Step 1: Given Data

Location of building : guwahati


Zone : V
Zone Factor, Z = 0.36 from table 3 of IS:1893-2016
Purpose the building : Residential
Importance Factore, I= 1.2 from table 8 of IS:1893-2016
Building frame system : SMRF
Response reduction factor, R = 5.0 from Table 9 of IS:1893-2016
Height of the building, h=16.175 m
base dimension , d=11.065 m
Type of Soil = Medium (Type II)
Wall Thickness = 0.15 m
Beam Size = 250 mm x350 mm
Column Size = 300 mm x 450 mm

Step 2 : Calculation of time period


from cl.7.6.2 © of IS:1893-2016
Time period (Ta)=0.09*h/ (d^1/2)
=0.09*16.175/11.065^(1/2)
=0.438 sec
Step 3: calculation of Sa/g
from cl.6.4.2 (b) of IS:1893-2016
Sa/g = 2.5

Step 4: Calculation of Seismic Co-efficient :


from cl.6.4.2 of IS:1893-2016
Ah = (Z/2) x (I/R) x (Sa/g)
= (0.36/2) x (1.2/5) x 2.5
= 0.108

Step 5: Calculation of Weight of floors :


A. Dead Load Calculation :
I. Slab :

Sl No Type of Self Weight (kN) Floor Finish (kN) Terrace Water profing
Floor

(2.55 + 0.15 + 0.15 +


(2.55 + 0.15 + 0.15 + 0.6 + 0.6 ) x ( 5.55 (2.55 + 0.15 + 0.15 + 0.6 + 0.6 ) x
Head 0.6 ) x ( 5.55 + 4.05 + 0
1 + 4.05 + 0.225 + 0.225 +0.6 + 0.6 ) x ( 5.55 + 4.05 + 0.225 + 0.225 +0.6 +
room 0.225 +0.6 + 0.6 ) x 1
0.125 x 25 = 142.383 0.6 ) x 1 = 45.562
68.344

{(4.35 + 4.165 + 2.55


{(4.35 + 4.165 + 2.55 + 0.15 + 0.15 + 0.6 {(4.35 + 4.165 + 2.55 + 0.15 + 0.15
+ 0.15 + 0.6 + 0.6 ) x
+ 0.6 ) x (3.75 +0.15 + 0.6 ) x 0.125 x 25} + 0.6 + 0.6 ) x (3.75 +0.15 + 0.6 ) x
+0.15 + 0.6 ) x 1.5 + {(
2 open Roof + {(4.05 + 5.55 + 0.225 + 0.6 ) x (4.35 + 1} + {(4.05 + 5.55 + 0.225 + 0.6 ) x
5.55 + 0.225 + 0.6 ) x (
4.165 + 0.15 + 0.6 ) x 0.125x 25} = (4.35 + 4.165 + 0.15 + 0.6 ) x 1} =
4.165 + 0.15 + 0.6 ) x
478.531 153.131
229.695
{(4.35 + 4.165 + 2.55
{(4.35 + 4.165 + 2.55 + 0.15 + 0.15 + 0.6 {(4.35 + 4.165 + 2.55 + 0.15 + 0.15
+ 0.15 + 0.6 + 0.6 ) x
+ 0.6 ) x (3.75 +0.15 + 0.6 ) x 0.125 x 25} + 0.6 + 0.6 ) x (3.75 +0.15 + 0.6 ) x
+0.15 + 0.6 ) x 1.5 + {(
2 open Roof + {(4.05 + 5.55 + 0.225 + 0.6 ) x (4.35 + 1} + {(4.05 + 5.55 + 0.225 + 0.6 ) x
5.55 + 0.225 + 0.6 ) x (
4.165 + 0.15 + 0.6 ) x 0.125x 25} = (4.35 + 4.165 + 0.15 + 0.6 ) x 1} =
4.165 + 0.15 + 0.6 ) x
478.531 153.131
229.695

(4.35 +4.165 + 2.55 +0.15 +0.15 +


(4.35 +4.165 + 2.55 +0.15 +0.15 + 0.6 +
Other 0.6 + 0.6) x (5.55 +4.05 + 3.75 +
3 0.6) x (5.55 +4.05 + 3.75 + 0.225 + 0.225 Absent
floors 0.225 + 0.225 +0.6 + 0.6 ) x 1 =
+0.6 + 0.6 ) x 0.125 x 25 = 588.984
188.475

