Professional Documents
Culture Documents
Catálogo de Seccionalizador
Catálogo de Seccionalizador
Catálogo de Seccionalizador
SPGSS SERIES
15kV, 27kV, 38kV
400A, 630A
SF6 GI Sectionalizer for overhead line-----------------------------------------------------------------------------------------------------------------------------------
INTRODUCTION
The SF6 GI-Sectionalizer ( Gas Insulated Sectionalizer ) of SHINSUNG is designed to meet the demands of oilless,
maintenance free operation. The SF6 GI-Sectionalizer uses the SF6 gas as the insulating and arc quenching media,
and combined with unique puffing technics, it ensures the safe & long life load current switching.
The switch itself can be used also as a line load break switch and combined with control, it works as a Sectionalizer.
There are two options of mechanism. One is quick break, quick open spring toggled motor mechanism and the other is
spring stored energy mechanism. In case of spring toggled motor mechanism, the close, open time is within 0.6 sec.
So, if the reclosing interval of the backup protection device is more than 0.7 sec, this mechanism is recommended.
In case of spring stored energy mechanism(manual closing) with low energy tripping mechanism, the opening time after
current cessation is within 5 cycles.
CHARACTERISTICS
* SF6 gas insulation, SF6 gas interruption.
* Pure puffer technics, no leakage current path between open contacts.
* Short arcing time (0.5 cycles), heavy tulip contacts with Tungsten-cooper arc resistant contact material ensures
more than 5 times making current, more than 400 times load current switchings.
* At atmospheric gas pressure, it ensures the rated insulation, interruption ratings.
* Tig welded stainless steel tank case and double sealing technics with EPDM rubber ensures the sealed
for life characteristics.
* Three CT's and automatic CT shortening device
* Six voltage sensors can be integrated.
* In case of electrical closing options, the internal battery charging source can be supplied.
* SAFETY DEVICES
- High Gas Pressure bursting membrane 4 6 kg.f/cm².G (standard)
- Gas Pressure Meter (standard)
- Low Gas Pressure Target and Electrical, Mechanical Interlocking Device - optional
- Manual Locking Device (Electrical, Mechanical) - optional
* BUSHING CONNECTIONS
- NEMA type Flat Terminal with copper alloy (Pollution density 0.06 mg/cm²)
SHINSUNG 1 ---------------------------------------------------------------------------------------------------------------------------------------------------ISO9001
-----------------------------------------------------------------------------------------------------------------------------------SF6 GI Sectionalizer for overhead line
Mainly Active Load Current (0.7PF). A 400/ 630 400/ 630 400/ 630
Loop Current A 400/ 630 400/ 630 400/ 630
Number of Switching's times 400 400 400
Cable Charging Current A 20 25 20
Transformer Magnetizing Current A 14/ 22 14/ 22 14/ 22
Overload current A 900 900 900
BASIC INSULATION LEVEL (1.2x50 )
Phase to Earth kV 110 150 170
Across Interrupter kV 125 165 195
On Loss of SF6 Gas kV 110 150 170
POWER FREQUENCY INSULATION LEVEL (1 min)
Phase to Earth kV 60 70 70
Across Interrupter kV 60 77 80
ENVIRONMENTAL
Ambient Temperature -25 +70 -25 +70 -25 +70
Humidity % 0 100 0 100 0 100
Altitude (max.) m 1000 1000 1000
OPERATING PERFORMANCE
Close/Open DC Voltage Vdc 24 24 24
<0.7 <0.7 <0.7 Spring toggle
manual manual manual mechanism
Close/Open Time sec closing closing closing
<5 cycle <5 cycle <5 cycle Spring stored
open open open mechanism
Mechanical operations times 10,000 10,000 10,000
Applied Standard; IEC 60694(1996), IEC 60265-1(1998), ANSI/IEEE C 37.60, 37.61, 37.63, 37.90
* NOTE 1. The contacts of all the ratings are the same. 2. The contacts distance & structure of 27, 38 kV are the same.
