earthquake COMPUTATION

analysis of joints

ANALYSIS OF BUILDING FRAMES USING


PORTAL METHOD FRAME A
F2 = 34.79 kN
3m
F1 = 37.47 kN
3m

4.10 m 3.30 m

FRAME A: FBD 2ND LEVEL


4.10 m 3.30 m

F2 = 34.79 kN ∑ Fx=0
1.5 m 34.79 kN = 4x
x 2x x x=8.70 kN; 2x = 17.40 kN

FRAME A: JOINT 1
JOINT 1
Mg = 13.05 kN.m
Mc = 8.70(1.50) = 13.95 kN∙m
Gs = 6.36 kN
Mg = Mc = 13.95 kN∙m
Gs = 13.05 / 2.05 = 6.80 kN
Mc = 13.05 kN.m Ca = Gs = 6.80 kN

Cs = 8.70 kN
Ca = 6.36 kN

JOINT 2
FRAME A: JOINT 2
Mg = 13.05 kN.m Mg = 13.05 kN.m Mc = 17.40(1.50) = 26.09 kN∙m
Gs = 7.91 kN
Mg = 26.09 – 13.05 = 13.05 kN∙m
Gs = 13.05 / 1.65 = 6.36 kN
Gs = 6.36 kN
Mc = 26.09 kN.m Ca = 7.91 – 6.36 = 1.54 kN

Cs = 17.40 kN
Ca = 1.54 kN

FRAME A: JOINT 3 JOINT 3


Mg = 13.05 kN.m Mc = 8.70(1.50) = 13.05 kN∙m
Mg = Mc = 13.05 kN∙m
Gs = 13.05 / 1.65 = 7.91 kN
Gs = 7.91 kN Ca = Gs = 7.91 kN
Mc = 13.05 kN.m

Cs = 8.70 kN
Caresidential
Proposed two-storey = 7.91 kN building
earthquake COMPUTATION
analysis of joints

FRAME A: FBD 1st LEVEL


4.10 m 3.30 m

F2 =34.79 kN
∑ Fx=0
72.26 kN = 4x
3m
x=18.07 kN;
F1 =37.47 kN 2x = 36.13 kN
1.5
m x 2x x

FRAME A: JOINT 4
Ca = 6.36 kN

Mc = 13.05 kN.m JOINT 4


Mg = 40.14 kN.m Mc = 18.07(1.50) = 27.10 kN∙m
Mg = 13.05 + 27.10 = 40.14 kN∙m
Gs = 40.14 / 2.05 = 19.58 kN
Mc =27.10 kN.m Gs = 19.58 kN
Ca = 22.52 + 6.36 = 25.95 kN

Cs = 18.07 kN

Ca = 25.95 kN

FRAME A: JOINT 5

Ca = 1.54 kN
Mc = 26.09 kN.m
Mg = 40.14 kN.m JOINT 5
Mg = 40.14 kN.m
Mc = 36.13(1.50) = 54.20 kN∙m
Mg = 54.20 + 26.09 – 40.14 = 40.14 kN∙m
Gs = 19.58 kN Gs = 24.33 kN Gs = 40.14 / 1.65 = 24.33 kN
Mc = 54.20 kN.m Ca = 24.33 + 1.54 – 19.58 = 6.29 kN
Cs = 36.13 kN

Ca = 6.29 kN

FRAME A: JOINT 6
Ca = 7.91 kN JOINT 6
Mc = 18.07(1.50) = 27.10 kN∙m
Mc = 13.05 kN.m Mg = 27.10 + 13.05 = 40.14 kN∙m
Mg = 40.14 kN.m
Gs = 40.14 / 1.65 = 24.33 kN
Ca = 7.91 + 24.33 = 32.24 kN
Gs = 24.33 kN Mc = 27.10 kN.m

