Four laning/ Two Laning with paved shoulder from Km 0.000 to Km 83.

453 of
Dausa - Lalsot - Kauthun section of NH-11A Extn.

Balance Work Punch List -2020


S.No Carriageway Activity Chainage Side Length Start Date Finish Date Remark
1 MCW Drain 2+045 2+130 LHS 85
2 MCW Drain 2+360 2+415 LHS 55
3 MCW Drain 2+724 2+734 LHS 10
4 MCW Drain 2+924 2+930 LHS 6
5 MCW Drain 3+090 3+120 LHS 30 Widening
6 MCW Drain 3+240 3+250 LHS 10
7 MCW Drain 3+280 3+320 LHS 40 Widening
8 MCW Drain 3+334 3+350 LHS 16 Widening
9 MCW Drain 3+360 3+435 LHS 75 Widening
10 MCW Drain 3+600 3+607 LHS 7
11 MCW Drain 3+982 3+990 LHS 8
12 MCW Drain 4+190 4+197 LHS 7
13 MCW Drain 4+330 4+430 LHS 100 Widening
14 MCW Drain 4+600 4+660 LHS 60 Widening
15 MCW Drain 4+730 4+800 LHS 70 Widening
16 MCW Drain 4+675 4+790 RHS 115 Slab Widening
17 MCW Drain 4+180 4+236 RHS 56 Drain Slab
18 MCW Drain 3+520 3+525 RHS 5 Drain Slab
19 MCW Drain 2+998 3+185 RHS 187 Drain Slab Widening
20 MCW Drain 2+502 2+512 RHS 10 Drain Slab
21 MCW Drain 2+045 2+130 RHS 85 Drain Slab
22 MCW Drain 6+940 7+060 LHS 120 Drain Slab
23 MCW Drain 7+578 7+585 LHS 7 Drain
Four laning/ Two Laning with paved shoulder from Km 0.000 to Km 83.453 of
Dausa - Lalsot - Kauthun section of NH-11A Extn.

Balance Work Punch List -2020


S.No Carriageway Activity Chainage Side Length Start Date Finish Date Remark
24 MCW Drain 8+773 8+888 RHS 115 Drain Slab
25 MCW Drain 8+477 8+484 RHS 7 Drain Slab
26 MCW Drain 8+397 8+477 RHS 80 Drain Slab Widening
27 MCW Drain 8+383 8+397 RHS 14 Drain
28 MCW Drain 8+117 8+383 RHS 266 Drain Slab Widening
29 MCW Drain 8+058 8+117 RHS 59 Drain Slab
30 MCW Drain 8+056 8+058 RHS 2 Drain Slab Widening
31 MCW Drain 7+460 7+568 RHS 108 Drain
32 MCW Drain 7+137 7+148 RHS 11 Drain
33 MCW Drain 7+151 7+158 RHS 7 Drain
34 MCW Drain 6+240 6+377 RHS 137 Drain
35 MCW Drain 6+192 6+225 RHS 33 Drain
36 MCW Drain 6+146 6+168 RHS 22 Drain
37 MCW Drain 5+939 5+948 RHS 9 Drain
38 MCW Drain 5+928 5+939 RHS 11 Drain Slab
39 MCW Drain 5+738 5+749 RHS 11 Drain
40 MCW Drain 18+496 18+506 RHS 10 Drain
41 MCW Drain 27+675 27+800 RHS 125 Drain
42 MCW Drain 27+980 28+000 RHS 20 Work in Progress
43 MCW Drain 23+900 23+980 LHS 80 Drain
44 MCW Drain 24+490 24+620 LHS 130 Drain
45 MCW Drain 23+860 23+900 RHS 40 Drain
46 MCW Drain 24+220 24+583 RHS 363 Drain
Four laning/ Two Laning with paved shoulder from Km 0.000 to Km 83.453 of
Dausa - Lalsot - Kauthun section of NH-11A Extn.