II.Beam : (Per Floor)


Self Weight of Beam = 0.25 x 0.35 x 25 kN/m = 2.188 kN/m

Type of Longitudinal Beams Transitional Beam


Sl No Floor
Type Number Length (m) Type Number Length (m)

Head Type 1 3 2.55 - 0.15 - 0.15 = 2.25 Type 2 2 5.55 - 0.225 - 0.225 =
1
room
-- -- Type 3 2 4.05 - 0.225 - 0.225 =
--

Type 1 4 4.35 - 0.15 - 0.15 = 4.05 Type 4 4 5.55 - 0.225 - 0.225 =

Other
2 Type 2 4 4.165 - 0.15 - 0.15 = 3.865 Type 5 4 4.05 - 0.225 - 0.225 =
floors

Type 3 4 2.55 - 0.15 - 0.15 = 2.25 Type 6 4 3.75 - 0.225 - 0.225 =

III. Wall : (Per Floor)


Height of Wall = ( 3 - 0.35 ) m = 2.65 m
Weight per meter length of wall = ( 0.15 x 2.65 x 20 ) kN/m = 7.95 kN/m
For RCC walls
Weight per meter length of wall = ( 0.15 x 2.65 x 25 ) kN/m = 9.938 kN/m
Considering 30 % wall oppenings

Type of Longitudinal Beams Transitional Beam


Sl No Floor
Type Number Length (m) Type Number Length (m)

Type 1 2 2.55 - 0.15 - 0.15 = 2.25 Type 2 2 5.55 - 0.225 - 0.225 =


Head
1
room

-- -- Type 3 2 4.05 - 0.225 - 0.225 =


--

Type 1 4 4.35 - 0.15 - 0.15 = 4.05 Type 4 4 5.55 - 0.225 - 0.225 =

Other
2
floors
Other Type 2 4 4.165 - 0.15 - 0.15 = 3.865 Type 5 4 4.05 - 0.225 - 0.225 =
2
floors

Type 3 3 2.55 - 0.15 - 0.15 = 2.25 Type 6 4 3.75 - 0.225 - 0.225 =

type 1 1 1.8 - 1 = 0.8 Type 3 2 1.65


RCC Wall
3
at lift 1.8 -- -- --
Type 2 1

IV. Columns : (Per Floor)


Height of Columns = ( 3 - 0.35 ) m = 2.65 m
Number of Column = 16
Self Weight of Column = 0.3 x 0.45 x 2.65 x 25 x 16 kN = 143.1 kN
Self Weight of Column at roof= 0.3 x 0.45 x 2.65 x 25 x 6 kN = 53.663 kN
B. Live Load calculation :
Taking Live Load at Terrace = 0 kN/m2
Live Load at other floors = 2 kN/m2

I.Live Load at Terrace = 0 kN


II. Live Load at other floors : = (4.35 +4.165 + 2.55 +0.15 +0.15 + 0.6 + 0.6) x (5.55 +4.05 + 3.75 + 0.225 + 0.225 +0.6 + 0.6
376.95 kN

C. Calculation of Lump Masses at different Levels :


I. Seismic weight at Level 4

w4 =256.289 + 861.357 + 52.84 + 193.988 + 121.874 + ( 480.872 / 2) + 58.634 + ( 58.634 / 2 ) +53.663 +( 143.1 /
2 ) kN = 1939.948 kN

II. Seismic weight at Level 3

w3 = 777.459+ 193.988 + 480.872 + 58.634 + 143.1 + 376.95 kN = 2031.003 kN

III. Seismic weight at Level 2

w2 = 777.459+ 193.988 + 480.872 + 58.634 + 143.1 + 376.95 kN = 2031.003 kN

IV. Seismic weight at Level 1

w1 = 777.459+ 193.988 + ( 480.872 / 2 ) + 58.634 + 143.1 + 376.95 kN = 1790.567 kN

Step 6: Calculation of Base Shear :