3. The bushing creepage distances are as follows(15 kV- 550 mm, 27 kV- 740 mm, 38 kV- 960 mm)
4. The continuous current ratings of inside the tank case are the same 630 A ratings.
ISO9001---------------------------------------------------------------------------------------------------------------------------------------------------- SHINSUNG 2
SF6 GI Sectionalizer for overhead line--------------------------------------------------------------------------------------------------------------------------
OVERVIEW-SF6 GI SECTIONALIZER
The SF6 GI Sectionalizer consists of bushings, SUS304L tank case, operator independent mechanism, main driving
shaft and insulating arms, Puffer interrupting part, CT's, voltage sensors and bursting membrane, low pressure locking
device, mechanism box with motor, auxiliary contacts, sealing connector with automatic CT shorting device, etc.
BUSHINGS
* The bushings is made of high quality porcelain, is horizontally mounted to the SUS case.
The SUS case is bulged to shape the sealing groove and it also strengthen the case itself.
* The sealing is done with specially designed EPDM gasket to seal the gas and to prevent water penetration.
* The inside of the bushing halls is treated with semi conductive painting to short the gap between the cooper stud
and bushing wall inside. So it ensures good RIV characteristics and also good partial discharge control.
* The stud and bushing is o-ring gas sealed and at terminal side it is water sealed.
TANK CASE
* The tank case is made of low carbon stainless steel to prevent the corrosion because of welding.
It is designed for maximum strength and minimum welding line.
* The bushing reception halls, shaft reception halls are press bulged, and the case itself has just one welding line.
* The rear and front side plate is also press bulged to reinforce and to form the welding line.
* At the maximum bursting pressure of 6 kg.f/cm².G, the operation is not affected and at 10 kg.f/cm².G
the tank case is not destroyed.
,INTERRUPTING PARTS
* The SF6 GI LBS uses the puffing technics and the arcing time is just half cycles. Because of extremely short arc times,
the arc by products are negligible, even after duty tests.
* The compressed gas concentrate the arc though the nozzle and exhaust it through the hall of fixed contact
to condense, cool the arc plasma.
* There is no plastic insulating material between open contacts, so there is no problems because of deterioration
by arc or leakage current.
* The 9 pieces, large tulip contacts with tungsten-cooper tips have good short circuit carrying capacity,
good making current capacity.
* The interrupting, insulation performances are guaranteed at atmospheric pressure.
SHINSUNG 3 --------------------------------------------------------------------------------------------------------------------------------------------------ISO9001
-------------------------------------------------------------------------------------------------------------------------------SF6 GI Sectionalizer for overhead line
BURSTING MEMBRANE
* The bursting membrane burst at the pressure of 4 6 kg.f/cm².G and release the excessive gas to the outside
before the case or bushings destroyed, because of internal fault.
It is located at the opposite side of operating handle and exhaust the gas through safe path.
* The specially chosen and designed Al plate is precisely machined and the thin point is perfectly water sealed
to prevent the corrosion.
* If the bursting membrane operates, actually the gas is fully exhausted and the low gas pressure locking devices
interlocks the electrical/manual operations.
MECHANISM BOX
* The stainless steel mechanism box is thoroughly welded to the tank case and the bottom side is rubber gasket sealed
to protect the water, moisture penetration.
* The motor, auxiliary contacts, low gas locking device, sealing and automatic CT shorting PCB is located inside
the mechanism box and it connected to the control cubicle through the control cable and connector.
ISO9001------------------------------------------------------------------------------------------------------------------------------------------------- SHINSUNG 4
SF6 GI Sectionalizer for overhead line -------------------------------------------------------------------------------------------------------------------------------
* BATTERY CHARGER
Input 220 or 120 Vac
Output max. 1 A Rapid Charging
15 mA Trickle Charging
* POWER SUPPLY
Input 220 or 120 Vac (upon request)
24 Vdc 2 A
Parallel connected with battery
RTU
The RTU is developed to communicate
with C.C, to measure the electrical quantity,
and to get the fault information.
