Makiling Warehouse 3

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

A B C D E F G H I A

5 5 5.4 3.8 5.5 5.5 5.5 5.5 3.8

MOTOR MOTOR MOTOR MOTOR MOTOR MOTOR MOTOR MOTOR

1
WATER WATER FAN FAN FAN FAN FAN FAN FAN FAN
TANK TANK

5.3
5

FLY ASH ARRESTER

2 SETTLING TANK

FEEDING
BOILER
FLAT
SHELL IDF FAN
FORM FURNACE
WATER SCRUBBER
5

5.3
CHIMNEY
SAMPLING PORT

3 S L I D I N G D O O R S L I D I N G D O O R S L I D I N G D O O R S L I D I N G D O O R

A F
SCALE
L O O R P L A N
NTS
01

PROJECT: APROVED: REVISION SHEET


SURVEYING, REALTY, REV. # REV. INFO REV. BY: DATE:

HRE ENGINEERING PROPOSED BOILER AND KLNDRY BUILDING


ANTHONY TAN / CATHERINE CHEN A 1-3
& CONSULTANCY ARCHITECT
PROV'L. ADD. : HRE TRADING, JOVIAL BLDG., LOPEZ JAENA ST. BUTUAN CITY
OWNER: ANTHONY TAN / CATHERINE CHEN OWNER
DRAWN BY: DATE: REV.
PUROK 2, BRGY. 2 BUENAVISTA AGUSAN DEL NORTE,
MANILA ADD: 18-J, SOUTH TOWER, ONE SHANG, SHANGRI-LA, MANDALUYANG LOCATION: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY ADRESS: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY RENBERT JAMES MAY 15, 2020
A
A B C D E F G H I

5 5 5.4 3.8 5.5 5.5 5.5 5.5 3.8

ROOF DECK LINE

TOP OF ROOF

CEILING LINE

1.9
CONCRETE COLUMN

0.9
FL

0.1
A F R O N T
SCALE
E L E V A T I O N
NTS
03

3 2 1 3 2 1

5 5 5 5

ROOF DECK ROOF DECK LINE


1

TOP OF ROOF
1.1

CEILING LINE

TOP OF DOOR
1.9

CONCRETE COLUMN
0.9

FL
FL
0.1

A RIGHT SIDE ELEVATION


SCALE NTS
A LEFT SIDE ELEVATION
SCALE NTS
A KLN DRY SECTION
SCALE NTS
05 06 07
PROJECT: APROVED: REVISION SHEET
SURVEYING, REALTY, REV. # REV. INFO REV. BY: DATE:

HRE ENGINEERING PROPOSED BOILER AND KLNDRY BUILDING


ANTHONY TAN / CATHERINE CHEN A 1-3
& CONSULTANCY ARCHITECT
PROV'L. ADD. : HRE TRADING, JOVIAL BLDG., LOPEZ JAENA ST. BUTUAN CITY
OWNER: ANTHONY TAN / CATHERINE CHEN OWNER
DRAWN BY: DATE: REV.
PUROK 2, BRGY. 2 BUENAVISTA AGUSAN DEL NORTE,
MANILA ADD: 18-J, SOUTH TOWER, ONE SHANG, SHANGRI-LA, MANDALUYANG LOCATION: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY ADRESS: P-13 B, BRGY. SAN VICENTE, BUTUAN CITYRENBERT JAMES
MAY 15, 2020
A
A B C D E F G H I A

5 5 5.4 3.8 5.5 5.5 5.5 5.5 3.8

1 3.8

ROOF DECK ON FILL ROOF DECK ON FILL ROOF DECK ON FILL ROOF DECK ON FILL ROOF DECK ON FILL ROOF DECK ON FILL
5

SLOPE

SLOPE

11.4
ROOF DECK ON FILL ROOF DECK ON FILL ROOF DECK ON FILL ROOF DECK ON FILL ROOF DECK ON FILL ROOF DECK ON FILL
5

3
11.4
0.5

S ROOF
SCALE
FRAMING PLAN
NTS
21

PROJECT: APROVED: REVISION SHEET


SURVEYING, REALTY, REV. # REV. INFO REV. BY: DATE:

