PL4415 2007 Nachihangi June 2011
PL4415 2007 Nachihangi June 2011
Licence Holders; PL No,; Proposed Work for Actual Work Done Data Analysis, Interpretation and Results Personnel Expenditure Reviewers
Location Grids, QDS & the Reporting Period Descriptions Employed USD Remarks
Reporting Period
Geochemical sampling and Geochemical soil sampling and geology mapping Potential for Ni-Cu mineralization.
geology mapping: were deferred in the June quarter due to other
exploration work obligations and commitments.
2011 exploration work programs initiated and
results will be reported in future quarters.
Line cutting for surface EM Two EM grids totaling of 21.7 line kms were The survey data will be used to help
geophysical survey: planned on the tenement to follow-up several identify ultramafic intrusions which may
2010 soil geochem anomalies, intersected have the potential to host nickel-
ultramafic rock in 2010 reverse circulation drill copper sulphide deposits.
hole, NRC10-045 in the vicity of several untested
EM anomalies and increasing magnetic
anomalies. SPEM survey was deffered to the next
quarter. Results to be reported in future quarters.
Other Work: Ntaka Hill base Field equipment purchased, field crew mobilized
camp was kept on care & to field, work program initiated
maintenance during rainy
season & re-opened in Mid-
May. Prepartion for 2011 field
program