Cim CSS G11

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 8

Republic of the Philippines

Department of Education
Region VII, Central Visayas
Division of City Schools – Tagbilaran
Tagbilaran City

COMPETENCY IMPLEMENTATION MATRIX


Teacher: ENGR. FLORIDEL C. PELIN Grade/year level: GRADE 11
School: TAGBILARAN CITY SCIENCE HIGH SCHOOL Specialization: TVL – ICT (COMPUTER SYSTEM SERVICING)

CONTENT COMPETENCY CODE NO. OF DATE LOCAL PROJECT ASSESSMENT STRATEGIE LEARNING
WEEKS & DAY MATERIAL S RESOURC
TAUGH INTEGRATED/ ES
T CONTEXTUALIZ
ATION
INTEGRATION
LESSON 8: INSTALLING AND CONFIGURING COMPUTER SYSTEMS (ICCS)
Content Standard: The learners demonstrate an understanding of concepts and principles in installing configuring computer systems
 Types and parts of computers L.O 1. Assemble TLE_IACS 5 weeks June 5 –  Provide Non- Model for  Performance  Discussion  Curriculu
 Computer operating systems computer hardware S9- July 7, Functional Computer Task  Reporting m Guide
 Windows / MAC OS X /Linux 12ICCS-Ia- 80 hrs/sem 2017 Computer System  Oral Test  TESDA
 Peripheral devices 1.1 Plan unit assembly to e-28 Components for (non- Training
 Computer systems design ensure OHS policies and 4 hrs/week MTWT Model functional PC Regulation
 Computer assembly procedures are followed in HF  Instructional equipment’s  Internet
procedures accordance with systems Module Hard copy with label)  CBLM
requirements  Distance Learning  DLP/DLL
 Power ON self-test and basic-
Module Download
input-output-system (BIOS)
1.2 Prepare unit assembly  Textbooks for Operating
configuration procedures
to ensure OHS policies Computer System System (Win
 CMOS
and procedures are Servicing 7, 8) Server 8
 Motherboards followed in accordance & 12
 Multimedia storage devices:  Photocopy of
with systems requirements Images for
- Video cards Computer System
- Sound cards 1.3 Identify materials  Activity Sheets
 - Graphical user interface necessary to complete the  Video clips
work in accordance with
established procedures and
check against system
requirements

1.4 Obtain materials


necessary to complete the
work in accordance with
established procedures and
check against system
requirements

1.5 Obtain tools,


equipment and testing
devices needed to carry
out installation work in
accordance with
established procedures and
check for correct operation
and safety

1.6 Assemble computer


hardware in accordance
with established
procedures and system
requirements

1.7 Perform BIOS


configuration

 Software Installers preparation L.O. 2 Prepare installer TLE_IACS 5 weeks July 10 –  Instructional Individual  Conferencing  Discussion  Curriculu
and OS installation procedures S9- Aug. 11, Module Hard copy Flash Drive  Oral Test  Reporting m Guide
 Application and 2.1 Create portable 12ICCS-If- 25 days 2017  Distance Learning (at least 2 )  TESDA
devices/drivers installation bootable devices in j-29 Module Created Training
procedures accordance with software 80 hrs/sem MTWT  Textbooks for Bootable Regulation
 Desktop PC interface/ hook up manufacturer instruction HF Computer System Flash Drive  Internet
procedures 4 hrs/week Servicing 8GB using  CBLM
 Application packages and use 2.2 Prepare customized  Photocopy of Rufus  DLP/DLL
of application programs installers in accordance Images for
 Bootable devices with software utilization Computer System Create
- -CD/DVD bootable guide and end user  Activity Sheets CD/DVD
- -USB bootable using Rufus agreement  Video clip Installer using
software Free
- -USB bootable using 2.3 Carry out installation OS/Applicatio
diskpart/CMD of portable applications in n Software
accordance with software
user guide and software Download
license Free OS
 Installation of Operating LO 3. Install operating TLE_IACS 10 weeks Aug. 13  Instructional o Practical  PPT  Curriculu
System system and drivers for S9- – Oct. Module Hard copy Demonstration Presentation m Guide
- Windows Server 2008/higher peripherals/ devices 12ICCS- 50 days 20, 2017  Video clip w/ oral  Discussion  TESDA
version IIa-j-30 MTWT  Distance Learning questioning Training
- Windows XP/7/8/10 3.1 Install Operating 80 hrs/sem HF Module Regulation
 Install and configure of System (OS) in  Textbooks for  Internet
peripherals devices accordance with 4 hrs/week Computer System  CBLM
 Install /Update Operating established installation Servicing  DLP/DLL
system procedures and to comply  Photocopy of
 Checking of work with end-user Images for
requirements Computer System
 Activity Sheets
3.2 Install peripherals/
devices in accordance
with manufacturer’s
instructions and/ or OS
installation procedures