HRE ENGINEERING PROPOSED BOILER AND KLNDRY BUILDING


ANTHONY TAN / CATHERINE CHEN S2-1
& CONSULTANCY CIVIL ENGINEER
PROV'L. ADD. : HRE TRADING, JOVIAL BLDG., LOPEZ JAENA ST. BUTUAN CITY
OWNER: ANTHONY TAN / CATHERINE CHEN OWNER
DRAWN BY: DATE: REV.
PUROK 2, BRGY. 2 BUENAVISTA AGUSAN DEL NORTE,
MANILA ADD: 18-J, SOUTH TOWER, ONE SHANG, SHANGRI-LA, MANDALUYANG LOCATION: P-13 B, BRGY. SAN VICENTE, BUTUAN CITYADRESS: P-13 B, BRGY. SAN VICENTE, BUTUAN CITYRENBERT JAMES
MAY 15, 2020
A
A B C D E F G H I A

5 5 5.4 3.8 5.5 5.5 5.5 5.5 3.8

1
5

2
5

S S L A B
SCALE
P L A N D E T A I L
NTS
22

PROJECT: APROVED: REVISION SHEET


SURVEYING, REALTY, REV. # REV. INFO REV. BY: DATE:

HRE ENGINEERING PROPOSED BOILER AND KLNDRY BUILDING


ANTHONY TAN / CATHERINE CHEN S2-2
& CONSULTANCY CIVIL ENGINEER
PROV'L. ADD. : HRE TRADING, JOVIAL BLDG., LOPEZ JAENA ST. BUTUAN CITY
OWNER: ANTHONY TAN / CATHERINE CHEN OWNER
DRAWN BY: DATE: REV.
PUROK 2, BRGY. 2 BUENAVISTA AGUSAN DEL NORTE,
MANILA ADD: 18-J, SOUTH TOWER, ONE SHANG, SHANGRI-LA, MANDALUYANG LOCATION: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY ADRESS: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY RENBERT JAMES MAY 15, 2020
A
H I J D E F G H I A

5 5 5.8 3.8 5.5 5.5 5.5 5.5 3.8

1 WF WF WF WF WF WF WF WF
C2-F2 C2-F2 C2-F2 C1-F1 C1-F1 C1-F1 C1-F1 C1-F1 C1-F1 C1-F1
5

WF

WF
WF WF WF WF WF WF WF

C1-F1 C1-F1 C1-F1 C1-F1 C1-F1 C1-F1 C1-F1

2
C2-F2

C2-F2
WF WF WF WF WF WF
5

WF

WF

WF WF WF WF WF WF WF

C2-F2 C2-F2 C2-F2


WF WF

3 C1-F1
WF
C1-F1
WF
C1-F1
WF
C1-F1
WF
C1-F1
WF
C1-F1
WF
C1-F1

S F O U N D A T I O N
SCALE
P L A N
NTS
23

PROJECT: APROVED: REVISION SHEET


SURVEYING, REALTY, REV. # REV. INFO REV. BY: DATE:

HRE ENGINEERING PROPOSED BOILER AND KLNDRY BUILDING


ANTHONY TAN / CATHERINE CHEN S 2-3
& CONSULTANCY CIVIL ENGINEER
PROV'L. ADD. : HRE TRADING, JOVIAL BLDG., LOPEZ JAENA ST. BUTUAN CITY
OWNER: ANTHONY TAN / CATHERINE CHEN OWNER
DRAWN BY: DATE: REV.
PUROK 2, BRGY. 2 BUENAVISTA AGUSAN DEL NORTE,
MANILA ADD: 18-J, SOUTH TOWER, ONE SHANG, SHANGRI-LA, MANDALUYANG LOCATION: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY ADRESS: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY RENBERT JAMES MAY 15, 2020
A
SCHEDULE OF ROOF DECK PLAN WF-1 SECTION WF-1
BOTTOM BARS TOP BARS
SHORT DIRECTION
MARK THICKNESS SHORT DIRECTION LONG DIRECTION LONG DIRECTION
REMARKS
CONTINUOUS EDGE DISCONT. EDGE CONTINUOUS EDGE DISCONT. EDGE 0.35
S1 100 mm 10@120 10@300 10@100 10@120 10@200 10@300

