Professional Documents
Culture Documents
Progress IT
Progress IT
Description
Preliminary
Data & Voice Work
Server Work
PABX system
CCTV Work
Test Comitioning
Progress
Discount
PROGRESS
No Description
I Preliminary Work (as building regulation)
1 Preliminary works incl. cleaning floor, wall protection for project area
2 Overtime work (after working hours : as building regulation
3 Mobilization material, transportation & temporary lamp
12 Supply & install cable tray galvanis 200 x 100 include joint ,elbow, hanging support
IV PABX system
Setting, termination & programing configuration system existing PABX incl demolition & moving existing
1 PABX
V CCTV Work
1 Supply & install point of cctv cable with coaxial cable c/w DC cable power
include BNC conector & jack DC power
2 Termination existing cctv & testcom
VI Test Comitioning
1 Testcom, drawing ME, suppoting material & 9 months Waranty installation,.
Progress Total
Discount
PROGRESS
IT Work
DONESIA
Progress
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
-0.23%
-0.23%
PROGRESS
Qty Bobot/item % Bobot
60 mtr
9.33% 0.00%
1 ls 1.85% 0.00%
78.28% 0.00%
1 ls 1.85% 0.00%
1.85% 0.00%
1 ls 5.08% 0.00%
5.08% 0.00%
100.23% 0.00%
-0.23% -0.23%
100.00% -0.23%