Balance Work Punch List -2020


S.No Carriageway Activity Chainage Side Length Start Date Finish Date Remark

Total 2824
Four laning/ Two Laning with paved shoulder from Km 0.000 to Km 83.453 of
Dausa - Lalsot - Kauthun section of NH-11A Extn.

Balance Work Punch List -2020


S.No Carriageway Activity Chainage Side Length Start Date Finish Date Remark
Hindrance Land
1 MCW Drain 3+770 3+830 RHS 60 Hindrance (Ma
2 MCW Drain 6+456 6+540 RHS 84 Hindrance (Joshi
6 MCW Drain 28+080 28+120 RHS 40 Hindrance Lan
12 MCW Drain 54+250 54+270 RHS 20 Hindrance Lan
13 MCW Drain 23+630 23+855 LHS 225 Hindrance Lan
MCW Drain 24+583 24+900 RHS 317 Hindrance Lan
13 Total 746
Four laning/ Two Laning with paved shoulder from Km 0.000 to Km 83.453 of
Dausa - Lalsot - Kauthun section of NH-11A Extn.

Balance Work Punch List -2020


S.No Carriageway Activity Chainage Side Length M-15 Qty of concrete in CUM M-25 Qty of concrete in CUM
1 EXISITING NH11 Drain 0+000 0+250 250 40.000 148.500
2 RAMP 1 Drain 0+215 0+405 RHS 190 30.400 112.860
3 RAMP2 Drain 0+210 0+500 LHS 290 46.400 172.260
4 SEMI DIRECTION RAMP Drain 0+100 0+340 240 38.400 126.720
5 LOOP1 Drain 0+340 0+480 140 22.400 80.080
MOUNTABLE DRAIN Drain 0+320 0+350 LHS 30 4.800 27.000
1 MCW Drain 7+578 7+585 LHS 7 1.120 3.696
2 MCW Drain 8+383 8+397 RHS 14 2.240 7.392
3 MCW Drain 7+460 7+568 RHS 108 17.280 57.024
4 MCW Drain 7+137 7+148 RHS 11 1.760 5.808
5 MCW Drain 7+151 7+158 RHS 7 1.120 3.696
6 MCW Drain 6+240 6+377 RHS 137 21.920 84.392
7 MCW Drain 6+192 6+225 RHS 33 5.280 21.780
8 MCW Drain 6+146 6+168 RHS 22 3.520 14.630
9 MCW Drain 5+939 5+948 RHS 9 1.440 4.752
10 MCW Drain 5+738 5+749 RHS 11 1.760 5.808
11 MCW Drain 18+496 18+506 RHS 10 1.600 5.280
12 MCW Drain 27+675 27+800 RHS 125 20.000 66.000
13 MCW Drain 23+900 23+980 LHS 80 12.800 42.240
14 MCW Drain 24+490 24+620 LHS 130 20.800 68.640
15 MCW Drain 23+860 23+900 RHS 40 6.400 21.120
16 MCW Drain 24+220 24+583 RHS 363 58.080 191.664
Four laning/ Two Laning with paved shoulder from Km 0.000 to Km 83.453 of
Dausa - Lalsot - Kauthun section of NH-11A Extn.

Balance Work Punch List -2020


S.No Carriageway Activity Chainage Side Length M-15 Qty of concrete in CUM M-25 Qty of concrete in CUM
17 MCW Drain 4+180 4+236 RHS 56 0.000 9.240
18 MCW Drain 3+520 3+525 RHS 5 0.000 0.825
19 MCW Drain 2+502 2+512 RHS 10 0.000 1.650
20 MCW Drain 2+045 2+130 RHS 85 0.000 14.025
21 MCW Drain 6+940 7+060 LHS 120 0.000 19.800
22 MCW Drain 8+773 8+888 RHS 115 0.000 18.975
23 MCW Drain 8+477 8+484 RHS 7 0.000 1.155
Four laning/ Two Laning with paved shoulder from Km 0.000 to Km 83.453 of
Dausa - Lalsot - Kauthun section of NH-11A Extn.