CONCRETE FOOTING
CONTINOUS
STRAIGHT BARS
GF 075 mm 400 400 400 400 400 400

SCHEDULE
SCHEDULE OF COLUMNS OF FOOTING

0.16 0.16
SOG 4"
GRAVELED BED
THK

0.5
BASED EARTH
WELL COMPACTED

COLUMN C1 C2
SECTION 400mm x 300mm 400mm x 400mm FOOTING: LENGTH WIDTH HIGHT

0.08
VERT. BARS 4 - 16mmØ, 2 - 12mmØ MID. 8 - 16mmØ, 2 - 12mmØ MID.
F1 1.20 M 1.20 M 350mm
REINFORCEMENT:
LAT. TIES 10mm Ø RSB TIES SP. @ 10mm Ø RSB TIES SP. @
3 - @50mm, 4 - @10mm, 5 - 3 - @50mm, 4 - @10mm, 5 -
16 mm Ø STEELBAR SPACED @
180mm ON CENTER, BOTH WAYS
0.19
@150mm REST @ 20mm @150mm REST @ 20mm WITH EFFECTIVE 2 21 HOOK 180°
ON BOTH ENDPOINTS
O.C. O.C.

SCHEDULE OF BEAMS SECTION C1-F1


LONGITUDINAL REINFORCEMENT BAR
SIZE ARRANGEMENT
MARK SUPPORT MIDSPAN SUPPORT STIRRUPS REMARKS TB-1 150mm SHED 40 G.I. PIPE

BREATH DEPTH SUPPORT MIDSPAN WELDED PLATE


TOP BOTTOM TOP BOTTOM TOP BOTTOM MID

SEE SCHEDULE 3.00 ANCHOR BOLT

10mm Ø STIRRUPS SP
NGL 1/2" THICK BASE PLATE

RB 200mm x 400mm
2-#16
1-#12
2-#16
1-#12
2-#16
1-#12
2-#16
1-#12
2-#16
1-#12
2-#16
1-#12
@ 4 - 50mm, 4 - 100mm
REST @ 250mm CONCRETE OF COLUMNS 400mm x 400mm
4 - STIRRUPS
SPACED @ 2" ON TOP
O.C. CONCRETE COLUMN
CLASS "A"

SEE SCHEDULE
OF COLUMNS
BACK BACK

1.5
FILL FILL
2.00

10mm FLOOR SLAB

.35
1.50

0.50 0.30 100 MM THK


0.50 NOTES: GRAVEL BASE
TOP CHORD: 2 - 2 1/2" x 2 1/2" x 1/4" ANGLE BARS 0.35
BOTTOM CHORD: 2 1/2" x 2 1/2" x 1/4" ANGLE BARS
WEB MEMBERS: 2" x 2" x 1/4" ANGLE BARS
USE: 2" x 6" LITE C-PURLINS SPACED @ 700mm O.C. 1.60
USE: 10mm SAG ROD SPACED @ 2.50M O.C.

PROJECT: APROVED: REVISION SHEET


SURVEYING, REALTY, REV. # REV. INFO REV. BY: DATE:

HRE ENGINEERING PROPOSED BOILER AND KLNDRY BUILDING


ANTHONY TAN / CATHERINE CHEN S 2-4
& CONSULTANCY CIVIL ENGINEER
PROV'L. ADD. : HRE TRADING, JOVIAL BLDG., LOPEZ JAENA ST. BUTUAN CITY
OWNER: ANTHONY TAN / CATHERINE CHEN OWNER
DRAWN BY: DATE: REV.
PUROK 2, BRGY. 2 BUENAVISTA AGUSAN DEL NORTE,
MANILA ADD: 18-J, SOUTH TOWER, ONE SHANG, SHANGRI-LA, MANDALUYANG LOCATION: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY ADRESS: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY RENBERT JAMES MAY 15, 2020
A
SECTION

SHORT SPAN

L L
4 4

12 mmØ BENT BARS

4
ALONG LONG SIDE

L
SPACED @ 0.20M O.C.

