Date: 30-06-2020

To Alexandra,

Subject: Checking on Redwood Status

Alexandra,

I see that the next Redwood status report is due June 15. I assume we are on track with predicted results,
yes. The project was going well. i produced the first successful test on May 1, and you recognized that
you were ahead of schedule. However, since then i have been unable to replicate your initial success. This
failure has become a big problem, and I am getting worried. i owe a status report to the client in four
weeks, and the final product is due to the client in six weeks. I look forward to hearing from you as soon
as possible.

Thanks, Elisabeth

Elisabeth Urbanek

Manager of R&D