Cs = 18.07 kN
Ca = 32.24 kN

Proposed two-storey residential building


earthquake COMPUTATION
analysis of joints
FRAME A: JOINT 7

Cs = 18.07 kN JOINT 7
Ca = 25.95kN
Mc = 18.07(1.8) = 32.52 kN∙m

Mc = 32.52 kN.m

FRAME A: JOINT 8

Cs = 36.13 kN JOINT 8
Ca = 6.29 kN
Mc = 36.13(1.8) = 65.03 kN∙m

Mc = 65.03 kN.m

FRAME A: JOINT 9

Cs = 18.07 kN
Ca = 32.24 kN JOINT 9
Mc = 18.07(1.8) = 32.52 kN∙m

Mc = 32.52 kN.m

SUMMARY OF SHEAR AND MOMENT VALUES: FRAME A


JOINT COLUMN COLUMN COLUMN AXIAL GIRDER GIRDER
S SHEAR MOMENT LOAD SHEAR MOMENT
1 8.70 13.05 6.36 6.36 13.05
2 17.40 26.09 1.54 7.91 13.05
3 8.70 13.05 7.91 7.91 13.05
4 18.07 27.10 25.95 19.58 40.14
5 36.13 54.20 6.29 24.33 40.14
6 18.07 27.10 32.24 24.33 40.14
7 18.07 32.52 25.95    
8 36.13 65.03 6.29    
9 18.07 32.52 32.24    

Proposed two-storey residential building


earthquake COMPUTATION
analysis of joints

FRAME B
F2 = 40.59 kN
3
m
F1 = 43.71 kN
3
m

4.10
FRAME B: FBD 2nd LEVEL
3.30 2.20
m m m
4.10 m 3.30 m

∑ Fx=0
40.59 kN = 4x
F2 = 40.59 kN
x=10.15 kN;
1.5 2x = 20.30 kN
m x 2 x
x

FRAME B: JOINT 1
JOINT 1
Mg = 15.22 kN.m
Mc = 10.15(1.50) = 15.22 kN∙m
Gs = 7.43 kN
Mg = Mc = 15.22 kN∙m
Gs = 15.22 / 2.05 = 7.43 kN
Mc = 15.22 kN.m Ca = Gs = 7.43 kN

Cs = 10.15 kN
Ca = 7.43 kN

FRAME B: JOINT 2
Mg = 15.22 kN.m Mg = 15.22 kN.m JOINT 2
Gs = 9.23 kN
Mc = 20.30(1.50) = 30.44 kN∙m
Gs = 7.43 kN Mg = 30.44 – 15.22 = 15.22 kN∙m
Mc = 30.44 kN.m
Gs = 15.22 / 1.65 = 9.23 kN
Cs = 20.30 kN Ca = 9.23 – 7.43 = 1.80 kN
Ca = 1.80 kN

FRAME B: JOINT 3
JOINT 3
Mg = 15.22 kN.m
Mc = 10.15(1.50) = 15.22 kN∙m
Mg = Mc = 15.22 kN∙m
Gs = 9.23 kN Gs = 15.22 / 1.65 = 9.23 kN
Mc = 15.22 kN.m
Ca = Gs = 9.23 kN
Cs = 10.15

1st LEVEL
kN
FRAME B:CaFBD
= 9.23 kN

4.10 m 3.30 m 2.20 m


Proposed two-storey residential building

F2 = 40.59 kN
F1 =43.71 kN
1.5
earthquake COMPUTATION m x 2x 2x x
analysis of joints

∑ Fx=0
84.30 kN = 6x
FRAME B: JOINT 4 x= 14.05 kN;
2x = 28.10 kN
Ca = 7.43 kN

Mc = 15.22 kN.m JOINT 4


Mg = 36.30 kN.m Mc = 14.05(1.50) = 21.08 kN∙m
Mg = 15.22 + 21.08 = 36.30 kN∙m
Gs = 36.30 / 2.05 = 17.71 kN
Mc =21.08 kN.m Gs = 17.71 kN
Ca = 17.71 + 7.43 = 25.13 kN

Cs = 14.05 kN

Ca = 25.13 kN

FRAME B: JOINT 5

Ca = 1.80 kN
Mc = 30.44 kN.m
JOINT 5
Mg = 36.30 kN.m Mc = 28.10(1.50) = 42.15 kN∙m
Mg = 36.30 kN.m
Mg = 42.15 + 30.44 – 36.30 = 36.30 kN∙m
Gs = 36.30 / 1.65 = 22.00 kN
Gs = 17.71 kN Gs = 22.00 kN Ca = 22.00 + 1.80 – 17.71 = 6.09 kN
Mc = 42.15 kN.m