12 mmØ BOTTOM BARS


ALONG LONG SIDE
SPACED @ 0.20M O.C.
LONG SPAN

12 mmØ BOTTOM BARS


12 mmØ ALONG LONG SIDE
BENT BARS SPACED @ 0.20M O.C.
ALONG
LONG SIDE
4

SPACED @
L

0.20M O.C.

TYPICAL TWO WAY SLAB FOR ROOF DECK


PROJECT: APROVED: REVISION SHEET
SURVEYING, REALTY, REV. # REV. INFO REV. BY: DATE:

HRE ENGINEERING PROPOSED BOILER AND KLNDRY BUILDING


ANTHONY TAN / CATHERINE CHEN A S-5
& CONSULTANCY CIVIL ENGINEER
PROV'L. ADD. : HRE TRADING, JOVIAL BLDG., LOPEZ JAENA ST. BUTUAN CITY
OWNER: ANTHONY TAN / CATHERINE CHEN OWNER
DRAWN BY: DATE: REV.
PUROK 2, BRGY. 2 BUENAVISTA AGUSAN DEL NORTE,
MANILA ADD: 18-J, SOUTH TOWER, ONE SHANG, SHANGRI-LA, MANDALUYANG LOCATION: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY ADRESS: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY RENBERT JAMES MAY 15, 2020
A
ELECTRICAL NOTES

1. THE ELECTRICAL WORKS SHALL BE DONE IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE,
2. ALL WIRING SHALL BE INSTALLED IN PVC PIPE(THICKWALL) / PVC FLEX. PIPE EMBEDDED INSIDE THE CONCRETE AND HOLLOW BLOCK STRUCTURE SLABS, COLUMNS, WALL PARTITIONS AND OR RUNS CONCEALED BETWEEN DOUBLE WALL WOODEN PARTITIONS AND INSIDE THE
CEILING SPACES WHERE THE USE OF CONCEALED CONDUIT WIRING IMPRACTIBLE SURFACE METAL MOULDING WIRING MAY BE USED.
3. UNLESS OTHERWISE INDICATED ON THE PLAN THE MINIMUM SIZES OF WIRE PVC PIPE TO BE USED SHALL BE NO. 2mm AND 20 mm Ø RESPECTIVELY.
4. ALL LIGHTING CIRCUIT HOMERUNS AND CONVENIENCE OUTLETS SHALL BE WIRED WITH NOT LEES THAN 3.5 mm THHN IN SIZES UNLESS OTHERWISE INDICATED ON THE PLAN
5. WHEREVER REQUIRED AND NECESSARY PULL BOXES OR JUNCTION BOXES OF PROPER SIZES SHALL BE INSTALL AT CONVENIENT AND INCONSPICOUS LOCATION ALTHOUGH SUCH BOXES OR JUNCTIONARE NOT SHOWN ON THE PLANS NOR MENTIONED IN THE SPECIFICATIONS.
6. ALL SERVICE ENTRANCE EQUIPMENT SUCH AS PANELBOARD CIRCUIT BREAKER ETC. SHALL BE PROPERLY GROUNDED IN ACCORDANCE WITH REQUIREMENTS OF THE PHILIPPINE ELECTRICAL CODES.
7. THE POWER SOURCE SHALL BE SINGLE PHASE 2-WIRE, 220 VOLTS, 60 Hz, AC.
8. ALL DEVICES SHALL BE INSTALLED AT THE FOLLOWING HEIGHT ABOVE THE FINISHED FLOOR LEVEL UNLESS OTHERWISED NOTED:
A. WALL SWITCHES 1200 mm FROM THE CENTER OF DEVICE TO FINISHED FLOOR LINE
B. DUPLEX CONVENIENCE OUTLET 300 mm FROM CENTER OF DEVICE TO FINISHED FLOOR LINE
C. PANEL BOARD 1680 mm FROM TOP OF PANEL TO FINISHED FLOOR LINE
9. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT AND IMMEDIATE SUPERVISION OF A DULY LICENSED ELECTRICAL ENGINEER.
MOTOR MOTOR MOTOR MOTOR MOTOR MOTOR MOTOR MOTOR

