EMPORIUM MALL, LAHORE MAIN SUMMARY OF BILL OF QUANTITIES

FIRE SUPPRESSION SYSTEM WORKS DATED: FEBRUARY 01, 2014

MAIN SUMMARY OF COST OF ALL MECHANICAL WORKS

ITEM NO. DESCRIPTION AMOUNT IN FIGURES (Rs.)

1.0 TOTAL COST OF FIRE PROTECTION WORKS 152,673,673.65

2.0 TOTAL COST OF HVAC WORKS 201,330,156.09

3.0 TOTAL COST OF PLUMBING WORKS 72,996,171.01

4.0 TOTAL TENDERED PRICE OF WORKS (SUM OF S. NO 1.0 TO 3.0) 427,000,000.74

(RUPEES IN WORDS: __________________________________________________________________________________________________ ONLY).


152,673,673.00 0.65

201,330,156.00 0.09

72,996,171.00 0.01

427,000,000.00 0.74
EMPORIUM MALL, LAHORE MAIN SUMMARY OF BILL OF QUANTITIES

FIRE SUPPRESSION SYSTEM WORKS DATED: FEBRUARY 01, 2014

MAIN SUMMARY OF COST OF FIRE SUPPRESSION WORKS

ITEM NO. DESCRIPTION AMOUNT IN FIGURES (Rs.)

1.0 COST OF BOQ BASMENT 01 : EQUIPMENT / METERIAL & INSTALLATION 57,733,374

2.0 COST OF BOQ BASMENT 02 : EQUIPMENT / METERIAL & INSTALLATION 64,434,439

3.0 COST OF BOQ BASMENT 03 & B4 : EQUIPMENT / METERIAL & INSTALLATION 30,505,860

4.0 TOTAL TENDERED PRICE OF WORKS (SUM OF S. NO 1.0 TO 3.0) 152,673,674

(RUPEES IN WORDS: __________________________________________________________________________________________________ ONLY).


EMPORIUM MALL, LAHORE BILL OF QUANTITIES
FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

SUMMARY OF BOQ - BASMENT 01 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

ITEM NO. DESCRIPTION AMOUNT IN FIGURES (Rs.)

1.0 FIRE SPRINKLERS (SECTION 21 13 10 & DS No. -21 13 10) 6,260,426.00

2.0 CORRUGATED STAINLESS STEEL FLEXIBLE CONNECTOR 1,043,400.00

3.0 ALARM CHECK VALVE ASSEMBLY (SECTION 21 11 18 & DS No. -21 11 18) 4,898,750.00

4.0 CHECK VALVE (SECTION 21 05 23) 153,375.00

5.0 DELUGE VALVE (SECTION 21 90 10) 1,213,750.00

6.0 PORTABLE FIRE EXTINGUISHER FOR FIRE TYPES A, B & C (SECTION 21 21 10) 40,250.00

7.0 FLEXIBLE CONNECTOR (SECTION 21 10 10) 200,555.00

8.0 DOYMA SLEEVE (AS PER FND DRAWING NOS. FND/PWS/01 & FND PWS/03) 20,127.97

9.0 BLACK STEEL SCHEDULE 40 PIPING (SECTION 21 10 10) 31,395,184.22

10.0 HYDRANT VALVES (SECTION 21 11 16) 1,159,100.00

11.0 FIRE BRIGADE CONNECTION & VALVING (SECTION 21 13 12) 190,000.00

12.0 FIRE HOSE REEL (SECTION 21 12 16) 3,633,850.00

13.0 SIESMIC BRACING (REFER FND/SS/10 & FND/SS/11) 1,290,000.00

14.0 FIRE SPRINKLER SYSTEM ACCEPTANCE TEST (SECTION 21 13 17) 45,000.00

15.0 PAINTING COATING & STENCILING (SECTION 21 05 50) 1,717,306.25

16.0 PIPE SUPPORT SYSTEM (SECTION 21 05 29) 1,675,000.00

17.0 MISCELLANEOUS 2,797,300.00

TOTAL= 57,733,374.44
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

BOQ - BASMENT 01 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MATERIAL INSTALLATION TOTAL
ITEM
DESCRIPTION QTY. UNIT RATE AMOUNT RATE AMOUNT RATE AMOUNT
NO.
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
1.0 FIRE SPRINKLERS (SECTION 21 13 10 & DS No. -21 13 10)
1.1 Fire Sprinkler-Pendent Ceiling Concealed, Standard Response 370 Nos. 2,772 1,025,640 250 92,500 3,022 1,118,140
1.2 Fire Sprinkler-Upright, Standard Response 3,910 Nos. 798 3,120,180 250 977,500 1,048 4,097,680
1.3 Fire Sprinkler-Upright, Standard Response With Guard 180 Nos. 1,680 302,400 250 45,000 1,930 347,400
1.4 Fire Sprinkler-Side Wall, Standard Response 35 Nos. 2,268 79,380 250 8,750 2,518 88,130
1.5 Fire Sprinkler- Open Sprinkler 82 Nos. 4,788 392,616 250 20,500 5,038 413,116
1.6 Cabinet complete with 06 Spare Sprinklers (Pendent Ceiling Concealed) 2 Nos. 31,500 63,000 5,500 11,000 37,000 74,000
1.7 Cabinet complete with 06 Spare Sprinklers (Upright Sprinkler ) 2 Nos. 17,220 34,440 5,500 11,000 22,720 45,440
1.8 Cabinet complete with 06 Spare Sprinklers (Open Sprinkler ) 1 No. 39,900 39,900 5,500 5,500 45,400 45,400
1.9 Cabinet complete with 06 Spare Sprinklers (Side Sprinkler ) 1 No. 25,620 25,620 5,500 5,500 31,120 31,120
Sub-total Carried to Summary 6,260,426

2.0 CORRUGATED STAINLESS STEEL FLEXIBLE CONNECTOR


2.1 Corrugated Stainless Steel Flexible Connector Ø 1" X 3 ft (UL/FM) 370 Nos. 2,070 765,900 750 277,500 2,820 1,043,400
Sub-total Carried to Summary 1,043,400

3.0 ALARM CHECK VALVE ASSEMBLY (SECTION 21 11 18 & DS No. -21 11 18)

3.1 Alarm Check Valve Assembly - Ø6 inch (Refer Detail Drawing FND / ADD / 04) 10 Nos. 246,500 2,465,000 8,500 85,000 255,000 2,550,000

3.2 Alarm Check Valve Assembly - Ø4 inch (Refer Detail Drawing FND / ADD / 04) 10 No. 227,375 2,273,750 7,500 75,000 234,875 2,348,750

Sub-total Carried to Summary 4,898,750

4.0 CHECK VALVE (SECTION 21 05 23)


4.1 Ø 6 inch 0 No. 42,075 Rate Only 1,500 Rate Only Rate Only
4.2 Ø 4 inch 5 Nos. 29,325 146,625 1,350 6,750 30,675 153,375
4.3 Ø2 1/2 inch 0 No. 14,875 Rate Only 1,925 Rate Only Rate Only
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

BOQ - BASMENT 01 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MATERIAL INSTALLATION TOTAL
ITEM
DESCRIPTION QTY. UNIT RATE AMOUNT RATE AMOUNT RATE AMOUNT
NO.
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
Sub-total Carried to Summary 153,375

5.0 DELUGE VALVE (SECTION 21 90 10)


5.1 Ø 4 inch 0 No. 686,375 Rate Only 5,500 Rate Only Rate Only
5.2 Ø 3 inch 2 Nos. 601,375 1,202,750 5,500 11,000 606,875 1,213,750
5.3 Ø2 1/2 inch 0 No. 450,500 Rate Only 4,500 Rate Only Rate Only
Sub-total Carried to Summary 1,213,750

6.0 PORTABLE FIRE EXTINGUISHER FOR FIRE TYPES A, B & C (SECTION 21 21 10)
6.1 Installation of 06kg Dry Powder Extinguisher (ABC) 34 Nos. - - 350 11,900 350 11,900
6.2 Installation of 6 kg CO2 Fire Extinguisher 81 Nos. - - 350 28,350 350 28,350
Sub-total Carried to Summary 40,250

7.0 FLEXIBLE CONNECTOR (SECTION 21 10 10)


7.1 Ø 8 inch 0 No. 19,975 Rate Only 1,800 Rate Only Rate Only
7.2 Ø 6 inch 1 No. 14,875 14,875 1,800 1,800 16,675 16,675
7.3 Ø 4 inch 14 Nos. 10,370 145,180 1,500 21,000 11,870 166,180
7.4 Ø 3 inch 2 Nos. 7,650 15,300 1,200 2,400 8,850 17,700
Sub-total Carried to Summary 200,555

8.0 DOYMA SLEEVE (AS PER FND DRAWING NOS. FND/PWS/01 & FND PWS/03)
8.1 Ø 8 inch Pipe (Wet Application) 0 No. 2,966 Rate Only 1,500 Rate Only Rate Only
8.2 Ø 6 inch Pipe (Wet Application) 0 No. 2,119 Rate Only 1,500 Rate Only Rate Only
8.3 Ø 4 inch Pipe(Dry Application) 7 Nos. 1,525 10,678 1,350 9,450 2,875 20,128
Sub-total Carried to Summary 20,128

9.0 BLACK STEEL SCHEDULE 40 PIPING (SECTION 21 10 10)


9.1 Ø 8 inch 0 Rft 2,720 Rate Only 413 Rate Only Rate Only
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

BOQ - BASMENT 01 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MATERIAL INSTALLATION TOTAL
ITEM
DESCRIPTION QTY. UNIT RATE AMOUNT RATE AMOUNT RATE AMOUNT
NO.
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
9.2 Ø 6 inch 1,845 Rft 1,805 3,331,108 280 516,600 2,085 3,847,708
9.3 Ø 4 inch 11,200 Rft 1,031 11,545,745 225 2,520,000 1,256 14,065,745
9.4 Ø 4 inch (Buried in Ground with Thrust Blocks) 250 Rft 1,144 286,041 225 56,250 1,369 342,291
9.5 Ø 3 inch 1,500 Rft 722 1,083,287 216 324,000 938 1,407,287
9.6 Ø 2 1/2 inch 0 Rft 577 Rate Only 180 Rate Only Rate Only
9.7 Ø 2 inch 650 Rft 349 227,141 126 81,900 475 309,041
9.8 Ø 1 1/2 inch 8,400 Rft 263 2,211,304 96 806,400 359 3,017,704
9.9 Ø 1 1/4 inch 12,500 Rft 227 2,839,261 85 1,062,500 312 3,901,761
9.10 Ø 1 inch 18,500 Rft 170 3,146,192 60 1,110,000 230 4,256,192
9.11 Ø 1/2 inch 1,450 Rft 111 160,455 60 87,000 171 247,455
Sub-total Carried to Summary 31,395,184

10.0 HYDRANT VALVES (SECTION 21 11 16)

10.1 External Fire Hydrant - Double Delivery (Data Sheet No. FND-21 11 16-1/2) 10 Nos. 40,375 403,750 7,000 70,000 47,375 473,750

Ø 2 1/2 inch Hydrant Valve with Quick Coupling (Data Sheet No. FND-21 11 16-
10.2 12 Nos. 22,525 270,300 3,000 36,000 25,525 306,300
2/2)
2 x 100Ft , Ø 2 1/2 inch Quick Coupling Hose, 2 Nos. Diffuser Nozzle With Cabinet
10.3 6 Nos. 55,675 334,050 7,500 45,000 63,175 379,050
(Similar to SRI Mdel D Hose Cabinet)
Sub-total Carried to Summary 1,159,100

11.0 FIRE BRIGADE CONNECTION & VALVING (SECTION 21 13 12)


11.1 Fire Brigade Connection (Data Sheet No. FND-21 11 17-1/1) 5 Nos. 34,500 172,500 3,500 17,500 38,000 190,000
Sub-total Carried to Summary 190,000

12.0 FIRE HOSE REEL (SECTION 21 12 16)


Fire Hose Reel With Double Cabinet & Architrave - Ø 1 inch x 100ft Data Sheet No.
12.1 22 Nos. 157,675 3,468,850 7,500 165,000 165,175 3,633,850
FND-21 12 16-1/1)
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

BOQ - BASMENT 01 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MATERIAL INSTALLATION TOTAL
ITEM
DESCRIPTION QTY. UNIT RATE AMOUNT RATE AMOUNT RATE AMOUNT
NO.
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
Sub-total Carried to Summary 3,633,850

13.0 SIESMIC BRACING (REFER FND/SS/10 & FND/SS/11)


13.1 Transverse Seismic Bracing For Pipe Dia
13.1.1 Ø 6" 1 Lot 215,000 215,000 87,500 87,500 302,500 302,500
13.1.2 Ø 4" 1 Lot 215,000 215,000 137,500 137,500 352,500 352,500
13.2 Longitudinal Seismic Bracing For Pipe Dia
13.2.1 Ø 6" 1 Lot 205,000 205,000 87,500 87,500 292,500 292,500
13.2.2 Ø 4" 1 Lot 205,000 205,000 137,500 137,500 342,500 342,500
Sub-total Carried to Summary 1,290,000

14.0 FIRE SPRINKLER SYSTEM ACCEPTANCE TEST (SECTION 21 13 17)


14.1 Fire Sprinkler System Acceptance Test 1 Lot 45,000 45,000 - 45,000 45,000
Sub-total Carried to Summary 45,000

15.0 PAINTING COATING & STENCILING (SECTION 21 05 50)


15.1 Painting, Coating
15.1.1 Ø 8 inch 0 Rft 50 Rate Only 14 Rate Only Rate Only
15.1.2 Ø 6 inch 1,845 Rft 40 73,800 11 20,756 51 94,556
15.1.3 Ø 4 inch 11,200 Rft 35 392,000 10 112,000 45 504,000
15.1.4 Ø 4 inch (Buried in Ground) 250 Rft 35 8,750 10 2,500 45 11,250
15.1.5 Ø 3 inch 1,500 Rft 35 52,500 10 15,000 45 67,500
15.1.6 Ø 2 1/2 inch 0 Rft 35 Rate Only 10 Rate Only Rate Only
15.1.7 Ø 2 inch 650 Rft 15 9,750 5 3,250 20 13,000
15.1.8 Ø 1 1/2 inch 8,400 Rft 15 126,000 5 42,000 20 168,000
15.1.9 Ø 1 1/4 inch 12,500 Rft 15 187,500 5 62,500 20 250,000
15.1.10 Ø 1 inch 18,500 Rft 15 277,500 5 92,500 20 370,000
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

BOQ - BASMENT 01 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MATERIAL INSTALLATION TOTAL
ITEM
DESCRIPTION QTY. UNIT RATE AMOUNT RATE AMOUNT RATE AMOUNT
NO.
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
15.1.11 Ø 3/4 inch 1,450 Rft 15 21,750 5 7,250 20 29,000
15.1.12 Stenciling & Identification Tags of Valves 1 Lot 75,000 75,000 35,000 35,000 110,000 110,000
Signage As Per NFPA (For Example: Signage of Fire Brigade Connection, Landing
15.1.13 1 Lot 65,000 65,000 35,000 35,000 100,000 100,000
Valve etc)
Sub-total Carried to Summary 1,717,306

16.0 PIPE SUPPORT SYSTEM (SECTION 21 05 29)


16.1 Hilti / Fischer Pipe Support System 1 Lot 1,675,000 1,675,000 - 1,675,000 1,675,000
Sub-total Carried to Summary 1,675,000

17.0 MISCELLANEOUS
17.1 Hydraulic System Name Plates (Section 21 13 12) 1 Lot 40,000 40,000 - - 40,000 40,000
17.2 Hydrostatic Testing 1 Lot 75,000 75,000 - - 75,000 75,000
17.3 Shop Drawings 1 Lot 50,000 50,000 - - 50,000 50,000
17.4 As Built Drawings 1 Lot 50,000 50,000 - - 50,000 50,000
17.5 Inspector Test Valve with Open Sprinkler 10 Nos. 12,980 129,800 - - 12,980 129,800
17.6 ACV & Deluge Security Cage/Fence 22 Nos. 75,000 1,650,000 - - 75,000 1,650,000
Fire Stoping of Walls & Structure Openings (For Small Openings - Hilti FS - ONE or
17.7 1 Lot 345,000 345,000 - - 345,000 345,000
Approved Equivalent)
17.8 Pipe Sleeves 1 Lot 50,000 50,000 - - 50,000 50,000
17.9 Isolation Valves Locks (Wire / Chain Type) 22 Nos. 5,000 110,000 1,250 27,500 6,250 137,500
17.10 Structural Opennings & Core Cuts 1 Lot 145,000 145,000 - - 145,000 145,000
17.11 Operation & Maintenance Instructions to Clients Representatives 1 Lot 45,000 45,000 - - 45,000 45,000
17.12 Operation & Maintenance Manuals 1 Lot 25,000 25,000 - - 25,000 25,000
Excavation & Backfilling for Laying External Fire Pipes (Refer Detail Drawing - FND /
17.13 2,000 ft³ 22 44,000 6 11,000 28 55,000
ADD / 05)
Sub-total Carried to Summary 2,797,300
3,300 528 2,772
950 152 798
2,000 320 1,680
2,700 432 2,268
5,700 912 4,788
37,500 6,000 31,500
20,500 3,280 17,220
47,500 7,600 39,900
30,500 4,880 25,620

290,000
43,500 246,500
267,500
40,125 227,375
- -
- -
49,500 7,425 42,075
34,500 5,175 29,325
17,500 2,625 14,875
- -
- -
807,500 121,125 686,375
707,500 106,125 601,375
530,000 79,500 450,500

23,500 3,525 19,975


17,500 2,625 14,875
12,200 1,830 10,370
9,000 1,350 7,650

3,626 906.62 2720 3,133.16 -


2,407 601.83 1805 2,085.48 3,847,708
1,374 343.62 1031 1,255.87 14,065,745
1,526 381.39 1144 1,369.16 342,291
963 240.73 722 938.19 1,407,287
769 192.20 577 756.59 -
466 116.48 349 475.45 309,041
351 87.75 263 359.25 3,017,704
303 75.71 227 312.14 3,901,761
227 56.69 170 230.06 4,256,192
148 36.89 111 170.66 247,455
31,395,184 -

47,500
7,125 40,375
26,500
3,975 22,525
65,500
9,825 55,675

185,500
27,825 157,675
EMPORIUM MALL, LAHORE BILL OF QUANTITIES

FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

SUMMARY OF BOQ - BASMENT 02 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

ITEM NO. DESCRIPTION AMOUNT IN FIGURES (Rs.)

1.0 FIRE SPRINKLERS (SECTION 21 13 10 & DS No. -21 13 10) 5,251,446.00

2.0 CORRUGATED STAINLESS STEEL FLEXIBLE CONNECTOR 1,029,300.00

3.0 ALARM CHECK VALVE ASSEMBLY (SECTION 21 11 18 & DS No. -21 11 18) 2,113,875.00

4.0 OS & Y GATE VALVE (SECTION 21 05 23) 1,208,100.00

5.0 DELUGE VALVE (SECTION 21 90 10) 1,213,750.00

6.0 PORTABLE FIRE EXTINGUISHER FOR FIRE TYPES A, B & C (SECTION 21 21 10) 19,600.00

7.0 FLEXIBLE CONNECTOR (SECTION 21 10 10) 426,730.00

8.0 BLACK STEEL SCHEDULE 40 PIPING (SECTION 21 10 10) 41,627,917.89

9.0 HYDRANT VALVES (SECTION 21 11 16) 685,350.00

10.0 FIRE HOSE REEL (SECTION 21 12 16) 3,468,675.00

11.0 SIESMIC BRACING (REFER FND/SS/10 & FND/SS/11) 1,917,500.00

12.0 FIRE SPRINKLER SYSTEM ACCEPTANCE TEST (SECTION 21 13 17) 45,000.00

13.0 PAINTING COATING & STENCILING (SECTION 21 05 50) 1,870,375.00

14.0 PIPE SUPPORT SYSTEM (SECTION 21 05 29) 1,675,000.00

15.0 MISCELLANEOUS 1,881,820.00

TOTAL= 64,434,438.89
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

BOQ - BASMENT 02 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MATERIAL INSTALLATION TOTAL
ITEM
DESCRIPTION QTY. UNIT RATE AMOUNT RATE AMOUNT RATE AMOUNT
NO.
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
1.0 FIRE SPRINKLERS (SECTION 21 13 10 & DS No. -21 13 10)
1.1 Fire Sprinkler-Pendent Ceiling Concealed, Standard Response 365 Nos. 2,772 1,011,780 250 91,250 3,022 1,103,030
1.2 Fire Sprinkler-Upright, Standard Response 3455 Nos. 798 2,757,090 250 863,750 1,048 3,620,840
1.3 Fire Sprinkler-Side Wall, Standard Response 0 No. 2,604 Rate Only 250 Rate Only Rate Only
1.4 Fire Sprinkler- Open Sprinkler 72 Nos. 4,788 344,736 250 18,000 5,038 362,736
1.5 Cabinet complete with 06 Spare Sprinklers (Pendent Ceiling Concealed) 2 Nos. 31,500 63,000 5,500 11,000 37,000 74,000
1.6 Cabinet complete with 06 Spare Sprinklers (Upright Sprinkler ) 2 Nos. 17,220 34,440 5,500 11,000 22,720 45,440
1.7 Cabinet complete with 06 Spare Sprinklers (Open Sprinkler ) 1 No. 39,900 39,900 5,500 5,500 45,400 45,400
Sub-total Carried to Summary 5,251,446

2.0 CORRUGATED STAINLESS STEEL FLEXIBLE CONNECTOR


2.1 Corrugated Stainless Steel Flexible Connector Ø 1" X 3 ft (UL/FM) 365 Nos. 2,070 755,550 750 273,750 2,820 1,029,300
Sub-total Carried to Summary 1,029,300

3.0 ALARM CHECK VALVE ASSEMBLY (SECTION 21 11 18 & DS No. -21 11 18)

3.1 Alarm Check Valve Assembly - Ø6 inch (Refer Detail Drawing FND / ADD / 04) 0 No. 246,500 Rate Only 8,500 Rate Only Rate Only

3.2 Alarm Check Valve Assembly - Ø4 inch (Refer Detail Drawing FND / ADD / 04) 9 Nos. 227,375 2,046,375 7,500 67,500 234,875 2,113,875

Sub-total Carried to Summary 2,113,875

4.0 OS & Y GATE VALVE (SECTION 21 05 23)


4.1 Ø10 inch 12 No. 98,175 1,178,100 2,500 30,000 100,675 1,208,100
4.2 Ø8 inch 0 No. 90,500 Rate Only 2,000 Rate Only Rate Only
4.3 Ø6 inch 0 No. 70,500 Rate Only 2,000 Rate Only Rate Only
Sub-total Carried to Summary 1,208,100

5.0 DELUGE VALVE (SECTION 21 90 10)


5.1 Ø 4 inch 0 No. 686,375 Rate Only 5,500 Rate Only Rate Only
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

BOQ - BASMENT 02 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MATERIAL INSTALLATION TOTAL
ITEM
DESCRIPTION QTY. UNIT RATE AMOUNT RATE AMOUNT RATE AMOUNT
NO.
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
5.2 Ø 3 inch 2 Nos. 601,375 1,202,750 5,500 11,000 606,875 1,213,750
Sub-total Carried to Summary 1,213,750

6.0 PORTABLE FIRE EXTINGUISHER FOR FIRE TYPES A, B & C (SECTION 21 21 10)
6.1 Installation of 06kg Dry Powder Extinguisher (ABC) 33 Nos. - - 350 11,550 350 11,550
6.2 Installation of 6 kg CO2 Fire Extinguisher 23 Nos. - - 350 8,050 350 8,050
Sub-total Carried to Summary 19,600

