Process Flow Diagram FOR Aromatics Recovery Unit (UNIT NO: 200)
Process Flow Diagram FOR Aromatics Recovery Unit (UNIT NO: 200)
ADAPTATION PROJECT
1 PFD-200-0101 200-MP-67 A/B added as per Technical- Basis and Scope of Also reflected on
PFD-200-GLOBAL-
Work/ Supply 8.12.1 (6648-00-02-41-SW-02 Rev. 2) 0101
1 PFD-200-0102 200-C-5 is changed to 200-C-55 as per clarification with Also reflected on
PFD-200-GLOBAL-
Sonatrach (E05/CL-SH/6648/L/0478). 0101
1 PFD-200-0102 200-MP-5 A/B is changed to 200-MP-70 A/B as per Also reflected on
PFD-200-GLOBAL-
clarification with Sonatrach (E05/CL-SH/6648/L/0478). 0101
1 PFD-200-0102 200-MP-6 A/B is changed to 200-MP-73 A/B as per Also reflected on
PFD-200-GLOBAL-
clarification with Sonatrach (E05/CL-SH/6648/L/0478). 0101
1 PFD-200-0103 200-MP-2 A/B is changed to 200-MP-69 A/B as per Also reflected on
PFD-200-GLOBAL-
clarification with Sonatrach (E05/CL-SH/6648/L/0478). 0101
1 PFD-200-0104 200-MP-13 A/B is changed to 200-MP-74 A/B as per Also reflected on
PFD-200-GLOBAL-
clarification with Sonatrach (E05/CL-SH/6648/L/0478). 0101
1 PFD-200-0108 200-MP-18 A/B is changed to 200-MP-75 A/B as per
clarification with Sonatrach (E05/CL-SH/6648/L/0478).
2 PFD-200- 200-V-6 (Modified) is replaced with 200-V-64 (New) as per
GLOBAL-0101 E05/SH-CL/6648/E1397.
2 PFD-200- 200-V-7 (Existing) is replaced with 200-V-65 (New) as per
GLOBAL-0101 E05/SH-CL/6648/E1397.
SKIKDA REFINERY REHABILITATION & ADAPTATION PROJECT