Door Schedule Window Schedule: Label D1 D2 D3 D4 D5 Label W1 W2 V1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

WINDOW SCHEDULE DOOR SCHEDULE NOTES.

LABEL D1 D2 D3 D4 D5
LABEL W1 W2 V1 1. ALL DIMENSIONS TO BE CHECKED ON SITE , WRITTEN DIMENSIONS TO BE
FOLLOWED IN PREFFERENCE TO THE SCALE DIMENSIONS

ELEVATION
2. ALL WALLS LESS THAN 200mm THICK TO BE REINFORCED WITH HOOP
DESCRIPTION Steel casement and glazed Steel casement and glazed Steel louvred ELEVATION IRON AT
with PVO EVERY ALTERNATE COURSE

DIMENSIONS 1500 X 1500 1200 X 1500 500 X 500


3. ALL REINFORCED WORKS TO BE IN ACCORDANCE WITH STRUCTURAL
(LXH) ENGINEER'S DETAILS

07 13 05 DESCRIPTION Steel casement and Hard wood paneled door Steel casement and Steel casement with free Ledged braced and
QUANTITY glazed/pvo glazed/pvo panes battened 4. ALL WINDOWS AND EXTERNAL GLASSED DOORS TO HAVE BURGLAR
PROOFING
DIMENSIONS 1200 X 2400 900 X 2100 900 X 2400 900 X 2100 750 X 2100
TO THE ARCHITECTS DETAILS
(LXH)
QUANTITY 07 06 02 02 05 5. ALL DOOR FRAMES TO BE REBATED AND MOULDED AND FULL WIDTH OF
WALL
WITH MOULDED ARCHITRAVES TO DETAIL, PROVIDE RUBBER STOPS TO
ALL

965
steel steel plate DOORS

1,194
plate

6. ALL INTERNAL PLASTER TO BE TWO COATS AND TO BE FINISHED WITH A


TYPICAL BOUNDARY WALL ELEVATION 92 690
STEEL FLOAT
WALL BOUNDARY
ELEVATION B SECTION
7. ALL PAINTS TO BE IN 3 COATS
ELEVATION D 3,000 3,000
Scale 1:100 Scale 1:100
4,000 230 8. A SPLASH APRON OF 500mm ALONG THE PERIMETER OF THE BUILDING
GATE concrete
coping
BOUNDARY WALL PLAN 9. SAMPLES OF FITTINGS, MATERILAS ETC... TO BE PRODUCED AND
APPROVED
BEFORE COMMENCING WORK

10. ALL WINDOWS HAVE SILLS BUILT IN REIFORCED CONCRETE

11. THE TRUSSES, ROOF FRAMES, AND PURLINS TO BE PAINTED WITH TWO
COATS OF OIL PAINT

12. FIRE PROTECTION EQUIPMENT TO BE PROVIDED AND INSTALLED BY


BUILDING
ELEVATION G ELEVATION H FIRE CONSULTANTS AND AS GUIDED BY THEM.
ELEVATION C
Scale 1:100 Scale 1:100
Scale 1:100 ( ANY DESCRIPANCY SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT)
ELEVATION A
Scale 1:100 SECTION Q-Q
Scale:1:100
D

19,100

200 3,200 200 3,200 200 1,300 200 3,200 200 2,500 200 4,300 200

1,176 1,500 1,969 1,500 921 1,200 1,182 1,500 2,379 900 3,423 900 551

ROOF NOTES INTERNAL FINISHES


W1 W1 W1 G.C.I.sheetspitched at
D1 D3 D3 250 nailed on FLOORS SKIRTINGS
200

200

75x50mm purlins on A B

CONSELLING 100x50mm rafters with C D


PROGRAMM
3,200

3,600

3,200

ROOM EXECUTIVE STORE 100x50mm struts on WALLS CEILINGS


OFFICER
DIRECTOR 150x50mm double tie beams on ELEVATION F
5,062

(CHILDREN)
D2 D2
100x75mm wall plates and ELEVATION E
200

D2 D2 200x25mm fascia boards. Scale 1:100


Scale 1:100
200
1,200

1,200

D1 D2
CEILING
2,301

D2 metal lathe plastered ceiling on 50x100mm


RECEPTION ACCOUNTS
200

OFFICE treated timber joists and 50x50mm FLOORS A) CEMENT SCREED


1,500

W2 ROOF NOTES
CONSELLING brandering at 600mm c/c
G.C.I.sheetspitched at FRONT SIDE EAST SIDE B) GRANO
3,300

