SKIKDA REFINERY REHABILITATION &

ADAPTATION PROJECT

PROCESS FLOW DIAGRAM


FOR
AROMATICS RECOVERY UNIT
(UNIT NO : 200)

CONTRACT NO. : DEV-K-23-09


SKIKDA REFINERY REHABILITATION &
PROJECT NAME :
ADAPTATION PROJECT
SONATRACH
OWNER :
ACTIVITE AVAL-DIVISION RAFFINAGE
LOCATION : SKIKDA, ALGERIA

F 30 Jun. 2013 AS-BUILT H.J. Jung H.S.Shin P.S.Choi

2 30 Jun. 2011 Revised as per Marked H.J. Jung P.S.Choi K.Y.Nam

1 23 Apr. 2010 Client’s comment incorporated J.H. Kwak P.S.Choi C.S.Koh

0 23 Oct. 2009 ISSUE FOR APPROVAL J.H. Kwak P.S.Choi C.S.Koh

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED PM

DOC.NO : 6648-0200-5-PS-PF-0001-F TOTAL 13 SHEETS (INCL. COVER)

SAMSUNG ENGINEERING CO., LTD.


SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PROCESS FLOW DIAGRAM FOR


AROMATICS RECOVERY UNIT
Doc. No : 6648-0200-5-PS-PF-0001-F Page: 2 of 13

UNIT 200 DRAWING LIST


Acct. Drawing Number Drawing Title Issue Issue
Stage Date
1 PFD-200-GLOBAL-0101 UNIT 200 – AROMATICS F 30.06.2013
RECOVERY
2 PFD-200-0101 EXTRACTIVE DISTILLATION F 30.06.2013

3 PFD-200-0102 SOLVENT RECOVERY F 30.06.2013

4 PFD-200-0103 SOLVENT REGENERATION F 30.06.2013


& STEAM GENERATION
5 PFD-200-0104 BENZENE FRACTIONATION #1 F 30.06.2013

6 PFD-200-0105 BENZENE FRACTIONATION #2 F 30.06.2013

7 PFD-200-0106 TOLUENE FRACTIONATION F 30.06.2013

8 PFD-200-0107 SOLVENT STORAGE SYSTEM F 30.06.2013

9 PFD-200-0108 CLAY CHARGE TANK F 30.06.2013


& HYDROCARBONS VENT/SUMP
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PROCESS FLOW DIAGRAM FOR


AROMATICS RECOVERY UNIT
Doc. No : 6648-0200-5-PS-PF-0001-F Page: 3 of 13

UNIT 200 CHANGE LIST


Rev. PFD No. Description Remarks

0 General Equipment number has been corrected as per Technical Basis


and Scope of Work/Supply (Doc. No. : 6648-00-02-41-SW-
02) Rev.2
Equipment name has been corrected as per Equipment List
(Doc. No. : 6648-0100-5-PS-EL-0001-0) Rev.0
0 PFD-200- Item number of 200-E-64 is added because it was missing.
GLOBAL-0101
1 General Old item numbers were specified on the drawing if the MOM of
equipments are to be replaced by new one. Meeting for
Process
Specified pressure, temperature, flowrate and pump head and Clarification for
duty of Heat exchanger and heater on the PFD. PFD (unit 100,
Deleted the note 1 and 2 on global PFD. 200, 400, 500)
with Sonatrach
was reflected.
Unified control symbol of air fan cooler. (E05/CL-
SH/6648/M/0057)
Cooling water line symbols were unified with "WCR, WCS".

Nitrogen line symbols were unified with "N2".