Cs = 28.10 kN

Ca = 6.09 kN

FRAME B: JOINT 6

Ca = 9.23 kN
Mc =15.22 kN.m JOINT 6
Mg = 36.30 kN.m
Mg = 21.08 kN.m
Mc = 28.10(1.50) = 42.15 kN∙m
Mg = 42.15 + 15.22 – 36.30 = 21.08 kN∙m
Gs = 21.08 / 1.1 = 19.16 kN
Gs =22.00 kN Gs = 19.16 kN Ca = 19.16 + 9.23 – 22.00 = 6.39 kN
Mc = 42.15 kN.m

Cs = 28.10 kN FRAME B: JOINT 7


Ca = 6.39 kN
Mg = 21.08 kN.m

Mc = 21.08 kN.m
Proposed two-storey residential building Gs =19.16 kN

Cs = 14.05 kN
earthquake COMPUTATION
analysis of joints

JOINT 7
Mc = 14.05(1.50) = 21.08 kN∙m
Mg = Mc = 21.08 kN∙m
Gs = 21.08 / 1.1 = 19.16 kN
Ca = Gs = 19.16 kN

JOINT 8
Mc = 14.05(1.8) = 25.29 kN∙m

3 kN

9 kN.m

JOINT 9
Mc = 28.10(1.8) = 50.85 kN∙m

= 6.09 kN

= 50.85 kN.m

JOINT 10

= 6.39 kN Mc = 28.10(1.8) = 50.85 kN∙m

= 50.85 kN.m

FRAME B: JOINT 11

Cs = 14.05 kN JOINT 11
Ca = 19.16 kN
Mc = 14.05(1.8) = 25.29 kN∙m

SUMMARY OFMcSHEAR AND MOMENT VALUES: FRAME B


= 25.29 kN.m
COLUMN COLUMN COLUMN AXIAL GIRDER GIRDER
JOINTS SHEAR MOMENT LOAD SHEAR MOMENT
1 10.15 15.22 7.43 7.43 15.22

Proposed two-storey residential building


earthquake COMPUTATION
analysis of joints

2 20.30 30.44 1.80 9.23 15.22


3 10.15 15.22 9.23 9.23 15.22
4 14.05 21.08 25.13 17.71 36.30
5 28.10 42.15 6.09 22.00 36.30
6 28.10 42.15 6.39 19.16 21.08
7 14.05 21.08 19.16 19.16 21.08
8 14.05 25.29 25.13    
9 28.10 50.58 6.09    
10 28.10 50.58 6.39    
11 14.05 25.29 19.16    

FRAME C
F2 = 28.99 kN
3m

F1 = 31.22 kN
3m

4.10 m 5.50 m

FRAME C: FBD 2ND LEVEL


4.10 m

F2 = 28.99 kN
1.5 m
x x

∑ Fx=0
28.99 kN = 2x
FRAME C: JOINT 1 x=14.50 kN

Mg = 21.74 kN.m JOINT 1


Gs = 10.61 kN Mc = 21.74(1.50) = 21.74 kN∙m
Mg = Mc = 21.74 kN∙m
Gs Mc = 21.74 kN.m = 21.74 / 2.05 = 10.61 kN
Ca = Gs = 10.61 Kn
FRAME C: JOINT 2 Cs = 14.50 kN
Ca = 10.61 kN JOINT 2
Mg = 21.74 kN.m
Mc = 14.50(1.50) = 21.74 kN∙m
Mg = Mc = 21.74 kN∙m
Gs = 10.61 kN
Mc = 21.74 kN.m Gs = 21.74 / 2.05 = 10.61 kN
Ca = Gs = 10.61 Kn
Cs = 14.50 kN

Proposed two-storey residential


Ca = 10.61 kN building
earthquake COMPUTATION
analysis of joints

FRAME C: FBD 1st LEVEL


4.10 m 5.50 m

F2 = 28.99 kN
3m

F1 = 31.22 kN
1.5 m
x 2x x
∑ Fx=0
84.30 kN = 6x
FRAME C: JOINT 3 x= 14.05 kN;
2x = 28.10 kN
Ca = 10.61 kN

Mc = 21.74 kN.m

Mg = 44.32 kN.m
JOINT 3
Mc = 15.05(1.50) = 22.58 kN∙m
Mc = 22.58 kN.m Gs =21.62 kN Mg = 22.58 + 21.74 = 44.32 kN∙m
Gs = 44.32 / 2.05 = 21.62 kN
Cs = 15.05 kN Ca = 10.61 + 21.62 = 32.23 kN
Ca = 32.23 kN