It's use the DSP for calculation and
-processor for other tasks.
It's can measure the V, I, kW, kVAR,
Power Factor, Harmonics and can detect
the fault current and memory the wave
form for further analyzation.
SHINSUNG 5 -----------------------------------------------------------------------------------------------------------------ISO9001
------------------------------------------------------------------------------------------------------------------------- SF6 GI Sectionalizer for overhead line
HARDWARE
* MEASUREMENT
- Instantaneous Metering
. Currents Ia,b,c,n Input currents
- Demand Metering
. Currents Ia,b,c,n Input currents
- Max./Min. Metering
. Currents Ia,b,c,n Input currents
ISO9001---------------------------------------------------------------------------------------------------------------------------------------------- SHINSUNG 6
SF6 GI Sectionalizer LBS for overhead line --------------------------------------------------------------------------------------------------------------------
EVENTS
Many kinds of EVENTS with time tags are useful for analysis of the switch, RTU, Communication and Power LIne.
* FAULT INDICATOR
The fault information is used for identifying the faulted section and faulted phase. It has the special logics to
distinguish the temporary fault and permanent fault.
- IN PROGRESS
It memory the current, voltage, wave form until the over current condition finish, and it takes the maximum RMS
fault current.
- FINAL
If the over current condition is finished and the current goes to 0 (Back up protection device clears the fault.) or
goes to normal current (forward protection device clears the fault.), it wait the maximum reclosing interval of
back up device, and when the programmed time elapsed it finally decide whether the over current was
temporary or permanent fault.
The every effective over current condition is recorded as the events and the final temporary or permanent fault
Information is recorded as fault indicator information.
It consists of start time, fault current level, end time, number of over load conditions and temporary or
permanent fault information.
The fault indicator can check the forward fault or reverse fault to give the correct fault information.
* COMMUNICATION PORTS
- PORTS 1 Modem DNP 3.0 Level 2
Communication rate 9600 BPS (Programmable)
Interface RS-232C
- PORTS 3 LCD
Communication rate 19200 BPS
Interface RS-232C
SHINSUNG 7-----------------------------------------------------------------------------------------------------------------------------------------------------ISO9001
-------------------------------------------------------------------------------------------------------------------------------- SF6 GI Sectionalizer for overhead line
OPERATIONS OF SECTIONALIZER
MINIMUM PICK UP
Phase current : 40 A ~ 450 A
Ground current : 10 A ~ 300 A
If the line current exceeds the minimum pick-up current level and it lasts more than one cycle, the control be armed and
if the current is decreased below one Amps, It finish the count.
This feature prevent the sectionalizer from mis-counting because of the operation of lightning arrestor and the following
power
frequency current. The current restraint feature also prevent the sectionalizer from mis-counting because of downstream
protection devices clear the fault.
* COUNT
1, 2, 3 can be selected
The sectionalizer opens when the counts reaches to the preset number of counts.
* RESET TIME
15 ~ 120 sec
The counts are reset when the line current below the minimum pick-up current during reset time.
[ Manual operation ]
If the right side of operating handle is pulled down, at the final stroke, the switch CLOSE quickly
If the left side of handle is pulled down, at the final stroke, the switch OPEN quickly
[ Electrical operation ]
Push the CLOSE/OPEN button, then the close or open relay is self held and the switch close or open within 0.7sec, If
the switch fails close or open within 2 seconds, the motor automatically stops to prevent battery or motor from damage
ISO9001---------------------------------------------------------------------------------------------------------------------------------------------------SHINSUNG 8
Instantaneous Metering (Current, Voltage, Demand, Phase Angle)
This screen shows Instantaneous metering of line current and line to ground voltage.
Dimension of current is [A], voltage is [kV].
IA, IB, IC is current of A phase, B phase, C phase.
IN is current of neutral line(unbalance current).
Each voltages correspond to A, B, C, R, S, T phase.
* Setting
You can access the main menu screen via the MENU pushbutton.
Then you can access any submenus via INCREASE, DECREASE, and SELECT pushbutton.
SHINSUNG 9---------------------------------------------------------------------------------------------------------------------------------------------------ISO9001
------------------------------------------------------------------------------------------------------------------------------- SF6 GI Sectionalizer for overhead line
During inrush current restraint function is activated, phase minimum pickup current of sectionalizer is applied this
multiple.
Note) During inrush current restraint function is activated, ground minimum pickup current of sectionalizer is blocked.
Sectionalizer is tripped when fault current count is equal to this count setting.
If count setting is 3 count and fault current count of sectionalizer is 1 or 2, then fault current is disappears,
count goes to 0 after this count reset time.
This time must longer than total summation of the maximum reclosing intervals of backup circuit breakers or reclosers.
Note) One shot lockout function is auto setting. When the sectionalizer is closed, it operates in 1 count setting during
10 [s] automatically.
ISO9001-------------------------------------------------------------------------------------------------------------------------------------------------- SHINSUNG 10
SF6 GI Sectionalizer for overhead line----------------------------------------------------------------------------------------------------------------------------------
* Event
You can access any submenus via INCREASE, DECREASE, and SELECT pushbutton.
SHINSUNG 11--------------------------------------------------------------------------------------------------------------------------------------------------ISO9001
----------------------------------------------------------------------------------------------------------------------------- SF6 GI Sectionalizer for overhead line
(4) Diagnostic
This event is about self test of sectionalizer control circuit and power on, etc.
ISO9001--------------------------------------------------------------------------------------------------------------------------------------------- SHINSUNG 12
SF6 GI Sectionalizer for overhead line------------------------------------------------------------------------------------------------------------------------------
* Status
SHINSUNG 13-----------------------------------------------------------------------------------------------------------------------------------------------------ISO9001
--------------------------------------------------------------------------------------------------------------------------------- SF6 GI Sectionalizer for overhead line
INSTALLATION
During moving or installation the switch, the lifting hole should be used and otherwise the bushing can be destroyed.
* Install the mounting bracket first, lift the switch using the lifting hole and tighten the clamp using the hanger bolts
and nuts.
* The operating handle side should be faced with the pole, if otherwise the lineman can be injured during the operation
of bursting membrane.
* Connect the earth wire firmly to the earth terminal
The grounding line of arrester, earth wire of switch and control cubicle should be T connected to the earthing wire.
* Connect the control cable and the external power cable.
When the cable is not used, not connected, the protection cap should be covered the receptacle.
ISO9001------------------------------------------------------------------------------------------------------------------------------------------------ SHINSUNG 14
SF6 GI Sectionalizer for overhead line----------------------------------------------------------------------------------------------------------------------------------
SHINSUNG 15-----------------------------------------------------------------------------------------------------------------------------------------------------ISO9001
----------------------------------------------------------------------------------------------------------------------------------SF6 GI Sectionalizer for overhead line
ISO9001----------------------------------------------------------------------------------------------------------------------------------------------------SHINSUNG 16
SF6 GI Sectionalizer for overhead line ---------------------------------------------------------------------------------------------------------------------------------
SHINSUNG 17 ------------------------------------------------------------------------------------------------------------------------------------------------ISO9001
Business Network
Headquarters in Korea
Shinsung Industrial Electic Co., Ltd
190-4 Soohyang-ri, Sunghwan-eup, Cheonan-si, Chungcheongnam-do, Republic of Korea
Tel : +82- 41- 582 -5029 Fax: +82-41- 582 - 8752 Email: intlbiz@ssiec.co.kr
Website: www.ssiec.co.kr
Information and specifications in this document are subject to change without prior notice.