7.0 FLEXIBLE CONNECTOR (SECTION 21 10 10)


7.1 Ø 10 inch 8 Nos. 35,275 282,200 2,500 20,000 37,775 302,200
7.2 Ø 8 inch 0 No. 19,975 Rate Only 2,500 Rate Only Rate Only
7.3 Ø 6 inch 0 No. 14,875 Rate Only 1,800 Rate Only Rate Only
7.4 Ø 4 inch 9 Nos. 10,370 93,330 1,500 13,500 11,870 106,830
7.5 Ø 3 inch 2 Nos. 7,650 15,300 1,200 2,400 8,850 17,700
Sub-total Carried to Summary 426,730

8.0 BLACK STEEL SCHEDULE 40 PIPING (SECTION 21 10 10)


8.1 Ø 10 inch 3,700 Rft 2,992 11,072,011 455 1,682,438 3,447 12,754,449
8.2 Ø 8 inch 0 Rft 2,720 Rate Only 413 Rate Only Rate Only
8.3 Ø 6 inch 1,900 Rft 1,805 3,430,410 280 532,000 2,085 3,962,410
8.4 Ø 4 inch 9,000 Rft 1,031 9,277,831 225 2,025,000 1,256 11,302,831
8.5 Ø 3 inch 1,800 Rft 722 1,299,945 216 388,800 938 1,688,745
8.6 Ø 2 1/2 inch 0 Rft 577 Rate Only 180 Rate Only Rate Only
8.7 Ø 2 inch 1,500 Rft 349 524,171 126 189,000 475 713,171
8.8 Ø 1 1/2 inch 9,200 Rft 263 2,421,904 96 883,200 359 3,305,104
8.9 Ø 1 1/4 inch 12,700 Rft 227 2,884,689 85 1,079,500 312 3,964,189
8.10 Ø 1 inch 16,000 Rft 170 2,721,031 60 960,000 230 3,681,031
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

BOQ - BASMENT 02 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MATERIAL INSTALLATION TOTAL
ITEM
DESCRIPTION QTY. UNIT RATE AMOUNT RATE AMOUNT RATE AMOUNT
NO.
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
8.11 Ø 1/2 inch 1,500 Rft 111 165,988 60 90,000 171 255,988
Sub-total Carried to Summary 41,627,918

9.0 HYDRANT VALVES (SECTION 21 11 16)


Ø 2 1/2 inch Hydrant Valve with Quick Coupling (Data Sheet No. FND-21 11 16-
9.1 12 Nos. 22,525 270,300 3,000 36,000 25,525 306,300
2/2)
2 x 100Ft , Ø 2 1/2 inch Quick Coupling Hose, 2 Nos. Diffuser Nozzle With
9.2 6 Nos. 55,675 334,050 7,500 45,000 63,175 379,050
Cabinet (Similar to SRI Mdel D Hose Cabinet)
Sub-total Carried to Summary 685,350

10.0 FIRE HOSE REEL (SECTION 21 12 16)


Fire Hose Reel With Double Cabinet & Architrave - Ø 1 inch x 100ft Data Sheet
10.1 21 Nos. 157,675 3,311,175 7,500 157,500 165,175 3,468,675
No. FND-21 12 16-1/1)
Sub-total Carried to Summary 3,468,675

11.0 SIESMIC BRACING (REFER FND/SS/10 & FND/SS/11)


11.1 Transverse Seismic Bracing For Pipe Dia
11.1.1 Ø 10" 1 Lot 245,000 245,000 93,750 93,750 338,750 338,750
11.1.2 Ø 6" 1 Lot 215,000 215,000 87,500 87,500 302,500 302,500
11.1.3 Ø 4" 1 Lot 215,000 215,000 112,500 112,500 327,500 327,500
11.2 Longitudinal Seismic Bracing For Pipe Dia
11.2.1 Ø 10" 1 Lot 245,000 245,000 93,750 93,750 338,750 338,750
11.2.2 Ø 6" 1 Lot 205,000 205,000 87,500 87,500 292,500 292,500
11.2.3 Ø 4" 1 Lot 205,000 205,000 112,500 112,500 317,500 317,500
Sub-total Carried to Summary 1,917,500

12.0 FIRE SPRINKLER SYSTEM ACCEPTANCE TEST (SECTION 21 13 17)


12.1 Fire Sprinkler System Acceptance Test 1 Lot 45,000 45,000 - 45,000 45,000
Sub-total Carried to Summary 45,000
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

BOQ - BASMENT 02 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MATERIAL INSTALLATION TOTAL
ITEM
DESCRIPTION QTY. UNIT RATE AMOUNT RATE AMOUNT RATE AMOUNT
NO.
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
13.0 PAINTING COATING & STENCILING (SECTION 21 05 50)
13.1 Painting, Coating
13.1.1 Ø 10 inch 3,700 Rft 55 203,500 15 55,500 70 259,000
13.1.2 Ø 8 inch 0 Rft 50 Rate Only 14 Rate Only Rate Only
13.1.3 Ø 6 inch 1,900 Rft 40 76,000 11 21,375 51 97,375
13.1.4 Ø 4 inch 9,000 Rft 35 315,000 10 90,000 45 405,000
13.1.5 Ø 3 inch 1,800 Rft 35 63,000 10 18,000 45 81,000
13.1.6 Ø 2 1/2 inch 0 Rft 35 Rate Only 10 Rate Only Rate Only
13.1.7 Ø 2 inch 1,500 Rft 15 22,500 5 7,500 20 30,000
13.1.8 Ø 1 1/2 inch 9,200 Rft 15 138,000 5 46,000 20 184,000
13.1.9 Ø 1 1/4 inch 12,700 Rft 15 190,500 5 63,500 20 254,000
13.1.10 Ø 1 inch 16,000 Rft 15 240,000 5 80,000 20 320,000
13.1.11 Ø 3/4 inch 1,500 Rft 15 22,500 5 7,500 20 30,000
13.2 Stenciling & Identification Tags of Valves 1 Lot 75,000 75,000 35,000 35,000 110,000 110,000
Signage As Per NFPA (For Example: Signage of Fire Brigade Connection, Landing
13.3 1 Lot 65,000 65,000 35,000 35,000 100,000 100,000
Valve etc)
Sub-total Carried to Summary 1,870,375

14.0 PIPE SUPPORT SYSTEM (SECTION 21 05 29)


14.1 Hilti / Fischer Pipe Support System 1 Lot 1,675,000 1,675,000 - 1,675,000 1,675,000
Sub-total Carried to Summary 1,675,000

15.0 MISCELLANEOUS
15.1 Hydraulic System Name Plates (Section 21 13 12) 1 Lot 40,000 40,000 - - 40,000 40,000
15.2 Hydrostatic Testing 1 Lot 75,000 75,000 - - 75,000 75,000
15.3 Shop Drawings 1 Lot 50,000 50,000 - - 50,000 50,000
15.4 As Built Drawings 1 Lot 50,000 50,000 - - 50,000 50,000
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

BOQ - BASMENT 02 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MATERIAL INSTALLATION TOTAL
ITEM
DESCRIPTION QTY. UNIT RATE AMOUNT RATE AMOUNT RATE AMOUNT
NO.
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
15.5 Inspector Test Valve with Open Sprinkler 9 Nos. 12,980 116,820 - - 12,980 116,820
15.6 ACV & Deluge Security Cage/Fence 11 Nos. 75,000 825,000 - - 75,000 825,000
Fire Stoping of Walls & Structure Openings (For Small Openings - Hilti FS - ONE
15.7 1 Lot 345,000 345,000 - - 345,000 345,000
or Approved Equivalent)
15.8 Pipe Sleeves 1 Lot 50,000 50,000 - - 50,000 50,000
15.9 Isolation Valves Locks (Wire / Chain Type) 23 Nos. 5,000 115,000 - - 5,000 115,000
15.10 Structural Opennings & Core Cuts 1 Lot 145,000 145,000 - - 145,000 145,000
15.11 Operation & Maintenance Instructions to Clients Representatives 1 Lot 45,000 45,000 - - 45,000 45,000
15.12 Operation & Maintenance Manuals 1 Lot 25,000 25,000 - - 25,000 25,000
Sub-total Carried to Summary 1,881,820
3,300 528 2,772
950 152 798
3,100 496 2,604
5,700 912 4,788
37,500 6,000 31,500
20,500 3,280 17,220
47,500 7,600 39,900
41,500 6,225 35,275

3,990 997.48 2,992.44 3,447.15


EMPORIUM MALL, LAHORE BILL OF QUANTITIES

FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

SUMMARY OF BOQ - BASMENT 03 & B4 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

ITEM NO. DESCRIPTION AMOUNT IN FIGURES (Rs.)

1.0 FIRE PUMP SET (SECTION 21 30 00 & DS No. 21 30 00) 1,905,747.90


2.0 FIRE SPRINKLERS (SECTION 21 13 10 & DS No. 21 13 10) 2,617,150.00
3.0 CORRUGATED STAINLESS STEEL FLEXIBLE CONNECTOR 56,400.00
4.0 ALARM CHECK VALVE ASSEMBLY (SECTION 21 11 18 & DS No. 21 11 18) 1,174,375.00
5.0 ISOLATING VALVES (SECTION 21 05 23) 2,121,921.25
6.0 OS & Y GATE VALVE (SECTION 21 05 23) 1,024,600.00
7.0 CHECK VALVE (SECTION 21 05 23) 280,625.00
8.0 STRAINERS WITH BALL VALVE WITH MATERIAL/FLANGES/UNIONS etc (SECTION 21 05 23) 34,250.00
9.0 PORTABLE FIRE EXTINGUISHER FOR FIRE TYPES A, B & C (SECTION 21 21 10) 24,500.00
10.0 FLEXIBLE CONNECTOR (SECTION 21 10 10) 233,430.00
11.0 DOYMA SLEEVE (AS PER FND DRAWING NOS. FND/PWS/01 & FND PWS/03) 27,449.15
12.0 BLACK STEEL SCHEDULE 40 PIPING (SECTION 21 10 10) 12,238,392.02
13.0 HYDRANT VALVES (SECTION 21 11 16) 662,950.00
14.0 FIRE BRIGADE CONNECTION & VALVING (SECTION 21 13 12) 76,000.00
15.0 FIRE HOSE REEL (SECTION 21 12 16) 4,310,775.00
16.0 SIESMIC BRACING (REFER FND/SS/10 & FND/SS/11) 937,500.00
17.0 FIRE SPRINKLER SYSTEM ACCEPTANCE TEST (SECTION 21 13 17) 45,000.00
18.0 PAINTING COATING & STENCILING (SECTION 21 05 50) 984,125.00
19.0 PIPE SUPPORT SYSTEM (SECTION 21 05 29) 895,000.00
20.0 MISCELLANEOUS 855,670.00
TOTAL= 30,505,860.32
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

BOQ - BASMENT 03 & B4 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MATERIAL INSTALLATION TOTAL
ITEM
DESCRIPTION QTY. UNIT RATE AMOUNT RATE AMOUNT RATE AMOUNT
NO.
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
1.0 FIRE PUMP SET (SECTION 21 30 00 & DS No. 21 30 00)

Installation of Fire Pump Diesel Engine Driven, Electrical Motor Driven & Electric
Motor Driven Jockey pump Complete With Controller including supply of all
1.1 consumables required for installation (Section No. 21 30 00 with Supply & 1 Lot 0 0 141,264 141,264 141,264 141,264
Installation of Diesel tank complete with high & low level controller including
supply of all consumables required for installation. (OWNER FURNISHED)

Foundation & Support for Diesel Engine, Electric Engine Fire Pump and Jockey
1.2 1 Lot 82,500 82,500 8,500 8,500 91,000 91,000
Pump
1.3 Foundation & Support for Diesel Tank With Containment Bund 1 Lot 35,000 35,000 8,500 8,500 43,500 43,500
Supply and Installation of wiring between Diesel Fire Pump Set and Controller
1.4 1 Lot 35,000 35,000 7,500 7,500 42,500 42,500
Supply and Installation of wiring between Electric Fire Pump Set and Controller
1.5 1 Lot 55,000 55,000 7,500 7,500 62,500 62,500
Supply and Installation of wiring between Jockey Pump Set and Controller
1.6 1 Lot 25,000 25,000 5,500 5,500 30,500 30,500

1.7 Lifting, Shifting & Placement of Fire pump sets 1 Lot 15,000 15,000 12,000 12,000 27,000 27,000
1.8 Lifting, Shifting & Placement of Diesel Tank to the Fire Pump Room 1 Lot 10,000 10,000 5,000 5,000 15,000 15,000
1.9 Fuel Piping Connection to Diesel Engine & Fuel Sensing Line 1 Lot 45,000 45,000 17,500 17,500 62,500 62,500
1.10 Installation of Waste Cone Ø 6" x Ø 8" 1 No. 1,000 1,000 1,250 1,250 2,250 2,250
1.11 Installation of Pressure Relief Valve Ø 6" 1 No. 4,000 4,000 1,500 1,500 5,500 5,500
Supply & Installation of Fire Engine Exhaust Pipe (MS) - Ø 8" with 2" thick
1.12 350 Rft 2,568 898,800 850 297,500 3,418 1,196,300
Rockwool Insulation & Cladding
1.13 Fire Pumps Water Pressure Sensing Lines
1.13.1 Stainless Steel tubing & their hookup with controller As Per NFPA 1 Lot 95,000 95,000 17,500 17,500 112,500 112,500
1.13.2 Stainless Steel Globe Valve - Ø 1/2 inch 12 Nos. 2,979 35,751 200 2,400 3,179 38,151
1.13.3 Stainless Steel Tee - Ø 1/2 inch With 1/4 Inch Plug 6 Nos. 1,596 9,577 300 1,800 1,896 11,377
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

BOQ - BASMENT 03 & B4 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MATERIAL INSTALLATION TOTAL
ITEM
DESCRIPTION QTY. UNIT RATE AMOUNT RATE AMOUNT RATE AMOUNT
NO.
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
1.13.4 Ø1/2 inch - Stainless Steel Check Valve with 3/32 Inch Orifice in Clapper 6 Nos. 3,784 22,706 200 1,200 3,984 23,906
Sub-total Carried to Summary 1,905,748

2.0 FIRE SPRINKLERS (SECTION 21 13 10 & DS No. 21 13 10)


2.1 Fire Sprinkler-Pendent Ceiling Concealed, Standard Response 20 Nos. 3,024 60,480 250 5,000 3,274 65,480
2.2 Fire Sprinkler-Upright, Standard Response 1,150 Nos. 1,092 1,255,800 250 287,500 1,342 1,543,300
2.3 Fire Sprinkler-Upright, Standard Response With Guard 415 Nos. 1,932 801,780 250 103,750 2,182 905,530
2.4 Fire Sprinkler-Side Wall, Standard Response 6 Nos. 2,520 15,120 250 1,500 2,770 16,620
2.5 Cabinet complete with 06 Spare Sprinklers (Pendent Ceiling Concealed) 1 No. 32,760 32,760 5,500 5,500 38,260 38,260
2.6 Cabinet complete with 06 Spare Sprinklers (Upright Sprinkler ) 2 Nos. 18,480 36,960 5,500 11,000 23,980 47,960
Sub-total Carried to Summary 2,617,150

3.0 CORRUGATED STAINLESS STEEL FLEXIBLE CONNECTOR


3.1 Corrugated Stainless Steel Flexible Connector Ø 1" X 3 ft (UL/FM) 20 Nos. 2,070 41,400 750 15,000 2,820 56,400
Sub-total Carried to Summary 56,400

4.0 ALARM CHECK VALVE ASSEMBLY (SECTION 21 11 18 & DS No. 21 11 18)

4.1 Alarm Check Valve Assembly - Ø6 inch (Refer Detail Drawing FND / ADD / 04) 0 No. 246,500 Rate Only 8,500 Rate Only Rate Only

4.2 Alarm Check Valve Assembly - Ø4 inch (Refer Detail Drawing FND / ADD / 04) 5 Nos. 227,375 1,136,875 7,500 37,500 234,875 1,174,375

Sub-total Carried to Summary 1,174,375

5.0 ISOLATING VALVES (SECTION 21 05 23)


5.1 Ø4 inch 2 Nos. 88,825 177,650 1,500 3,000 90,325 180,650
5.2 Ø3 inch 5 Nos. 74,588 372,938 1,500 7,500 76,088 380,438
5.3 Ø2-1/2 inch 5 Nos. 65,875 329,375 1,350 6,750 67,225 336,125
5.4 Ø2 inch 11 Nos. 60,435 664,785 975 10,725 61,410 675,510
5.5 Ø 1 1/2 inch 5 Nos. 24,374 121,869 300 1,500 24,674 123,369
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

BOQ - BASMENT 03 & B4 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MATERIAL INSTALLATION TOTAL
ITEM
DESCRIPTION QTY. UNIT RATE AMOUNT RATE AMOUNT RATE AMOUNT
NO.
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
5.6 Ø1 1/4 inch 12 Nos. 22,525 270,300 250 3,000 22,775 273,300
5.7 Ø 1 inch 7 Nos. 21,590 151,130 200 1,400 21,790 152,530
Sub-total Carried to Summary 2,121,921

6.0 OS & Y GATE VALVE (SECTION 21 05 23)


6.1 Ø10 inch 1 No. 98,175 98,175 2,500 2,500 100,675 100,675
6.2 Ø8 inch 10 Nos. 76,925 769,250 2,500 25,000 79,425 794,250
6.3 Ø6 inch 1 Nos. 59,925 59,925 2,500 2,500 62,425 62,425
6.4 Ø3 inch 0 No. 42,280 Rate Only 2,000 Rate Only Rate Only
6.5 Ø2 1/2 inch 2 Nos. 31,875 63,750 1,750 3,500 33,625 67,250
Sub-total Carried to Summary 1,024,600

7.0 CHECK VALVE (SECTION 21 05 23)


7.1 Ø 8 inch 2 Nos. 98,175 196,350 2,500 5,000 100,675 201,350
7.2 Ø 6 inch 0 No. 42,925 Rate Only 2,500 Rate Only Rate Only
7.3 Ø 4 inch 2 Nos. 29,325 58,650 2,000 4,000 31,325 62,650
7.4 Ø2 1/2 inch 1 No. 14,875 14,875 1,750 1,750 16,625 16,625
Sub-total Carried to Summary 280,625

8.0 STRAINERS WITH BALL VALVE WITH MATERIAL/FLANGES/UNIONS etc (SECTION 21 05 23)
8.1 Ø2 1/2 inch 1 No. 32,500 32,500 1,750 1,750 34,250 34,250
Sub-total Carried to Summary 34,250

9.0 PORTABLE FIRE EXTINGUISHER FOR FIRE TYPES A, B & C (SECTION 21 21 10)
9.1 Installation of 06kg Dry Powder Extinguisher (ABC) 45 Nos. - - 350 15,750 350 15,750
9.2 Installation of 6 kg CO2 Fire Extinguisher 25 Nos. - - 350 8,750 350 8,750
Sub-total Carried to Summary 24,500

10.0 FLEXIBLE CONNECTOR (SECTION 21 10 10)


EMPORIUM MALL, LAHORE BILL OF QUANTITIES
FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

BOQ - BASMENT 03 & B4 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MATERIAL INSTALLATION TOTAL
ITEM
DESCRIPTION QTY. UNIT RATE AMOUNT RATE AMOUNT RATE AMOUNT
NO.
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
10.1 Ø 10 inch 1 Nos. 35,275 35,275 2,500 2,500 37,775 37,775
10.2 Ø 8 inch 1 Nos. 19,975 19,975 2,500 2,500 22,475 22,475
10.3 Ø 6 inch 0 No. 14,875 Rate Only 2,500 Rate Only Rate Only
10.4 Ø 4 inch 14 Nos. 10,370 145,180 2,000 28,000 12,370 173,180
Sub-total Carried to Summary 233,430

11.0 DOYMA SLEEVE (AS PER FND DRAWING NOS. FND/PWS/01 & FND PWS/03)
11.1 Ø 8 inch Pipe (Wet Application) 5 Nos. 2,966 14,831 1,800 9,000 4,766 23,831
11.2 Ø 6 inch Pipe (Wet Application) 1 No. 2,119 2,119 1,500 1,500 3,619 3,619
Sub-total Carried to Summary 27,449

12.0 BLACK STEEL SCHEDULE 40 PIPING (SECTION 21 10 10)


12.1 Ø 10 inch 300 Rft 2,992 897,731 455 136,414 3,447 1,034,145
12.2 Ø 8 inch 135 Rft 2,720 367,182 413 55,795 3,133 422,977
12.3 Ø 6 inch 15 Rft 1,805 27,082 280 4,200 2,085 31,282
12.4 Ø 4 inch 4,750 Rft 1,031 4,896,633 225 1,068,750 1,256 5,965,383
12.5 Ø 3 inch 450 Rft 722 324,986 216 97,200 938 422,186
12.6 Ø 2 1/2 inch 350 Rft 577 201,806 180 63,000 757 264,806
12.7 Ø 2 inch 1,200 Rft 349 419,337 126 151,200 475 570,537
12.8 Ø 1 1/2 inch 2,500 Rft 263 658,126 96 240,000 359 898,126
12.9 Ø 1 1/4 inch 4,000 Rft 227 908,564 85 340,000 312 1,248,564
12.10 Ø 1 inch 6,000 Rft 170 1,020,387 60 360,000 230 1,380,387
Sub-total Carried to Summary 12,238,392

13.0 HYDRANT VALVES (SECTION 21 11 16)


Ø 2 1/2 inch Hydrant Valve with Quick Coupling (Data Sheet No. FND-21 11
13.1 9 Nos. 22,525 202,725 2,000 18,000 24,525 220,725
16-2/2)
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

BOQ - BASMENT 03 & B4 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MATERIAL INSTALLATION TOTAL
ITEM
DESCRIPTION QTY. UNIT RATE AMOUNT RATE AMOUNT RATE AMOUNT
NO.
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
2 x 100Ft , Ø 2 1/2 inch Quick Coupling Hose, 2 Nos. Diffuser Nozzle With
13.2 7 Nos. 55,675 389,725 7,500 52,500 63,175 442,225
Cabinet (Similar to SRI Mdel D Hose Cabinet)
Sub-total Carried to Summary 662,950

14.0 FIRE BRIGADE CONNECTION & VALVING (SECTION 21 13 12)


14.1 Fire Brigade Connection (Data Sheet No. FND-21 11 17-1/1) 2 Nos. 34,500 69,000 3,500 7,000 38,000 76,000
Sub-total Carried to Summary 76,000

15.0 FIRE HOSE REEL (SECTION 21 12 16)


Fire Hose Reel With Double Cabinet & Architrave - Ø 1 inch x 100ft Data Sheet
15.1 21 Nos. 205,275 4,310,775 - - 205,275 4,310,775
No. FND-21 12 16-1/1)
Sub-total Carried to Summary 4,310,775

16.0 SIESMIC BRACING (REFER FND/SS/10 & FND/SS/11)


16.1 Transverse Seismic Bracing For Pipe Dia
16.1.1 Ø 10" 1 Lot 75,000 75,000 18,750 18,750 93,750 93,750
16.1.2 Ø 4" 1 Lot 300,000 300,000 75,000 75,000 375,000 375,000
16.2 Longitudinal Seismic Bracing For Pipe Dia
16.2.1 Ø 10" 1 Lot 75,000 75,000 18,750 18,750 93,750 93,750
16.2.2 Ø 4" 1 Lot 300,000 300,000 75,000 75,000 375,000 375,000
Sub-total Carried to Summary 937,500

