Door Schedule Window Schedule: Label D1 D2 D3 D4 D5 Label W1 W2 V1
Door Schedule Window Schedule: Label D1 D2 D3 D4 D5 Label W1 W2 V1
Door Schedule Window Schedule: Label D1 D2 D3 D4 D5 Label W1 W2 V1
LABEL D1 D2 D3 D4 D5
LABEL W1 W2 V1 1. ALL DIMENSIONS TO BE CHECKED ON SITE , WRITTEN DIMENSIONS TO BE
FOLLOWED IN PREFFERENCE TO THE SCALE DIMENSIONS
ELEVATION
2. ALL WALLS LESS THAN 200mm THICK TO BE REINFORCED WITH HOOP
DESCRIPTION Steel casement and glazed Steel casement and glazed Steel louvred ELEVATION IRON AT
with PVO EVERY ALTERNATE COURSE
07 13 05 DESCRIPTION Steel casement and Hard wood paneled door Steel casement and Steel casement with free Ledged braced and
QUANTITY glazed/pvo glazed/pvo panes battened 4. ALL WINDOWS AND EXTERNAL GLASSED DOORS TO HAVE BURGLAR
PROOFING
DIMENSIONS 1200 X 2400 900 X 2100 900 X 2400 900 X 2100 750 X 2100
TO THE ARCHITECTS DETAILS
(LXH)
QUANTITY 07 06 02 02 05 5. ALL DOOR FRAMES TO BE REBATED AND MOULDED AND FULL WIDTH OF
WALL
WITH MOULDED ARCHITRAVES TO DETAIL, PROVIDE RUBBER STOPS TO
ALL
965
steel steel plate DOORS
1,194
plate
11. THE TRUSSES, ROOF FRAMES, AND PURLINS TO BE PAINTED WITH TWO
COATS OF OIL PAINT
19,100
200 3,200 200 3,200 200 1,300 200 3,200 200 2,500 200 4,300 200
1,176 1,500 1,969 1,500 921 1,200 1,182 1,500 2,379 900 3,423 900 551
200
75x50mm purlins on A B
3,600
3,200
(CHILDREN)
D2 D2
100x75mm wall plates and ELEVATION E
200
1,200
D1 D2
CEILING
2,301
W2 ROOF NOTES
CONSELLING brandering at 600mm c/c
G.C.I.sheetspitched at FRONT SIDE EAST SIDE B) GRANO
3,300
3,700
ROOM
D1 250 nailed on Scale:1:100 Scale:1:100 C) CERAMIC TILES
(WOMEN) W1 H
D) TERRAZZO
1,602
75x50mm purlins on
100x50mm rafters with E) WOOD BLOCKS
100x50mm struts on F) CARPET
W1
200
B G) PVC
1,500
1,500
200
18,800
D1
15,200
CEILING
3,100
W2 W2 NATURAL VARNISH
metal lathe plastered ceiling on 50x100mm
604
1,526
7,800
1,500
W2 E) GLOSS PAINT
10,400
G
E F) CERAMIC TILES
2,102
G) GRANO
1,530
3,100
150mm thick concrete loor slab on Scale:1:100 Scale:1:100
804
1,500
200
W2 CEILINGS A) ROOF EXPOSED
200mm well compacted hardcore on D2
well compacted murram B) PAINTED SOFT WOOD
1,500
D1
230mm thick plinth walls C) PAINTED PLASTERD ON METAL LATHE
2,000
1,598
STORE
1,500 50mm sand blinding D) ARMSTRONG SUSPENDED CEILING
729
690x230mm foundation base D1 150 150 150 150 150 150 E) PLASTER AND PAINT
200
200
depth of foundation to be determined from site
FOUNDATION CONSTRUCTION Q
25mm cement sand screed on V V V V V
1,009 1,500 2,072 1,500 3,333 1,500 CROSS SECTION K-K 200 3,056 200 2,744 200 150mm thick concrete loor slab on WALLS A) PLASTER AND PAINT
B) CERAMIC TILES UPTO 2100mm/ PLASTER
1,500
6,400 200mm well compacted hardcore on
Scale 1:100 D4 AND PAINT UPTO CEILING HEIGHT
2,950
200 3,200 200 4,700 200 3,200 200 7,200 well compacted murram D5 D5 D5 D5 D5 D4
F 230mm thick plinth walls C) EXPOSED FAIR FACED BRICKS
1,000
50mm sand blinding FEMALE MALE D) WALL PAPER
690x230mm foundation base E) PRE CAST CONC. PERFORATIONS
C GROUND PLAN depth of foundation to be determined from site Q F) CLAY BRICKS PERFORATIONS
GROUND PLAN Scale 1:100
4,050 150
7,791
3,291
PROJECT: CLIENT: DRAWING TITLE: GENERAL NOTES DATE SIGN REVISION Drawn by: A.G Checked by:
proposed community Library and administrative
Kabale Women in Development. Floor plan, Cross section, Elevations and 0782 365 301/0754 365 301
building to be built at Kachiro Village, Kamwezi Sub Window and Door schedule Scale: 1:100 Date: Nov/2016
P.O BOX 894, KABALE
county, Kabale District Sheet no: