CONTRACTOR EMPLOYER ENGINEER

AL NABOODAH ENGINEERING LLC DUBAI PROPERTIES HALCROW INTERNATIONAL PARTNERSHIP


P.O. BOX: 11193, DUBAI, UAE PO BOX 500272, DUBAI UAE PO BOX 360, DUBAI UAE

PROJECT: LA VILLE CONTEMPORAINE BUSINESS BAY PHASE 1 & 2, INFRASTRUCTURE WORKS PACKAGE 2

SL.NO.________

CONCRETE PRE-POUR INSPECTION


CONTRACT NO.: DATE:
DRAWING/SPECIFICATIONS :
LOCATION/DESCRIPTION:

ACCEPTANCE ANE Site ANE Section CONSULTANT/


Item ACTIVITY
Engr. Engr CLIENT
Check that existing concrete surface has been chipped,
1
joints has been prepared properly
Check that necessary tests have been conducted on
2
the soil surface(for apron slabs & blinding)
Installation of waterproofing membrane/polythene sheet
3
has been done as per requirement
Check that formwork installation had been proper,
4 release agent applied and meets the requirement as
per the approved design drawing.
Check that reinforcement has been erected as per
5
drawing/specification
Check that all civil piping has been fixed as per
6
drawing/specification
Check that all electrical items/embeds are fixed properly
7
as per drawing/specification
Check that all embedded items, box outs, metal
8 sleeves, bolts and dowel bars have been fixed in
position as per drawing/specification
Check that provisions for grout/formwork has been
9
done
Check that area has been cleaned and proper access
10
been provided
Check if more than one source of steel is used. If yes
11
provide details

All setting out verified by Surveyor including concreting Surveyor Name & Sign
12 level and all dimensions checked and correct within
tolerances Date :

ALL THE ABOVE ACTIVITIES HAVE BEEN FULLY COMPLIED


CONSTRUCTION SITE/FIELD ENGINEER NAME: DATE:
SIGNATURE:
COMMENTS/REMARKS:

AUTHORISED ANE REPRESENTATIVE CONSULTANT/CLIENT


NAME
SIGNATURE
DATE