CAPPING BEAM B13 CAPPING BEAM B13

1000 1000
GROUND LVL. GROUND LVL.

800 200

800 200
(+2.905) (+2.905)

1000

1000
WALER-1 WALER-1
STRUT-1
19 20 21 22 WL-1
(+1.405)

2065
E - 500
WALER-2 WALER-2
E - 499
H STRUT-2

2375
E - 498 WL-2
E - 497 (-1.595)
11976 9157

3350
KING POST E - 496

70
E - 495

2462

34
1185

STRAIGHT STRUT E - 494


E - 381
E - 382
E - 493
E - 492
J
E - 383

2462
E - 384 E - 491
3068

34
E - 385 E - 490

70
KING POST E - 489
E - 386
E - 387 E - 488
9157 9157 E - 487

70
34

E - 388 WALER-3 WALER-3


2458

2458

34
70

E - 389 STRAIGHT STRUT E - 486 STRUT-3


WL-3
E - 390 E - 485 (-5.695)
E - 391 E - 484
E - 392 E - 483
2458

2458
E - 393 E - 482

34
7 0

E - 394

70
34

KING POST E - 481

17440
E - 395 E - 480 WL-4
6250

E - 396 E - 479 (-7.595)

15°

15°
E - 397 E - 478
9157 9157

70
34

E - 398 E - 477 WALER-4 WALER-4


2458

2458

34
70

E - 399 STRAIGHT STRUT E - 476 EXCAVATION LVL


E - 400 RL1 6000 RL1
E - 475 6000

4907
(-8.80)
E - 401 E - 474
E - 402 E - 473
2458

2458
E - 403

34
0

E - 472 PILE TOE LVL. PILE TOE LVL.


7

70
34

E - 404 KING POST E - 471 (-10.095) (-10.095)


E - 405 E - 470
6250

E - 406
E - 407 9157 9157
E - 469
E - 468
TYPICAL CROSS SECTION A-A FROM E-381 TO E-418 , E-458 TO E-500

70
34

E - 408 (SCALE 1:75)


2458

2458

34
E - 467
70

E - 409
STRAIGHT STRUT
E - 466 K

4907
E - 410 E - 465
E - 411 E - 464 SCHEDULE OF MEMBER (STRAIGHT STRUT & ROCK BOLT)
2458

2458

E - 412 E - 463

5560
70

34

E - 413 E - 462 STRUT LEVEL NO. MAIN STRUT SPLAY WALER


34

70
4408

E - 414 KING POST


E - 461
E - 415
1580

1580

E - 460 2xISWB-600
E - 416 E - 459
2xISWB-600
WITH 16 MM THK. ISWB-600
WITH BATTEN PLATES
E - 417
E - 418
E - 458
L FLANGE PLATE
850
E - 457
E - 431

E - 435

E - 446

E - 456
E - 421

E - 423

E - 428
E - 429

E - 432
E - 433

E - 440

E - 455
E - 420

E - 422

E - 424
E - 425
E - 426

E - 430

E - 434

E - 436
E - 437

E - 441
E - 442

E - 444
E - 445

E - 447

E - 449
E - 450
E - 451
E - 452
E - 453
E - 419

E - 427

E - 438
E - 439

E - 443

E - 448

E - 454

550

250
600

485
LEVEL - 1

600
(+1.405)

250
250 250 250 A1

2xISWB-600
2xISWB-600
WITH 16 MM THK. ISWB-600
WITH BATTEN PLATES
FLANGE PLATE
850
550
DESIGN FORCES - LEVEL 1,2,3 & 4

250
NORMAL CONDITION
LEVEL - 2

600

485
STRUCTURAL ELEMENTS FORCES
(-1.595) 600
MAIN STRUT 3860 KN

250
250 250 250 SPLAY 1540 KN

2xISWB-600 ROCK BOLT 280 KN


2xISWB-600
WITH 16 MM THK. ISWB-600
WITH BATTEN PLATES
FLANGE PLATE
850
STRUT LAYOUT PLAN 550
(SCALE 1:150)

250
COLABA KEY PLAN SEEPZ
600

485
LEVEL - 3

N
600

(-5.695) 01 05 10 15 20 25

250
250 250 250 A
2xISMC-300
WITH 12 MM THK. E
FLANGE PLATE G
H
- -
90
LEVEL - 4
(-7.595)

240
90 L

REFERENCE DRAWINGS General Consultant (GC) : Detailed Design Consultant : Contractor :


UGC05-CAC-SVN-4262-002 (DDC, ARCHITECTURAL, MEP) MUMBAI METRO RAIL CORPORATION LTD.
UGC05-CAC-SVN-4262-003 NaMTTRI Building, Plot No. R-13, 'E'- Block,
OMIKRON KAPPA - PSP - INDUS CONSULTRANS JV Bandra Kurla Complex, Bandra (East), Mumbai 400051.
UGC05-CAC-SVN-4262-004 A JOINT VENTURE OF
UGC05-CAC-SVN-4262-005 OMIKRON KAPPA CONSULTING S. A (GREECE), PSP CONSULTING ENGINEERS GMBH Drawing Title :
NOTIFICATION : (GERMANY) & INDUS CONSULTRANS PVT. LTD. (INDIA)
ARCHITECTURAL DESIGN - FOUNTAINHEAD VIDYANAGRI SECANT PILE LAYOUT PLAN
A B C
Project Title :
WITH ROCK BOLT /STRUT DETAIL
As noted in the DSR No. _________________ MUMBAI METRO LINE 3 (COLABA-BANDRA-SEEPZ) (SHEET 1 OF 5)
dated ________ CONTRACT UGC-05
A : Objection. A complete resubmission is required. DESIGN AND CONSTRUCTION OF UNDERGROUND STATIONS AT JKIL-CRTG JV
B : No Objection with comments. DHARAVI, B.K.C., VIDYANAGRI AND SANTACRUZ & MID VENTILATION Rev. Drg. Status
A1 07-03-018 AN ST BMG DK Drawing No. :
C : Notice of No objection. REVISED AS PER LDC COMMENTS SHAFT AT AGREEPADA HUTMENT AND ASSOCIATED TUNNELS
Discipline Contractor Address : UGC05-CAC-SVN-4262-001 A1 D
Assessor Engineer A0 24-02-018 AD FIRST SUBMISSION ST BMG DK Designed : PS Checked : BMG Approved :DK
Leader P-Preliminary, D-Definitive, C-Construction Reference, W-Working Drawing, B-As Built
Rev. Date Drawn Description Designed Checked Approved Scale : AS SHOWN Drawn : AD Date : 24-0-2018
CAD File Name : UGC05-CAC-SVN-4262-001-A1.DWG A1