Balance Work Punch List -2020


S.No Carriageway Activity Chainage Side Length M-15 Qty of concrete in CUM M-25 Qty of concrete in CUM
24 MCW Drain 8+058 8+117 RHS 59 0.000 9.735
25 MCW Drain 5+928 5+939 RHS 11 0.000 1.815
26 MCW Drain 2+998 3+185 RHS 187 0.000 30.855
27 MCW Drain 8+397 8+477 RHS 80 0.000 13.200
28 MCW Drain 8+117 8+383 RHS 266 0.000 43.890
29 MCW Drain 8+056 8+058 RHS 2 0.000 0.330
30 MCW Drain 4+675 4+790 RHS 115 0.000 18.975
32 MCW Drain 3+090 3+120 LHS 30 0.000 4.950
33 MCW Drain 3+280 3+320 LHS 40 0.000 6.600
34 MCW Drain 3+334 3+350 LHS 16 0.000 2.640
35 MCW Drain 3+360 3+435 LHS 75 0.000 12.375
36 MCW Drain 4+330 4+430 LHS 100 0.000 16.500
37 MCW Drain 4+600 4+660 LHS 60 0.000 9.900
38 MCW Drain 4+730 4+800 LHS 70 0.000 11.550
39 MCW Drain 27+980 28+000 RHS 20 3.200 10.560
40 MCW Drain 2+045 2+130 LHS 85 13.600 44.880
41 MCW Drain 2+360 2+415 LHS 55 8.800 29.040
42 MCW Drain 2+724 2+734 LHS 10 1.600 5.280
43 MCW Drain 2+924 2+930 LHS 6 0.960 3.168
44 MCW Drain 3+240 3+250 LHS 10 1.600 5.280
45 MCW Drain 3+600 3+607 LHS 7 1.120 3.696
46 MCW Drain 3+982 3+990 LHS 8 1.280 4.224
Four laning/ Two Laning with paved shoulder from Km 0.000 to Km 83.453 of
Dausa - Lalsot - Kauthun section of NH-11A Extn.

Balance Work Punch List -2020


S.No Carriageway Activity Chainage Side Length M-15 Qty of concrete in CUM M-25 Qty of concrete in CUM
47 MCW Drain 4+190 4+197 LHS 7 1.120 3.696
Total 3964 392.800 1630.151
Four laning/ Two Laning with paved shoulder from Km 0.000 to Km 83.453 of
Dausa - Lalsot - Kauthun section of NH-11A Extn.

Balance Work Punch List -2020


S.No Carriageway Activity Chainage Side Length M-15 Qty of concrete in CUM M-25 Qty of concrete in CUM
Hindrance Land
1 MCW Drain 3+770 3+830 RHS 60 9.600 31.680
2 MCW Drain 6+456 6+540 RHS 84 13.440 44.352
3 MCW Drain 28+080 28+120 RHS 40 6.400 21.120
4 MCW Drain 54+250 54+270 RHS 20 3.200 10.560
5 MCW Drain 23+630 23+855 LHS 225 36.000 118.800
6 MCW Drain 24+583 24+900 RHS 317 50.720 167.376
Total 746 119.360 393.888
Two Laning with paved shoulder from Km 0.000 to Km 83.453 of
Dausa - Lalsot - Kauthun section of NH-11A Extn.

alance Work Punch List -2020


Quantity of steel in MT Remark
6.922 Drain
5.261 Drain
8.030 Drain
6.645 Drain
3.876 Drain
1.778 Drain
0.183 Drain
0.366 Drain
2.820 Drain
0.287 Drain
0.183 Drain
3.865 Drain
0.966 Drain
0.647 Drain
0.235 Drain
0.287 Drain
0.261 Drain
3.264 Drain
2.089 Drain
3.394 Drain
1.044 Drain
9.478 Drain
Two Laning with paved shoulder from Km 0.000 to Km 83.453 of
Dausa - Lalsot - Kauthun section of NH-11A Extn.

