Download as pdf
Download as pdf
You are on page 1of 3
- maple wari consrtan mene hee atines ‘General Consultant for Mumbai Metro Line 3 Ref: GCC-UGCOS-LET-002034-A00 ate: 09 December, 2019, Se To, ‘M/s Kumar Infraprojets Lid & M/s China Railways No.3 464, Ander Industral Estate, Veera Desal Road, Andheri (W}, Mumba -400053, Ind ention: Mr, Somesh Pan ial: somesh pandey@jkumarcrtgcom Project: Mumbat Metro Line3 ‘Contract: MM3-CBS-UGC-05 ‘Subject: Suggested Standard PSD firing Detalls, Dear Sit, This has arlerence to the emails shared with you on 20-11-2019 and on 25-11-2019 regarding the fixing of Platform Screen Doors (PS) to Civil Works. The suggested arrangement is proposed to have a standardised ets al throughout MML-3 witha view to have appropriate durability and least of the maintenance inthe ‘operation mes. The same is also acceptable tothe Pacage “12 MM3-CBS-STPT SWC The suggested sketch I tached herewith fr your perusal You are equested to adopt the samen the design; incase of any query pleas fel re to discuss and resolve the Sincerely, ty Project Manager (Civil) ‘Ene: Typical Sketch for PSD fxing (Ce: MIRC Mr. Suyash Teived,CPM/4, (UGC-05) {€/0 MAPLE Consortia, MNRCL Une 3 Tans Of, Wing North Sie of Gy Pak Blok, Bandra Kurla Compe, andr (Est), Mumba - 400051, Page tof SCHEMATIC PLATFORM SCREEN DOOR FIXING ARRANGEMENT WAPLE-GC FOR WML-3- MRE

You might also like