17.0 FIRE SPRINKLER SYSTEM ACCEPTANCE TEST (SECTION 21 13 17)


17.1 Fire Sprinkler System Acceptance Test 1 Lot 45,000 45,000 - 45,000 45,000
Sub-total Carried to Summary 45,000

18.0 PAINTING COATING & STENCILING (SECTION 21 05 50)


18.1 Painting, Coating
18.1.1 Ø 10 inch 300 Rft 55 16,500 15 4,500 70 21,000
18.1.2 Ø 8 inch 135 Rft 50 6,750 14 1,856 64 8,606
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

BOQ - BASMENT 03 & B4 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MATERIAL INSTALLATION TOTAL
ITEM
DESCRIPTION QTY. UNIT RATE AMOUNT RATE AMOUNT RATE AMOUNT
NO.
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
18.1.3 Ø 6 inch 15 Rft 40 600 11 169 51 769
18.1.4 Ø 4 inch 4,750 Rft 35 166,250 10 47,500 45 213,750
18.1.5 Ø 3 inch 450 Rft 35 15,750 10 4,500 45 20,250
18.1.6 Ø 2 1/2 inch 350 Rft 35 12,250 10 3,500 45 15,750
18.1.7 Ø 2 inch 1,200 Rft 15 18,000 5 6,000 20 24,000
18.1.8 Ø 1 1/2 inch 2,500 Rft 15 37,500 5 12,500 20 50,000
18.1.9 Ø 1 1/4 inch 4,000 Rft 15 60,000 5 20,000 20 80,000
18.1.10 Ø 1 inch 6,000 Rft 15 90,000 5 30,000 20 120,000
18.1.11 Stenciling & Identification Tags of Valves 1 Lot 175,000 175,000 35,000 35,000 210,000 210,000
Signage As Per NFPA (For Example: Signage of Fire Brigade Connection, Landing
18.1.12 1 Lot 185,000 185,000 35,000 35,000 220,000 220,000
Valve etc)
Sub-total Carried to Summary 984,125

19.0 PIPE SUPPORT SYSTEM (SECTION 21 05 29)


19.1 Hilti / Fischer Pipe Support System 1 Lot 895,000 895,000 - 895,000 895,000
Sub-total Carried to Summary 895,000

20.0 MISCELLANEOUS
20.1 Hydraulic System Name Plates (Section 21 13 12) 1 Lot 40,000 40,000 - - 40,000 40,000
20.2 Hydrostatic Testing 1 Lot 75,000 75,000 - - 75,000 75,000
20.3 Shop Drawings 1 Lot 50,000 50,000 - - 50,000 50,000
20.4 As Built Drawings 1 Lot 50,000 50,000 - - 50,000 50,000
20.5 Inspector Test Valve with Open Sprinkler 4 Nos. 12,980 51,920 - - 12,980 51,920
20.6 Stainless Steel Vortex Plate - Ø 20 inch & 6mm thick (FND/PWS/04) 3 Nos. 10,000 30,000 - - 10,000 30,000
Fire Stoping of Walls & Structure Openings (For Small Openings - Hilti FS - ONE
20.7 1 Lot 215,000 215,000 - - 215,000 215,000
or Approved Equivalent)
20.8 Pipe Sleeves 1 Lot 50,000 50,000 - - 50,000 50,000
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
FIRE SUPPRESSION SYSTEM WORKS DATED:FEBRUARY 01, 2014

BOQ - BASMENT 03 & B4 (SUPPLY OF EQUIPMENT / MATERIAL & INSTALLATION)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MATERIAL INSTALLATION TOTAL
ITEM
DESCRIPTION QTY. UNIT RATE AMOUNT RATE AMOUNT RATE AMOUNT
NO.
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
20.9 Isolation Valves Locks (Wire / Chain Type) 19 Nos. 5,000 95,000 1,250 23,750 6,250 118,750
20.10 Structural Opennings & Core Cuts 1 Lot 105,000 105,000 - - 105,000 105,000
20.11 Operation & Maintenance Instructions to Clients Representatives 1 Lot 45,000 45,000 - - 45,000 45,000
20.12 Operation & Maintenance Manuals 1 Lot 25,000 25,000 - - 25,000 25,000
Sub-total Carried to Summary 855,670
3,600 576 3,024
1,300 208 1,092
2,300 368 1,932
3,000 480 2,520
39,000 6240 32,760
22,000 3520 18,480

104,500 15675 88,825


87,750 13162.5 74,588
77,500 11625 65,875
71,100 10665 60,435
28,675 4301.25 24,374
26,500 3975 22,525
25,400 3810 21,590
0 -
0 -
115,500 17325 98,175
90,500 13575 76,925
70,500 10575 59,925
49,742 7461.229 42,280
37,500 5625 31,875
0 -
0 -
115,500 17325 98,175
50,500 7575 42,925
34,500 5175 29,325
17,500 2625 14,875
241,500
36,225 205,275
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
HVAC WORKS DATED: FEBRUARY 01, 2014
SUMMARY OF BILL OF QUANTITIES
ITEM NO. DESCRIPTION AMOUNT IN FIGURES (Rs.)

1.0 ELECTRIC OPERATED WATER COOLED CENTRIFUGAL CHILLERS (SECTION 23 64 17 & DS/1264-23 64 17) 957,500
2.0 PACKAGED FIRE TUBE STEAM BOILERS (SECTION 23 52 39 & DS/1264-23 52 39) 4,076,880
3.0 BOILER FEED WATER UNIT (REFER SECTION 23 53 10 & DS-1264-23 53 10) 959,500
4.0 STEAM PIPING, VALVES & SPECIALTIES AND THERMAL INSULATION (SECTION 23 22 13 - DS / 1264 - 23 22 13) 21,372,048
5.0 CENTRIFUGAL PUMPS (SECTION 23 21 30 & DS/1264-23 21 30) 1,974,000
6.0 AIR HANDLING UNITS (SECTION 23 73 10 & DS/1264-23 73 10) 6,907,288
7.0 FAN COIL UNITS (SECTION 23 73 20 & DS/1264-23 73 20) 2,750,388
8.0 SMALL SPLIT TYPE AIR-CONDITIONER (SECTION 23 81 26 & DS/1264-23 81 26) 616,336
9.0 FANS (SECTION 23 34 16 / 23 34 25 & DS/1264-23 34 16 / 23 34 25) 515,214
10.0 METER & GAUGES (SECTION 23 05 19) 1,228,060
11.0 PIPING (SECTION 23 21 13 & DS/1264-23 21 13 ) 64,259,195
12.0 VALVES & SPECIALITIES (SECTION 23 05 23) 26,025,444
13.0 DUCT WORK (MACHINE MADE) (SECTION 23 31 13) 22,860,982
14.0 THERMAL INSULATION (SECTION 23 07 13 & 23 07 19 & DS/1264-23 07 13 & 23 07 19) 25,426,402
15.0 SOUND ATTENUATION (SECTION 23 33 19 & DS/1264-23 33 19) 326,000
16.0 AIR SEPARATORS (SECTION 23 86 10 & DS/1264-23 86 10) 1,178,250
17.0 WATER TREATMENT FOR CHILLED WATER CIRCUIT (SECTION 23 25 13) 1,875,000
18.0 WATER TREATMENT FOR CONDENSER WATER CIRCUIT (SECTION 23 25 17) 1,616,000
19.0 AIR DEVICES (SECTION 23 37 13) 9,362,669
20.0 CLEANING, BALANCING & TESTING (SECTION 23 05 93) 1,165,000
21.0 PAINTING & FINISHING AND MECHANICAL IDENTIFICATION (SECTION 23 05 50 & 23 05 53) 610,000
22.0 TEST RUN OF THE PLANT (SECTION 23 05 94) 360,000
23.0 TOOLS AND INSTRUMENTS (SECTION 23 89 10) 900,000
24.0 EXPANSION TANK (SECTION 23 25 30 & DS/1264-23 25 30) 1,003,000
25.0 OIL DAY TANK 220,000
26.0 12 MONTH OPERATION OF THE PLANT (SECTION 23 01 60 & DS/1264-23 01 60) 1,675,000
27.0 MISCELLANEOUS 1,110,000
TOTAL = 201,330,156
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
1.0 ELECTRIC OPERATED WATER COOLED CENTRIFUGAL CHILLERS (SECTION 23 64 17 & DS/1264-23 64 17)
Installation of Owner Furnished Electric Operated Water Cooled Centrifugal Chillers
1.1 5 Nos - 0 150,000 750,000 150,000 750,000
(CH/01 to CH/05)
Installation (Section
of Owner 23 64Electric
Furnished 17 & DS/1264-23 64 17)
Operated Water Cooled Centrifugal Chillers
1.2 2 Nos - 0 95,000 190,000 95,000 190,000
(CH/06 to CH/07) (Section 23 64 17 & DS/1264-23 64 17)
1.3 Foundation / Supports (By Civil Contractor) 7 Lots - Rate Only - Rate Only Rate Only
1.4 Installation of Owner Furnished Flow Switches 7 Lots - 0 2,500 17,500 2,500 17,500
Sub-total Carried to Summary 957,500
2.0 PACKAGED
Installation FIRE Furnished
of Owner TUBE STEAM BOILERS
Packaged (SECTION
Fire Tube Steam 23 52
Boiler (B-01 39 & DS/1264-23 52 39)
& B-02)
2.1 complete with Controller & Safety Reilief Valves including supply & installation of all 2 Nos - 0 275,000 550,000 275,000 550,000
Lifting, Shifting
consumables & Placement
required of Owner Furnished Packaged Fire Tube Steam Boiler
for installation
2.2 2 Lots - 0 75,000 150,000 75,000 150,000
(From Ground
Installation to LevelFurnished
of Owner B4 at Lev.-14.980 meter)
Boiler Blow Down Tank (BDT-01) complete with all
2.3 1 No - 0 75,000 75,000 75,000 75,000
accessories
Lifting, and &consumables
Shifting Placement ofrequired for installation
Owner Furnished Boiler Blow Down Tank (From Ground
2.4 Supply 1 Lot - 0 65,000 65,000 65,000 65,000
to Level&B4
Installation of TDSmeter)
at Lev.-14.980 Control System for Automatic Control of Boiler Blow Down
2.5 including Controller, Solenoid Valves & any other Accessory Required to Completely 2 Lots 575,000 1,150,000 60,000 120,000 635,000 1,270,000
Supply
Install &&Commission
Installation of Flue
the Duct Ø 20" (Ø 500mm) with insulation, including Jacketing
System
2.6 60 Rft 3,228 193,689 908 54,475 4,136 248,164
& Cladding
Supply & Installation of Flue Duct Ø 30" (Ø 750mm) with insulation, including Jacketing
2.7 300 Rft 4,450 1,335,000 1,163 348,960 5,613 1,683,960
& Cladding
Supply & Installation of Back Draft Damper for Flue Duct Ø 20" (Ø 500mm) complete in
2.8 2 Nos 15,678 31,356 1,700 3,400 17,378 34,756
all respect
2.9 Foundation / Supports (By Civil Contractor) 2 Lots - Rate Only - Rate Only Rate Only
Sub-total Carried to Summary 4,076,880
3.0 BOILER FEED WATER UNIT (REFER SECTION 23 53 10 & DS-1264-23 53 10)
Supply & Installation of Boiler Feed Water Unit (BFW-01) complete in all respect
including:
a) Level Sensor with Controller
b) Temperature Sensor with Controller
3.1
c) Motorized Valves (For Make-up Water Line to be Interlocked with Level Controller) 1 No. 75,000 75,000 42,500 42,500 117,500 117,500
d) Motorized Valves (For Steam Line to be Interlocked with Temperature Sensor)
e) Automatic Air Vent
Lifting, Shifting & Placement of Boiler Feed Water Unit (From Ground to Level B4 at Lev.-
3.2 Supply 1 Lot 65,000 65,000 - 0 65,000 65,000
14.980&meter)
Installation of Feed Water Pumps (3-Set of 2-Pumps, One Stand-by & Each Set
3.3 shall have Duplex Control Panel) complete with all accessories and consumables 6 Nos 15,000 90,000 34,500 207,000 49,500 297,000
Lifting,
requiredShifting & Placement of Feed Water Pumps (From Ground to Level B4 at Lev.-
for installation
3.4 Supply 6 Lots 25,000 150,000 2,500 15,000 27,500 165,000
14.980&meter)
Installation of Power/Control/Interlocking Wiring for Feed Water Pumps
3.5 Duplex Panel to Boiler Panel with Conduit/Cable Trays/Supports & all consumables 3 Lots 105,000 315,000 - 0 105,000 315,000
3.6 required for/installation
Foundation Supports (By Civil Contractor) 1 Lot Rate Only Rate Only Rate Only
Sub-total Carried to Summary 959,500
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
4.0 STEAM PIPING, VALVES & SPECIALTIES AND THERMAL INSULATION (SECTION 23 22 13 - DS / 1264 - 23 22 13)
4.1 Steam Piping
4.1.1 Ø ½" (Ø 15mm) 150 Rft 78 11,648 51 7,635 129 19,283
4.1.2 Ø ¾" (Ø 20mm) 500 Rft 96 48,041 67 33,650 163 81,691
4.1.3 Ø 1" (Ø 25mm) 30 Rft 141 4,225 81 2,421 222 6,646
4.1.4 Ø 1 ¼" (Ø 32mm) 200 Rft 188 37,511 99 19,850 287 57,361
4.1.5 Ø 1 ½" (Ø 40mm) 300 Rft 217 65,151 117 34,950 334 100,101
4.1.6 Ø 2" (Ø 50mm) 450 Rft 290 130,302 148 66,600 438 196,902
4.1.7 Ø 2 ½" (Ø 65mm) 10 Rft 477 4,771 201 2,013 678 6,784
4.1.8 Ø 3" (Ø 75mm) 750 Rft 599 449,149 230 172,125 828 621,274
4.1.9 Ø 4" (Ø 100mm) 210 Rft 819 172,058 278 58,433 1,098 230,491
4.1.10 Ø 5" (Ø 125mm) 100 Rft 1,066 106,611 311 31,100 1,377 137,711
4.1.11 Ø 6" (Ø 150mm) 1100 Rft 1,382 1,520,195 365 401,500 1,747 1,921,695
4.1.12 Ø 8" (Ø 200mm) 25 Rft 2,086 52,154 809 20,213 2,895 72,366
4.2 Condensate Return Piping -
4.2.1 Ø ½" (Ø 15mm) 1000 Rft 78 77,655 51 50,900 129 128,555
4.2.2 Ø ¾" (Ø 20mm) 10 Rft 96 961 67 673 163 1,634
4.2.3 Ø 1" (Ø 25mm) 10 Rft 141 1,408 81 807 222 2,215
4.2.4 Ø 1 ¼" (Ø 32mm) 425 Rft 188 79,712 99 42,181 287 121,893
4.2.5 Ø 1 ½" (Ø 40mm) 800 Rft 217 173,737 117 93,200 334 266,937
4.2.6 Ø 2" (Ø 50mm) 375 Rft 290 108,585 148 55,500 438 164,085
4.2.7 Ø 2 ½" (Ø 65mm) 250 Rft 477 119,279 201 50,313 678 169,592
4.2.8 Ø 3" (Ø 75mm) 525 Rft 599 314,404 230 120,488 828 434,892
4.2.9 Ø 4" (Ø 100mm) 450 Rft 819 368,697 278 125,213 1,098 493,909
4.2.10 Ø 5" (Ø 125mm) 25 Rft 1,066 26,653 311 7,775 1,377 34,428
4.3 Feed Water Piping -
4.3.1 Ø 2" (Ø 50mm) 0 Rft 290 Rate Only 170 Rate Only Rate Only
4.3.2 Ø 2 ½" (Ø 65mm) 275 Rft 477 131,207 238 65,313 715 196,520
4.3.3 Ø 3" (Ø 75mm) 50 Rft 599 29,943 275 13,750 874 43,693
4.4 Make-up Water Piping -
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
4.4.1 Ø 1 ½" (Ø 40mm) 0 Rft 217 Rate Only 133 Rate Only Rate Only
4.4.2 Ø 2" (Ø 50mm) 50 Rft 290 14,478 170 8,500 460 22,978
4.4.3 Ø 2 ½" (Ø 65mm) 100 Rft 477 47,712 238 23,750 715 71,462
4.4.4 Ø 3" (Ø 75mm) 100 Rft 599 59,886 275 27,500 874 87,386
4.5 Blow Down Drain/Feed Water Drain/Over Flow & Safety Reilief Piping -
4.5.1 Ø 1" (Ø 25mm) 100 Rft 141 14,083 91 9,140 232 23,223
4.5.2 Ø 1 ¼" (Ø 32mm) 50 Rft 188 9,378 114 5,675 301 15,053
4.5.3 Ø 1 ½" (Ø 40mm) 25 Rft 217 5,429 133 3,325 350 8,754
4.5.4 Ø 2" (Ø 50mm) 200 Rft 290 57,912 170 34,000 460 91,912
4.5.5 Ø 2 ½" (Ø 65mm) 200 Rft 477 95,424 238 47,500 715 142,924
4.5.6 Ø 3" (Ø 75mm) 10 Rft 599 5,989 275 2,750 874 8,739
4.5.7 Ø 4" (Ø 100mm) 25 Rft 819 20,483 341 8,513 1,160 28,996
4.5.8 Ø 5" (Ø 125mm) 35 Rft 1,066 37,314 392 13,720 1,458 51,034
4.5.9 Ø 6" (Ø 150mm) 500 Rft 1,382 690,998 470 235,000 1,852 925,998
4.6 Gas Piping -
4.6.1 Ø 2 ½" (Ø 65mm) 0 Rft 477 Rate Only 238 Rate Only Rate Only
4.6.2 Ø 3" (Ø 75mm) 130 Rft 599 77,852 275 35,750 874 113,602
4.6.3 Ø 4" (Ø 100mm) 100 Rft 819 81,933 341 34,050 1,160 115,983
4.6.4 Ø 5" (Ø 125mm) 0 Rft 1,066 Rate Only 392 Rate Only Rate Only
4.7 Diesel Oil Piping -
4.7.1 Ø ½" (Ø 15mm) 0 Rft 78 Rate Only 57 Rate Only Rate Only
4.7.2 Ø ¾" (Ø 20mm) 200 Rft 96 19,216 75 14,920 171 34,136
4.7.3 Ø 1" (Ø 25mm) 0 Rft 141 Rate Only 91 Rate Only Rate Only
4.8 Gate Valves (Cast Steel, Flanged, SS Trim)
4.8.1 Ø ½" (Ø 15mm) 60 Nos 1,949 116,949 540 32,400 2,489 149,349
4.8.2 Ø ¾" (Ø 20mm) 10 Nos 2,119 21,186 540 5,400 2,659 26,586
4.8.3 Ø 1" (Ø 25mm) 5 Nos 3,051 15,254 740 3,700 3,791 18,954
4.8.4 Ø 1 ¼" (Ø 32mm) 5 Nos 4,237 21,186 900 4,500 5,137 25,686
4.8.5 Ø 1 ½" (Ø 40mm) 5 Nos 6,356 31,780 1,050 5,250 7,406 37,030
4.8.6 Ø 2" (Ø 50mm) 15 Nos 890 13,347 1,250 18,750 2,140 32,097
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
4.8.7 Ø 2 ½" (Ø 65mm) 30 Nos 28,390 851,695 3,100 93,000 31,490 944,695
4.8.8 Ø 3" (Ø 75mm) 10 Nos 30,932 309,322 4,500 45,000 35,432 354,322
4.8.9 Ø 4" (Ø 100mm) 5 Nos 41,356 206,780 6,000 30,000 47,356 236,780
4.8.10 Ø 5" (Ø 125mm) 10 Nos 59,746 597,458 7,500 75,000 67,246 672,458
4.8.11 Ø 6" (Ø 150mm) 1 No 81,525 81,525 9,000 9,000 90,525 90,525
4.9 Strainer (Cast Steel, Flanged, SS Trim)
4.9.1 Ø ½" (Ø 15mm) 30 Nos 3,305 99,153 650 19,500 3,955 118,653
4.9.2 Ø ¾" (Ø 20mm) 5 Nos 4,025 20,127 675 3,375 4,700 23,502
4.9.3 Ø 1" (Ø 25mm) 0 No 6,600 Rate Only 885 Rate Only Rate Only
4.9.4 Ø 1 ¼" (Ø 32mm) 0 No 11,483 Rate Only 1,040 Rate Only Rate Only
4.9.5 Ø 1 ½" (Ø 40mm) 1 No 13,220 13,220 1,195 1,195 14,415 14,415
4.9.6 Ø 2" (Ø 50mm) 0 No 23,305 Rate Only 1,400 Rate Only Rate Only
4.9.7 Ø 2 ½" (Ø 65mm) 10 Nos 26,695 266,949 3,100 31,000 29,795 297,949
4.9.8 Ø 3" (Ø 75mm) 0 No 27,119 Rate Only 4,500 Rate Only Rate Only
4.9.9 Ø 4" (Ø 100mm) 1 No 31,900 31,900 6,000 6,000 37,900 37,900
4.9.10 Ø 5" (Ø 125mm) 2 Nos 49,576 99,153 7,500 15,000 57,076 114,153
4.9.11 Ø 6" (Ø 150mm) 0 No 69,322 Rate Only 9,000 Rate Only Rate Only
4.10 Check Valves (Cast Steel, Flanged, SS Trim)
4.10.1 Ø ½" (Ø 15mm) 30 Nos 2,373 71,186 650 19,500 3,023 90,686
4.10.2 Ø ¾" (Ø 20mm) 5 Nos 3,263 16,314 675 3,375 3,938 19,689
4.10.3 Ø 1" (Ø 25mm) 1 No 4,110 4,110 885 885 4,995 4,995
4.10.4 Ø 1 ¼" (Ø 32mm) 1 No 5,700 5,700 1,040 1,040 6,740 6,740
4.10.5 Ø 1 ½" (Ø 40mm) 0 No 6,458 Rate Only 1,195 Rate Only Rate Only
4.10.6 Ø 2" (Ø 50mm) 2 Nos 11,186 22,373 1,400 2,800 12,586 25,173
4.10.7 Ø 2 ½" (Ø 65mm) 10 Nos 27,542 275,424 3,100 31,000 30,642 306,424
4.10.8 Ø 3" (Ø 75mm) 0 No 32,000 Rate Only 4,500 Rate Only Rate Only
4.10.9 Ø 4" (Ø 100mm) 1 No 47,288 47,288 6,000 6,000 53,288 53,288
4.10.10 Ø 5" (Ø 125mm) 2 Nos 70,763 141,525 7,500 15,000 78,263 156,525
4.10.11 Ø 6" (Ø 150mm) 0 No 80,254 Rate Only 9,000 Rate Only Rate Only
4.11 Sight Glass
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
4.11.1 Ø ½" (Ø 15mm) 30 Nos 13,200 396,000 650 19,500 13,850 415,500
4.11.2 Ø ¾" (Ø 20mm) 0 No 17,000 Rate Only 675 Rate Only Rate Only
4.11.3 Ø 1" (Ø 25mm) 0 No 28,000 Rate Only 885 Rate Only Rate Only
4.12 Steam Seperator for 10,000Kg/Hr Steam
4.12.1 Ø 4" (Ø 100mm) 0 No 850,000 Rate Only 6,000 Rate Only Rate Only
4.12.2 Ø 5" (Ø 125mm) 0 No 950,000 Rate Only 7,500 Rate Only Rate Only
4.12.3 Ø 6" (Ø 150mm) 1 No 850,000 850,000 11,000 11,000 861,000 861,000
4.13 Float & Thermostatic Steam Trap Selection @ PD = 75 Psi, Condensate Capacity = 4800 Kg/Hr
4.13.1 Ø 2" (Ø 50mm) 0 No 122,500 Rate Only 4,000 Rate Only Rate Only
4.13.2 Ø 2 ½" (Ø 65mm) 2 Nos 150,000 300,000 6,000 12,000 156,000 312,000
4.13.3 Ø 3" (Ø 75mm) 0 No 200,000 Rate Only 8,000 Rate Only Rate Only
4.14 Thermodynamic Steam Trap
4.14.1 Ø ½" (Ø 15mm) 30 Nos. 14,500 435,000 950 28,500 15,450 463,500
4.14.2 Ø ¾" (Ø 20mm) 0 No 18,000 Rate Only 1,000 Rate Only Rate Only
4.14.3 Ø 1" (Ø 25mm) 0 No 25,000 Rate Only 1,200 Rate Only Rate Only
Supply & Installation of Thermostatically Controlled Valve with Teperature Controller at
4.15 Make-up water line of Blow Down Tank Ø 2½" (Ø 62mm) complete with all accessories 1 Lot 808,300 808,300 15,500 15,500 823,800 823,800
and consumables
Installation required forofinstallation
& Commissioning Steam Flow Meter Ø 5" (Ø 125mm) {Owner Furnished}
4.16 2 Lots - 0 7,500 15,000 7,500 15,000
complete in all respect.
Installation & Commissioning of Gas Flow Meter Ø 3" (Ø 80mm) {Owner Furnished}
4.17 2 Lots - 0 4,500 9,000 4,500 9,000
complete in all respect.
Installation & Commissioning of Deisel Oil Fuel Flow Meter Ø ¾" (Ø 20mm) {Owner
4.18 2 Lots - 0 2,500 5,000 2,500 5,000
Furnished} complete in all respect.
Installation & Commissioning of Water Fow Meter Ø 2" (Ø 50mm) {Owner Furnished}
4.19 1 Lot - 0 3,500 3,500 3,500 3,500
complete in all respect.
4.20 Metal Expansion Joints Suitable for Steam System of 8.0 Bar Pressure at 174°C Temperature - -