alance Work Punch List -2020


Quantity of steel in MT Remark
0.441 Drain Slab
0.039 Drain Slab
0.079 Drain Slab
0.669 Drain Slab
0.944 Drain Slab
0.905 Drain Slab
0.055 Drain Slab
Two Laning with paved shoulder from Km 0.000 to Km 83.453 of
Dausa - Lalsot - Kauthun section of NH-11A Extn.

alance Work Punch List -2020


Quantity of steel in MT Remark
0.464 Drain Slab
0.087 Drain Slab
1.304 Drain Slab Widening
0.558 Drain Slab Widening
1.855 Drain Slab Widening
0.014 Drain Slab Widening
0.802 Slab Widening
0.209 Widening
0.279 Widening
0.112 Widening
0.523 Widening
0.697 Widening
0.418 Widening
0.488 Widening
0.522 Work in Progress
2.219 Drain
1.436 Drain
0.261 Drain
0.157 Drain
0.261 Drain
0.183 Drain
0.209 Drain
Two Laning with paved shoulder from Km 0.000 to Km 83.453 of
Dausa - Lalsot - Kauthun section of NH-11A Extn.

alance Work Punch List -2020


Quantity of steel in MT Remark
0.183 Drain
78.252
Two Laning with paved shoulder from Km 0.000 to Km 83.453 of
Dausa - Lalsot - Kauthun section of NH-11A Extn.

alance Work Punch List -2020


Quantity of steel in MT Remark
Hindrance Land
1.567 Hindrance (Majar)

2.284 Hindrance (Joshi Kothi)

1.044 Hindrance Land

0.522 Hindrance Land

5.875 Hindrance Land

8.277 Hindrance Land


19.56878
Four laning/ Two Laning with paved shoulder from Km 0.000 to Km 83.453
Dausa - Lalsot - Kauthun section of NH-11A Extn.

Balance Work Punch List -2020


S.No Carriageway Activity Chainage Side Length
1 EXISITING NH11 Drain 0+000 0+250 250
2 RAMP 1 Drain 0+215 0+405 RHS 190
3 RAMP2 Drain 0+210 0+500 LHS 290
4 SEMI DIRECTION RAMP Drain 0+100 0+340 240
5 LOOP1 Drain 0+340 0+480 140

MOUNTABLE DRAIN Drain 0+320 0+350 LHS 30


1 MCW Drain 7+578 7+585 LHS 7
2 MCW Drain 8+383 8+397 RHS 14
3 MCW Drain 7+460 7+568 RHS 108
4 MCW Drain 7+137 7+148 RHS 11
5 MCW Drain 7+151 7+158 RHS 7
6 MCW Drain 6+240 6+377 RHS 137
7 MCW Drain 6+192 6+225 RHS 33
8 MCW Drain 6+146 6+168 RHS 22
9 MCW Drain 5+939 5+948 RHS 9
10 MCW Drain 5+738 5+749 RHS 11
11 MCW Drain 18+496 18+506 RHS 10
12 MCW Drain 27+675 27+800 RHS 125
13 MCW Drain 23+900 23+980 LHS 80
14 MCW Drain 24+490 24+620 LHS 130
15 MCW Drain 23+860 23+900 RHS 40
16 MCW Drain 24+220 24+583 RHS 363
17 MCW Drain 4+180 4+236 RHS 56
18 MCW Drain 3+520 3+525 RHS 5
19 MCW Drain 2+502 2+512 RHS 10
20 MCW Drain 2+045 2+130 RHS 85
21 MCW Drain 6+940 7+060 LHS 120
22 MCW Drain 8+773 8+888 RHS 115
23 MCW Drain 8+477 8+484 RHS 7
24 MCW Drain 8+058 8+117 RHS 59
25 MCW Drain 5+928 5+939 RHS 11
26 MCW Drain 2+998 3+185 RHS 187
27 MCW Drain 8+397 8+477 RHS 80
28 MCW Drain 8+117 8+383 RHS 266
29 MCW Drain 8+056 8+058 RHS 2
30 MCW Drain 4+675 4+790 RHS 115
32 MCW Drain 3+090 3+120 LHS 30
33 MCW Drain 3+280 3+320 LHS 40
34 MCW Drain 3+334 3+350 LHS 16
35 MCW Drain 3+360 3+435 LHS 75
36 MCW Drain 4+330 4+430 LHS 100
37 MCW Drain 4+600 4+660 LHS 60
38 MCW Drain 4+730 4+800 LHS 70
39 MCW Drain 27+980 28+000 RHS 20
40 MCW Drain 2+045 2+130 LHS 85
41 MCW Drain 2+360 2+415 LHS 55
42 MCW Drain 2+724 2+734 LHS 10
43 MCW Drain 2+924 2+930 LHS 6
44 MCW Drain 3+240 3+250 LHS 10
45 MCW Drain 3+600 3+607 LHS 7
46 MCW Drain 3+982 3+990 LHS 8
47 MCW Drain 4+190 4+197 LHS 7
Total 3964
Hindrance Land
1 MCW Drain 3+770 3+830 RHS 60
2 MCW Drain 6+456 6+540 RHS 84
3 MCW Drain 28+080 28+120 RHS 40
4 MCW Drain 54+250 54+270 RHS 20
5 MCW Drain 23+630 23+855 LHS 225
6 MCW Drain 24+583 24+900 RHS 317
Total 746
Grand Total 4710
houlder from Km 0.000 to Km 83.453 of
n section of NH-11A Extn.