3,700

ROOM
D1 250 nailed on Scale:1:100 Scale:1:100 C) CERAMIC TILES
(WOMEN) W1 H
D) TERRAZZO
1,602

75x50mm purlins on
100x50mm rafters with E) WOOD BLOCKS
100x50mm struts on F) CARPET
W1
200

B G) PVC
1,500
1,500

W2 W2 150x50mm double tie beams on

200
18,800

A D1 100x75mm wall plates and H) PRECAST CONCRETE PAVERS


K K
632

CONFERENCE HALL 200x25mm fascia boards.


1,443

SKIRTINGS A) EX 125 X 25mm HARD WOOD WITH


1,200

D1
15,200

CEILING
3,100

W2 W2 NATURAL VARNISH
metal lathe plastered ceiling on 50x100mm
604
1,526

W2 treated timber joists and 50x50mm


B) EX 125 X 25mm HARD WOOD PAINTED
C) PVC

7,800
1,500

W2 brandering at 600mm c/c


S W2 LIBRALY S D) EX 125 X 25mm CEMENT SCREED
1,538
10,100

W2 E) GLOSS PAINT

10,400
G
E F) CERAMIC TILES
2,102

G) GRANO
1,530

W2 FOUNDATION CONSTRUCTION W2 W2 H) TERRAZO


25mm cement sand screed on REAR SIDE WEST SIDE

3,100
150mm thick concrete loor slab on Scale:1:100 Scale:1:100
804

1,500

200
W2 CEILINGS A) ROOF EXPOSED
200mm well compacted hardcore on D2
well compacted murram B) PAINTED SOFT WOOD
1,500

D1
230mm thick plinth walls C) PAINTED PLASTERD ON METAL LATHE

2,000
1,598

STORE
1,500 50mm sand blinding D) ARMSTRONG SUSPENDED CEILING
729

690x230mm foundation base D1 150 150 150 150 150 150 E) PLASTER AND PAINT
200

900 900 900 900 900 1,000 1,091


F) HARD WOOD T & G STRIPS

200
depth of foundation to be determined from site
FOUNDATION CONSTRUCTION Q
25mm cement sand screed on V V V V V

1,009 1,500 2,072 1,500 3,333 1,500 CROSS SECTION K-K 200 3,056 200 2,744 200 150mm thick concrete loor slab on WALLS A) PLASTER AND PAINT
B) CERAMIC TILES UPTO 2100mm/ PLASTER

1,500
6,400 200mm well compacted hardcore on
Scale 1:100 D4 AND PAINT UPTO CEILING HEIGHT

2,950
200 3,200 200 4,700 200 3,200 200 7,200 well compacted murram D5 D5 D5 D5 D5 D4
F 230mm thick plinth walls C) EXPOSED FAIR FACED BRICKS

1,000
50mm sand blinding FEMALE MALE D) WALL PAPER
690x230mm foundation base E) PRE CAST CONC. PERFORATIONS
C GROUND PLAN depth of foundation to be determined from site Q F) CLAY BRICKS PERFORATIONS
GROUND PLAN Scale 1:100
4,050 150
7,791
3,291

Scale 1:100 CROSS SECTION S-S GROUND PLAN


Scale 1:100 Scale 1:100

PROJECT: CLIENT: DRAWING TITLE: GENERAL NOTES DATE SIGN REVISION Drawn by: A.G Checked by:
proposed community Library and administrative
Kabale Women in Development. Floor plan, Cross section, Elevations and 0782 365 301/0754 365 301

building to be built at Kachiro Village, Kamwezi Sub Window and Door schedule Scale: 1:100 Date: Nov/2016
P.O BOX 894, KABALE
county, Kabale District Sheet no:

GSPublisherVersion 0.1.100.100

You might also like