4.20.1 Ø 1" (Ø 25mm) 0 No 3,850 Rate Only 740 Rate Only Rate Only
4.20.2 Ø 1 ¼" (Ø 32mm) 0 No 5,100 Rate Only 900 Rate Only Rate Only
4.20.3 Ø 1 ½" (Ø 40mm) 0 No 5,517 Rate Only 1,050 Rate Only Rate Only
4.20.4 Ø 2" (Ø 50mm) 0 No 6,695 Rate Only 1,250 Rate Only Rate Only
4.20.5 Ø 2 ½" (Ø 65mm) 0 No 9,958 Rate Only 3,100 Rate Only Rate Only
4.20.6 Ø 3" (Ø 75mm) 10 Nos 11,000 110,000 4,500 45,000 15,500 155,000
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
4.20.7 Ø 4" (Ø 100mm) 5 No 13,792 68,962 6,000 30,000 19,792 98,962
4.20.8 Ø 5" (Ø 125mm) 0 No 16,017 Rate Only 7,500 Rate Only Rate Only
4.20.9 Ø 6" (Ø 150mm) 10 Nos 21,458 214,576 9,000 90,000 30,458 304,576
4.21 Insulation of Steam Piping Including Cladding
4.21.1 Ø ½" (Ø 15mm) 150 Rft 220 32,926 57 8,610 277 41,536
4.21.2 Ø ¾" (Ø 20mm) 500 Rft 220 109,755 62 31,200 282 140,955
4.21.3 Ø 1" (Ø 25mm) 30 Rft 240 7,203 70 2,085 310 9,288
4.21.4 Ø 1 ¼" (Ø 32mm) 200 Rft 278 55,563 78 15,670 356 71,233
4.21.5 Ø 1 ½" (Ø 40mm) 300 Rft 278 83,345 83 25,005 361 108,350
4.21.6 Ø 2" (Ø 50mm) 450 Rft 305 137,365 91 41,018 396 178,382
4.21.7 Ø 2 ½" (Ø 65mm) 10 Rft 514 5,145 118 1,175 632 6,320
4.21.8 Ø 3" (Ø 75mm) 750 Rft 617 463,027 133 99,750 750 562,777
4.21.9 Ø 4" (Ø 100mm) 210 Rft 755 158,458 152 31,920 907 190,378
4.21.10 Ø 5" (Ø 125mm) 100 Rft 892 89,176 171 17,100 1,063 106,276
4.21.11 Ø 6" (Ø 150mm) 1100 Rft 926 1,018,660 175 191,950 1,101 1,210,610
4.21.12 Ø 8" (Ø 200mm) 25 Rft 1,166 29,154 204 5,100 1,370 34,254
4.22 Insulation of Condensate Return Piping Including Cladding -
4.22.1 Ø ½" (Ø 15mm) 1000 Rft 137 137,193 49 49,000 186 186,193
4.22.2 Ø ¾" (Ø 20mm) 10 Rft 150 1,495 55 553 205 2,048
4.22.3 Ø 1" (Ø 25mm) 10 Rft 168 1,681 62 622 230 2,302
4.22.4 Ø 1 ¼" (Ø 32mm) 425 Rft 195 82,796 70 29,699 265 112,495
4.22.5 Ø 1 ½" (Ø 40mm) 800 Rft 198 158,595 75 60,184 273 218,779
4.22.6 Ø 2" (Ø 50mm) 375 Rft 224 84,117 83 31,084 307 115,200
4.22.7 Ø 2 ½" (Ø 65mm) 250 Rft 412 102,895 107 26,750 519 129,645
4.22.8 Ø 3" (Ø 75mm) 525 Rft 446 234,086 116 60,638 561 294,723
4.22.9 Ø 4" (Ø 100mm) 450 Rft 523 235,526 128 57,785 652 293,311
4.22.10 Ø 5" (Ø 125mm) 25 Rft 583 14,577 140 3,488 723 18,064
4.23 Insulation of Feed Water Piping Including Cladding -
4.23.1 Ø 1 ½" (Ø 40mm) 0 Rft 198 Rate Only 75 Rate Only Rate Only
4.23.2 Ø 2" (Ø 50mm) 275 Rft 224 61,686 83 22,795 307 84,480
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
4.23.3 Ø 2 ½" (Ø 65mm) 50 Rft 412 20,579 107 5,350 519 25,929
4.24 Insulation of Blow Down Drain/Feed Water Drain/Over Flow & Safety Reilief Piping Including Cladding -
4.24.1 Ø 1" (Ø 25mm) 100 Rft 168 16,806 62 6,215 230 23,021
4.24.2 Ø 1 ¼" (Ø 32mm) 50 Rft 195 9,741 70 3,494 265 13,235
4.24.3 Ø 1 ½" (Ø 40mm) 25 Rft 198 4,956 75 1,881 273 6,837
4.24.4 Ø 2" (Ø 50mm) 200 Rft 224 44,862 83 16,578 307 61,440
4.24.5 Ø 2 ½" (Ø 65mm) 200 Rft 412 82,316 107 21,400 519 103,716
4.24.6 Ø 3" (Ø 75mm) 10 Rft 446 4,459 116 1,155 561 5,614
4.24.7 Ø 4" (Ø 100mm) 25 Rft 523 13,085 128 3,210 652 16,295
4.24.8 Ø 5" (Ø 125mm) 35 Rft 583 20,407 140 4,883 723 25,290
4.24.9 Ø 6" (Ø 150mm) 500 Rft 643 321,718 151 75,330 794 397,048
4.25 Cladding of Valve & Specialties (Open able Boxes with Insulation) -
4.25.1 Ø ½" (Ø 15mm) 180 Nos 2,034 366,102 950 171,000 2,984 537,102
4.25.2 Ø ¾" (Ø 20mm) 20 Nos 2,034 40,678 950 19,000 2,984 59,678
4.25.3 Ø 1" (Ø 25mm) 10 Nos 2,034 20,339 1,150 11,500 3,184 31,839
4.25.4 Ø 1 ¼" (Ø 32mm) 10 Nos 2,373 23,729 1,375 13,750 3,748 37,479
4.25.5 Ø 1 ½" (Ø 40mm) 10 Nos 2,373 23,729 1,375 13,750 3,748 37,479
4.25.6 Ø 2" (Ø 50mm) 20 Nos 3,051 61,017 1,725 34,500 4,776 95,517
4.25.7 Ø 2 ½" (Ø 65mm) 55 Nos 3,390 186,441 1,750 96,250 5,140 282,691
4.25.8 Ø 3" (Ø 75mm) 10 Nos 3,390 33,898 1,750 17,500 5,140 51,398
4.25.9 Ø 4" (Ø 100mm) 10 Nos 4,407 44,068 2,025 20,250 6,432 64,318
4.25.10 Ø 5" (Ø 125mm) 15 Nos 5,085 76,271 2,175 32,625 7,260 108,896
4.25.11 Ø 6" (Ø 150mm) 2 Nos 5,763 11,525 2,425 4,850 8,188 16,375
4.26 Supply & Installation of Spool Piece (To be installed in place of Steam, Gas, Diesel Oil & Water Flow Meters to make system operational, if Flow meter are not available)
4.26.1 Spool Piece for Steam Flow Meter 1 Lot 75,000 75,000 - 0 75,000 75,000
4.26.2 Spool Piece for Gas Flow Meter 1 Lot 75,000 75,000 - 0 75,000 75,000
4.26.3 Spool Piece for Diesel Oil Flow Meter 1 Lot 35,000 35,000 - 0 35,000 35,000
4.26.4 Spool Piece for Water Flow Meter 1 Lot 65,000 65,000 - 0 65,000 65,000
4.27 Pipe Pressure Testing 1 Lot 75,000 75,000 - 0 75,000 75,000
4.28 Pipe Sleeves 1 Lot 25,000 25,000 - 0 25,000 25,000
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
Pipe Supports System for Steam Piping with Guides & Anchors (Hilti, Fischer or
4.29 1 Lot 325,000 325,000 - 0 325,000 325,000
Approved Equivalent) - Refer Detail FND/EJ/01 for reference
Sub-total Carried to Summary 21,372,048
5.0 CENTRIFUGAL PUMPS (SECTION 23 21 30 & DS/1264-23 21 30)
Installation of Owner Furnished Centrifugal Pumps (P/01, 02) Condenser Water Pumps
5.1 2 Nos - 0 50,000 100,000 50,000 100,000
(Section 23 of
Installation 21Owner
30 & DS/1264-23 21 30)
Furnished Centrifugal Pumps (P/03, 04, 05, 06, 07, 08)
5.2 6 Nos - 0 50,000 300,000 50,000 300,000
Condenser
Installation Water Pumps
of Owner (SectionCentrifugal
Furnished 23 21 30 & DS/1264-23
Pumps 21 11)
(P/09, 10, 30) Condenser Water
5.3 3 Nos - 0 37,500 112,500 37,500 112,500
Pumps (Section
Installation 23 21Furnished
of Owner 30 & DS/1264-23 21Pumps
Centrifugal 30) (P/17, 18, 19) Primary Chilled Water
5.4 3 Nos - 0 26,500 79,500 26,500 79,500
Pumps (Section
Installation 23 21Furnished
of Owner 30 & DS/1264-23 21Pumps
Centrifugal 30) (P/20, 21, 22, 23, 24, 25) Primary
5.5 6 Nos - 0 32,500 195,000 32,500 195,000
Chilled Water
Installation of Pumps
Owner (Section
Furnished23Centrifugal
21 30 & DS/1264-23 21 30)Primary Chilled Water
Pumps (P/26,27)
5.6 2 Nos - 0 32,500 65,000 32,500 65,000
Pumps (Section
Installation 23 21Furnished
of Owner 30 & DS/1264-23 21Pumps
Centrifugal 30) (P/33, 34) Secondary Chilled Water
5.7 2 Nos - 0 48,500 97,000 48,500 97,000
Pumps (Section
Installation 23 21Furnished
of Owner 30 & DS/1264-23 21Pumps
Centrifugal 30) (P/35, 36, 37) Secondary Chilled
5.8 3 Nos - 0 80,000 240,000 80,000 240,000
Water Pumps
Installation of(Section 23 21 30 &
Owner Furnished DS/1264-23
Centrifugal 21 30)
Pumps (P/38, 39) Secondary Chilled Water
5.9 2 Nos - 0 27,500 55,000 27,500 55,000
Pumps (Section
Installation 23 21Furnished
of Owner 30 & DS/1264-23 21Pumps
Centrifugal 30) (P/40, 41) Seconary Chilled Water
5.10 2 Nos - 0 27,500 55,000 27,500 55,000
Pumps (Section
Installation 23 21Furnished
of Owner 30 & DS/1264-23 21Pumps
Centrifugal 30) (P/42, 43) Secondary Chilled Water
5.11 2 Nos - 0 32,500 65,000 32,500 65,000
Pumps (Section
Installation 23 21Furnished
of Owner 30 & DS/1264-23 21Pumps
Centrifugal 30) (P/44, 45) Secondary Chilled Water
5.12 2 Nos - 0 42,500 85,000 42,500 85,000
Pumps (Section 23 21 30 & DS/1264-23 21 30)
5.13 Foundation / Supports (By Civil Contractor) 35 Lots 15,000 Rate Only - Rate Only Rate Only
5.14 Commissioning & Testing 35 Lots 15,000 525,000 - 0 15,000 525,000
Sub-total Carried to Summary 1,974,000
6.0 AIR HANDLING UNITS (SECTION 23 73 10 & DS/1264-23 73 10)
Installation of Owner Furnished Air Handling Units (AHU/B4-01) (Section 23 73 10 &
6.1 1 No - 0 15,000 15,000 15,000 15,000
DS/1264-23
Installation of73 10) Furnished Air Handling Units (AHU/B3-01) (Section 23 73 10 &
Owner
6.2 1 No - 0 15,000 15,000 15,000 15,000
DS/1264-23
Installation of73 10) Furnished Air Handling Units (AHU/B2-01) (Section 23 73 10 &
Owner
6.3 1 No - 0 20,000 20,000 20,000 20,000
DS/1264-23
Installation of73 10) Furnished Air Handling Units (AHU/B2-02) (Section 23 73 10 &
Owner
6.4 1 No - 0 20,000 20,000 20,000 20,000
DS/1264-23
Installation of73 10) Furnished Air Handling Units (AHU/B2-03) (Section 23 73 10 &
Owner
6.5 1 No - 0 10,000 10,000 10,000 10,000
DS/1264-23
Installation of73 10) Furnished Air Handling Units (AHU/B1-01) (Section 23 73 10 &
Owner
6.6 1 No - 0 25,000 25,000 25,000 25,000
DS/1264-23
Installation of73 10) Furnished Air Handling Units (AHU/B1-02) (Section 23 73 10 &
Owner
6.7 1 No - 0 25,000 25,000 25,000 25,000
DS/1264-23 73 10)
6.8 Refrigerant Piping Between Outdoor & Indoor Units 1 Lot 750,000 750,000 50,000 50,000 800,000 800,000
6.9 Power Wiring Between Indoor and Outdoor Units in Conduit 50 Rft 1,483 74,153 150 7,500 1,633 81,653
6.10 Control Wiring in Conduit 50 Rft 381 19,068 50 2,500 431 21,568
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
6.11 Remote Isolator Near Indoor & Outdoor Units 3 Nos 30,297 90,890 2,500 7,500 32,797 98,390
6.12 Refrigerant Tray for Refrigerant Pipes (Size as Required) 1 Lot 545,000 545,000 7,500 7,500 552,500 552,500
6.13 Support for Refrigerant Trays 1 Lot 25,000 25,000 7,500 7,500 32,500 32,500
6.14 Foundation / Supports (By Civil Contractor) 7 Lots - Rate Only - Rate Only Rate Only
6.15 Commissioning & Testing 7 Lots 741,525 5,190,678 - 0 741,525 5,190,678
Sub-total Carried to Summary 6,907,288
7.0 FAN COIL UNITS (SECTION 23 73 20 & DS/1264-23 73 20)
Installation of Owner Furnished Fan Coil Units (FCU/B4-01 TO 02) (Section 23 73 20 &
7.1 2 Nos - 0 4,500 9,000 4,500 9,000
DS/1264-23
Installation of73 20) Furnished Fan Coil Units (FCU/B3-01A TO 02A) (Section 23 73 20
Owner
7.2 2 Nos - 0 4,500 9,000 4,500 9,000
& DS/1264-23
Installation 73 20)Furnished Fan Coil Units (FCU/B2-01) (Section 23 73 20 &
of Owner
7.3 1 No - 0 8,500 8,500 8,500 8,500
DS/1264-23
Installation of73 20) Furnished Fan Coil Units (FCU/B2-02) (Section 23 73 20 &
Owner
7.4 1 No - 0 8,500 8,500 8,500 8,500
DS/1264-23
Installation of73 20) Furnished Fan Coil Units (FCU/B1-01) (Section 23 73 20 &
Owner
7.5 1 No - 0 8,500 8,500 8,500 8,500
DS/1264-23
Installation of73 20) Furnished Fan Coil Units (FCU/B1-02) (Section 23 73 20 &
Owner
7.6 1 No - 0 8,500 8,500 8,500 8,500
DS/1264-23
Installation of73 20) Furnished Fan Coil Units (FCU/B3-01 TO B3-10) (Section 23 73 20
Owner
7.7 10 Nos - 0 1,500 15,000 1,500 15,000
& DS/1264-23
Installation 73 20)Furnished Fan Coil Units (FCU/B1-H1) (Section 23 73 20 &
of Owner
7.8 2 Nos - 0 4,500 9,000 4,500 9,000
DS/1264-23
Installation of73 20) Furnished Fan Coil Units (FCU/B1-BNQT1) (Section 23 73 20 &
Owner
7.9 2 Nos - 0 4,000 8,000 4,000 8,000
DS/1264-23
Installation of73 20) Furnished Fan Coil Units (FCU/B1-R1) (Section 23 73 20 &
Owner
7.10 4 Nos - 0 4,000 16,000 4,000 16,000
DS/1264-23
Installation of73 20) Furnished Fan Coil Units (FCU/B1-R2) (Section 23 73 20 &
Owner
7.11 4 Nos - 0 3,000 12,000 3,000 12,000
DS/1264-23
Installation of73 20) Furnished Fan Coil Units (FCU/B1-COMM1) (Section 23 73 20 &
Owner
7.12 2 Nos - 0 3,000 6,000 3,000 6,000
DS/1264-23
Installation of73 20) Furnished Fan Coil Units (FCU/B1-R3) (Section 23 73 20 &
Owner
7.13 4 Nos - 0 2,500 10,000 2,500 10,000
DS/1264-23
Installation of73 20) Furnished Fan Coil Units (FCU/B1-R4) (Section 23 73 20 &
Owner
7.14 4 Nos - 0 2,500 10,000 2,500 10,000
DS/1264-23
Installation of73 20) Furnished Fan Coil Units (FCU/B1-R5) (Section 23 73 20 &
Owner
7.15 2 Nos - 0 2,500 5,000 2,500 5,000
DS/1264-23
Installation of73 20) Furnished Fan Coil Units (FCU/B1-R6) (Section 23 73 20 &
Owner
7.16 6 Nos - 0 2,500 15,000 2,500 15,000
DS/1264-23
Installation of73 20) Furnished Fan Coil Units (FCU/B1-R7) (Section 23 73 20 &
Owner
7.17 6 Nos - 0 2,500 15,000 2,500 15,000
DS/1264-23 73 20)
7.18 Foundation & Supports 54 Lots 1,483 80,085 500 27,000 1,983 107,085
Ø 5/8'' Refrigerant Piping Hard Type L, with Insulation (Section 23 23 15, 23 07 19 &
7.19 644 Rft 424 272,881 105 67,620 529 340,501
DS/1264-23
Ø 23 15,Piping
3/8'' Refrigerant 23 07 Hard
19) Type L, with Insulation (Section 23 23 15, 23 07 19 &
7.20 644 Rft 424 272,881 65 41,860 489 314,741
DS/1264-23 23 15, 23 07 19)
7.21 Power Wiring Between Indoor and Outdoor Units in Conduit 644 Rft 445 286,525 75 48,300 520 334,825
7.22 Control Wiring in Conduit 644 Rft 169 109,153 50 32,200 219 141,353
7.23 Remote Isolator Near Indoor & Outdoor Units 92 Nos 6,356 584,746 1,550 142,600 7,906 727,346
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
7.24 Refrigerant Tray for Refrigerant Pipes (Size as Required) 1 Lot 375,000 375,000 15,000 15,000 390,000 390,000
7.25 Support for Refrigerant Trays 1 Lot 50,000 50,000 6,500 6,500 56,500 56,500
7.26 Commissioning & Testing For Fan Coil Units 54 Lots 1,800 97,200 - 0 1,800 97,200
7.27 Di-Electric Coupling Between Steel and Copper Pipes 16 Nos 1,695 27,119 450 7,200 2,145 34,319
7.28 Shrader Fitting For Air Vent/Pressure Testing 16 Nos 636 10,169 150 2,400 786 12,569
7.29 Auxiliary Drain Pan 8 Nos 2,119 16,949 500 4,000 2,619 20,949
Sub-total Carried to Summary 2,750,388
8.0 SMALL SPLIT TYPE AIR-CONDITIONER (SECTION 23 81 26 & DS/1264-23 81 26)
Supply & Installation of Small Split Air-Conditioners AC/B3-01,02 (Section 23 81 26 &
8.1 2 Nos 57,627 115,254 2,650 5,300 60,277 120,554
DS/1264-23
Supply 81 26) of Small Split Air-Conditioners AC/B3-03 to 05 (Section 23 81 26
& Installation
8.2 3 Nos 83,051 249,153 2,650 7,950 85,701 257,103
& DS/1264-23
Ø 81 26)
5/8'' Refrigerant Piping Hard Type L, with Insulation (Section 23 23 15, 23 07 19 &
8.3 70 Rft 424 29,661 105 7,350 529 37,011
DS/1264-23 23 15,Piping
Ø 3/8'' Refrigerant 23 07 Hard
19) Type L, with Insulation (Section 23 23 15, 23 07 19 &
8.4 70 Rft 297 20,763 65 4,550 362 25,313
DS/1264-23 23 15, 23 07 19)
8.5 Power Wiring Between Indoor and Outdoor Units in Conduit 70 Rft 403 28,178 75 5,250 478 33,428
8.6 Control Wiring in Conduit 70 Rft 127 8,898 50 3,500 177 12,398
8.7 Remote Isolator Near Indoor & Outdoor Units 5 Nos 6,356 31,780 1,550 7,750 7,906 39,530
8.8 Foundation & Supports 5 Lots 1,000 5,000 500 2,500 1,500 7,500
8.9 Commissioning & Testing 5 Lots 2,500 12,500 - 0 2,500 12,500
8.10 Refrigerant Tray for Refrigerant Pipes (Size as Required) 1 Lot 50,000 50,000 6,500 6,500 56,500 56,500
8.11 Support for Refrigerant Trays 1 Lot 12,000 12,000 2,500 2,500 14,500 14,500
Sub-total Carried to Summary 616,336
9.0 FANS (SECTION 23 34 16 / 23 34 25 & DS/1264-23 34 16 / 23 34 25)
Installation of Owner Furnished Centrifugal Fans FN/B3-E-04 (Section 23 34 16 &
9.1 2 Nos - 0 5,500 11,000 5,500 11,000
DS/1264-23
Installation of34 16) Furnished Centrifugal Fans FN/B3-E-05 (Section 23 34 16 &
Owner
9.2 2 Nos - 0 5,000 10,000 5,000 10,000
DS/1264-23
Installation of34 16) Furnished Centrifugal Fans FN/B3-E-06 (Section 23 34 16 &
Owner
9.3 1 No - 0 6,000 6,000 6,000 6,000
DS/1264-23
Installation of34 16) Furnished Centrifugal Fans FN/B3-01 (Section 23 34 16 &
Owner
9.4 1 No - 0 6,000 6,000 6,000 6,000
DS/1264-23
Installation of34 16) Furnished Centrifugal Fans FN/B3-02 (Section 23 34 16 &
Owner
9.5 1 No - 0 10,000 10,000 10,000 10,000
DS/1264-23
Installation of34 16) Furnished Centrifugal Fans FN/B3-03 (Section 23 34 16 &
Owner
9.6 1 No - 0 6,000 6,000 6,000 6,000
DS/1264-23
Installation of34 16) Furnished Centrifugal Fans FN/B3-04 (Section 23 34 16 &
Owner
9.7 1 No - 0 6,000 6,000 6,000 6,000
DS/1264-23
Installation of34 16) Furnished Centrifugal Fans FN/B3-S-03 (Section 23 34 16 &
Owner
9.8 1 No - 0 3,000 3,000 3,000 3,000
DS/1264-23
Installation of34 16) Furnished Centrifugal Fans FN/B4-01 (Section 23 34 16 &
Owner
9.9 1 No - 0 38,500 38,500 38,500 38,500
DS/1264-23 34 16)
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
Installation of Owner Furnished Centrifugal Fans FN/B2-E-01,02 (Section 23 34 16 &
9.10 2 Nos - 0 1,500 3,000 1,500 3,000
DS/1264-23
Installation of34 16) Furnished Centrifugal Fans FN/B1-E-01,02 (Section 23 34 16 &
Owner