FAN FAN FAN FAN FAN FAN FAN FAN

C1

C2

S L I D I N G D O O R S L I D I N G D O O R S L I D I N G D O O R S L I D I N G D O O R

E LIGHTING AND CONVENIENCE OUTET LAYOUT PLAN


SCALE NTS
11
CIRCUIT NO. OF VA/ CB AMPERE LOAD TO EXISTING 250 MDP
LOAD PHASE VOLTS WIRE SIZE & CONDUIT
NO. OUTLET CIRCUIT AT AF POLE AB BC CA ABC
1 L.O. 8 1 220 800 15 20 1P 2 - 2.0 mm2 THHN 13 mm Ø CONDUIT
2 C.O. 3 1 220 800 30 20 1P 2 - 3.5 mm2 THHN 13 mm Ø CONDUIT
TOTAL 3 - 5.5 mm2 THHN 20 mm Ø CONDUIT 100AT
COMPUTATION SUBFEEDER
1. LIGHT = 800VA / 220V
= 3.64A
t = 3.63 + 2.54 + 21.32 + 21.32 15A 1P 30A 2P
= 48.82 A
USE 2-2.0mm2 THHN
USE: 3 - 22mm2 THHN 25mmØ CONDUIT
13mmØCONDUIT
2. C.O. = 800VA x 0.7 DEMAND FACTOR
= 560 VA / 220 V
= 2.54A
USE 2-3.5mm2 THHN
13mmØCONDUIT GROUND

PROJECT: APROVED: REVISION SHEET


SURVEYING, REALTY, REV. # REV. INFO REV. BY: DATE:

HRE ENGINEERING PROPOSED BOILER AND KLNDRY BUILDING


ANTHONY TAN / CATHERINE CHEN E 1-1
& CONSULTANCY ELECTRICAL ENGINEER
PROV'L. ADD. : HRE TRADING, JOVIAL BLDG., LOPEZ JAENA ST. BUTUAN CITY
OWNER: ANTHONY TAN / CATHERINE CHEN OWNER
DRAWN BY: DATE: REV.
PUROK 2, BRGY. 2 BUENAVISTA AGUSAN DEL NORTE,
MANILA ADD: 18-J, SOUTH TOWER, ONE SHANG, SHANGRI-LA, MANDALUYANG LOCATION: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY ADRESS: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY RENBERT JAMES MAY 15, 2020
A
MOTOR MOTOR MOTOR MOTOR MOTOR MOTOR MOTOR MOTOR

FAN FAN FAN FAN FAN FAN FAN FAN

BOILER

S L I D I N G D O O R S L I D I N G D O O R S L I D I N G D O O R S L I D I N G D O O R

MECHANICAL LOADS
BOILER 10 HP
8 UNITS FAN BLOWER MOTOR 4 HP

M MECHANICAL LAYOUT PLAN


SCALE NTS
01

PROJECT: APROVED: REVISION SHEET


SURVEYING, REALTY, REV. # REV. INFO REV. BY: DATE:

