Professional Documents
Culture Documents
Casting, Forming & Jointing Process - Part 1
Casting, Forming & Jointing Process - Part 1
Casting, Forming & Jointing Process - Part 1
MY PROFILE
REPORTS
BUY PACKAGE Solution Report For Casting, Forming & Jointing Process Part 1
Represent whole test solution with correct and incorrect answers.
NEWS View Your Test Analysis
Ask an Expert
Q. No Question Status
Q.1 Match ListI (Pattern Material) with ListII (Allowances) and select the correct
answer using the codes given below the lists:
ListI ListII
A Bronze 1 25 mm/m
B Lead 2 10 mm/m
C Cast iron 3 15 mm/m
D Steel 4 20 mm/m
Codes:
A B C D
(a) 1 2 4 3
(b) 2 1 4 3
(c) 3 1 2 4
(d) 3 2 4 1
a. a
b. b
c. c
d. d
Not Attempt Correct Ans. c
FAQ? Have any doubt? Solution
Q.2 Match ListI with ListII and select the correct answer using the codes given below
the lists:
ListI ListII
A Pin hole porosity 1 Moulding material defect
B Cuts and washes 2 Pouring Metal defect
http://s2.onlinetestseriesmadeeasy.in/madeeasy/index.php?pageName=timeManagementReport&testid=1358&t=a&testType=2 1/5
1/30/2017 MADE EASY ONLINE TEST SERIES
C Slag inclusion 3 Metallurgical defect
D Hot tear 4 Gas defect
Codes:
A B C D
(a) 1 2 3 4
(b) 4 3 2 1
(c) 4 1 2 3
(d) 4 2 3 1
a. a
b. b
c. c
d. d
Not Attempt Correct Ans. c
FAQ? Have any doubt? Solution
Q.3 Which of the following statement is correct for shrinkage allowance ?
a. Liquid shrinkage > solid shrinkage > phase transformation phase
b. Solid shrinkage > Liquid shrinkage > Phases transformation phase
c. Phase transformation phase > Liquid shrinkage > Solid shrinkage
d. Liquid shrinkage > Phase transformation phase > Solid shrinkage
Not Attempt Correct Ans. a
FAQ? Have any doubt? Solution
Q.4 A casting size 400 mm × 200 mm × 150 mm solidifies in 20 minutes. The
solidification time for casting 400 mm × 200 mm × 30 mm under similar condition
is
a. 2 min
b. 2.4 min
c. 3.2 min
d. 3.9 min
Not Attempt Correct Ans. b
FAQ? Have any doubt? Solution
Q.5 A spherical drop of molten metal of radius 1 mm solidifies in 8 seconds. Then a
similar drop of radius 2 mm would solidify in __________ seconds.
Q.6 The shape factor for a casting in the form of a sphere with diameter 30 cm, will be
___________.
Not Attempt Correct Ans. 2
http://s2.onlinetestseriesmadeeasy.in/madeeasy/index.php?pageName=timeManagementReport&testid=1358&t=a&testType=2 2/5
1/30/2017 MADE EASY ONLINE TEST SERIES
Q.7 A hollow part of steel in produced by the sand casting process. A cylindrical core
of diameter 160 mm and height 200 mm is placed inside the mould cavity. Then
the net force that tends to left the core during pouring of molten metal with be
____________ N. [Take density of core material 2000 kg/m3 and density of steel
15000 kg/m3 ]
Q.8 Consider the following ingredients used in moulding.
(1) Dry silica sand
(2) Clay
(3) Phenol formaldehyde
(4) Sodium silicate
Those used for shell mould casting include
a. 1, 2 and 4
b. 2, 3 and 4
c. 1 and 3
d. 1, 2, 3 and 4
Not Attempt Correct Ans. c
FAQ? Have any doubt? Solution
Q.9 Match ListI (Moulding/Casting Process) with ListII (Product) and select the
correct answer using the codes given below the lists:
ListI ListII
A Shell moulding 1 Rain water pipe
B Slush moulding 2 Cylinder block
C Centrifugal moulding 3 Turbine blade
D Dry sand moulding 4 Hollow casting
Codes:
A B C D
(a) 3 4 1 2
(b) 1 2 3 4
(c) 3 4 2 1
(d) 4 1 2 3
a. a
b. b
c. c
d. d
Not Attempt Correct Ans. a
FAQ? Have any doubt? Solution
http://s2.onlinetestseriesmadeeasy.in/madeeasy/index.php?pageName=timeManagementReport&testid=1358&t=a&testType=2 3/5
1/30/2017 MADE EASY ONLINE TEST SERIES
Q.10 Three metal casting which are being cast have same volume but different
shapes; one is sphere, one is a cube and one is a cylinder having its height equal
to its diameter. The correct order of increasing solidification time is for
a. cylinder < cube < sphere
b. sphere < cylinder < cube
c. cylinder < sphere < cube
d. cube < cylinder < sphere
Not Attempt Correct Ans. d
FAQ? Have any doubt? Solution
Q.11 A gating design for a mould of 25 cm × 50 cm × 14 cm is shown. The cross
sectional area of the gate is 5 cm2 . As the mould starts filling, a stopwatch is
actuated at time t = 0. The reading (in sec) shown by the stopwatch when the
mould will be filled is
a. 21.11
b. 23.71
c. 30.91
d. 105.59
Not Attempt Correct Ans. a
FAQ? Have any doubt? Solution
Q.12 Molten aluminium was poured in a sand mold and the thickness of solid skin
formed after 15 sec and 30 sec were found to be 2 mm and 4 mm respectively,
then the thickness of the solid skin at the end of 80 sec after pouring will be
a. 7.326 mm
b. 8.316 mm
c. 9.346 mm
d. 6.218 mm
Not Attempt Correct Ans. b
FAQ? Have any doubt? Solution
Q.13 While cooling, a cubical casting of side 50 mm undergoes 4%, 5% and 6% volume
shrinkage during the liquid state, phase transition and solid state respectively.
The volume of metal compensated from the riser is _________%
http://s2.onlinetestseriesmadeeasy.in/madeeasy/index.php?pageName=timeManagementReport&testid=1358&t=a&testType=2 4/5
1/30/2017 MADE EASY ONLINE TEST SERIES
Q.14 A cast steel slab of dimension 30 × 20 × 5 cm is poured horizontally using a side
riser. The riser is cylindrical in shape with diameter and height both equal to 12
cm. The freezing ratio of the mould is ___________.
Q.15 A down sprue of 150 mm length has diameter of 15 mm at its top ends. The liquid
metal in the pouring cup is maintained upto 50 mm height. For no aspiration
effect, diameter of down sprue at its lower end will be ___________ mm.
Q.16 Two casting of the same metal have same surface area, one casting is in the
form of a sphere and the other is a cube. The ratio of solidification time for the
sphere to that of cube is _______________.
http://s2.onlinetestseriesmadeeasy.in/madeeasy/index.php?pageName=timeManagementReport&testid=1358&t=a&testType=2 5/5