9.11 2 Nos - 0 1,500 3,000 1,500 3,000
DS/1264-23
Installation of34 16) Furnished Propeller Fans FN/B3-S-01 (Section 23 34 25 &
Owner
9.12 22 Nos - 0 1,100 24,200 1,100 24,200
DS/1264-23
Installation of34 25) Furnished Propeller Fans FN/B3-E-01 (Section 23 34 25 &
Owner
9.13 22 Nos - 0 1,100 24,200 1,100 24,200
DS/1264-23
Installation of34 25) Furnished Propeller Fans FN/B3-S-02 (Section 23 34 25 &
Owner
9.14 39 Nos - 0 1,150 44,850 1,150 44,850
DS/1264-23
Installation of34 25) Furnished Propeller Fans FN/B3-E-02 (Section 23 34 25 &
Owner
9.15 24 Nos - 0 1,150 27,600 1,150 27,600
DS/1264-23
Installation of34 25) Furnished Propeller Fans FN/B3-E-03 (Section 23 34 25 &
Owner
9.16 1 No - 0 3,000 3,000 3,000 3,000
DS/1264-23
Installation of34 25) Furnished Propeller Fans FN/B3-E-07 (Section 23 34 13 &
Owner
9.17 2 Nos - 0 38,500 77,000 38,500 77,000
DS/1264-23 34 13)
9.18 Foundation / Supports (By Civil Contractor) 125 Lots - Rate Only - Rate Only Rate Only
9.19 Commissioning & Testing 125 Lots 1,695 211,864 - 0 1,695 211,864
Sub-total Carried to Summary 515,214
10.0 METER & GAUGES (SECTION 23 05 19)
10.1 Thermometers with Wells for Pipe Thermometer (Section 23 05 19) 38 Nos 8,051 305,932 650 24,700 8,701 330,632
10.2 Duct Thermometers (Section 23 05 19) 10 Nos 6,356 63,559 500 5,000 6,856 68,559
10.3 Pressure Gauges on Pipes (Section 23 05 19) 110 Nos 4,915 540,678 525 57,750 5,440 598,428
10.4 Gauge Outlets with Cock (Section 23 05 19) 110 Nos 1,695 186,441 400 44,000 2,095 230,441
Sub-total Carried to Summary 1,228,060
11.0 PIPING (SECTION 23 21 13 & DS/1264-23 21 13 )
11.1 Chilled Water Piping (Section 23 21 10 & DS/1264-23 21 10 )
11.1.1 Ø 18" (Ø 450mm) 120 Rft 6,910 829,197 1,160 139,200 8,070 968,397
11.1.2 Ø 16" (Ø 400mm) 1200 Rft 5,857 7,028,436 1,128 1,353,600 6,985 8,382,036
11.1.3 Ø 14" (Ø 350mm) 506 Rft 4,607 2,330,966 990 500,940 5,597 2,831,906
11.1.4 Ø 12" (Ø 300mm) 954 Rft 3,356 3,201,887 852 812,808 4,208 4,014,695
11.1.5 Ø 10" (Ø 250mm) 70 Rft 2,614 182,976 829 58,061 3,443 241,037
11.1.6 Ø 8" (Ø 200mm) 7200 Rft 2,086 15,020,320 713 5,136,480 2,800 20,156,800
11.1.7 Ø 6" (Ø 150mm) 4060 Rft 1,382 5,610,903 302 1,226,120 1,684 6,837,023
11.1.8 Ø 5" (Ø 125mm) 1270 Rft 1,066 1,353,961 262 333,248 1,329 1,687,209
11.1.9 Ø 4" (Ø 100mm) 50 Rft 819 40,966 241 12,045 1,060 53,011
11.1.10 Ø 3" (Ø 75mm) 1270 Rft 599 760,558 202 256,794 801 1,017,352
11.1.11 Ø 2 ½" (Ø 65mm) 165 Rft 477 78,724 180 29,618 657 108,342
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
11.1.12 Ø 2" (Ø 50mm) 50 Rft 290 14,478 135 6,740 424 21,218
11.1.13 Ø 1 ½" (Ø 40mm) 270 Rft 217 58,636 107 28,782 324 87,418
11.1.14 Ø 1 ¼" (Ø 32mm) 365 Rft 188 68,458 91 33,106 278 101,564
11.1.15 Ø 1" (Ø 25mm) 365 Rft 141 51,404 74 27,112 215 78,516
11.1.16 Ø ¾" (Ø 20mm) 50 Rft 96 4,804 63 3,146 159 7,950
11.1.17 Ø ¼" (Ø 8mm) 10 Rft 78 777 47 474 125 1,250
11.2 Condenser Water Piping (Section 23 21 10 & DS/1264-23 21 10) 0
11.2.1 Ø 26" (Ø 650mm) 174 Rft 21,388 3,721,517 2,650 461,100 24,038 4,182,617
11.2.2 Ø 24" (Ø 600mm) 460 Rft 15,679 7,212,373 1,977 909,190 17,656 8,121,563
11.2.3 Ø 20" (Ø 400mm) 20 Rft 9,213 184,266 1,380 27,600 10,593 211,866
11.2.4 Ø 18" (Ø 400mm) 20 Rft 6,910 138,200 1,160 23,200 8,070 161,400
11.2.5 Ø 16" (Ø 400mm) 20 Rft 5,857 117,141 1,128 22,560 6,985 139,701
11.2.6 Ø 14" (Ø 350mm) 20 Rft 4,607 92,133 990 19,800 5,597 111,933
11.2.7 Ø 12" (Ø 300mm) 80 Rft 3,356 268,502 852 68,160 4,208 336,662
11.2.8 Ø 10" (Ø 250mm) 520 Rft 2,614 1,359,252 829 431,309 3,443 1,790,561
11.2.9 Ø 8" (Ø 200mm) 50 Rft 2,086 104,308 713 35,670 2,800 139,978
11.2.10 Ø 6" (Ø 150mm) 50 Rft 1,382 69,100 302 15,100 1,684 84,200
11.3 Make-Up Water Piping (Section 23 21 10 & DS/1264-23 21 10)
11.3.1 Ø 2" (Ø 50mm) 100 Rft 386 38,608 135 13,480 521 52,088
11.3.2 Ø 1 ½" (Ø 40mm) 20 Rft 290 5,791 107 2,132 396 7,923
11.4 Flexible Connectors at Expansion Joints
11.4.1 Ø 14" (Ø 350mm) 2 Nos 59,110 118,220 14,000 28,000 73,110 146,220
11.4.2 Ø 12" (Ø 300mm) 4 Nos 43,500 174,000 13,000 52,000 56,500 226,000
11.4.3 Ø 10" (Ø 250mm) 2 Nos 24,750 49,500 13,000 26,000 37,750 75,500
11.4.4 Ø 8" (Ø 200mm) 18 Nos 16,125 290,250 10,000 180,000 26,125 470,250
11.4.5 Ø 6" (Ø 150mm) 8 Nos 13,200 105,600 9,000 72,000 22,200 177,600
11.4.6 Ø 5" (Ø 125mm) 4 Nos 9,900 39,600 7,500 30,000 17,400 69,600
11.4.7 Ø 4" (Ø 100mm) 2 Nos 8,625 17,250 6,000 12,000 14,625 29,250
11.4.8 Ø 3" (Ø 75mm) 4 Nos 6,750 27,000 4,500 18,000 11,250 45,000
11.5 Pipe Sleeves 1 Lot 63,559 63,559 - 0 63,559 63,559
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
Supports as per Hilti / Fischer Support System. Use C-Channel (Hilti/Fischer) of
ITY
Required Strength Instead of Threaded Rods for Services Running at Level B1. For (3) x (5) (3) x (7) (5) + (7) (6) + (8)
Services Running At B1, Span Between Supports Shall be 3000mm C/C for Mechanical
11.6 1 Lot 675,000 675,000 - 0 675,000 675,000
Services and 1500mm C/C for Cable Trays. For Other Areas, Follow Specifications for
11.7 the
PipeC/C Span. Testing
Pressure This Contractor to Install Complete Support System for all Mechanical 1 Lot 345,000 345,000 - 0 345,000 345,000
and Electrical Services Hanged from B1 Roof. (Excluding Steam Piping Supports)
Sub-total Carried to Summary 64,259,195
12.0 VALVES & SPECIALITIES (SECTION 23 05 23)
12.1 Supply and Installation of Butterfly Valves with Material/Flanges/Unions etc (Section 23 05 23)
12.1.1 Ø 16" (Ø 400mm) 3 Nos 280,932 842,797 13,300 39,900 294,232 882,697
12.1.2 Ø 14" (Ø 350mm) 0 No 179,237 Rate Only 12,350 Rate Only Rate Only
12.1.3 Ø 12" (Ø 300mm) 7 Nos 69,915 489,407 12,350 86,450 82,265 575,857
12.1.4 Ø 10" (Ø 250mm) 40 Nos 55,297 2,211,864 9,500 380,000 64,797 2,591,864
12.1.5 Ø 8" (Ø 200mm) 85 Nos 36,706 3,119,968 8,550 726,750 45,256 3,846,718
12.1.6 Ø 6" (Ø 150mm) 35 Nos 17,479 611,758 8,075 282,625 25,554 894,383
12.1.7 Ø 5" (Ø 125mm) 7 Nos 13,983 97,881 6,650 46,550 20,633 144,431
12.1.8 Ø 4" (Ø 100mm) 0 No 9,852 Rate Only 5,225 Rate Only Rate Only
12.1.9 Ø 3" (Ø 75mm) 0 Nos 7,627 Rate Only 4,275 Rate Only Rate Only
12.1.10 Ø 2 ½" (Ø 65mm) 10 Nos 6,992 69,915 2,945 29,450 9,937 99,365
12.1.11 Ø 2" (Ø 50mm) 0 No 6,292 Rate Only 2,470 Rate Only Rate Only
12.2 Supply and Installation of Gate Valves with Material/Flanges/Unions etc (Section 23 05 23)
12.2.1 Ø 2" (Ø 50mm) 8 Nos 4,068 32,542 1,615 12,920 5,683 45,462
12.2.2 Ø 1 ½" (Ø 40mm) 5 Nos 2,847 14,237 1,283 6,413 4,130 20,650
12.2.3 Ø 1 ¼" (Ø 32mm) 5 Nos 2,237 11,186 1,140 5,700 3,377 16,886
12.2.4 Ø 1" (Ø 25mm) 13 Nos 1,695 22,034 903 11,733 2,597 33,766
12.2.5 Ø ¾" (Ø 20mm) 9 Nos 1,186 10,678 713 6,413 1,899 17,090
12.2.6 Ø ½" (Ø 15mm) 0 No 1,051 Rate Only 570 Rate Only Rate Only
12.2.7 Ø ¼" (Ø 8mm) 0 No 678 Rate Only 523 Rate Only Rate Only
12.3 Supply and Installation of Check Valve with Material/Flanges/Unions etc (Section 23 05 23) -
12.3.1 Ø 12" (Ø 300mm) 4 Nos 209,100 836,400 12,350 49,400 221,450 885,800
12.3.2 Ø 10" (Ø 250mm) 9 Nos 122,352 1,101,165 12,350 111,150 134,702 1,212,315
12.3.3 Ø 8" (Ø 200mm) 20 Nos 84,216 1,684,322 9,500 190,000 93,716 1,874,322
12.3.4 Ø 6 (Ø 150mm)
"
6 Nos 41,949 251,695 8,550 51,300 50,499 302,995
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
12.3.5 Ø 5" (Ø 125mm) 0 No 36,864 Rate Only 7,125 Rate Only Rate Only
12.3.6 Ø 4" (Ø 100mm) 0 No 24,470 Rate Only 5,700 Rate Only Rate Only
12.3.7 Ø 3" (Ø 75mm) 0 No 16,843 Rate Only 4,275 Rate Only Rate Only
12.3.8 Ø 2 ½" (Ø 65mm) 0 No 14,619 Rate Only 2,945 Rate Only Rate Only
12.3.9 Ø 2" (Ø 50mm) 3 Nos. 5,847 17,542 1,615 4,845 7,462 22,387
12.3.10 Ø 1 ½" (Ø 40mm) 0 No 3,369 Rate Only 1,378 Rate Only Rate Only
12.4 Supply and Installation of Ball Valve with Material/Flanges/Unions etc (Section 23 05 23) -
12.4.1 Ø 10" (Ø 250mm) 0 No 202,034 Rate Only 12,350 Rate Only Rate Only
12.4.2 Ø 8" (Ø 200mm) 0 No 115,254 Rate Only 10,450 Rate Only Rate Only
12.4.3 Ø 6 (Ø 150mm)
"
0 No 57,627 Rate Only 8,550 Rate Only Rate Only
12.4.4 Ø 5 (Ø 125mm)
"
0 No 45,085 Rate Only 7,125 Rate Only Rate Only
12.4.5 Ø 4" (Ø 100mm) 0 No 30,169 Rate Only 5,700 Rate Only Rate Only
12.4.6 Ø 3" (Ø 75mm) 0 No 22,034 Rate Only 4,275 Rate Only Rate Only
12.4.7 Ø 2 ½" (Ø 65mm) 0 No 15,119 Rate Only 2,945 Rate Only Rate Only
12.4.8 Ø 2" (Ø 50mm) 8 Nos 6,237 49,898 1,188 9,500 7,425 59,398
12.4.9 Ø ¾" (Ø 20mm) 50 Nos 556 27,797 665 33,250 1,221 61,047
12.5 Supply and Installation of Flexible Connector with Material/Flanges/Unions etc (Section 23 05 23) -
12.5.1 Ø 12" (Ø 300mm) 7 Nos 48,696 340,870 12,350 86,450 61,046 427,320
12.5.2 Ø 10" (Ø 250mm) 27 Nos 31,304 845,217 12,350 333,450 43,654 1,178,667
12.5.3 Ø 8" (Ø 200mm) 54 Nos 24,348 1,314,783 9,500 513,000 33,848 1,827,783
12.5.4 Ø 6" (Ø 150mm) 15 Nos 17,391 260,870 8,550 128,250 25,941 389,120
12.5.5 Ø 5 (Ø 125mm)
"
0 No 13,913 Rate Only 7,125 Rate Only Rate Only
12.5.6 Ø 4" (Ø 100mm) 0 No 12,522 Rate Only 5,700 Rate Only Rate Only
12.5.7 Ø 3" (Ø 75mm) 0 No 10,435 Rate Only 4,275 Rate Only Rate Only
12.5.8 Ø 2 ½" (Ø 65mm) 0 No 8,348 Rate Only 2,945 Rate Only Rate Only
12.6 Supply and Installation of Flow Balancing & Shut-off Valve with Material/Flanges/Unions etc (Section 23 86 20) -
12.6.1 Ø 10" (Ø 250mm) 6 Nos 251,466 1,508,799 12,350 74,100 263,816 1,582,899
12.6.2 Ø 8" (Ø 200mm) 8 Nos 161,297 1,290,376 9,500 76,000 170,797 1,366,376
12.6.3 Ø 6" (Ø 150mm) 3 Nos 73,928 221,783 8,550 25,650 82,478 247,433
12.6.4 Ø 5" (Ø 125mm) 0 No 64,849 Rate Only 7,125 Rate Only Rate Only
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
12.6.5 Ø 4" (Ø 100mm) 0 No 46,279 Rate Only 5,700 Rate Only Rate Only
12.6.6 Ø 3" (Ø 75mm) 0 No 35,077 Rate Only 4,275 Rate Only Rate Only
12.6.7 Ø 2 ½" (Ø 65mm) 5 Nos 25,203 126,013 2,945 14,725 28,148 140,738
12.6.8 Ø 2" (Ø 50mm) 0 No 9,801 Rate Only 1,188 Rate Only Rate Only
12.6.9 Ø 1 ½" (Ø 40mm) 0 No 6,780 Rate Only 998 Rate Only Rate Only
12.6.10 Ø 1 ¼" (Ø 32mm) 3 Nos 6,780 20,339 855 2,565 7,635 22,904
12.6.11 Ø 1" (Ø 25mm) 7 Nos 5,601 39,204 703 4,921 6,304 44,125
12.6.12 Ø ¾" (Ø 20mm) 0 No 4,834 Rate Only 513 Rate Only Rate Only
12.6.13 Ø ¼" (Ø 8mm) 0 No 4,363 Rate Only 399 Rate Only Rate Only
12.7 Supply and Installation of Strainers with Ball valve with Material/Flanges/Unions etc (Section 23 05 23) -
12.7.1 Ø 12" (Ø 300mm) 4 Nos 129,287 517,148 12,350 49,400 141,637 566,548
12.7.2 Ø 10" (Ø 250mm) 9 Nos 91,826 826,435 12,350 111,150 104,176 937,585
12.7.3 Ø 8" (Ø 200mm) 20 Nos 59,826 1,196,522 9,500 190,000 69,326 1,386,522
12.7.4 Ø 6" (Ø 150mm) 6 Nos 39,652 237,913 8,550 51,300 48,202 289,213
12.7.5 Ø 5 (Ø 125mm)
"
0 No 28,174 Rate Only 7,125 Rate Only Rate Only
12.7.6 Ø 4" (Ø 100mm) 0 No 18,435 Rate Only 5,700 Rate Only Rate Only
12.7.7 Ø 3" (Ø 75mm) 0 No 15,304 Rate Only 4,275 Rate Only Rate Only
12.7.8 Ø 2 ½" (Ø 65mm) 5 Nos 14,609 73,043 2,945 14,725 17,554 87,768
12.7.9 Ø 2" (Ø 50mm) 0 No 13,426 Rate Only 1,235 Rate Only Rate Only
12.7.10 Ø 1 ½" (Ø 40mm) 0 No 7,652 Rate Only 1,045 Rate Only Rate Only
12.7.11 Ø 1 ¼" (Ø 32mm) 0 No 6,470 Rate Only 903 Rate Only Rate Only
12.7.12 Ø 1" (Ø 25mm) 0 No 3,826 Rate Only 741 Rate Only Rate Only
12.7.13 Ø ¾" (Ø 20mm) 0 No 2,296 Rate Only 551 Rate Only Rate Only
12.8 Supply and Installation of Strainers with Material/Flanges/Unions etc (Section 23 05 23) -
12.8.1 Ø 10" (Ø 250mm) 0 No 91,826 Rate Only 12,350 Rate Only Rate Only
12.8.2 Ø 8" (Ø 200mm) 0 No 59,826 Rate Only 9,500 Rate Only Rate Only
12.8.3 Ø 6" (Ø 150mm) 0 No 39,652 Rate Only 8,550 Rate Only Rate Only
12.8.4 Ø 5" (Ø 125mm) 0 No 28,174 Rate Only 7,125 Rate Only Rate Only
12.8.5 Ø 4" (Ø 100mm) 0 No 18,435 Rate Only 5,700 Rate Only Rate Only
12.8.6 Ø 3" (Ø 75mm) 1 No 15,304 15,304 4,275 4,275 19,579 19,579
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
12.8.7 Ø 2 ½" (Ø 65mm) 0 No 14,609 Rate Only 2,945 Rate Only Rate Only
12.8.8 Ø 2" (Ø 50mm) 2 Nos 13,426 26,852 1,188 2,375 14,614 29,227
12.8.9 Ø 1 ½" (Ø 40mm) 0 No 7,652 Rate Only 998 Rate Only Rate Only
12.8.10 Ø 1 ¼" (Ø 32mm) 5 Nos 6,470 32,348 855 4,275 7,325 36,623
12.8.11 Ø 1" (Ø 25mm) 0 No 3,826 Rate Only 703 Rate Only Rate Only
12.8.12 Ø ¾" (Ø 20mm) 9 Nos 2,296 20,661 513 4,617 2,809 25,278
12.9 Supply and Installation of Air Vents with Material/Flanges/Unions etc (Section 23 86 35) -
12.9.1 Ø 6" (Ø 150mm) 0 No 556,522 Rate Only - Rate Only Rate Only
12.9.2 Ø 5" (Ø 125mm) 0 No 452,174 Rate Only - Rate Only Rate Only
12.9.3 Ø 4" (Ø 100mm) 0 No 347,826 Rate Only - Rate Only Rate Only
12.9.4 Ø 3" (Ø 75mm) 0 No 260,870 Rate Only - Rate Only Rate Only
12.9.5 Ø 2 ½" (Ø 65mm) 0 No 104,348 Rate Only - Rate Only Rate Only
12.9.6 Ø 2" (Ø 50mm) 0 No 52,174 Rate Only - Rate Only Rate Only
12.9.7 Ø 1 ½" (Ø 40mm) 0 No 34,783 Rate Only - Rate Only Rate Only
12.9.8 Ø 1 ¼" (Ø 32mm) 0 No 17,391 Rate Only - Rate Only Rate Only
12.9.9 Ø 1" (Ø 25mm) 0 No 1,724 Rate Only 808 Rate Only Rate Only
12.9.10 Ø ¾" (Ø 20mm) 10 Nos 1,530 15,304 713 7,125 2,243 22,429
12.10 Supply and Installation of Pressure Reducing Valves (Section 23 05 23) -
12.10.1 Ø 2" (Ø 50mm) 2 Nos 158,000 316,000 1,615 3,230 159,615 319,230
12.11 Supply and Installation of Relief Valves (Section 23 05 23) -
12.11.1 Ø 2" (Ø 50mm) 2 Nos 135,000 270,000 5,700 11,400 140,700 281,400
12.12 Supply and Installation of Flow Meter (Section 23 86 30) -
12.12.1 Ø 10" (Ø 250mm) 2 Nos 347,458 694,915 6,175 12,350 353,633 707,265
12.12.2 Ø 6" (Ø 150mm) 2 Nos 245,763 491,525 5,225 10,450 250,988 501,975
Sub-total Carried to Summary 26,025,444
13.0 DUCT WORK (MACHINE MADE) (SECTION 23 31 13)
Sheet Metal Duct Work (Air Conditioning ) (Supply Air), Machine made Ducts (Section
13.1 24,000 ft² 132 3,161,288 75 1,800,000 207 4,961,288
23 31 Metal
Sheet 13) Duct Work (Air Conditioning ) (Return Air), Machine made Ducts (Section
13.2 10,500 ft² 132 1,383,064 75 787,500 207 2,170,564
23 31 13)
13.3 Sheet Metal Duct Work (Fresh Air) Machine made Ducts (Section 23 31 13) 12,900 ft² 124 1,600,803 65 838,500 189 2,439,303
13.4 Sheet Metal Duct Work (Exhaust Air) Machine made Ducts (Section 23 31 13) 12,000 ft² 124 1,489,119 65 780,000 189 2,269,119
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
13.5 Quadrant Volume Dampers 250 ft² 2,669 667,373 585 146,250 3,254 813,623
13.6 Butterfly Dampers
13.6.1 Ø 8" (Ø 200mm) 0 No 3,432 Rate Only 775 Rate Only Rate Only
13.6.2 Ø 6" (Ø 150mm) 80 Nos 2,059 164,746 475 38,000 2,534 202,746
13.6.3 Ø 4" (Ø 100mm) 0 No 992 Rate Only 300 Rate Only Rate Only
13.7 Flexible Ducts (Section 23 33 46)
13.7.1 Ø 8" (Ø 200mm) 0 Rft 162 Rate Only 70 Rate Only Rate Only
13.7.2 Ø 6" (Ø 150mm) 410 Rft 124 50,694 53 21,730 177 72,424
13.7.3 Ø 4" (Ø 100mm) 0 Rft 101 Rate Only 35 Rate Only Rate Only
13.8 Duct Test Holes "Super-Tester" 1 Lot 75,000 75,000 0 0 75,000 75,000
13.9 Duct Supports as per Hilti/Fischer Support System 1 Lot 350,000 350,000 0 0 350,000 350,000
13.10 Duct Access Doors (To be installed below VCDs) 1 Lot 135,000 135,000 45,000 45,000 180,000 180,000
13.11 G.I Frame as Duct Sleeve 1 Lot 25,000 25,000 0 0 25,000 25,000
13.12 Wire Mesh on Duct Opening 1 Lot 45,000 45,000 0 0 45,000 45,000
18 gage sheet metal duct complete with structure and support system (Refer Drawing
13.8 1 Lot 8,733,773 8,733,773 0 0 8,733,773 8,733,773
No. ME-FNDH-57-B3-501,502
Sheet Metal Duct Work (Exhaust&Air)
601,602)
( (Refer Drawing No. ME-FNDH-57-B3-502 & 602)
13.8.1 2850 ft 2
79 223,894 105 299,250 184 523,144
(Size 500mm x 450mm)
Sub-total Carried to Summary 22,860,982
14.0 THERMAL INSULATION (SECTION 23 07 13 & 23 07 19 & DS/1264-23 07 13 & 23 07 19)
Insulation of Supply & Return Air Duct with Fibre Glass Blanket in Ceiling Concealed
14.1 34500 ft² 28 975,312 24 828,000 52 1,803,312
Application