HRE ENGINEERING PROPOSED BOILER AND KLNDRY BUILDING


ANTHONY TAN / CATHERINE CHEN M 1-1
& CONSULTANCY MECHANICAL ENGINEER
PROV'L. ADD. : HRE TRADING, JOVIAL BLDG., LOPEZ JAENA ST. BUTUAN CITY
OWNER: ANTHONY TAN / CATHERINE CHEN OWNER
DRAWN BY: DATE: REV.
PUROK 2, BRGY. 2 BUENAVISTA AGUSAN DEL NORTE,
MANILA ADD: 18-J, SOUTH TOWER, ONE SHANG, SHANGRI-LA, MANDALUYANG LOCATION: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY ADRESS: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY RENBERT JAMES MAY 15, 2020
A
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORK AND HIGHWAYS
TABLE OF CONTENTS OFFICE OF THE BUILDING OFFICIAL
BUTUAN CITY
ARCHITECTURAL
A1 01 PERSPECTIVE APPROVED BY:
02 SITE DEVELOPMENT PLAN
03 VICINITY MAP
04 TABLE OF CONTENTS
HEAD BUILDING SECTION DATE
A2 01 FLOOR PLAN
A3 01 FRONT ELEVATION RECOMMENDING APPROVAL:

02 RIGHT SIDE ELEVATION


LAND USE & ZONING
STRUCTURAL
S1 01 FOUNDATION PLAN
S2 01 ROOF FRAMING PLAN HEAD SECTION DATE

S3 01 TRUSS DETAIL
02 STRUT DETAIL RECOMMENDING APPROVAL:
03 FOUNDATION SECTION DET.
04 TIE ROD & SAG ROD CONN.
05 TIE BEAM REINFORCEMENT
LAND AND GRADE
06 FOOTING DETAILS

ELECTRICAL
HEAD SECTION DATE
E1 01 ELECTRICAL LAYOUT PLAN
02 SCHEDULE OF LOADS
RECOMMENDING APPROVAL:
03 SINGLE LINE DIAGRAM
04 LEGENDS & SYMBOLS
05 GENERAL SPECIFICATION ARCHITECTURAL

P E R S P E C T I V E MECHANICAL
HEAD SECTION DATE
E1 01 MECHANICAL LAYOUT PLAN
02 MECHANICAL LOAD
RECOMMENDING APPROVAL:

ROAD
STRUCTURAL
TO BUTUAN CITY

TO BINGKILAN

SAN VICENTE HEAD SECTION DATE


ELEMENTARY DUE EAST 102.92 M
SCHOOL

BOILER
KILN DRYER RECOMMENDING APPROVAL:

LOT 334 -A SANITARY


>>>

AREA =10,000 SQ.M.


ER
N RIV

MANDACPAN
PROVINCIAL ROAD

MINI MARKET
GUSA

ROAD
HEAD SECTION DATE
>>> A

EXISTING BLDG RECOMMENDING APPROVAL:

ELECTRICAL

EXISTING BLDG
THIS LOADING/UNLOADING AREA

SITE HEAD SECTION DATE


>
TO TUNGAO

ER >>

RECOMMENDING APPROVAL:
E N T R A N C E

A V I C I N I T Y M A P
DUE EAST 20.00 M
N RIV

PROPERTY LINE - DUE EAST 102.92 M

KILN DRYER
BOILER

MECHANICAL
WIDE)
(20.00M

SCALE NTS
GUSA

01
EXISTING BLDG
NT
EXISTING BLDG

EXISTING ROAD
EASME

>>> A
LEGAL

A SITE DEVELOPMENT PLAN


SCALE NTS
HEAD SECTION DATE

01
TO BITOS

PROJECT: APROVED: REVISION SHEET


SURVEYING, REALTY, REV. # REV. INFO REV. BY: DATE:

HRE ENGINEERING PROPOSED BOILER AND KLNDRY BUILDING


ANTHONY TAN / CATHERINE CHEN A 1-1
& CONSULTANCY ARCHITECT
PROV'L. ADD. : HRE TRADING, JOVIAL BLDG., LOPEZ JAENA ST. BUTUAN CITY
OWNER: ANTHONY TAN / CATHERINE CHEN OWNER
DRAWN BY: DATE: REV.
PUROK 2, BRGY. 2 BUENAVISTA AGUSAN DEL NORTE,
MANILA ADD: 18-J, SOUTH TOWER, ONE SHANG, SHANGRI-LA, MANDALUYANG LOCATION: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY ADRESS: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY RENBERT JAMES MAY 15, 2020
A
SPECIFICATION
5 5 5.4 3.8 5.5 5.5 5.5 5.5 3.8 1. ALL ELECTRONICS OUTLET MUST
MOTOR MOTOR MOTOR MOTOR MOTOR MOTOR MOTOR MOTOR BE 0.30M ABOVE THE FLOOR
LEVEL UNLESS SPECIFIED.
2. ALL INFORMATION OUTLETS BE
IN CATEGORY 6 OR UNLESS
STATED.
WATER WATER FAN FAN FAN FAN FAN FAN FAN FAN 3. TELECOMMUNICATION OUTLETS
TANK TANK
ARE INDICATIVE AND
5

