Progress Report - IT Work

PT. MONOTARO INDONESIA

Description
Preliminary
Data & Voice Work
Server Work
PABX system
CCTV Work
Test Comitioning
Progress
Discount
PROGRESS

No Description
I Preliminary Work (as building regulation)
1 Preliminary works incl. cleaning floor, wall protection for project area
2 Overtime work (after working hours : as building regulation
3 Mobilization material, transportation & temporary lamp

II Data & Voice Work


1 Supply and install point of data cable UTP cat 6 in conduit Hight impact for Working table
2 Supply and install point of data cable UTP cat 6 in conduit hight impact for WIFI
3 Supply and install point of data cable UTP cat 6 in conduit Hight impact for Access Door
4 Supply and instal Modular jack RG 45 cat 6 include face plate
5 Patch cord data cat 6 custom length max 5 mtr
6 Supply and install point of voice cable TC 2 X 2 X 0,6
7 Supply and install Voice modular RG 11
8 MDF panel Box include LSA conection
Feeder cable telephone line, multipair from shaft building to MDF tenant Cap 20 pair analog TC 10 X 2 X
9
0,6
10 HDMI cable for projector (guest room)
11 HDMI cable for TV monitor (guest room, it staff, meeting room 1,2,3,4,5)

12 Supply & install cable tray galvanis 200 x 100 include joint ,elbow, hanging support

13 Floor hacking / Chipping for conceal wiring

III Server Work


1 Setting rack server + include 50 pcs cage nut (Rack server by owner)
2 PDU socket 8 outlet
3 Patch panel 24port cat 6
4 Wiring management
5 Termination Data cable
6 Patch cord data cat 6@2mtr(from patch panel to switch hub

IV PABX system
Setting, termination & programing configuration system existing PABX incl demolition & moving existing
1 PABX

V CCTV Work
1 Supply & install point of cctv cable with coaxial cable c/w DC cable power
include BNC conector & jack DC power
2 Termination existing cctv & testcom

VI Test Comitioning
1 Testcom, drawing ME, suppoting material & 9 months Waranty installation,.

Progress Total
Discount

PROGRESS
IT Work
DONESIA

Progress
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
-0.23%
-0.23%

PROGRESS
Qty Bobot/item % Bobot

1.00 ls 1.06% 0.00%


1.00 ls 2.91% 0.00%
1.00 ls 1.85% 0.00%
5.82% 0.00%

24 point 7.30% 0.00%


5 point 1.52% 0.00%
4 point 1.22% 0.00%
24 pcs 1.98% 0.00%
130 pcs 12.90% 0.00%
129 point 29.86% 0.00%
129 pcs 5.97% 0.00%
1 unit 1.59% 0.00%
0.00% 0.00%
20 mtr 0.79% 0.00%
100 mtr 3.97% 0.00%

60 mtr
9.33% 0.00%
1 ls 1.85% 0.00%
78.28% 0.00%

1 unit 0.56% 0.00%


2 unit 0.57% 0.00%
2 unit 2.16% 0.00%
4 unit 0.76% 0.00%
1 ls 0.76% 0.00%
33 pcs 2.41% 0.00%
7.22% 0.00%

1 ls 1.85% 0.00%
1.85% 0.00%

5.0 point 1.75% 0.00%


0.00% 0.00%
1.0 ls 0.24% 0.00%
1.98% 0.00%

1 ls 5.08% 0.00%
5.08% 0.00%

100.23% 0.00%
-0.23% -0.23%

100.00% -0.23%