Insulation of Supply & Return Air Duct with Fibre Glass Board in Non Air conditioned
14.2 500 ft² 93 46,443 40 20,000 133 66,443
Space-Exposed to View

14.3 Insulation of Exhaust Air Duct Including Vapor Barrier & Jacketing 0 ft² 31 0 33 0 63 0

14.4 Insulation of Chilled Water Piping Including Vapor Barrier, Jacketing & Cladding (Polystyrene) 0
14.4.1 Ø 18" (Ø 450mm) 120 Rft 2,715 325,786 296 35,508 3,011 361,294
14.4.2 Ø 16" (Ø 400mm) 1200 Rft 2,547 3,055,979 265 318,000 2,812 3,373,979
14.4.3 Ø 14" (Ø 350mm) 506 Rft 2,084 1,054,313 230 116,380 2,314 1,170,693
14.4.4 Ø 12" (Ø 300mm) 954 Rft 1,775 1,693,290 210 200,340 1,985 1,893,630
14.4.5 Ø 10" (Ø 250mm) 70 Rft 1,258 88,052 172 12,005 1,429 100,057
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
14.4.6 Ø 8" (Ø 200mm) 7200 Rft 1,053 7,584,384 158 1,139,400 1,212 8,723,784
14.4.7 Ø 6" (Ø 150mm) 4060 Rft 750 3,045,422 134 542,416 884 3,587,838
14.4.8 Ø 5" (Ø 125mm) 1270 Rft 593 752,697 118 150,368 711 903,065
14.4.9 Ø 4" (Ø 100mm) 50 Rft 525 26,238 109 5,450 634 31,688
14.4.10 Ø 3" (Ø 75mm) 1270 Rft 458 582,164 100 126,619 558 708,783
14.4.11 Ø 2 ½" (Ø 65mm) 165 Rft 392 64,685 90 14,916 482 79,601
14.4.12 Ø 2" (Ø 50mm) 50 Rft 303 15,126 80 3,980 382 19,106
14.4.13 Ø 1 ½" (Ø 40mm) 270 Rft 235 63,550 70 18,968 306 82,518
14.4.14 Ø 1 ¼" (Ø 32mm) 365 Rft 220 80,277 64 23,451 284 103,729
14.4.15 Ø 1" (Ø 25mm) 365 Rft 198 72,390 58 21,115 256 93,506
14.4.16 Ø ¾" (Ø 20mm) 50 Rft 182 9,106 52 2,590 234 11,696
14.4.17 Ø ¼" (Ø 8mm) 10 Rft 150 1,497 45 447 194 1,944
14.5 Insulation of Chilled Water Piping Including Vapor Barrier, Jacketing & Cladding (Fibre Glass) 0
14.5.1 Ø 16" (Ø 400mm) 50 Rft 1,712 85,583 211 10,545 1,923 96,128
14.5.2 Ø 14" (Ø 350mm) 35 Rft 1,461 51,130 190 6,638 1,651 57,768
14.5.3 Ø 12" (Ø 300mm) 25 Rft 1,284 32,103 178 4,455 1,462 36,558
14.5.4 Ø 10" (Ø 250mm) 30 Rft 1,145 34,357 164 4,926 1,309 39,283
14.5.5 Ø 8" (Ø 200mm) 25 Rft 903 22,573 149 3,713 1,051 26,285
14.5.6 Ø 6" (Ø 150mm) 20 Rft 724 14,477 151 3,013 875 17,491
14.5.7 Ø 5" (Ø 125mm) 35 Rft 656 22,958 140 4,883 795 27,841
14.5.8 Ø 4" (Ø 100mm) 35 Rft 589 20,609 128 4,494 717 25,103
14.5.9 Ø 3" (Ø 75mm) 25 Rft 502 12,540 116 2,888 617 15,428
14.5.10 Ø 2 ½" (Ø 65mm) 40 Rft 463 18,521 107 4,280 570 22,801
14.5.11 Ø 2" (Ø 50mm) 40 Rft 252 10,094 83 3,316 335 13,410
14.5.12 Ø 1 ½" (Ø 40mm) 25 Rft 223 5,576 75 1,881 298 7,456
14.5.13 Ø 1 ¼" (Ø 32mm) 30 Rft 219 6,575 70 2,096 289 8,671
14.5.14 Ø 1" (Ø 25mm) 25 Rft 189 4,727 62 1,554 251 6,280
14.5.15 Ø ¾" (Ø 20mm) 20 Rft 168 3,365 55 1,105 223 4,470
14.6 Cladding of Valves & Specialities (openable boxes with insulation) 0
14.6.1 Ø 16" (Ø 400mm) 3 Nos 7,246 21,737 2,975 8,925 10,221 30,662
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
14.6.2 Ø 14" (Ø 350mm) 0 No 6,483 Rate Only 2,925 Rate Only Rate Only
14.6.3 Ø 12" (Ø 300mm) 13 Nos 6,254 81,305 2,710 35,230 8,964 116,535
14.6.4 Ø 10" (Ø 250mm) 4 Nos 6,102 24,407 2,600 10,400 8,702 34,807
14.6.5 Ø 8" (Ø 200mm) 110 Nos 6,102 671,186 2,600 286,000 8,702 957,186
14.6.6 Ø 6" (Ø 150mm) 47 Nos 5,720 268,856 2,375 111,625 8,095 380,481
14.6.7 Ø 5" (Ø 125mm) 7 Nos 5,492 38,441 2,160 15,120 7,652 53,561
14.6.8 Ø 4" (Ø 100mm) 0 No 5,339 Rate Only 2,050 Rate Only Rate Only
14.6.9 Ø 3" (Ø 75mm) 0 No 4,958 Rate Only 1,825 Rate Only Rate Only
14.6.10 Ø 2 ½" (Ø 65mm) 17 Nos 4,958 84,280 1,825 31,025 6,783 115,305
14.6.11 Ø 2" (Ø 50mm) 5 Nos 4,958 24,788 1,825 9,125 6,783 33,913
14.6.12 Ø 1 ½" (Ø 40mm) 5 Nos 4,576 22,881 1,500 7,500 6,076 30,381
14.6.13 Ø 1 ¼" (Ø 32mm) 7 Nos 4,576 32,034 1,500 10,500 6,076 42,534
14.6.14 Ø 1" (Ø 25mm) 20 Nos 4,195 83,898 1,275 25,500 5,470 109,398
14.6.15 Ø ¾" (Ø 20mm) 0 No 3,814 Rate Only 1,050 Rate Only Rate Only
Sub-total Carried to Summary 25,426,402
15.0 SOUND ATTENUATION (SECTION 23 33 19 & DS/1264-23 33 19)
Installation of Owner Furnished Sound Attenuator Boxes (SA/B4-01) (Section 23 33 19
15.1 1 No 0 0 12,000 12,000 12,000 12,000
& DS/1264-23
Installation 33 19)Furnished Sound Attenuator Boxes (SA/B3-01) (Section 23 33 19
of Owner
15.2 4 Nos 0 0 15,500 62,000 15,500 62,000
& DS/1264-23
Installation 33 19 Furnished
of Owner ) Sound Attenuator Boxes (SA/B2-01 to 04) (Section 23
15.3 4 Nos 0 0 12,000 48,000 12,000 48,000
33 19 & DS/1264-23
Installation 33 19 ) Sound Attenuator Boxes (SA/B1-01to 04) (Section 23
of Owner Furnished
15.4 4 Nos 0 0 12,000 48,000 12,000 48,000
33 19 & DS/1264-23 33 19)
15.5 Support & Hangers (Section 23 85 10 & DS/1264-23 85 10) 13 Lots 5,000 65,000 500 6,500 5,500 71,500
15.6 Commissioning & Testing 13 Lots 6,500 84,500 0 0 6,500 84,500
Sub-total Carried to Summary 326,000
16.0 AIR SEPARATORS (SECTION 23 86 10 & DS/1264-23 86 10)
Supply & Installation of Air Seperator (AS/01) (Hotel) (Section 23 86 10 & DS/1264-23
16.1 1 No 129,640 129,640 19,500 19,500 149,140 149,140
86 10) & Installation of Air Seperator (AS/02) (Banquet) (Section 23 86 10 & DS/1264-
Supply
16.2 1 No 129,640 129,640 19,500 19,500 149,140 149,140
23 86 10)
Supply & Installation of Air Seperator (AS/03) (Food Court) (Section 23 86 10 &
16.3 1 No 129,640 129,640 19,500 19,500 149,140 149,140
DS/1264-23 86 10) of Air Seperator (AS/04) (Mall) (Section 23 86 10 & DS/1264-23
Supply & Installation
16.4 1 No 233,051 233,051 19,500 19,500 252,551 252,551
86 10) & Installation of Air Seperator (AS/05) (Cinema) (Section 23 86 10 & DS/1264-
Supply
16.5 1 No 129,640 129,640 19,500 19,500 149,140 149,140
23 86 10)
Supply & Installation of Air Seperator (AS/06) (Hypermarket) (Section 23 86 10 &
16.6 1 No 129,640 129,640 19,500 19,500 149,140 149,140
DS/1264-23 86 10)
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
16.7 Foundation / Supports (By Civil Contractor) 6 Lots 0 Rate Only 0 Rate Only Rate Only
16.8 Commissioning & Testing of Air Seperators 6 Lots 30,000 180,000 0 0 30,000 180,000
Sub-total Carried to Summary 1,178,250
17.0 WATER TREATMENT FOR CHILLED WATER CIRCUIT (SECTION 23 25 13)
17.1 Water Treatment Equipment (Bypass Feeder) 1 No 35,000 35,000 5,000 5,000 40,000 40,000
17.2 Water Treatment Chemicals for One (01) Year Operation 1 Lot 1,800,000 1,800,000 0 0 1,800,000 1,800,000
17.3 Commissioning & Testing 1 Lot 35,000 35,000 0 0 35,000 35,000
Sub-total Carried to Summary 1,875,000
18.0 WATER TREATMENT FOR CONDENSER WATER CIRCUIT (SECTION 23 25 17)
18.1 Water Treatment Equipment 1 No 975,000 975,000 26,000 26,000 1,001,000 1,001,000
18.2 Water Treatment Chemicals for One (01) Year Operation 1 Lot 600,000 600,000 0 0 600,000 600,000
18.3 Commissioning & Testing 1 Lot 15,000 15,000 0 0 15,000 15,000
Sub-total Carried to Summary 1,616,000
19.0 AIR DEVICES (SECTION 23 37 13)
19.1 Supply Air Square Diffuser (Tuttle & Bailey AME Series) 40 ft² 1,189 47,542 500 20,000 1,689 67,542
19.2 Return Air Square Diffuser (Tuttle & Bailey AME Series) 0 ft² 1,189 Rate Only 500 Rate Only Rate Only
19.3 Supply Air Round Diffusers Flush Face (Tuttle & Bailey S Type) with 4 No. Damper
19.3.1 Ø 21" (Ø 525mm) 40 Nos 5,403 216,102 2,050 82,000 7,453 298,102
19.3.2 Ø 18" (Ø 450mm) 18 Nos 4,590 82,620 2,050 36,900 6,640 119,520
19.3.3 Ø 15" (Ø 375mm) 8 Nos 3,890 31,119 2,050 16,400 5,940 47,519
19.3.4 Ø 12" (Ø 300mm) 6 Nos 3,097 18,585 1,450 8,700 4,547 27,285
19.4 Return Air Round Diffusers Flush Face (Tuttle & Bailey S Type)
19.4.1 Ø 21" (Ø 525mm) 68 Nos 5,403 367,373 2,050 139,400 7,453 506,773
19.4.2 Ø 18" (Ø 450mm) 22 Nos 4,590 100,980 2,050 45,100 6,640 146,080
19.4.3 Ø 15" (Ø 375mm) 6 Nos 3,890 23,339 2,050 12,300 5,940 35,639
19.5 Exhaust Air Disc Valve for Toilet Exhaust (Ø 6" ) 82 Nos 864 70,881 410 33,620 1,274 104,501
19.6 Exhaust Air Register (A 77D Series) 20 ft² 1,044 20,890 523 10,450 1,567 31,340
19.7 Exhaust Air Register (T 77 Series) 165 ft² 972 160,456 518 85,388 1,490 245,843
19.8 Return Air Grill (A 70 Series) 25 ft² 972 24,311 518 12,938 1,490 37,249
19.9 Supply & Exhaust Air Grill (T 70 Series) 235 ft² 972 228,528 518 121,613 1,490 350,140
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
19.10 Supply Air Registers (A 557 Series) 120 ft² 1,044 125,339 523 62,700 1,567 188,039
19.11 Fresh Air & Exhaust Air Louvers 770 ft² 3,025 2,329,576 700 539,000 3,725 2,868,576
19.12 Control Dampers & Actuators (Section 23 33 13) 85 ft² 7,344 624,228 1,150 97,750 8,494 721,978
19.13 Motorized Dampers (UL 555/UL555 S Certified or Approved Equivalent)
19.13.1 1900 mm x 2400 mm 1 No 608,842 608,842 27,000 27,000 635,842 635,842
19.13.2 2700 mm x 2400 mm 1 No 795,358 795,358 37,000 37,000 832,358 832,358
19.14 Fire Dampers (Curtain/Shutter Type) 310 ft² 6,019 1,865,844 750 232,500 6,769 2,098,344
Sub-total Carried to Summary 9,362,669
20.0 CLEANING, BALANCING & TESTING (SECTION 23 05 93)
20.1 Cleaning & Adjusting 1 Lot 135,000 135,000 0 135,000 135,000
20.2 Balancing (Assistance to TAB Contractor) 1 Lot 285,000 285,000 0 285,000 285,000
20.3 Provisional Sum for Testing & Balancing by Independent Agency 1 Lot 745,000 745,000 0 745,000 745,000
Sub-total Carried to Summary 1,165,000
21.0 PAINTING & FINISHING AND MECHANICAL IDENTIFICATION (SECTION 23 05 50 & 23 05 53)
21.1 Painting & Finishing (Section 23 05 50) 1 Lot 450,000 450,000 0 450,000 450,000
21.2 Stencilling of Pipes & Ducts (Section 23 05 53) 1 Lot 75,000 75,000 0 75,000 75,000
21.3 Identification Tags on Valves, etc. (Section 23 05 53) 1 Lot 35,000 35,000 0 35,000 35,000
21.4 Equipment Data Plates (Section 23 05 53) 1 Lot 50,000 50,000 0 50,000 50,000
Sub-total Carried to Summary 610,000
22.0 TEST RUN OF THE PLANT (SECTION 23 05 94)
22.1 Three Months Test Run 1 Lot 360,000 360,000 0 360,000 360,000
Sub-total Carried to Summary 360,000
23.0 TOOLS AND INSTRUMENTS (SECTION 23 89 10)
23.1 Instruments 1 Lot 650,000 650,000 0 650,000 650,000
23.2 Tools 1 Lot 250,000 250,000 0 250,000 250,000
Sub-total Carried to Summary 900,000
24.0 EXPANSION TANK (SECTION 23 25 30 & DS/1264-23 25 30)
24.1 Expansion Tank & Pressurization Unit ET/01 (Section 23 25 30 & DS/1264-23 25 30) 1 No 970,000 970,000 28,000 28,000 998,000 998,000

24.2 Foundation / Supports 1 Lot 10,000 Rate Only 2,500 Rate Only Rate Only
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
MATERIAL INSTALLATION TOTAL
ESTIM
ITEM ATED RATE AMOUNT RATE AMOUNT RATE AMOUNT
DESCRIPTION UNIT
NO. QUANT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
ITY
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
24.3 Commissioning & Testing 1 Lot 5,000 5,000 0 0 5,000 5,000
Sub-total Carried to Summary 1,003,000

25.0 OIL DAY TANK


Supply & Installation of Oil Day Tank (Size = ø3'-6" x 7'-0") with all accessories as
25.1 1 No 175,000 175,000 15,000 15,000 190,000 190,000
shown in Detail Dwg. No. FND/DOT/01
25.2 Containment Bund of Masonry (Size = 4'-0" x 4'-0" x 2'-9"(H) Complete in all respect 1 Lot 0 0 0 0 0 0
Lifting, Shifting & Placement of Oil Day Tank (From Ground to Level B4 at Lev.-14.980
25.3 1 Lot 15,000 15,000 0 0 15,000 15,000
meter)
25.4 Foundation / Supports 1 Lot 10,000 10,000 0 0 10,000 10,000

25.5 Commissioning & Testing 1 Lot 5,000 5,000 0 0 5,000 5,000

Sub-total Carried to Summary 220,000


26.0 12 MONTH OPERATION OF THE PLANT (SECTION 23 01 60 & DS/1264-23 01 60)
26.1 12 Month Operation Of The Plant 1 Lot 1,675,000 1,675,000 0 1,675,000 1,675,000
Sub-total Carried to Summary 1,675,000

27.0 MISCELLANEOUS

27.1 Operation & Maintenance Instructions to Clients Representatives 1 Lot 85,000 85,000 0 85,000 85,000

27.2 Shop Drawings 1 Lot 145,000 145,000 0 145,000 145,000

27.3 As Built Drawings 1 Lot 125,000 125,000 0 125,000 125,000

27.4 Operation & Maintenance Manuals 1 Lot 45,000 45,000 0 45,000 45,000

Lifting and Shifting of Equipments (Except for Chillers and Boilers) to the Location
27.5 1 Lot 200,000 200,000 0 200,000 200,000
Designated for Installation
Fire Prevention Jacket for All Pipes, Duct, Trays etc Crossing a Fire Barrier Wall / Floor
27.6 1 Lot 510,000 510,000 0 510,000 510,000
as per Required
Supply Fire Rating
and Installation of 24000mm x 2400mm Steel Platform at Level B3 Complete in
all Respect to Support all Equipments Coming at the Platform. Design of Platform to be
27.7 1 Lot 0 0 0 0 0
by This Contractor and Vetted by Civil / Mehchanical Consultant. Monkey Caged Ladder
Access to be also Provided. Sub-total Carried to Summary 1,110,000
104 25.89 77.66
128 32.03 96.08
188 46.94 140.83
250 62.52 187.56
290 72.39 217.17
386 96.52 289.56
636 159.04 477.12
798 199.62 598.86
1,092 273.11 819.33
1,421 355.37 1,066.11
1,843 460.67 1,382.00
2,782 695.39 2,086.16
- -
104 25.89 77.66
128 32.03 96.08
188 46.94 140.83
250 62.52 187.56
290 72.39 217.17
386 96.52 289.56
636 159.04 477.12
798 199.62 598.86
1,092 273.11 819.33
1,421 355.37 1,066.11
- -
386 96.52 289.56
636 159.04 477.12
798 199.62 598.86
- -
290 72.39 217.17
386 96.52 289.56
636 159.04 477.12
798 199.62 598.86
- -
188 46.94 140.83
250 62.52 187.56
290 72.39 217.17
386 96.52 289.56
636 159.04 477.12
798 199.62 598.86
1,092 273.11 819.33
1,421 355.37 1,066.11
1,843 460.67 1,382.00
- -
636 159.04 477.12
798 199.62 598.86
1,092 273.11 819.33
1,421 355.37 1,066.11
- -
104 25.89 77.66
128 32.03 96.08
188 46.94 140.83
274 54.88 219.51
274 54.88 219.51
300 60.02 240.09
347 69.45 277.82
347 69.45 277.82
382 76.31 305.25
643 128.62 514.47
772 154.34 617.37
943 188.64 754.56
1,115 222.94 891.76
1,158 231.51 926.05
1,458 291.54 1,166.14
- -
171 34.30 137.19
187 37.39 149.54
210 42.02 168.06
244 48.70 194.81
248 49.56 198.24
280 56.08 224.31
514 102.89 411.58
557 111.47 445.88
654 130.85 523.39
729 145.77 583.07
- -
248 49.56 198.24
280 56.08 224.31
514 102.89 411.58
- -
210 42.02 168.06
244 48.70 194.81
248 49.56 198.24
280 56.08 224.31
514 102.89 411.58
557 111.47 445.88
654 130.85 523.39
729 145.77 583.07
804 160.86 643.44
- -
2,542 508.47 2,033.90
2,542 508.47 2,033.90
2,542 508.47 2,033.90
2,966 593.22 2,372.88
2,966 593.22 2,372.88
3,814 762.71 3,050.85
4,237 847.46 3,389.83
4,237 847.46 3,389.83
5,508 1,101.69 4,406.78
6,356 1,271.19 5,084.75
7,203 1,440.68 5,762.71
9,213 2,303.33 6,909.98
7,809 1,952.34 5,857.03
6,142 1,535.55 4,606.65
4,475 1,118.76 3,356.28
3,485 871.32 2,613.95
2,782 695.39 2,086.16
1,843 460.67 1,382.00
1,421 355.37 1,066.11
1,092 273.11 819.33
798 199.62 598.86
636 159.04 477.12
386 96.52 289.56
290 72.39 217.17
250 62.52 187.56
188 46.94 140.83
128 32.03 96.08
104 25.89 77.66
- -
28,517 7,129.34 21,388.03
20,905 5,226.36 15,679.07
12,284 3,071.10 9,213.31
9,213 2,303.33 6,909.98
7,809 1,952.34 5,857.03
6,142 1,535.55 4,606.65
4,475 1,118.76 3,356.28
3,485 871.32 2,613.95
2,782 695.39 2,086.16
1,843 460.67 1,382.00