APPROXIMATE.
4. ALL WI-FI ACCESS POINTS SHALL
FLY ASH ARRESTER
BE CONFIGURED TO HAVE ONE
SSID.
SETTLING TANK 5. CONSULT DESIGNING PROF.
ELECTRONICS ENGR. FOR MORE
FEEDING
FLAT
BOILER DESIGN DETAILS.
SHELL IDF FAN
FORM FURNACE 6. CABLE TV OUTLETS ARE
WATER SCRUBBER
INDICATIVE AND APPROXIMATE.
5

7. CATV OUTLET SHALL BE RS-6


CHIMNEY CAOXIAL CABLE OR OTHERWISE
SAMPLING PORT
STATED.
8. CATV OUTLETS MUST BE 0.30M
TV ABOVE FINISHED FLOOR LEVEL
UNLESS SPECIFIED.
S L I D I N G D O O R S L I D I N G D O O R S L I D I N G D O O R S L I D I N G D O O R
9. CONSULT DESIGNING PROF.
ELECTRONICS ENGR.

E L E C T R O N I C S L A Y O U T

SERVICE HEAD FITTING

CLAMP TYPE DROP WIRE SEE DETAILS


(DET. "A")
FIFTH
TO TELCO TELEPHONE
MODEM
50mmØ CLIP

HOOK TO BE PROVIDED TV
PIPE BRACKET DETAIL "A"

TO CATV CO SPLITTER TV CABLE TV

ROOFING GUTTER
LEGENDS
DATA OUTLET CEILING MOUNTED
TELEPHONE/ LAND TERMINAL CABINET

ELECTRICAL SERVICE ENTRANCE EMBEDDED IN WALL CABLE TV OUTLET WALL MOUNTED


DATA OUTLET WALL MOUNTED
TV

CONDUIT ARRANGEMENT TV CABLE TV OUTLET CEILING MOUNTED


DATA OUTLET FLOOR MOUNTED

TO TELEPHONE
PROTECTOR CABINET TELEPHONE SPARE OUTLET BLANK

PROTECTOR CABINET
PROJECT: APROVED: REVISION SHEET
SURVEYING, REALTY, REV. # REV. INFO REV. BY: DATE:

HRE ENGINEERING PROPOSED BOILER AND KLNDRY BUILDING


ANTHONY TAN / CATHERINE CHEN EL 1-1
& CONSULTANCY ELECTRONICS ENGINEER
PROV'L. ADD. : HRE TRADING, JOVIAL BLDG., LOPEZ JAENA ST. BUTUAN CITY
OWNER: ANTHONY TAN / CATHERINE CHEN OWNER
DRAWN BY: DATE: REV.
PUROK 2, BRGY. 2 BUENAVISTA AGUSAN DEL NORTE,
MANILA ADD: 18-J, SOUTH TOWER, ONE SHANG, SHANGRI-LA, MANDALUYANG LOCATION: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY ADRESS: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY RENBERT JAMES MAY 15, 2020
A
A B C G I A
D E F H

