Assignments Management

ID Description Project Issued on Target date


Investigate the industry statistics on likelihood for each risk on
1 Salman 05/06/2016
web / Salman data base / PetroPars

Compare:
- Removal  of integrated packing element
2 Salman 11/06/2016
- Add Turn right-hand mechanism for packer setting separation
- Release S/T post cement job

Shear Pins enhancement practice;


- Market survey and feasibility of using tested shear pins 2 weeks prior
3 Salman
- Tested shear pins shall be witnessed and taken to the rig by to the job
Posco Rep. feasibility review)

Simulate torque & drag and hydraulic for 2SKA-2 via correlation
4 Salman 05/06/2016
with 2SKB-3

Complete the attached risk management in Excel, add swab cup


5 Salman 05/06/2016
leak and so on

6 Review the running procedure & program; insert the “lessons Salman 08/06/2016
learnt” and “Contingency plans”into the program

Communicate with WOC to find out an eligible service hand for 2 weeks prior
7 running the hanger Salman
to the job

2 weeks prior
8 Follow up with CTR / WI / GOT / AntoinOil / Resources Salman
to the job

9 Dir. Drilling PQ report Ph12 19/06/2016


10 Tender - Tubing Running & Rental Tools Ph12 22/06/2016
11 Risk Assessment - Milling DHSV in SPD12B-12 Ph12 22/06/2016
Keep in touch with Smith Gulf on proper mill as option B, as
12 Ph12 20/06/2016
discussed
Provide required info & fill up questionnaire to Kan Dana and set
13 Ph12 20/06/2016
up detailed meeting with Well Tec eng.
Follow up on inflaeable packer as contingency, in case unable to
14 Ph12 20/06/2016
secure the flapper in place
15 2SKC-1 20" top job cement report Salman 19/06/2016 20/06/2016
16 Tender Documents - Mud Ph12 21/06/2016 22/06/2016
17 Tender Documents - Casing Running Ph12 21/06/2016 22/06/2016
18 PQ - Drilling Fluid 1 (4 Companies) Ph12 22/06/2016 26/06/2016
19 PQ - Drilling Fluid 2 (4 Companies) Ph12 22/06/2016 26/06/2016
Investigate the sustained annulus pressure in Phase 1, potential
20 reasons, preventive actions, mitigation plan Ph19 3/7/2016 27/07/2016

Flowing plan for SPD19A-6 to manage the latest BS&W once


21 Ph19 3/7/2016 13/7/2016
started
22 Analyzing the effect of junk basket run on milling the SVCRs Ph19 3/7/2016 13/7/2016

23 SPD12B-11 sidetrack trajectory review Ph12 3/7/2016 10/7/2016


24 Present the Woc / hanger status to IOOC upon site visit Salman 3/7/2016 07/10/2016
Finish date Responsible 1 Responsible 2 Status

Hakimi Closed

Hashemi Closed

Hashemi Ongoing

HabibPour Closed

Hakimi Closed

Daghigh Ongoing

Karami Ongoing

Hashemi Ongoing

28/06/2016 Daneshkhah Babaei Closed


22/06/2016 Nasri Closed
Jahan Mahin Ongoing

Hashemi Ongoing

20/06/2016 Maghzi Closed

Baharlouei Ongoing

19/06/2016 Behnam Closed


Morovat Ongoing
Morovat Ongoing
25/06/2016 Jahan Mahin Safari Closed
28/06/2016 Nasri Closed

Hashemi Behnam Open

Dehghani Behnam Open


Behnam Open

Jahan Mahin Open


Hakimi Open
Remarks
The statistics shall be inserted in the presentation for
IOOC; Hakimi: "Nothing found"

Habib Pour to insert it into the program

The results shall be implemented into the setting


pressure & force
Alamouti Helped

Habib Pour to help


It can be updated upon receiving the final modifications
later

Stewart has been allocated, still his competency &


availability to be under evaluation

As backup plan

Hashemi to take the lead & introduce his assistant

With the help of Mr. Hassan-pour


Assignments Management
ID Description Number of Assignments Project
1 Babaei 1
2 Baharlouei 1
3 Behnam 4
4 Daghigh 1
5 Daneshkhah 1
6 Dehghani 1

7 HabibPour 1

8 Hakimi 3
9 Hashemi 5
10 Jahan Mahin 3
11 Karami 1
12 Maghzi 1
13 Morovat 2
14 Nasri 2
15 Nasri 2
16 Safari 1
Remarks