- maple wari consrtan
mene hee atines ‘General Consultant for Mumbai Metro Line 3
Ref: GCC-UGCOS-LET-002034-A00 ate: 09 December, 2019,
Se
To,
‘M/s Kumar Infraprojets Lid & M/s China Railways No.3
464, Ander Industral Estate, Veera Desal Road, Andheri (W},
Mumba -400053,
Ind
ention: Mr, Somesh Pan
ial: somesh pandey@jkumarcrtgcom
Project: Mumbat Metro Line3
‘Contract: MM3-CBS-UGC-05
‘Subject: Suggested Standard PSD firing Detalls,
Dear Sit,
This has arlerence to the emails shared with you on 20-11-2019 and on 25-11-2019 regarding the fixing of
Platform Screen Doors (PS) to Civil Works. The suggested arrangement is proposed to have a standardised
ets al throughout MML-3 witha view to have appropriate durability and least of the maintenance inthe
‘operation mes. The same is also acceptable tothe Pacage “12 MM3-CBS-STPT SWC The suggested sketch I
tached herewith fr your perusal
You are equested to adopt the samen the design; incase of any query pleas fel re to discuss and resolve the
Sincerely,
ty Project Manager (Civil)
‘Ene: Typical Sketch for PSD fxing
(Ce: MIRC Mr. Suyash Teived,CPM/4, (UGC-05)
{€/0 MAPLE Consortia, MNRCL Une 3 Tans Of, Wing North Sie of Gy Pak Blok, Bandra Kurla Compe,
andr (Est), Mumba - 400051,
Page tofSCHEMATIC PLATFORM SCREEN DOOR FIXING ARRANGEMENT
WAPLE-GC FOR WML-3- MRE