Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

T.B.P.E.

Registration # F-9361

REVIEW OF SUBMITTAL

DATE RECEIVED: November 12, 2019


PROJECT: Legend Oaks Business Park
LOCATION: Austin, Texas
DESCRIPTION: Column Reinforcing
ARCH NO: 17175
REVIEWED BY: Nicholas Rohr

Submit Specific
Reviewed Item

Furnish
Revise and Resubmit X as Corrected

Review is only for general conformance with the design concept of


the project and general compliance with the information included in
the Contract Documents. Contractor shall be solely responsible for
compliance with all Contract Documents, including, but not limited
to drawings and specifications, manufacturer’s instructions, Owner
directions, Codes, and Building official directions. Contractor is
solely responsible for correlating and confirming dimensions at the
job site, choice of fabrication processes and techniques of
construction: coordination of construction: coordination of his work
with that of other trades: and performing the work in a safe
satisfactory manner.

Arch Consulting Engineers, PLLC


510 South Congress Ave. Suite B-100 •Austin, TX• 78704
Phone (512) 328-5353
www.archce.net

Date: 2019-11-20 By: Nicholas Rohr

NOTES:
- Approved as Noted

510 South Congress Suite B-100 Austin, TX 78704


512 328 5353 Phone www.archce.net
Submittal #033100-6.0

Cadence McShane Construction Company LLC Project: 02-9232 - Legend Oaks Phase II


1221 S. Mopac Expressway, Suite 250 5701 W. William Cannon Drive
Austin, Texas 78746 Austin, Texas 78749
Phone: (512) 328-1411 
Fax: (512) 328-1432

Concrete Reinforcement - Column Shop Drawings


SPEC SECTION: 033100 - CONCRETE WORK   CREATED BY:  
STATUS:  Open DATE CREATED: 11/08/2019 

ISSUE DATE: 11/08/2019   REVISION: 0

RESPONSIBLE TAS Commercial Concrete Construction, LLC RECEIVED FROM: Scott Kearsing


CONTRACTOR:
BALL IN COURT:
Gwendolyn Gates (Carlson, Brigance & Doering, Inc.), Ellen Hunt (Ellen Hunt + Katheryn Lott Architects), Katheryn Lott (Ellen Hunt + Katheryn
Lott Architects)
DISTRIBUTION:
Tyler Stone (Cadence McShane Construction Company LLC) , Corey Homeier (Cadence McShane Construction Company LLC) , Tyler Earle
(Cadence McShane Construction Company LLC)
DESCRIPTION:
Shop drawings for concrete column reinforcement details
ATTACHMENTS:

 
SUBMITTAL WORKFLOW
SUBMITTER/ RETURNED
# NAME SENT DATE DUE DATE RESPONSE ATTACHMENTS COMMENTS
APPROVER DATE

1  Gwendolyn Gates Approver  11/22/2019 Pending

2  Ellen Hunt Approver  11/22/2019 Pending

3  Katheryn Lott Approver  11/22/2019 Pending

Cadence McShane Construction Company Page 1 of 2 Printed On: 11/08/2019  05 :10 PM


LLC
Submittal Cover Sheet
Date: 11/4/2019
Project Name: Legend Oaks TAS Job No. 70192
Location: 5701 W. William Cannon Drive TAS PM: Aaron Golden
Austin, TX 78749 agolden@tasconcrete.com
TAS PA: Krista Miller
kmiller@tasconcrete.com
G.C. : Cadence McShane
Submittal Item: Reinforcing-Columns
Spec. Section:
Submittal No. 2
Building Solid Solutions Since 1980

Contents:
RC-01(00.00) - Columns

Remarks: For review and approval.

Approval Stamps
3" O.C. 3" O.C. 3" O.C.

5" O.C.

5" O.C. 5" O.C.

Structural:
1 1/2" clear cover
1. Please confirm the typ. dimensions of cover at top & sides for reinforcement. for columns above
- The drawings specify top cover @ 1 1/2" and side cover @ 2" for Formed Faced Concrete. grade okay

2. Please confirm the specified top ties & links.


- The schedule on S0.3 calls for #4 ties @ 5" O.C.

GL Location: GL Location:
A.1 / 5.9 GL Location: C.9 / 5.9
B / 5.9 C/5 C / 5.9
C.9 / 5

3" O.C. 3" O.C. 3" O.C.

Reviewed
Submit Specific
Item
5" O.C.
5" O.C.
Rejected xX Furnish
as Corrected 5" O.C.
Review is only for general conformance with the design concept of
the project and general compliance with the information included in
the Contract Documents. Contractor shall be solely responsible for
compliance with all Contract Documents, including, but not limited
to drawings and specifications, manufacturer’s instructions, Owner
directions, Codes, and Building official directions. Contractor is
solely responsible for correlating and confirming dimensions at the
job site, choice of fabrication processes and techniques of
construction: coordination of construction: coordination of his work
with that of other trades: and performing the work in a safe
satisfactory manner.

Arch Consulting Engineers, PLLC


510 South Congress Ave. Suite B-100 •Austin, TX• 78704
Phone (512) 328-5353
www.archce.net

2019-11-20
Date: January 26, 2018 By:

3" O.C. 3" O.C. 3" O.C. 3" O.C. 3" O.C.
3" O.C.

5" O.C.
5" O.C. 5" O.C.

5" O.C. 5" O.C.


5" O.C.

GL Location:
C.9 / 4 GL Location:
A.1 / 5 A.1 / 3 GL Location:
A.1 / 4 C.9 / 3 A.1 / 2

Ref. Civil Elevations at each


Column Location for Top of
Slab / Top of Pier
Elevations.

VARIES
EL. 98'-0" T/G.B.
COORDINATE
WITH CIVIL SPOT
ELEVATIONS

GL Location:
B/5
C/4
GL Location: GL Location: B/4
GL Location: A.1 / 1.1 GL Location: GL Location: C.9 / 1.1 C/3
A.1 / 1.4 B / 1.1 B / 1.4 C.9 / 2 C / 1.1 B/3
C/2
B/2

You might also like