3.3 Configure peripherals/


devices in accordance
with manufacturer’s
instructions and/ or OS
installation procedures

3.4 Access OS and drivers


updates/ patches in
accordance with
manufacturer’s
recommendations and
requirements

3.5 Install OS and drivers


updates/ patches in
accordance with
manufacturer’s
recommendations and
requirements

3.6 Check the quality of


the work undertaken in
accordance with
established procedures
 Installation of applications LO 4. Install application TLE_IACS 5 weeks Nov.6 –  Instructional Download  Observation  Discussion  Curriculu
software with different software S9- Dec. 8, Module Hard copy Free Virtual  Performance  Hands-on m Guide
variations 12ICCS- 25 days 2017  Distance Learning Box Software Test  TESDA
 Software updates 4.1 Install Application IIIa-e-31 Module  Oral Test Training
 Virtualization software Software based on 80 hrs/sem  Textbooks for Regulation
 Disk management software software installation MTWT Computer System  Internet
 Antivirus / diagnostic software guides, end-user 4 hrs/week HF Servicing  CBLM
 Device drivers requirements and software  Photocopy of  DLP/DLL
license agreement Images for
 Drivers/Software update
procedures Computer System
4.2 Carry out variation to  Activity Sheets
- Application software license
application software in
agreements
accordance to customer/
- Stress-testing procedures client requirements
 - 5S and 3Rs environmental
policies
4.3 Access software
updates in accordance
with manufacturer’s
recommendations and
requirements

4.4 Install software


updates in accordance
with manufacturer’s
recommendations and
requirements
 Burning or testing installed LO 5. Conduct testing TLE_IACS 5 weeks Dec. 11-  PPT Presentation Download  Observation  Discussion  Curriculu
equipment/devices and documentation S9- 22, 2017  Video Clip Free Burning  Performance m Guide
 Stress test 12ICCS- 25 days Jan. 3-  Instructional Software Test  TESDA
- Processor 5.1 Test devices/ systems IIIf-j-32 31, 2018 Module Hard copy  Oral Test Training
- Memory and/or installation to 80 hrs/sem  Distance Learning Regulation
- Hard Disk determine whether it Module  Internet
- Video Card conforms to requirements 4 hrs/week MTWT  Textbooks for  CBLM
 5S and 3Rs environmental HF Computer System  DLP/DLL
5.2 Conduct stress test to Servicing
policies
ensure reliability of  Photocopy of
 Reporting and documentation
equipment in accordance Images for
procedures
with manufacturer’s Computer System
instructions and system
 Activity Sheets
requirements

5.3 Follow 5S and 3Rs


according to
environmental policies

5.4 Follow procedures in


forwarding documentation
to appropriate personnel
and/or authority on the
test conducted.
LESSON 9. SETTING-UP COMPUTER NETWORKS (SUCN)
 Computer network concepts LO 1 Install network TLE_IACS 10 weeks Feb.1  Instructional Make/Design  Analysis of  Group  Curriculu
 Network Design cables S9- March Module Hard copy a 3D Model of Learners’ Reporting m Guide
 Network cable installation 12SUCN- 50 days 14, 2018  Distance Learning a Network Product  Discussion  TESDA
 cable raceways/ducts 1.1 Plan cable routes in IVa-j-33 Module  Oral Test Training
 Copper cable splicing and accordance with network 160 hrs/sem  Textbooks for Regulation
cable testing design and actual MTWT Computer System  Internet
 Fiber optic cables splicing and installation site 8 hrs/week HF Servicing  CBLM
installation requirements  Photocopy of  DLP/DLL
1.2 Determine cable Images for
 Philippine Electrical Code
routes in accordance with Computer System
relevant to data connection
network design and actual  Activity Sheets
 OHS standards and 5S
installation site  Video Clip
principles
 Practicing 3Rs (reduce, reuse, 1.3 Identify necessary
recycle/recover)  3Rs network materials in
environmental policies  accordance with
Managing waste from established procedures
electrical and electronic and check against system
equipment (WEEE) requirements

1.4 Obtain necessary


network materials in
accordance with
established procedures
and check against system
requirements

1.5 Obtain tools,


equipment, and testing
devices in accordance
with established
procedures

1.6 Check tools,


equipment and testing
devices in accordance
with established
procedures

1.7 Follow OHS policies

1.8 Use appropriate PPE

1.9 Perform copper cable


splicing based on
Electronic Industries
Alliance /
Telecommunications
Industry Association
(EIA/TIA) standards

1.10 Install network


cables and cable raceways
in accordance with
established procedures
and installation
requirements

1.11 Perform installation


work and check for
unnecessary damage that
has occurred and complies
with requirements

1.12 Follow OHS


standards and 5S
principles according to
enterprise requirements

1.13 Dispose excess


components and materials
based on WEEE directives
and 3Rs waste
management program

You might also like