sub-Contractor:

Name: MR. SANYASAYYA Signature: Date:


Below portion is for SIDEM use only

Status: Approved Approved as noted Correction Reschedule Rejected


Comments:

Inspected by:

Name: Signature: Date:


MEP Engineering:

Name: Signature: Date:


Handed over to:

Name: MR. SANYASAYYA Signature: Date: