NOTES:

1. ALL DIMENSIONS ARE EXPRESSED IN


ROOF BRACING
MILLIMETERS.
IN ALL BAYS
2. CRITICAL CRANE HEIGHTS ARE NOT AVAILABLE
WITH ISPL. CUSTOMER TO CHECK HEIGHTS
ABOVE CRANE BEAM WITH CRANE SUPPLIER.
RF1-2

SP-1

SP-1
CRANE CRANE

THIS HEIGHT WITH CRANE SUPPLIER


*CUSTOMER TO CHECK & CONFIRM
BY OTHERS BEAM
~7500

7000

HOOK HEIGHT
5286
WALL BRACING AS
RF1-1

RF1-3
PER ANCHOR
BOLT PLAN

F.F.L+610

FOR APPROVAL
In order to schedule this 'APPROVED AS IS'
RIGID FRAME ELEVATION @ GRID LINE 2-A, 2-B, 2-C, 2-D, 2-E, 2-F project in an efficient
manner, kindly return 'APPROVED AS NOTED'
these drawings with your
comments marked in RED 'RESUBMIT AS NOTED'
as soon as possible.
Any changes made after the Approver : ____________
approval of these drawings
may delay the fabrication
schedule and subsequently Signature : ____________
the delivery of the building.
Please Tick mark only one
5286 (ASSUMED) Date : ____________
of the following.
CUSTOMER TO CONFIRM

350x12

800x6

Bolt Dia= 20 REV. DATE DESCRIPTION BY

Plate Thk= 16 200x10


IZHAR STEEL (PVT.) LTD.
250
70 CRANE BEAM DETAIL M/S TAIGA APPAREL Pvt. Ltd.
155 UTLITY AREA. KANNAH, LAHORE
BREAK UP
515

WQR MM M.MUS 11-05-2016 NTS


155 SPLICE BOLT TABLE
Qty CAPACITY BRIDGE WT HOIST & TROLLEY WHEEL BASE LOADING CATEGORY
135 Mark Top Bot Int Type Dia Length 16-03-132 08-973-16 A AP-08
SP-1 2 2 2 A325 20 80 6 MT 2.85 MT 1.22 MT 2200mm "2"
RIGID FRAME ELEVATION @ GRID LINE
100
SP-1 2-A, 2-B, 2-C, 2-D, 2-E, 2-F