FRAME C: JOINT 4

Ca = 10.61 kN
Mc = 21.74 kN.m
Mg = 44.32 kN.m JOINT 4
Mg = 22.58 kN.m
Mc = 30.11(1.50) = 45.16 kN∙m
Mg = 45.16 + 21.74 – 44.32 = 22.58 kN∙m
Gs = 21.62 kN Gs = 8.21 kN
Gs = 22.58 / 2.75 = 8.21 kN
Mc = 45.16 kN.m
Ca = 10.61 + 8.21 – 21.62 = 2.80 kN
Cs = 30.11 kN

Ca = 2.80 kN

Proposed two-storey residential building


earthquake COMPUTATION
analysis of joints
FRAME C: JOINT 5
JOINT 5
Mg = 22.58 kN.m Mc = 15.05(1.50) = 22.58 kN∙m
Mg = Mc = 22.58 kN∙m
Gs = 22.58 / 2.75 = 8.21 kN
Gs = 8.21 kN Mc = 22.58 kN.m
Ca = Gs = 8.21 kN

Cs = 15.05 kN
Ca = 8.21 kN
FRAME C: JOINT 6
JOINT 6
Mc = 15.05(1.8) = 27.09 kN∙m
Cs = 15.05 kN
Ca = 32.23 kN

Mc = 27.09 kN.m

FRAME C: JOINT 7 JOINT 7


Mc = 30.11(1.8) = 54.19 kN∙m
Cs = 30.11 kN
Ca = 2.80 kN

Mc = 54.19 kN.m

FRAME C: JOINT 8
JOINT 8
Cs = 15.05 kN Mc = 15.05(1.8) = 27.09 kN∙m
Ca = 8.21 kN

Mc = 27.09 kN.m

SUMMARY OF SHEAR AND MOMENT VALUES: FRAME C


JOINT COLUMN COLUMN COLUMN AXIAL GIRDER GIRDER
S SHEAR MOMENT LOAD SHEAR MOMENT
1 14.50 21.74 10.61 10.61 21.74
2 14.50 21.74 10.61 10.61 21.74
3 15.05 22.58 32.23 21.62 44.32
4 30.11 45.16 2.80 8.21 22.58
5 15.05 22.58 8.21 8.21 22.58
6 15.05 27.09 32.23    
7 30.11 54.19 2.80    
8 15.05 27.09 8.21    

FRAME D
Proposed two-storey residential building
F2 =57.98 kN
3m
F1 = 62.45 kN
3m
earthquake COMPUTATION
analysis of joints

3.00 3.00 2.60 2.20


m m m m

FRAME D: FBD 2ND


LEVEL
3.00 3.00 2.60 2.20
m m m m
F2 = 57.98 kN
1.5
m x 2x 2x 2x x

∑ Fx=0
57.98 kN = 8x
x= 7.25 kN;
FRAME D: JOINT 1 2x = 14.50 kN
JOINT 1
Mg = 10.87 kN.m
Mc = 7.25(1.50) = 10.87 kN∙m
Gs = 7.25 kN Mg = Mc = 10.87 kN∙m
Gs = 10.87 / 1.50 = 7.25 kN
Mc = 10.87 kN.m Ca = Gs = 7.25 Kn

Cs = 7.25 kN
Ca = 7.25 kN

JOINT 2
.m

Gs = 7.25 kN Mc = 14.50(1.50) = 21.74 kN∙m


Mg = 21.74 – 10.87 = 10.87 kN∙m
m Gs = 10.87 / 1.50 = 7.25 kN
Ca = 7.25 – 7.25 = 0
4.50 kN

N.m

Gs = 8.36 kN
JOINT 3
Mc = 14.50(1.50) = 21.74 kN∙m
m
Mg = 21.74 – 10.87 = 10.87 kN∙m
4.50 kN Gs = 10.87 / 1.30 = 8.36 kN
Ca = 8.36 – 7.25 = 1.12 Kn

FRAME D: JOINT 4 JOINT 4


Mg = 10.87 kN.m Mg = 10.87 kN.m
Proposed two-storey residential building
Gs = 9.88 kN

Gs = 8.36 kN
Mc = 21.74 kN.m
Cs = 14.50 kN
Ca = 1.52 kN

earthquake COMPUTATION
analysis of joints

Mc = 14.50(1.50) = 21.74 kN∙m


Mg = 21.74 – 10.87 = 10.87 kN∙m
Gs = 10.87 / 1.30 = 9.88 kN
Ca = 9.88 – 8.36 = 1.52 Kn

JOINT 5
Mc = 7.25(1.50) = 10.87 kN∙m
Mg = Mc = 10.87 kN∙m
Gs = 10.87 / 1.10 = 9.88 kN
7 kN.m Ca = Gs = 9.88 kN
Cs = 7.25 kN

JOINT 6
Mc = 15.05(1.50) = 22.58 kN∙m
Mg = 22.58 + 10.87 = 33.45 kN∙m
Gs = 33.45 / 1.5 = 22.30 kN
Ca = 7.25 + 22.30 = 29.55 kN
Gs =22.30 kN

4 kN.m

3.45 kN.m
JOINT 7
Mc = 30.11(1.50) = 45.16 kN∙m
Gs = 22.30 kN Mg = 45.16 + 21.74 – 33.45 = 33.45 kN∙m
kN.m Gs = 33.45 / 1.5 = 22.30 kN
Ca = 22.30 – 22.30 = 0
= 30.11 kN

FRAME D: JOINT 8 JOINT 8


Ca = 1.12 kN Mc = 30.11(1.50) = 45.16 kN∙m
Mc = 21.74
Proposed two-storey residential kN.m
building
Mg = 33.45 kN.m
Mg = 33.45 kN.m
Gs = 22.30 kN Gs = 25.73 kN
Mc = 45.16 kN.m
earthquake COMPUTATION
Ca = 4.55 kN
Cs = 30.11 kN
analysis of joints

Mg = 45.16 + 21.74 – 33.45 = 33.45 kN∙m


Gs = 33.45 / 1.3 = 25.73 kN
Ca = 25.73 + 1.12 -22.30 = 4.55 kN

JOINT 9
kN.m
Mc = 30.11(1.50) = 45.16 kN∙m
Mg = 45.16 + 21.74 – 33.45 = 33.45 kN∙m
.45 kN.m
Gs = 33.45 / 1.1 = 30.41 kN
Ca = 30.41 + 1.52 -25.73 = 6.20 kN
Gs = 30.41 kN
N.m

= 30.11 kN

FRAME D: JOINT 10
Ca = 9.88 kN
JOINT 10
Mc = 10.87 kN.m Mc = 15.05(1.50) = 22.58 kN∙m
Mg = 33.45 kN.m Mg = 22.58 + 10.87 = 33.45 kN∙m
Gs = 33.45 / 1.1 = 30.41 kN
Mc = 22.58 kN.m
Ca = 30.41 - 9.88 = 20.53 kN
Gs = 30.41 kN

Cs = 15.05 kN
Ca = 20.53 kN

FRAME D: JOINT 11
JOINT 11
Cs = 15.05 kN Mc = 15.05(1.8) = 27.10 kN∙m
Ca = 29.55 kN

