Professional Documents
Culture Documents
Cim CSS G11
Cim CSS G11
Cim CSS G11
Department of Education
Region VII, Central Visayas
Division of City Schools – Tagbilaran
Tagbilaran City
CONTENT COMPETENCY CODE NO. OF DATE LOCAL PROJECT ASSESSMENT STRATEGIE LEARNING
WEEKS & DAY MATERIAL S RESOURC
TAUGH INTEGRATED/ ES
T CONTEXTUALIZ
ATION
INTEGRATION
LESSON 8: INSTALLING AND CONFIGURING COMPUTER SYSTEMS (ICCS)
Content Standard: The learners demonstrate an understanding of concepts and principles in installing configuring computer systems
Types and parts of computers L.O 1. Assemble TLE_IACS 5 weeks June 5 – Provide Non- Model for Performance Discussion Curriculu
Computer operating systems computer hardware S9- July 7, Functional Computer Task Reporting m Guide
Windows / MAC OS X /Linux 12ICCS-Ia- 80 hrs/sem 2017 Computer System Oral Test TESDA
Peripheral devices 1.1 Plan unit assembly to e-28 Components for (non- Training
Computer systems design ensure OHS policies and 4 hrs/week MTWT Model functional PC Regulation
Computer assembly procedures are followed in HF Instructional equipment’s Internet
procedures accordance with systems Module Hard copy with label) CBLM
requirements Distance Learning DLP/DLL
Power ON self-test and basic-
Module Download
input-output-system (BIOS)
1.2 Prepare unit assembly Textbooks for Operating
configuration procedures
to ensure OHS policies Computer System System (Win
CMOS
and procedures are Servicing 7, 8) Server 8
Motherboards followed in accordance & 12
Multimedia storage devices: Photocopy of
with systems requirements Images for
- Video cards Computer System
- Sound cards 1.3 Identify materials Activity Sheets
- Graphical user interface necessary to complete the Video clips
work in accordance with
established procedures and
check against system
requirements
Software Installers preparation L.O. 2 Prepare installer TLE_IACS 5 weeks July 10 – Instructional Individual Conferencing Discussion Curriculu
and OS installation procedures S9- Aug. 11, Module Hard copy Flash Drive Oral Test Reporting m Guide
Application and 2.1 Create portable 12ICCS-If- 25 days 2017 Distance Learning (at least 2 ) TESDA
devices/drivers installation bootable devices in j-29 Module Created Training
procedures accordance with software 80 hrs/sem MTWT Textbooks for Bootable Regulation
Desktop PC interface/ hook up manufacturer instruction HF Computer System Flash Drive Internet
procedures 4 hrs/week Servicing 8GB using CBLM
Application packages and use 2.2 Prepare customized Photocopy of Rufus DLP/DLL
of application programs installers in accordance Images for
Bootable devices with software utilization Computer System Create
- -CD/DVD bootable guide and end user Activity Sheets CD/DVD
- -USB bootable using Rufus agreement Video clip Installer using
software Free
- -USB bootable using 2.3 Carry out installation OS/Applicatio
diskpart/CMD of portable applications in n Software
accordance with software
user guide and software Download
license Free OS
Installation of Operating LO 3. Install operating TLE_IACS 10 weeks Aug. 13 Instructional o Practical PPT Curriculu
System system and drivers for S9- – Oct. Module Hard copy Demonstration Presentation m Guide
- Windows Server 2008/higher peripherals/ devices 12ICCS- 50 days 20, 2017 Video clip w/ oral Discussion TESDA
version IIa-j-30 MTWT Distance Learning questioning Training
- Windows XP/7/8/10 3.1 Install Operating 80 hrs/sem HF Module Regulation
Install and configure of System (OS) in Textbooks for Internet
peripherals devices accordance with 4 hrs/week Computer System CBLM
Install /Update Operating established installation Servicing DLP/DLL
system procedures and to comply Photocopy of
Checking of work with end-user Images for
requirements Computer System
Activity Sheets
3.2 Install peripherals/
devices in accordance
with manufacturer’s
instructions and/ or OS
installation procedures