78,814 19,703.39 59,110.17


58,000 14,500.00 43,500.00
33,000 8,250.00 24,750.00
21,500 5,375.00 16,125.00
17,600 4,400.00 13,200.00
13,200 3,300.00 9,900.00
11,500 2,875.00 8,625.00
9,000 2,250.00 6,750.00
374,576 93,644.07 280,932 14,000 700 13,300
238,983 59,745.76 179,237 13,000 650 12,350
93,220 23,305.08 69,915 13,000 650 12,350
73,729 18,432.20 55,297 10,000 500 9,500
48,941 12,235.17 36,706 9,000 450 8,550
23,305 5,826.27 17,479 8,500 425 8,075
18,644 4,661.02 13,983 7,000 350 6,650
13,136 3,283.90 9,852 5,500 275 5,225
10,169 2,542.37 7,627 4,500 225 4,275
9,322 2,330.51 6,992 3,100 155 2,945
8,390 2,097.46 6,292 2,600 130 2,470
- - - -
5,085 1,016.95 4,068 1,700 85 1,615
3,559 711.86 2,847 1,350 68 1,283
2,797 559.32 2,237 1,200 60 1,140
2,119 423.73 1,695 950 48 903
1,483 296.61 1,186 750 38 713
1,314 262.71 1,051 600 30 570
847 169.49 678 550 28 523
- - - -
278,800 69,700.00 209,100 13,000 650 12,350
163,136 40,783.90 122,352 13,000 650 12,350
112,288 28,072.03 84,216 10,000 500 9,500
55,932 13,983.05 41,949 9,000 450 8,550
49,153 12,288.14 36,864 7,500 375 7,125
32,627 8,156.78 24,470 6,000 300 5,700
22,458 5,614.41 16,843 4,500 225 4,275
19,492 4,872.88 14,619 3,100 155 2,945
7,797 1,949.15 5,847 1,700 85 1,615
4,492 1,122.88 3,369 1,450 73 1,378
- - - -
252,542 50,508.47 202,034 13,000 650 12,350
144,068 28,813.56 115,254 11,000 550 10,450
72,034 14,406.78 57,627 9,000 450 8,550
56,356 11,271.19 45,085 7,500 375 7,125
37,712 7,542.37 30,169 6,000 300 5,700
27,542 5,508.47 22,034 4,500 225 4,275
18,898 3,779.66 15,119 3,100 155 2,945
7,797 1,559.32 6,237 1,250 63 1,188
695 138.98 556 700 35 665
- - - -
60,870 12,173.91 48,696 13,000 650 12,350
39,130 7,826.09 31,304 13,000 650 12,350
30,435 6,086.96 24,348 10,000 500 9,500
21,739 4,347.83 17,391 9,000 450 8,550
17,391 3,478.26 13,913 7,500 375 7,125
15,652 3,130.43 12,522 6,000 300 5,700
13,043 2,608.70 10,435 4,500 225 4,275
10,435 2,086.96 8,348 3,100 155 2,945
- - - -
314,333 62,866.62 251,466 13,000 650 12,350
201,621 40,324.24 161,297 10,000 500 9,500
92,410 18,481.95 73,928 9,000 450 8,550
81,061 16,212.23 64,849 7,500 375 7,125
57,848 11,569.64 46,279 6,000 300 5,700
43,847 8,769.34 35,077 4,500 225 4,275
31,503 6,300.66 25,203 3,100 155 2,945
12,251 2,450.26 9,801 1,250 63 1,188
8,475 1,694.92 6,780 1,050 53 998
8,475 1,694.92 6,780 900 45 855
7,001 1,400.15 5,601 740 37 703
6,043 1,208.55 4,834 540 27 513
5,453 1,090.64 4,363 420 21 399
- - - -
161,609 32,321.74 129,287 13,000 650 12,350
114,783 22,956.52 91,826 13,000 650 12,350
74,783 14,956.52 59,826 10,000 500 9,500
49,565 9,913.04 39,652 9,000 450 8,550
35,217 7,043.48 28,174 7,500 375 7,125
23,043 4,608.70 18,435 6,000 300 5,700
19,130 3,826.09 15,304 4,500 225 4,275
18,261 3,652.17 14,609 3,100 155 2,945
16,783 3,356.52 13,426 1,300 65 1,235
9,565 1,913.04 7,652 1,100 55 1,045
8,087 1,617.39 6,470 950 48 903
4,783 956.52 3,826 780 39 741
2,870 573.91 2,296 580 29 551
- - - -
114,783 22,956.52 91,826 13,000 650 12,350
74,783 14,956.52 59,826 10,000 500 9,500
49,565 9,913.04 39,652 9,000 450 8,550
35,217 7,043.48 28,174 7,500 375 7,125
23,043 4,608.70 18,435 6,000 300 5,700
19,130 3,826.09 15,304 4,500 225 4,275
18,261 3,652.17 14,609 3,100 155 2,945
16,783 3,356.52 13,426 1,250 63 1,188
9,565 1,913.04 7,652 1,050 53 998
8,087 1,617.39 6,470 900 45 855
4,783 956.52 3,826 740 37 703
2,870 573.91 2,296 540 27 513
- - - -
695,652 139,130.43 556,522 - - -
565,217 113,043.48 452,174 - - -
434,783 86,956.52 347,826 - - -
326,087 65,217.39 260,870 - - -
130,435 26,086.96 104,348 - - -
65,217 13,043.48 52,174 - - -
43,478 8,695.65 34,783 - - -
21,739 4,347.83 17,391 - - -
2,155 430.96 1,724 850 43 808
1,913 382.61 1,530 750 38 713
- -
1,700 85 1,615
- -
6,000 300 5,700
- -
6,500 325 6,175
5,500 275 5,225

146 15 132
146 15 132
138 14 124
138 14 124
2,966 297 2,669
0 0
3,814 381 3,432
2,288 229 2,059
1,102 110 992
0 0
180 18 162
137 14 124
112 11 101

31
3.1 28
103
10.3 93
34
3.4 31
0.0 0
3,017 301.7 2,715
2,830 283.0 2,547
2,315 231.5 2,084
1,972 197.2 1,775
1,398 139.8 1,258
1,170 117.0 1,053
833 83.3 750
659 65.9 593
583 58.3 525
509 50.9 458
436 43.6 392
336 33.6 303
262 26.2 235
244 24.4 220
220 22.0 198
202 20.2 182
166 16.6 150
0.0 0
1,902 190.2 1,712
1,623 162.3 1,461
1,427 142.7 1,284
1,272 127.2 1,145
1,003 100.3 903
804 80.4 724
729 72.9 656
654 65.4 589
557 55.7 502
514 51.4 463
280 28.0 252
248 24.8 223
244 24.4 219
210 21.0 189
187 18.7 168
0.0 0
8,051 805.1 7,246
7,203 720.3 6,483
6,949 694.9 6,254
6,780 678.0 6,102
6,780 678.0 6,102
6,356 635.6 5,720
6,102 610.2 5,492
5,932 593.2 5,339
5,508 550.8 4,958
5,508 550.8 4,958
5,508 550.8 4,958
5,085 508.5 4,576
5,085 508.5 4,576
4,661 466.1 4,195
4,237 423.7 3,814
1,398 209.745763 1,189
1,398 209.745763 1,189
0 0
6,356 953.389831 5,403
5,400 810 4,590
4,576 686.440678 3,890
3,644 546.610169 3,097
0 0
6,356 953.389831 5,403
5,400 810 4,590
4,576 686.440678 3,890
1,017 152.542373 864
1,229 184.322034 1,044
1,144 171.610169 972
1,144 171.610169 972
1,144 171.610169 972
1,229 184.322034 1,044
3,559 533.898305 3,025
8,640 1295.97458 7,344
0 0
716,285 107442.717 608,842
935,715 140357.25 795,358
7,081 1062.15 6,019
EMPORIUM MALL, LAHORE BILL OF QUANTITIES

PLUMBING WORKS DATED: FEBRUARY 01, 2014

SUMMRY OF BILL OF QUANTITIES

ITEM NO. DESCRIPTION AMOUNT IN FIGURES (Rs.)

1.0 WATER BOOSTER SYSTEM (SECTION 22 11 40 & DS 1264-22 11 40) OWNER FURNISHED 217,500.00

2.0 SEWAGE LIFTING STATIONS (SECTION 22 13 43 & DS 1264-22 13 43) OWNER FURNISHED 204,000.00

3.0 STEAM OPERATED HOT WATER STORAGE HEATER (SECTION 22 34 36 & DS 1264-22 34 36) 1,581,952.00

4.0 SUBMERSIBLE PUMPS (SECTION 22 11 51 & DS 1264-22 11 51) 2,939,872.46

5.0 CENTRIFUGAL PUMPS (SECTION 22 11 30 & DS/1264-22 11 30) 3,580,182.49

6.0 HOT WATER CIRCULATORS (SECTION 22 11 32 & DS 1264-22 11 32) 92,745.76

7.0 VALVES & SPECIALITIES (SECTION 22 05 23) 3,133,246.27

8.0 WATER METER (SECTION 22 68 15) 1,731,520.00

9.0 PLUMBING FIXTURES & FITTINGS (SECTION 22 41 10 & DS-1264-22 41 10) 4,032,676.00

10.0 COLD WATER SUPPLY SYSTEM (POTABLE SUPPLY) (SECTION 22 11 16 & DS-1264-22 11 16) 17,083,542.11

11.0 HOT WATER SUPPLY SYSTEM (SECTION 22 11 16 & DS-1264-22 11 16) 303,144.51

12.0 SOIL, WASTE & VENT WATER SYSTEM (SECTION 22 13 20 & DS-1264-22 13 20) 11,095,929.21

13.0 STORM WATER DRAINAGE SYSTEM (SECTION 22 13 20 & DS-1264-22 13 20) 17,101,415.36

14.0 THERMAL INSULATION (SECTION 22 07 19 & DS-1264-22 07 19) 366,029.82

15.0 DRAIN ACCESSORIES (SECTION 22 11 19) 1,061,827.03

16.0 PAINTING, COATING & STENCILING (SECTION 22 05 50) 695,000.00

17.0 MISCELLANEOUS 7,775,588.00


TOTAL = 72,996,171.01
EMPORIUM MALL, LAHORE BILL OF QUANTITIES
PLUMBING WORKS DATED: FEBRUARY 01, 2014

BILL OF QUANTITIES

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MATERIAL INSTALLATION TOTAL

ITEM RATE AMOUNT RATE AMOUNT RATE AMOUNT


DESCRIPTION QTY UNIT
NO. (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
(3) x (5) (3) x (7) (5) + (7) (6) + (8)
1.0 WATER BOOSTER SYSTEM (SECTION 22 11 40 & DS 1264-22 11 40) OWNER FURNISHED
Installation of Water Booster System, WBS/01, 02 & 03 (Section 22 11 40 & DS 1264-
1.1 3 Sets 0 0 20,000 60,000 20,000 60,000
22 11 40)
1.2 Foundation & Support 3 Lots 22,500 67,500 5,000 15,000 27,500 82,500

1.3 Commissioning & Testing 3 Lots 25,000 75,000 0 0 25,000 75,000


Sub-total Carried to Summary 217,500

2.0 SEWAGE LIFTING STATIONS (SECTION 22 13 43 & DS 1264-22 13 43) OWNER FURNISHED
Installation of Sewage Lifting Stations, SLS/01, 02 & 03 (Section 22 13 43 & DS 1264-
2.1 3 Sets 18,000 54,000 18,000 54,000 36,000 108,000
22 13 43)
2.2 Foundation & Support 3 Lots 0 0 22,000 66,000 22,000 66,000
2.3 Commissioning & Testing 3 Lots 0 0 10,000 30,000 10,000 30,000
Sub-total Carried to Summary 204,000

3.0 STEAM OPERATED HOT WATER STORAGE HEATER (SECTION 22 34 36 & DS 1264-22 34 36)
Supply & Installation of Steam Operated Hot Water Storage Heater (Section 22 34 36
3.1 1 No. 1,386,952 1,386,952 55,000 55,000 1,441,952 1,441,952
& DS 1264-22 34 36)
3.2 Foundation & Support 1 Lot 0 0 75,000 75,000 75,000 75,000
3.3 Commissioning & Testing 1 Lot 0 0 65,000 65,000 65,000 65,000
Sub-total Carried to Summary 1,581,952

4.0 SUBMERSIBLE PUMPS (SECTION 22 11 51 & DS 1264-22 11 51)


Supply & Installation of Submersible Pump, SP/B2-01 (Section 22 11 51 & DS-1264-
4.1 8 Nos. 138,550 1,108,400 3,500 28,000 142,050 1,136,400
22 11 51)
Supply & Installation of Submersible Pump, SP/B2-02 (Section 22 11 51 & DS-1264-
4.2 2 Nos. 206,125 412,250 3,000 6,000 209,125 418,250
22 11 51)
Supply & Installation of Submersible Pump, SP/B3-01 (Section 22 11 51 & DS-1264-
4.3 2 Nos. 43,775 87,550 2,500 5,000 46,275 92,550
22 11 51)
Supply & Installation of Submersible Pump, SP/B3-02 (Section 22 11 51 & DS-1264-
4.4 2 Nos. 43,775 87,550 2,500 5,000 46,275 92,550
22 11 51)
Supply & Installation of Submersible Pump, SP/B3-03 (Section 22 11 51 & DS-1264-
4.5 2 Nos. 31,025 62,050 2,500 5,000 33,525 67,050
22 11 51)
Supply & Installation of Submersible Pump, SP/B3-04 (Section 22 11 51 & DS-1264-
4.6 6 Nos. 83,300 499,800 3,500 21,000 86,800 520,800
22 11 51)
Supply & Installation of Submersible Pump, SP/B3-05 (Section 22 11 51 & DS-1264-
4.7 1 No. 97,325 97,325 5,000 5,000 102,325 102,325
22 11 51)
Supply & Installation of Submersible Pump, SP/B4-01 (Section 22 11 51 & DS-1264-
4.8 2 Nos. 144,925 289,850 6,500 13,000 151,425 302,850
22 11 51)
4.9 Commissioning & Testing 25 Lots 8,284 207,097 0 0 8,284 207,097
Sub-total Carried to Summary 2,939,872

5.0 CENTRIFUGAL PUMPS (SECTION 22 11 30 & DS/1264-22 11 30)


Supply and Installation of Centrifugal Pumps B1-01 (Section 22 11 30 & DS/1264-22
5.1 2 Nos. 239,398 478,797 10,500 21,000 249,898 499,797
11 30) and Installation of Centrifugal Pumps B1-02 (Section 22 11 30 & DS/1264-22
Supply
5.2 2 Nos. 419,558 839,117 12,500 25,000 432,058 864,117
11 30) and Installation of Centrifugal Pumps B1-03 (Section 22 11 30 & DS/1264-22
Supply
5.3 2 Nos. 249,121 498,243 10,500 21,000 259,621 519,243
11 30) and Installation of Centrifugal Pumps B1-04 (Section 22 11 30 & DS/1264-22
Supply
5.4 2 Nos. 249,121 498,243 10,500 21,000 259,621 519,243
11 30) and Installation of Centrifugal Pumps B3-01 (Section 22 11 30 & DS/1264-22
Supply
5.5 2 Nos. 290,256 580,513 10,500 21,000 300,756 601,513
11 30)
5.6 Foundation / Supports 10 Lots 44,915 449,153 0 0 44,915 449,153
5.7 Commissioning & Testing 10 Lots 12,712 127,119 0 0 12,712 127,119
Sub-total Carried to Summary 3,580,182

6.0 HOT WATER CIRCULATORS (SECTION 22 11 32 & DS 1264-22 11 32)


Supply & Installation of Hot Water Circulators CP/B3-01 & 02 (Section 22 11 32 & DS
6.1 2 Nos. 35,398 70,797 2,500 5,000 37,898 75,797
1264-22 11 32)
6.2 Foundation / Supports 2 Lots 4,237 8,475 0 0 4,237 8,475
6.3 Commissioning & Testing 2 Lots 4,237 8,475 0 0 4,237 8,475
Sub-total Carried to Summary 92,746

7.0 VALVES & SPECIALITIES (SECTION 22 05 23)


7.1 Gate Valves (Section 22 05 23)
7.1.1 Ø ¾" (Ø 20mm) 30 Nos. 2,539 76,169 500 15,000 3,039 91,169
7.1.2 Ø 1" (Ø 25mm) 6 Nos. 2,929 17,573 700 4,200 3,629 21,773
7.1.3 Ø 1¼" (Ø 32mm) 0 No. 4,178 Rate Only 850 Rate Only Rate Only
7.1.4 Ø 1½" (Ø 40mm) 0 No. 6,127 Rate Only 1,000 Rate Only Rate Only
7.1.5 Ø 2" (Ø 50mm) 0 No. 8,586 Rate Only 1,200 Rate Only Rate Only
7.1.6 Ø 2½" (Ø 65mm) 0 No. 10,480 Rate Only 1,500 Rate Only Rate Only
7.2 Gear Operated Butterfly Valves (Section 22 05 23) 0
7.2.1 Ø 2½" (Ø 65mm) 30 Nos. 12,192 365,756 1,500 45,000 13,692 410,756
7.2.2 Ø 3" (Ø 75mm) 2 Nos. 13,345 26,690 2,000 4,000 15,345 30,690
7.2.3 Ø 4" (Ø 100mm) 18 Nos. 18,176 327,173 2,500 45,000 20,676 372,173
7.2.4 Ø 6" (Ø 150mm) 15 Nos. 31,680 475,200 3,500 52,500 35,180 527,700
7.2.5 Ø 8" (Ø 200mm) 0 No. 61,688 Rate Only 4,500 Rate Only Rate Only
7.3 Swing Type Check Valves (Section 22 05 23) 0
7.3.1 Ø ¾" (Ø 20mm) 0 No. 6,437 Rate Only 500 Rate Only Rate Only
7.3.2 Ø 1" (Ø 25mm) 0 No. 7,997 Rate Only 700 Rate Only Rate Only
7.3.3 Ø 1½" (Ø 40mm) 0 No. 14,394 Rate Only 1,000 Rate Only Rate Only
7.3.4 Ø 2" (Ø 50mm) 0 No. 17,553 Rate Only 1,200 Rate Only Rate Only
7.3.5 Ø 2½" (Ø 65mm) 1 No. 9,856 9,856 1,500 1,500 11,356 11,356
7.3.6 Ø 4" (Ø 100mm) 0 No. 16,210 Rate Only 2,500 Rate Only Rate Only
7.3.7 Ø 6" (Ø 150mm) 0 No. 28,569 Rate Only 3,500 Rate Only Rate Only
7.4 Y-Strainers (Section 22 05 23) 0
7.4.1 Ø ¾" (Ø 20mm) 0 No. 5,000 Rate Only 500 Rate Only Rate Only
7.4.2 Ø 1" (Ø 25mm) 3 Nos. 5,490 16,469 700 2,100 6,190 18,569
7.4.3 Ø 1½" (Ø 40mm) 0 No. 9,396 Rate Only 1,000 Rate Only Rate Only
7.4.4 Ø 2" (Ø 50mm) 0 No. 12,515 Rate Only 1,200 Rate Only Rate Only
7.4.5 Ø 2½" (Ø 65mm) 2 Nos. 8,999 17,997 1,500 3,000 10,499 20,997
7.4.6 Ø 3" (Ø 75mm) 1 No. 10,576 10,576 2,000 2,000 12,576 12,576
7.4.7 Ø 4" (Ø 100mm) 0 No. 18,393 Rate Only 2,500 Rate Only Rate Only
7.4.8 Ø 6" (Ø 150mm) 0 No. 23,502 Rate Only 3,500 Rate Only Rate Only
7.5 Globe Valves (Section 22 05 23) 0
7.5.1 Ø ¾" (Ø 20mm) 5 Nos. 1,720 8,600 500 2,500 2,220 11,100
7.5.2 Ø 1" (Ø 25mm) 8 Nos. 2,200 17,600 700 5,600 2,900 23,200
7.5.3 Ø 1 ¼" (Ø 32mm) 0 No. 3,240 Rate Only 850 Rate Only Rate Only
7.5.4 Ø 1½" (Ø 40mm) 0 No. 4,680 Rate Only 1,000 Rate Only Rate Only
7.5.5 Ø 2" (Ø 50mm) 0 No. 6,560 Rate Only 1,200 Rate Only Rate Only
7.5.6 Ø 2½" (Ø 65mm) 2 Nos. 21,280 42,560 1,500 3,000 22,780 45,560
7.5.7 Ø 3" (Ø 75mm) 1 No. 27,600 27,600 2,000 2,000 29,600 29,600
7.5.8 Ø 4" (Ø 100mm) 0 No. 35,200 Rate Only 2,500 Rate Only Rate Only
7.6 Air Vents (Section 22 68 35) 0
7.6.1 Ø 1" (Ø 25mm) 11 Nos. 1,600 17,600 500 5,500 2,100 23,100
7.7 Foot Valves (Section 22 05 23) 0
7.7.1 Ø 6" (Ø 150mm) 0 No. 47,668 Rate Only 3,500 Rate Only Rate Only
7.8 Ball Valves (Section 22 05 23) 0
7.8.1 Ø ¾" (Ø 20mm) 4 Nos. 695 2,779 500 2,000 1,195 4,779
7.8.2 Ø 1" (Ø 25mm) 5 Nos. 1,085 5,423 700 3,500 1,785 8,923
7.9 Pressure Reducing Valves (PRV Assembly with complete accessories as shown in schematic Section 22 0
7.9.1 Ø ¾" (Ø 20mm) 0 No. 27,632 Rate Only 700 Rate Only Rate Only
7.9.2 Ø 1" (Ø 25mm) 3 Nos. 42,432 127,296 700 2,100 43,132 129,396
7.9.3 Ø 1½" (Ø 40mm) 0 No. 87,240 Rate Only 1,000 Rate Only Rate Only
7.9.4 Ø 2" (Ø 50mm) 0 No. 126,440 Rate Only 1,200 Rate Only Rate Only
7.9.5 Ø 2½" (Ø 65mm) 2 Nos. 191,111 382,221 1,500 3,000 192,611 385,221
7.9.6 Ø 3" (Ø 75mm) 1 No. 286,400 286,400 2,000 2,000 288,400 288,400
7.9.7 Ø 4" (Ø 100mm) 0 No. 782,461 Rate Only 2,500 Rate Only Rate Only
7.9.8 Pressure Gauge (Section 22 05 23) 12 Nos. 4,054 48,651 1,200 14,400 5,254 63,051
7.10 Special Pipe Sleeves (Doyma / Equivalent) as per FND Detail (FND/PWS/01, 02, 03)
7.10.1 Suitable for Ø3" (75mm) Pipe 7 Nos. 4,576 32,034 1,350 9,450 5,926 41,484
7.10.2 Suitable for Ø4" (100mm) Pipe 35 Nos. 5,593 195,763 1,650 57,750 7,243 253,513
7.10.3 Suitable for Ø6" (150mm) Pipe 2 Nos. 8,441 16,881 1,000 2,000 9,441 18,881
7.10.4 Suitable for Ø8" (200mm) Pipe 6 Nos. 12,712 76,271 1,200 7,200 13,912 83,471
7.10.5 Suitable for Ø10" (250mm) Pipe 3 Nos. 17,797 53,390 1,550 4,650 19,347 58,040
7.10.6 Suitable for Ø12" (300mm) Pipe 6 Nos. 22,678 136,068 1,950 11,700 24,628 147,768
Sub-total Carried to Summary 3,133,246