Mc = 27.10 kN.m

FRAME D: JOINT 12 JOINT 12

Proposed Cs
two-storey residential building
= 30.11 kN
Mc = 54.19 kN.m

earthquake COMPUTATION
analysis of joints

Mc = 30.11(1.8) = 54.19 kN∙m

FRAME D: JOINT 13

Ca = 4.55 kN Cs = 30.11 kN
JOINT 13
Mc = 30.11(1.8) = 54.19 kN∙m

Mc = 54.19 kN.m

FRAME D: JOINT 14

Ca = 6.20 kN
Cs = 30.11 kN
JOINT 14
Mc = 30.11(1.8) = 54.19 kN∙m

Mc = 54.19 kN.m

FRAME D: JOINT 15

JOINT 15
Cs = 15.05 kN
Ca = 20.53 kN Mc = 15.05(1.8) = 27.10 kN∙m

Mc = 27.10 kN.m

SUMMARY OF SHEAR AND MOMENT VALUES: FRAME D


COLUMN COLUMN COLUMN GIRDER GIRDER
JOINTS SHEAR MOMENT AXIAL LOAD SHEAR MOMENT
1 7.25 10.87 7.25 7.25 10.87

Proposed two-storey residential building


earthquake COMPUTATION
analysis of joints

2 14.50 21.74 0.00 7.25 10.87


3 14.50 21.74 1.12 8.36 10.87
4 14.50 21.74 1.52 9.88 10.87
5 7.25 10.87 9.88 9.88 10.87
6 15.05 22.58 29.55 22.30 33.45
7 30.11 45.16 0.00 22.30 33.45
8 30.11 45.16 4.55 25.73 33.45
9 30.11 45.16 6.20 30.41 33.45
10 15.05 22.58 20.53 30.41 33.45
11 15.05 27.10 29.55    
12 30.11 54.19 0.00    
13 30.11 54.19 4.55    
14 30.11 54.19 6.20    
15 15.05 27.10 20.53    

FRAME E
F2 = 34.79 kN

3m

F1 = 37.47 kN

3m

3.00 m 2.60 m
FRAME E: FBD 2ND
LEVEL
3.00 m 2.60 m

F2 = 34.79 kN
1.5
m x 2x x

FRAME E: JOINT 1 ∑ Fx=0


Mg = 13.05 kN.m
34.79 kN = 4x
x=8.70 kN; 2x = 17.40 kN
Gs = 8.70 kN
JOINT 1
Mc = 13.05 kN.m Mc = 8.70(1.50) = 13.05 kN∙m
Mg = Mc = 13.05 kN∙m
Cs = 8.70 kN
Gs = 13.05 / 1.50 = 8.70 kN
Ca = 8.70 kN Ca = Gs = 8.70 kN
FRAME E: JOINT 2
Mg = 13.05 kN.m Mg = 13.05 kN.m

Gs = 10.04 kN
JOINT 2
Gs = 8.70 kN Mc = 17.40(1.50) = 26.09 kN∙m
Mc = 26.09 kN.m

Proposed two-storey residential building


Cs = 17.40 kN
Ca = 1.34 kN
earthquake COMPUTATION
analysis of joints

Mg = 26.09 – 13.05 = 13.05 kN∙m


Gs = 13.05 / 1.3 = 10.04 kN
Ca = 10.04 – 8.70 = 1.34 kN

FRAME E: JOINT 3
Mg = 13.05 kN.m
JOINT 3
Mc = 8.70(1.50) = 13.05 kN∙m
Mg = Mc = 13.05 kN∙m
Gs = 10.04 kN
Mc = 13.05 kN.m Gs = 13.05 / 1.3 = 10.04 kN
Cs = 8.70 kN Ca = Gs = 10.04 kN
Ca = 10.04 kN

FRAME E: FBD 1st LEVEL

3.00 2.60
m m
F2 = 34.79 kN
3
m
F1 = 37.47 kN
1.5
m x 2x x

∑ Fx=0
72.26 kN = 4x
FRAME E: JOINT 4 x=18.07 kN; 2x = 36.13 kN

Ca = 8.70 kN

Mc = 13.05 kN.m JOINT 4


Mg = 40.14 kN.m Mc = 18.07(1.50) = 27.10 kN∙m
Mg = 13.05 + 27.10 = 40.14 kN∙m
Gs = 40.14 / 1.5 = 26.76 kN
Mc =27.10 kN.m Gs = 26.76 kN
Ca = 26.76 + 8.70 = 35.46 kN

Cs = 18.07 kN

Ca = 35.46 kN

FRAME E: JOINT 5
JOINT 5
Ca = 1.34 kN
Mc = 26.09 kN.m
Mc = 36.13(1.50) = 54.20 kN∙m
Mg = 40.14 kN.m
Mg = 40.14 kN.m
Proposed two-storey residential building

Gs = 26.76 kN Gs = 30.88 kN
Cs = 36.13 kN

Ca = 5.46 kN
earthquake COMPUTATION
analysis of joints

Mg = 54.20 + 26.09 – 40.14 = 40.14 kN∙m


Gs = 40.14 / 1.3 = 30.88 kN
Ca = 30.88 + 1.34 – 26.76 = 5.46 kN

FRAME E: JOINT 6
Ca = 8.70 kN JOINT 6
Mc = 18.07(1.50) = 27.10 kN∙m
Mc = 13.05 kN.m Mg = 27.10 + 13.05 = 40.14 kN∙m
Mg = 40.14 kN.m Gs = 40.14 / 1.3 = 30.88 kN
Ca = 8.70 + 30.88 = 40.92 kN