5 5 5.4 3.8 5.5 5.5 5.5 5.5 3.8

MOTOR MOTOR MOTOR MOTOR MOTOR MOTOR MOTOR MOTOR

1
WATER WATER FAN FAN FAN FAN FAN FAN FAN FAN
M
TANK TANK
5

3"Ø POLYMERIZING VINYL


CHLORIDE

FLY ASH ARRESTER

2 SETTLING TANK

FEEDING
BOILER
FLAT
SHELL IDF FAN
FORM FURNACE
WATER SCRUBBER
5

CHIMNEY
SAMPLING PORT

3
W A T E R

PLUMBING NOTES

1. GRADES OF HORIZONTAL PIPINGS

P
F R O M

RUN ALL HORIZONTAL PIPINGS IN FERFECT


ALIGNMENT A FORM GRADE OF NOT LESS PLUMBING LAYOUT PLAN
THAN TWO PERCENT ( 2 % ) SCALE NTS
11
R A I N

2. CHANGES IN DIRECTION
ALL CHANGE IN DIRECTION SHALL BE MADE BY
APPROPRIATE USE OF FORTY-FIVE DEGREES
S O U R C E

( 45 DEG. ) WYES, LONG SWEEP QUARTER BEND, WATER TANK


SIXTH EIGHT OF SIXTEENTH BENDS.
WHEN THE CHANGE OF FLOW IS FROM
HORIZONTAL TO VERTICAL A SINGLE 81 BEND MO
TO
COMBINATION MAYBE USED ON VERTICAL
O F

R
STACKS AND SHORT QUARTER BENDS MAYBE USED
R O O F

ON WASTE LINE, TEE AND CROSSES MAYBE ILE


R

USED IN VENT PIPES. BO


TO
ER
3. PROHIBITED FITTINGS W
AT
NO DOUBLE HUB OR TEE BRANCH SHALL BE
USED ON HORIZONTAL SOIL OR WASTE LINES, LEGEND :
THE DRILLING AND TAPPING OF HOUSE DRAIN,
WASTE OR VENT PIPES AND USE OF S.V. SEPTIC VAULT
SADDLE HUB AND BEND ARE PROHIBITED C.O. CLEAN OUT
4. PIPE CLEAN - OUTS WATER CLOSET
CLEAN - OUTS ARE REQUIRED UNDER THE
WC
FOLLOWING CONDITIONS VTR VENT THRU ROOF
IN F.D. FLOOR DRAIN
A. EVERY CHANGE IN HORIZONTAL RA
DIRECTIONS EXCEEDING TWENTY-TWO AND ONE OM MOTOR PUMP
FR M
HALF DEGREES (22 21) ER LAV. LAVATORY
W AT
B. ONE AND ONE HALF METERS (1.50m)
SH SHOWER HEAD
INSIDE THE PROPERTY LINE BEFORE THE HOUSE
DRAINAGE CONNECTION. URL URINAL BOWL
C. AT THE END OF ANY HORIZONTAL LINES. CB CATCH BASIN
5. THE DIGESTION CHAMBER OF SEPTIC VAULT HB HOSE BIB
MUST BE WATERPROOFED.
6. NOT LESS THAN 0.30 METER OF AIR SPACE MUST WATER LINE
BE LEFT BETWEEN THE TOP OF THE SEWAGE SANITARY LINE
AND THE UNDER PART
7. NO SEPTIC VAULT SHALL BE CONSTRUCTED
UNDER THE BUILDING. PROJECT: APROVED: REVISION SHEET
SURVEYING, REALTY, REV. # REV. INFO REV. BY: DATE:

HRE ENGINEERING PROPOSED BOILER AND KLNDRY BUILDING


ANTHONY TAN / CATHERINE CHEN P 1-1
& CONSULTANCY MASTER PLUMBER
PROV'L. ADD. : HRE TRADING, JOVIAL BLDG., LOPEZ JAENA ST. BUTUAN CITY
OWNER: ANTHONY TAN / CATHERINE CHEN OWNER
DRAWN BY: DATE: REV.
PUROK 2, BRGY. 2 BUENAVISTA AGUSAN DEL NORTE,
MANILA ADD: 18-J, SOUTH TOWER, ONE SHANG, SHANGRI-LA, MANDALUYANG LOCATION: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY ADRESS: P-13 B, BRGY. SAN VICENTE, BUTUAN CITY RENBERT JAMES MAY 15, 2020
A