1 PFD-200-0102 Changed "200-EA-52/" to "200-EA-52".

1 PFD-200-0101 200-MP-67 A/B added as per Technical- Basis and Scope of Also reflected on
PFD-200-GLOBAL-
Work/ Supply 8.12.1 (6648-00-02-41-SW-02 Rev. 2) 0101
1 PFD-200-0102 200-C-5 is changed to 200-C-55 as per clarification with Also reflected on
PFD-200-GLOBAL-
Sonatrach (E05/CL-SH/6648/L/0478). 0101
1 PFD-200-0102 200-MP-5 A/B is changed to 200-MP-70 A/B as per Also reflected on
PFD-200-GLOBAL-
clarification with Sonatrach (E05/CL-SH/6648/L/0478). 0101
1 PFD-200-0102 200-MP-6 A/B is changed to 200-MP-73 A/B as per Also reflected on
PFD-200-GLOBAL-
clarification with Sonatrach (E05/CL-SH/6648/L/0478). 0101
1 PFD-200-0103 200-MP-2 A/B is changed to 200-MP-69 A/B as per Also reflected on
PFD-200-GLOBAL-
clarification with Sonatrach (E05/CL-SH/6648/L/0478). 0101
1 PFD-200-0104 200-MP-13 A/B is changed to 200-MP-74 A/B as per Also reflected on
PFD-200-GLOBAL-
clarification with Sonatrach (E05/CL-SH/6648/L/0478). 0101
1 PFD-200-0108 200-MP-18 A/B is changed to 200-MP-75 A/B as per
clarification with Sonatrach (E05/CL-SH/6648/L/0478).
2 PFD-200- 200-V-6 (Modified) is replaced with 200-V-64 (New) as per
GLOBAL-0101 E05/SH-CL/6648/E1397.
2 PFD-200- 200-V-7 (Existing) is replaced with 200-V-65 (New) as per
GLOBAL-0101 E05/SH-CL/6648/E1397.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT

PROCESS FLOW DIAGRAM FOR


AROMATICS RECOVERY UNIT
Doc. No : 6648-0200-5-PS-PF-0001-F Page: 4 of 13

2 PFD-200- 200-C-8 (Modified) is replaced with 200-C-56 (New) as per


GLOBAL-0101 checking column condition on 2010 annual shutdown.
(Already reflected in P&ID and datasheet.)
2 PFD-200-0101 Temperature on stream <2040> is corrected from 4.0 deg C
to 40 deg C as per Stream summary R-S-I-S case.
2 PFD-200-0101 Equipment no. in destination arrow 200-MP-2 A/B is
changed to 200-MP-69A/B.
2 PFD-200-0101 Pressure on stream <2001> is corrected from 7.9 kg/cm2 G
to 7.6 kg/cm2 G. (Pressure of 200-MP-67 A/B discharge )
2 PFD-200-0101 Sequence of Make-up solvent is corrected as per P&ID.

2 PFD-200-0101 Duty of 200-E-64 is corrected from 0.24 MMkcal/hr to 0.27


Mmkcal/hr. (Same as P&ID and 200-E-64 Datasheet)
2 PFD-200-0101 Pressure on stream <2009> is corrected from 0.47 kg/cm2 G
to 0.42 kg/cm2 G as per Stream summary R-S-I-S case.
2 PFD-200-0104 200-V-6 (Modified) is replaced with 200-V-64 (New) as per
E05/SH-CL/6648/E1397.
2 PFD-200-0104 200-V-7 (Existing) is replaced with 200-V-65 (New) as per
E05/SH-CL/6648/E1397.
2 PFD-200-0104 PIC with FC cascade control line for 200-C-54 is shown.

2 PFD-200-0105 PIC with FC cascade control line for 200-C-54 is shown.

2 PFD-200-0105 Flow rate on stream <2065> is corrected from 21804 kg/hr to


12804 kg/hr as per stream summary R-S-I-S case.
2 PFD-200-0106 200-C-56 :
PAHH connected On/off valve is shown like as other
column.
2 PFD-200-0106 200-C-8 (Modified) is replaced with 200-C-56 (New) as per
checking column condition on 2010 annual shutdown.
(Already reflected in P&ID and datasheet.)
2 PFD-200-0107 On/Off valve on 200-V-9 bottom line is deleted.
Already deleted on P&ID stage 2.
Same concept is applied with other units.
2 PFD-200-0107 Equipment no. in destination arrow 200-MP-5 A/B is
changed to 200-MP-70A/B.
2 PFD-200-0107 Solvent loading line is moved from 200-S-51 to 200-MP-58
suction as per P&ID.
2 PFD-200-0108 Scope representation with GTC and DEC is deleted.