Duqm Refinery Project EPC Package One
Duqm Refinery Project EPC Package One
VOID
DATE: 07-12-2019
SUBCONTRACTOR IDENTIFICATION: Douglas OHI LLC
DOCUMENT TITLE:
MAR for SOUNDER EXE
SUBCONTRACTOR DOCUMENT No.: REV: 1 CODE:
TRD-OHIB-EPC1-FF-MAR-012
CONTRACTOR DOCUMENT No.: REV: DOCUMENT CLASS:
MATERIAL APPROVAL REQUEST
This certificate does not exempt the Subcontractor from the Terms of the Contract, Project Specifications or Quality Procedures but confirms that all
DISCIPLINE
REFERENCE DRAWING:
REMARKS:
CONTRACTOR REVIEW
ACCEPTED ACCEPTED WITH COMMENTS REJECTED REVISE AND RESUBMIT
CONTRACTOR SUPERVISOR
ENGINEERING
WITNESSED/REVIEWED BY: SUBCONTRACTOR NOTE:
CONSTRUCTION QUALITY (if required)
The documents have been reviewed to
general conformance with the
NAME: SIVA CHAITANYA.K contract. Such review does not relieve
the subcontractor of his
SIGNATURE: responsibilities under the item of the
contract nor authorize to waive any
DATE: 07-12-2019 contractual requirements.
REMARKS:
WITNESSED/REVIEWED BY: COMPANY
NAME:
SIGNATURE:
DATE:
This document is property of Duqm Refinery and Petrochemical Industries Company. Its reproduction without a written permission is strictly forbidden