k Punch List -2020


Starting date Finishing date Remark
1/5/20 31/5/20 Drain
1/5/20 31/5/20 Drain
1/5/20 31/5/20 Drain
1/5/20 31/5/20 Drain
1/5/20 31/5/20 Drain
1/5/20 31/5/20 Drain
1/5/20 31/5/20 Drain
1/5/20 31/5/20 Drain
1/5/20 31/5/20 Drain
1/5/20 31/5/20 Drain
1/5/20 31/5/20 Drain
1/6/20 30/6/20 Drain
1/6/20 30/6/20 Drain
1/6/20 30/6/20 Drain
1/6/20 30/6/20 Drain
1/6/20 30/6/20 Drain
1/5/20 30/6/20 Drain
1/5/20 31/5/20 Drain
1/5/20 31/5/20 Drain
1/6/20 30/6/20 Drain
1/5/20 30/5/20 Drain
1/5/20 30/6/20 Drain
1/5/20 30/6/20 Drain Slab
1/6/20 30/6/20 Drain Slab
1/6/20 30/6/20 Drain Slab
1/6/20 30/6/20 Drain Slab
1/6/20 30/6/20 Drain Slab
1/6/20 30/6/20 Drain Slab
1/6/20 30/6/20 Drain Slab
1/6/20 30/6/20 Drain Slab
1/6/20 30/6/20 Drain Slab
1/5/20 31/5/20 Drain Slab Widening
1/5/20 31/5/20 Drain Slab Widening
1/5/20 30/6/20 Drain Slab Widening
1/5/20 31/5/20 Drain Slab Widening
1/5/20 31/5/20 Slab Widening
1/5/20 31/5/20 Widening
1/5/20 31/5/20 Widening
1/5/20 31/5/20 Widening
1/5/20 31/5/20 Widening
1/5/20 31/5/20 Widening
1/5/20 31/5/20 Widening
1/5/20 31/5/20 Widening
1/5/20 31/5/20 Work in Progress
1/5/20 31/5/20 Drain
1/5/20 31/5/20 Drain
1/5/20 31/5/20 Drain
1/5/20 31/5/20 Drain
1/5/20 31/5/20 Drain
1/5/20 31/5/20 Drain
1/5/20 31/5/20 Drain
1/5/20 31/5/20 Drain

nce Land
Hindrance (Majar)
Hindrance (Joshi Kothi)
Hindrance Land
Hindrance Land
Hindrance Land
Hindrance Land
Four laning/ Two Laning with paved shoulder from Km 0
Dausa - Lalsot - Kauthun section of NH-11

