Rigid Frame Elevation at Grid Line 2-A, 2-B, 2-C, 2-D, 2-E, 2-F
Rigid Frame Elevation at Grid Line 2-A, 2-B, 2-C, 2-D, 2-E, 2-F
SP-1
SP-1
CRANE CRANE
7000
HOOK HEIGHT
5286
WALL BRACING AS
RF1-1
RF1-3
PER ANCHOR
BOLT PLAN
F.F.L+610
FOR APPROVAL
In order to schedule this 'APPROVED AS IS'
RIGID FRAME ELEVATION @ GRID LINE 2-A, 2-B, 2-C, 2-D, 2-E, 2-F project in an efficient
manner, kindly return 'APPROVED AS NOTED'
these drawings with your
comments marked in RED 'RESUBMIT AS NOTED'
as soon as possible.
Any changes made after the Approver : ____________
approval of these drawings
may delay the fabrication
schedule and subsequently Signature : ____________
the delivery of the building.
Please Tick mark only one
5286 (ASSUMED) Date : ____________
of the following.
CUSTOMER TO CONFIRM
350x12
800x6