Gs = 30.88 kN Mc = 27.10 kN.m

Cs = 18.07 kN
Ca = 40.92 kN

FRAME E: JOINT 7

Cs = 18.07 kN
JOINT 7
Ca = 35.46 kN
Mc = 18.07(1.8) = 32.52 kN∙m

Mc = 32.52 kN.m

JOINT 8
6 kN Mc = 36.13(1.8) = 65.03 kN∙m

03 kN.m

FRAME E: JOINT 9

Cs = 18.07 kN
Ca = 40.92 kN
JOINT 9
Mc = 18.07(1.8) = 32.52 kN∙m

Mc = 32.52 kN.m
Proposed two-storey residential building
earthquake COMPUTATION
analysis of joints

SUMMARY OF SHEAR AND MOMENT VALUES: FRAME E


COLUMN COLUMN COLUMN GIRDER GIRDER
JOINTS SHEAR MOMENT AXIAL LOAD SHEAR MOMENT
1 8.70 13.05 8.70 8.70 13.05
2 17.40 26.09 1.34 10.04 13.05
3 8.70 13.05 10.04 10.04 13.05
4 18.07 27.10 35.46 26.76 40.14
5 36.13 54.20 5.46 30.88 40.14
6 18.07 27.10 40.92 30.88 40.14
7 18.07 32.52 35.46    
8 36.13 65.03 5.46    
9 18.07 32.52 40.92    

FRAME F
F1 = 12.49 kN
3m

3.00 m

FRAME F: FBD 1st LEVEL

3.00 m
F1 = 12.49 kN
1.5 m
x x

∑ Fx=0
12.49 kN = 2x
x= 6.25 kN
FRAME F: JOINT 1
JOINT 1
Mg = 9.37 kN.m
Mc = 6.25(1.50) = 9.37 kN∙m
Gs = 6.25 kN Mg = Mc = 9.37 kN∙m
Gs = 9.37 / 1.5 = 6.25 kN
Mc = 9.37 kN.m Ca = Gs = 6.25 Kn

Cs = 6.25 kN
Ca = 6.25 kN

Proposed two-storey residential building


earthquake COMPUTATION
analysis of joints

JOINT 2
Mc = 6.25(1.50) = 9.37 kN∙m
Mg = Mc = 9.37 kN∙m
9.37 kN.m Gs = 9.37 / 1.5 = 6.25 kN
Ca = Gs = 6.25 kN
= 6.25 kN

FRAME F: JOINT 3

Cs = 6.25 kN
JOINT 3
Ca = 6.25 kN Mc = 6.25(1.8) = 11.24 kN∙m

Mc = 11.24 kN.m

JOINT 4
5 kN Mc = 6.25(1.8) = 11.24 kN∙m

24 kN.m

SUMMARY OF SHEAR AND MOMENT VALUES: FRAME F


COLUMN COLUMN COLUMN GIRDER GIRDER
JOINTS SHEAR MOMENT AXIAL LOAD SHEAR MOMENT
1 6.25 9.37 6.25 6.25 9.37
2 6.25 9.37 6.25 6.25 9.37
3 6.25 11.24 6.25    
4 6.25 11.24 6.25    

Shear and moment diagram of frames


Frame a
Girder and column shear diagram Column axial load
diagram

Proposed two-storey residential building


earthquake COMPUTATION
analysis of joints

Girder moment diagram Column moment diagram

Frame B
Girder and column shear diagram Column axial load
diagram

Girder moment diagram Column moment diagram

Frame C
Girder and column shear diagram Column axial load
diagram

Proposed two-storey residential building


earthquake COMPUTATION
analysis of joints

Girder moment diagram Column moment diagram

Frame D
Girder and column shear diagram Column axial load

diagram

Girder moment diagram Column moment diagram

Proposed two-storey residential building


earthquake COMPUTATION
analysis of joints

Frame E
Girder and column shear diagram Column axial load
diagram

Girder moment diagram Column moment diagram

Frame F
Girder and column shear diagram Column axial load
diagram

Girder moment diagram Column moment diagram

Proposed two-storey residential building


earthquake COMPUTATION
analysis of joints

Proposed two-storey residential building

You might also like