KOFI-T&C Progress Report
KOFI-T&C Progress Report
A. Lighitng system
B2 Installation lighting system along staircase Basement 2 Not yet install lighting fixture all points Waiting installation lighting fixtures 70% 0% 0% 0%
C. Distribution Borad
Revision00
Installation Distribution board at Ground Floor, Complete pulling
Waiting EDC supply and Identified labelling for all cable in
GF main cable, all cable of lighting circuit, power socket, Air Waiting finishing 2nd Fix remaining works 80% 0% 0% 0%
distribution board.
conditioner system, All connection in board.
Installation Fire alarm system, Complete pulling cable for all each
Waiting install Control panel, all equipment of system, include
BF - 8F floor(From Basement 1 to 8th Floor), Complete Testing Insulation Waiting finishing 2nd Fix remaining works 20% 0% 0% 0%
smoke, Heat, alarm Bell, SCM, TRM etc.
and Continuity for Cable
E. CCTV System
F. Data System
G. Telephone System
H. MVAC System
Revision00
I. Plumbing System
Revision00