Height, h Weight, W Base shear, Vb = Qi ={(W * h^2)/


Sl No Level W * h^2 Σ(W * h^2)} * Vb
(m) (m) Ah * ΣW , kN
1 4 12 1939.948 279352.512 441.011

841.592
2 3 9 2031.003 164511.243 259.712
841.592
3 2 6 2031.003 73116.108 115.428
4 1 3 1790.567 16115.103 25.441
Total 7792.521 533094.966 841.592

Step 7 : Column Shear at Each Level

A. Level 4 or Roof Level :


Q4 + 2Q4 + 2Q4 + Q4 = 441.011
So Q4 = 73.502 kN
჻ Shear at End column = 73.502 kN
Shear at intermediate Column = 2 x 73.502 kN = 147.004 kN

B. Level 3 :
Q3 + 2Q3 + 2Q3 + Q3 = 259.712
So Q3 = 43.285 kN
჻ Shear at End column = 43.285 kN
Shear at intermediate Column = 2 x 43.285 kN = 86.57 kN

C. Level 2 :
Q2 + 2Q2 + 2Q2 + Q2 = 115.428
So Q2 = 19.238 kN
჻ Shear at End column = 19.238 kN
Shear at intermediate Column = 2 x 19.238 kN = 38.476 kN

D. Level 1 :
Q1 + 2Q1 + 2Q1 + Q1 = 25.441
So Q1 = 4.24 kN
჻ Shear at End column = 4.240 kN
Shear at intermediate Column = 2 x 4.24 kN = 8.48 kN
Terrace Water profing (kN) Total Weight (kN)

(2.55 + 0.15 + 0.15 + 0.6 +


0.6 ) x ( 5.55 + 4.05 + 0.225 +
256.289
0.225 +0.6 + 0.6 ) x 1.5 =
68.344

{(4.35 + 4.165 + 2.55 + 0.15


+ 0.15 + 0.6 + 0.6 ) x (3.75
+0.15 + 0.6 ) x 1.5 + {(4.05 +
861.357
5.55 + 0.225 + 0.6 ) x (4.35 +
4.165 + 0.15 + 0.6 ) x 1.5} =
229.695
{(4.35 + 4.165 + 2.55 + 0.15
+ 0.15 + 0.6 + 0.6 ) x (3.75
+0.15 + 0.6 ) x 1.5 + {(4.05 +
861.357
5.55 + 0.225 + 0.6 ) x (4.35 +
4.165 + 0.15 + 0.6 ) x 1.5} =
229.695

Absent 777.459

nsitional Beam Total Toatal


Length Weight
(m) (kN)
Length (m)

5.55 - 0.225 - 0.225 = 5.1 3x2.25 +


24.15 x
2x5.1 +
2.188 =
2x3.6 =
4.05 - 0.225 - 0.225 = 3.6 52.84
24.15

5.55 - 0.225 - 0.225 = 5.1 4 x (4.05 +


3.865 +
88.66 x
2.25 + 5.1
4.05 - 0.225 - 0.225 = 3.6 2.188 =
+ 3.6 +
193.988
3.3) =
3.75 - 0.225 - 0.225 = 3.3 88.66

nsitional Beam Total Toatal


Length Weight
Length (m) (m) (kN)

5.55 - 0.225 - 0.225 = 5.1 0.7 x


(2x2.25 + 15.33 x
2x5.1 + 7.95 =
2x3.6) = 121.874
4.05 - 0.225 - 0.225 = 3.6 15.33

5.55 - 0.225 - 0.225 = 5.1 0.7 x 4 x


(4.05 +
3.865 + 60.487 x
5.1 + 3.6 + 7.95 =
3.3) + 0.7 480.872
x 3 x 2.25
0.7 x 4 x
(4.05 +
3.865 + 60.487 x
4.05 - 0.225 - 0.225 = 3.6 5.1 + 3.6 + 7.95 =
3.3) + 0.7 480.872
x 3 x 2.25
3.75 - 0.225 - 0.225 = 3.3 = 60.487

1.65 0.8 + 1.8 + 5.9 x


2 x 1.65 = 9.938 =
-- 5.9 58.634

.225 + 0.225 +0.6 + 0.6 ) x 2=