8.0 WATER METER (SECTION 22 68 15)


8.1 Supply & Installation of Water Meter Ø 150 (Tube Well Line) 2 Nos. 254,080 508,160 3,500 7,000 257,580 515,160
8.2 Supply & Installation of Water Meter Ø 100 (City Water line) 1 No. 153,920 153,920 2,500 2,500 156,420 156,420
8.3 Supply & Installation of Water Meter Ø 100 (City Water Line) 1 No. 153,920 153,920 2,500 2,500 156,420 156,420
8.4 Supply & Installation of Water Meter Ø 150 (Mall Supply) 2 Nos. 254,080 508,160 3,500 7,000 257,580 515,160
8.5 Supply & Installation of Water Meter Ø 150 (Hotel Supply) 1 No. 254,080 254,080 3,500 3,500 257,580 257,580
8.6 Supply & Installation of Water Meter Ø 65 (Hyperstar Supply) 1 No. 129,280 129,280 1,500 1,500 130,780 130,780
Sub-total Carried to Summary 1,731,520

9.0 PLUMBING FIXTURES & FITTINGS (SECTION 22 41 10 & DS-1264-22 41 10)


Supply & Installation of WC Western - Wall Hung- Concealed Flush Valve operated
9.1 12 Nos. 21,463 257,550 1,650 19,800 23,113 277,350
(Section
Supply &22 41 10 & DS-1264-22
Installation WC Eastern -41 10) Valve operated (Section 22 41 10 & DS-
Flush
9.2 26 Nos. 17,000 442,000 2,500 65,000 19,500 507,000
1264-22 41 10)
9.3 Urinals - Concealed Flush Valve operated (Section 22 41 10 & DS-1264-22 41 10) 4 Nos. 22,100 88,400 1,700 6,800 23,800 95,200
Supply & Installation of Counter Sunk Wash Basin (Section 22 41 10 & DS-1264-22
9.4 32 Nos. 22,525 720,800 2,500 80,000 25,025 800,800
41 10) & Installation of Wash Basin Single Lever Mixer (Section 22 41 10 & DS-1264-
Supply
9.5 32 Nos. 22,525 720,800 2,500 80,000 25,025 800,800
22 41 10)
Supply & Installation of WC & Urinals Hand Shower (Section 22 41 10 & DS-1264-22
9.6 42 Nos. 706 29,631 350 14,700 1,056 44,331
41 10) & Installation of Showe Mixer & Showers Head (Section 22 41 10 & DS-1264-
Supply
9.7 20 Nos. 60,074 1,201,475 1,500 30,000 61,574 1,231,475
22 41 10)
9.8 Supply & Installation of Bib Cock for WC (Section 22 41 10 & DS-1264-22 41 10) 38 Nos. 1,020 38,760 350 13,300 1,370 52,060
9.9 Supply & Installation of Bib Cock for Urinals (Section 22 41 10 & DS-1264-22 41 10) 4 Nos. 1,020 4,080 350 1,400 1,370 5,480
9.10 Supply & Installation of Bib Cock for Janitor (Section 22 41 10 & DS-1264-22 41 10) 2 Nos. 978 1,955 350 700 1,328 2,655
Supply & Installation of Liquid Soap Dispenser (Section 22 41 10 & DS-1264-22 41
9.11 18 Nos. 4,335 78,030 350 6,300 4,685 84,330
10)
9.12 Supply & Installation of Toilet Roll Holders (Section 22 41 10 & DS-1264-22 41 10) 38 Nos. 3,103 117,895 350 13,300 3,453 131,195
Sub-total Carried to Summary 4,032,676

10.0 COLD WATER SUPPLY SYSTEM (POTABLE SUPPLY) (SECTION 22 11 16 & DS-1264-22 11 16)
10.1 Cold Water Supply Piping UPVC Pipe Class E (Section 22 11 16)
10.1.1 Ø ¾" (Ø 20mm) 1250 Rft 104 129,800 65 81,250 169 211,050
10.1.2 Ø 1" (Ø 25mm) 1500 Rft 146 218,877 50 75,000 196 293,877
10.1.3 Ø 1 ¼" (Ø 32mm) 90 Rft 219 19,679 60 5,400 279 25,079
10.1.4 Ø 1 ½" (Ø 40mm) 170 Rft 290 49,340 75 12,750 365 62,090
10.1.5 Ø 2" (Ø 50mm) 115 Rft 441 50,758 90 10,350 531 61,108
10.1.6 Ø 2 ½" (Ø 65mm) 1000 Rft 714 713,942 105 105,000 819 818,942
10.1.7 Ø 3" (Ø 75mm) 160 Rft 934 149,483 125 20,000 1,059 169,483
10.1.8 Ø 4" (Ø 100mm) 450 Rft 1,522 684,725 174 78,201 1,695 762,926
10.1.9 Ø 6" (Ø 150mm) 2400 Rft 3,383 8,119,680 186 446,341 3,569 8,566,021
10.1.10Ø 8" (Ø 200mm) 700 Rft 5,184 3,628,800 205 143,500 5,389 3,772,300
10.2 Tube Well / City water inlet Piping Galvanized Iron (Section 22 11 16)
10.2.1 Ø 4" (Ø 100mm) 700 Rft 670 469,252 300 210,000 970 679,252
10.2.2 Ø 6" (Ø 150mm) 600 Rft 1,032 619,390 350 210,000 1,382 829,390
10.3 Flexible Connectors (Section 22 05 48)
10.3.1 Supply and Installation of flexible connectors (Rated for 12 bar service) at building expansion joints suitable for following pipe dia.
10.3.2 Ø 1" (Ø 25mm) 1 No. 4,750 4,750 700 700 5,450 5,450
10.3.3 Ø 2 ½" (Ø 65mm) 3 Nos. 7,517 22,551 1,500 4,500 9,017 27,051
10.3.4 Ø 4" (Ø 100mm) 2 Nos. 13,200 26,400 2,500 5,000 15,700 31,400
10.3.5 Ø 6" (Ø 150mm) 9 Nos. 20,438 183,942 3,500 31,500 23,938 215,442
10.3.6 Black
Ø 8" Steel (Schedule
(Ø 200mm)40) Suction Header (Ø 150mm) Flanged & Prefabricated to 2 Nos. 26,840 53,680 4,500 9,000 31,340 62,680
10.4 accommodate all Tees required for Pump/Piping connections (As per drawing) & Hot 2 Nos. 75,000 150,000 15,000 30,000 90,000 180,000
10.5 Dip
PipeGalvanized.
Supports as(Length 50ft)
per Hilti, Fisher Support System 1 Lot 265,000 265,000 0 0 265,000 265,000
10.6 Pressure Testing of Water Supply Piping 1 Lot 45,000 45,000 0 0 45,000 45,000
Sub-total Carried to Summary 17,083,542

11.0 HOT WATER SUPPLY SYSTEM (SECTION 22 11 16 & DS-1264-22 11 16)


11.1 Hot Water Supply Piping C-PVC (Schedule-40 Pipe) (Section 22 11 16)
11.1.1 Ø ¾" (Ø 20mm) 175 Rft 105 18,293 24 4,264 129 22,557
11.1.2 Ø 1" (Ø 25mm) 0 Rft 149 Rate Only 35 Rate Only Rate Only
11.1.3 Ø 1 ¼" (Ø 32mm) 20 Rft 225 4,500 52 1,049 277 5,549
11.1.4 Ø 1½" (Ø 40mm) 90 Rft 294 26,469 69 6,170 363 32,639
11.1.5 Ø 2" (Ø 50mm) 120 Rft 455 54,639 106 12,737 561 67,376
11.1.6 Ø 2½" (Ø 65mm) 140 Rft 751 105,168 175 24,516 926 129,684
11.2 Pressure Testing of Hot water Piping 1 Lot 12,712 12,712 0 0 12,712 12,712
11.3 Pipe Supports as per Hilti, Fisher Support System 1 Lot 32,627 32,627 0 0 32,627 32,627
Sub-total Carried to Summary 303,145

12.0 SOIL, WASTE & VENT WATER SYSTEM (SECTION 22 13 20 & DS-1264-22 13 20)
12.1 Building Drainage Pipe (uPVC) Class B Solvent Welded (Section 22 13 20 & DS-1264-22 13 20)
12.1.1 Ø 1" (Ø 25mm) 70 Rft 81 5,641 60 4,200 141 9,841
12.1.1 Ø 1 ¼" (Ø 32mm) 0 Rft 95 Rate Only 70 Rate Only Rate Only
12.1.1 Ø 1 ½" (Ø 40mm) 230 Rft 100 22,965 75 17,250 175 40,215
12.1.1 Ø 2" (Ø 50mm) 0 Rft 140 Rate Only 100 Rate Only Rate Only
12.1.1 Ø 2½" (Ø 65mm) 0 Rft 256 Rate Only 110 Rate Only Rate Only
12.1.1 Ø 3" (Ø 75mm) 2470 Rft 361 891,269 125 309,676 486 1,200,945
12.1.1 Ø 4" (Ø 100mm) 4220 Rft 527 2,223,194 145 611,900 672 2,835,094
12.1.1 Ø 6" (Ø 150mm) 2020 Rft 796 1,608,708 160 323,200 956 1,931,908
12.1.1 Ø 8" (Ø 200mm) 1950 Rft 1,806 3,521,052 210 409,500 2,016 3,930,552
12.2 Vent Piping (uPVC) Class B Solvent Welded (Section 22 13 20 & DS-1264-22 13 20) 0
12.2.1 Ø 2" (Ø 50mm) 375 Rft 125 46,962 100 37,500 225 84,462
12.2.2 Ø 2½" (Ø 65mm) 75 Rft 228 17,113 110 8,250 338 25,363
12.2.3 Ø 3" (Ø 75mm) 300 Rft 265 79,597 125 37,500 390 117,097
12.2.4 Ø 4" (Ø 100mm) 150 Rft 387 58,105 145 21,750 532 79,855
12.3 Condensate Drain Piping (uPVC) Class B Solvent Welded (Section 22 13 20 & DS-1264-22 13 20) 0.00
12.3.1 Ø 1" (Ø 25mm) 0 Rft 81 Rate Only 60 Rate Only Rate Only
12.3.2 Ø 1 ¼" (Ø 32mm) 500 Rft 85 42,452 70 35,000 155 77,452
12.3.3 Ø 1 ½" (Ø 40mm) 0 Rft 89 Rate Only 75 Rate Only Rate Only
12.4 Flexible Connectors (Section 22 05 48)
12.4.1 Supply and Installation of flexible connectors (Rated for 8.5 bar service) at building expansion joints suitable for following pipe dia.
12.4.2 Ø 3" (Ø 75mm) 3 Nos. 9,484 28,452 2,000 6,000 11,484 34,452
12.4.3 Ø 4" (Ø 100mm) 6 Nos. 13,200 79,200 2,500 15,000 15,700 94,200
12.4.4 Ø 6" (Ø 150mm) 3 Nos. 20,438 61,314 3,500 10,500 23,938 71,814
12.4.5 Ø 8" (Ø 200mm) 2 Nos. 26,840 53,680 4,500 9,000 31,340 62,680
12.5 Pressure Testing 1 Lot 45,000 45,000 0 0 45,000 45,000
12.6 Pipe Supports as per Hilti, Fisher Support System 1 Lot 455,000 455,000 0 0 455,000 455,000
Sub-total Carried to Summary 11,095,929

13.0 STORM WATER DRAINAGE SYSTEM (SECTION 22 13 20 & DS-1264-22 13 20)


13.1 Storm Water Drain Piping (uPVC) Class B Solvent Welded (Section 22 13 20 & DS-1264-22 13 20)
13.1.1 Ø 4" (Ø 100mm) 1260 Rft 387 487,746 145 182,700 532 670,446
13.1.2 Ø 6" (Ø 150mm) 0 Rft 700 Rate Only 160 Rate Only Rate Only
13.1.3 Ø 8" (Ø 200mm) 0 Rft 1,609 Rate Only 210 Rate Only Rate Only
13.1.4 Ø 10" (Ø 250mm) 0 Rft 3,049 Rate Only 250 Rate Only Rate Only
13.1.5 Ø 12" (Ø 300mm) 2050 Rft 4,674 9,580,818 290 594,500 4,964 10,175,318
13.1.6 Ø 14" (Ø 350mm) 0 Rft 8,648 Rate Only 340 Rate Only Rate Only
13.1.7 Ø 16" (Ø 400mm) 430 Rft 14,163 6,090,101 385 165,550 14,548 6,255,651
13.2 Pressure Testing 0 Lot 33,898 Rate Only 0 Rate Only Rate Only
13.3 Pipe Supports as per Hilti, Fisher Support System 0 Lot 228,814 Rate Only 0 Rate Only Rate Only
Sub-total Carried to Summary 17,101,415

14.0 THERMAL INSULATION (SECTION 22 07 19 & DS-1264-22 07 19)


14.1 Hot Water Pipe Insulation & Cladding (Where required) (Section 22 07 19 & DS-1264-22 07 19)
14.1.1 Ø ¾" (Ø 20mm) 175 Rft 214 37,536 50 8,750 264 46,286
14.1.2 Ø 1" (Ø 25mm) 0 Rft 240 Rate Only 56 Rate Only Rate Only
14.1.3 Ø 1 ¼" (Ø 32mm) 20 Rft 251 5,019 59 1,170 309 6,189
14.1.4 Ø 1½" (Ø 40mm) 90 Rft 268 24,130 63 5,625 331 29,755
14.1.5 Ø 2" (Ø 50mm) 120 Rft 410 49,226 96 11,475 506 60,701
14.1.6 Ø 2½" (Ø 65mm) 140 Rft 434 60,808 101 14,175 536 74,983
14.2 Condensate Drain Pipe Insulation (Section 22 07 19 & DS-1264-22 07 19)
14.2.1 Ø 1" (Ø 25mm) 0 Rft 214 Rate Only 50 Rate Only Rate Only
14.2.2 Ø 1 ¼" (Ø 32mm) 500 Rft 240 120,115 56 28,000 296 148,115
14.2.3 Ø 1 ½" (Ø 40mm) 0 Rft 255 Rate Only 60 Rate Only Rate Only
Sub-total Carried to Summary 366,030

15.0 DRAIN ACCESSORIES (SECTION 22 11 19)


15.1 Floor Drain with Trap (Section 22 11 19)
15.1.1 Ø 3" (Ø 75mm) 112 Nos. 4,104 459,648 350 39,200 4,454 498,848
15.2 Ceiling Cleanout (Section 22 11 19)
15.2.1 Ø 1½" (Ø 40mm) 4 Nos. 1,088 4,350 0 0 1,088 4,350
15.2.2 Ø 3" (Ø 75mm) 4 Nos. 1,838 7,350 0 0 1,838 7,350
15.2.3 Ø 4" (Ø 100mm) 17 Nos. 1,838 31,238 350 5,950 2,188 37,188
15.2.4 Ø 6" (Ø 150mm) 4 Nos. 5,700 22,800 400 1,600 6,100 24,400
15.2.5 Ø 8" (Ø 200mm) 8 Nos. 11,625 93,000 450 3,600 12,075 96,600
15.2.6 Ø 16" (Ø 300mm) 10 Nos. 30,922 309,216 1,250 12,500 32,172 321,716
15.3 Vent Cowls (Section 22 11 19)
15.3.1 Ø 3" (Ø 75mm) 4 Nos. 381 1,525 100 400 481 1,925
15.3.2 Ø 4" (Ø 100mm) 0 No. 424 Rate Only 125 Rate Only Rate Only
15.4 Floor Clean Out (Section 22 11 19)
15.4.1 Ø 2" (Ø 50mm) 7 Nos. 1,800 12,600 350 2,450 2,150 15,050
15.4.2 Ø 3" (Ø 75mm) 9 Nos. 3,000 27,000 500 4,500 3,500 31,500
15.4.3 Ø 4" (Ø 100mm) 4 Nos. 3,000 12,000 500 2,000 3,500 14,000
15.4.4 Ø 6" (Ø 150mm) 1 No. 8,250 8,250 650 650 8,900 8,900
Sub-total Carried to Summary 1,061,827

16.0 PAINTING, COATING & STENCILING (SECTION 22 05 50)


16.1 Painting 1 Lot 295,000 295,000 0 0 295,000 295,000
16.2 Coating 1 Lot 225,000 225,000 0 0 225,000 225,000
16.3 Stenciling, Identification Tags & Equipment Data Plate 1 Lot 175,000 175,000 0 0 175,000 175,000
Sub-total Carried to Summary 695,000

17.0 MISCELLANEOUS
17.1 Shop Drawings 1 Lot 150,000 150,000 0 0 150,000 150,000
17.2 As Built Drawings 1 Lot 85,000 85,000 0 0 85,000 85,000
17.3 MS Grating in Plant Room (Size= 200 x 150) (Hot Dipped Galvanized) 870 Rft 1,800 1,566,000 0 0 1,800 1,566,000
17.4 MS Grating in Ramps & Flood Tank Area (Size= 450 x 150) (Hot Dipped Galvanized) 780 Rft 4,050 3,158,688 0 0 4,050 3,158,688
17.5 MS Grating in Truck Unloading Area (Size= 400 x 150) (Hot Dipped Galvanized) 170 Rft 2,520 428,400 0 0 2,520 428,400
17.6 Side Wall Access Doors (600 X 600) As per Detail Shown on Drawings 7 Nos. 12,500 87,500 0 0 12,500 87,500
17.7 CI Manhole Covers Size 600 X 600 (B3 Ramps) 4 No. 20,000 80,000 0 0 20,000 80,000
17.8 CI Manhole Covers Size 750 X 750 (on sum pit) 3 Nos. 30,000 90,000 0 0 30,000 90,000
17.9 CI Manhole Covers Ø600 (For UGWT Tanks) 6 Nos. 15,000 90,000 0 0 15,000 90,000
17.10 CI Manhole Covers Ø600 (For Septic Tanks) 12 Nos. 15,000 180,000 0 0 15,000 180,000
17.11 CI Manhole Covers Size 1800 X 1200 (For B4 sum pit) 1 No. 120,000 120,000 0 0 120,000 120,000
17.12 Water Supply Connection in MEP Plant & AHU Rooms (With 50ft) Hose reel & nozzle 15 Nos. 50,000 750,000 0 0 50,000 750,000
17.13 Pipe Sleeves / Core Cutting (Where required) 1 Lot 10,000 10,000 0 0 10,000 10,000
17.14 UPCV to GI Adaptors 1 Lot 75,000 75,000 0 0 75,000 75,000
17.15 UPCV to MS Adaptors 1 Lot 75,000 75,000 0 0 75,000 75,000
Fire Stoping of Walls & Structure Openings (For Small Openings - Hilti FS - ONE or
17.16 1 Lot 345,000 345,000 125,000 125,000 470,000 470,000
Approved Equivalent)
17.17 Excavation & Backfilling (Section 22 05 90) 1 Lot 185,000 185,000 0 0 185,000 185,000
17.18 Operation & Maintenance Manuals 1 Lot 25,000 25,000 0 0 25,000 25,000
17.19 Disinfection of Water Distribution System (Section 22 70 10) 1 Lot 150,000 150,000 0 0 150,000 150,000
Sub-total Carried to Summary 7,775,588
163,000 24450 138,550
242,500 36375 206,125
51,500 7725 43,775
51,500 7725 43,775
36,500 5475 31,025
98,000 14700 83,300
114,500 17175 97,325
170,500 25575 144,925
9,746 1461.864 8,284

281,645 42246.75 239,398


493,598 74039.7 419,558
293,084 43962.6 249,121
293,084 43962.6 249,121
341,478 51221.7 290,256

3,174 634.7458 2,539


3,661 732.2034 2,929
5,223 1044.576 4,178
7,659 1531.864 6,127
10,733 2146.61 8,586
13,100 2620 10,480
0 0
15,240 3047.966 12,192
16,681 3336.271 13,345
22,720 4544.068 18,176
39,600 7920 31,680
77,110 15422.03 61,688
0 0
8,047 1609.322 6,437
9,996 1999.153 7,997
17,992 3598.475 14,394
21,941 4388.136 17,553
12,320 2464.068 9,856
20,263 4052.542 16,210
35,712 7142.373 28,569
0 0
6,250 1250 5,000
6,862 1372.407 5,490
11,745 2348.983 9,396
15,643 3128.644 12,515
11,248 2249.661 8,999
13,220 2644.068 10,576
22,992 4598.305 18,393
29,377 5875.424 23,502
0 0
2,150 430 1,720
2,750 550 2,200
4,050 810 3,240
5,850 1170 4,680
8,200 1640 6,560
26,600 5320 21,280
34,500 6900 27,600
44,000 8800 35,200
0 0
2,000 400 1,600
0 0
59,585 11916.95 47,668
0 0
868 173.678 695
1,356 271.1356 1,085
0 0
34,540 6908 27,632
53,040 10608 42,432
109,050 21810 87,240
158,050 31610 126,440
238,888 47777.63 191,111
358,000 71600 286,400
978,076 195615.3 782,461
5,068 1013.559 4,054

317,600 63520 254,080


192,400 38480 153,920
192,400 38480 153,920
317,600 63520 254,080
317,600 63520 254,080
161,600 32320 129,280

25,250 3787.5 21,463


20,000 3000 17,000
26,000 3900 22,100
26,500 3975 22,525
26,500 3975 22,525
830 124.5 706
70,675 10601.25 60,074
1,200 180 1,020
1,200 180 1,020
1,150 172.5 978
5,100 765 4,335
3,650 547.5 3,103

130 25.96 104


182 36.47946 146
273 54.66332 219
363 72.55892 290
552 110.3445 441
892 178.4856 714
1,168 233.5667 934
1,902 380.4028 1,522
4,229 845.8 3,383
6,480 1296 5,184
103 22.72936 81
122 26.82064 95
128 28.16167 100
180 39.56044 140
328 72.08047 256
463 101.7748 361
675 148.5911 527
1,021 224.6229 796
2,315 509.2908 1,806
0 0
161 35.32183 125
293 64.35756 228
340 74.83438 265
497 109.2582 387
0 0
103 22.72936 81
109 23.947 85
114 25.14435 89

496 109.1821 387


897 197.3854 700
2,063 453.8204 1,609
3,909 859.957 3,049
5,992 1318.186 4,674
11,088 2439.312 8,648
18,158 3994.7 14,163
5,130 1026 4,104

1,450 362.5 1,088


2,450 612.5 1,838
2,450 612.5 1,838
7,600 1900 5,700
15,500 3875 11,625
41,229 10307.2 30,922
2,250 450 1,800
5,062 1012.4 4,050
3,150 630 2,520

You might also like