Balance Work Punch List -2020


S.No Carriageway Activity Chainage Side Length
1 EXISITING NH11 Drain 0+000 0+250 250
2 RAMP 1 Drain 0+215 0+405 RHS 190
3 RAMP2 Drain 0+210 0+500 LHS 290
4 SEMI DIRECTION RAMP Drain 0+100 0+340 240
5 LOOP1 Drain 0+340 0+480 140

MOUNTABLE DRAIN Drain 0+320 0+350 LHS 30


1 MCW Drain 7+578 7+585 LHS 7
2 MCW Drain 8+383 8+397 RHS 14
3 MCW Drain 7+460 7+568 RHS 108
4 MCW Drain 7+137 7+148 RHS 11
5 MCW Drain 7+151 7+158 RHS 7
6 MCW Drain 6+240 6+377 RHS 137
7 MCW Drain 6+192 6+225 RHS 33
8 MCW Drain 6+146 6+168 RHS 22
9 MCW Drain 5+939 5+948 RHS 9
10 MCW Drain 5+738 5+749 RHS 11
11 MCW Drain 18+496 18+506 RHS 10
12 MCW Drain 27+675 27+800 RHS 125
13 MCW Drain 23+900 23+980 LHS 80
14 MCW Drain 24+490 24+620 LHS 130
15 MCW Drain 23+860 23+900 RHS 40
16 MCW Drain 24+220 24+583 RHS 363
17 MCW Drain 4+180 4+236 RHS 56
18 MCW Drain 3+520 3+525 RHS 5
19 MCW Drain 2+502 2+512 RHS 10
20 MCW Drain 2+045 2+130 RHS 85
21 MCW Drain 6+940 7+060 LHS 120
22 MCW Drain 8+773 8+888 RHS 115
23 MCW Drain 8+477 8+484 RHS 7
24 MCW Drain 8+058 8+117 RHS 59
25 MCW Drain 5+928 5+939 RHS 11
26 MCW Drain 2+998 3+185 RHS 187
27 MCW Drain 8+397 8+477 RHS 80
28 MCW Drain 8+117 8+383 RHS 266
29 MCW Drain 8+056 8+058 RHS 2
30 MCW Drain 4+675 4+790 RHS 115
32 MCW Drain 3+090 3+120 LHS 30
33 MCW Drain 3+280 3+320 LHS 40
34 MCW Drain 3+334 3+350 LHS 16
35 MCW Drain 3+360 3+435 LHS 75
36 MCW Drain 4+330 4+430 LHS 100
37 MCW Drain 4+600 4+660 LHS 60
38 MCW Drain 4+730 4+800 LHS 70
39 MCW Drain 27+980 28+000 RHS 20
40 MCW Drain 2+045 2+130 LHS 85
41 MCW Drain 2+360 2+415 LHS 55
42 MCW Drain 2+724 2+734 LHS 10
43 MCW Drain 2+924 2+930 LHS 6
44 MCW Drain 3+240 3+250 LHS 10
45 MCW Drain 3+600 3+607 LHS 7
46 MCW Drain 3+982 3+990 LHS 8
47 MCW Drain 4+190 4+197 LHS 7
Total 3964
Hindrance Land
1 MCW Drain 3+770 3+830 RHS 60
2 MCW Drain 6+456 6+540 RHS 84
3 MCW Drain 28+080 28+120 RHS 40
4 MCW Drain 54+250 54+270 RHS 20
5 MCW Drain 23+630 23+855 LHS 225
6 MCW Drain 24+583 24+900 RHS 317
Total 746
Grand Total 4710
Laning with paved shoulder from Km 0.000 to Km 83.453 of
a - Lalsot - Kauthun section of NH-11A Extn.

Balance Work Punch List -2020


Pcc Raft Wall slab
1/5/20 to 5/5/20 6/5/20 to 11/5/20 12/5/20 to 24/5/20 24/5/20 to 31/5/20
1/5/20 to 4/5/20 5/5/20 to 10/5/20 11/5/20 to 22/5/20 23/5/20 to 30/5/20
1/5/20 to 5/5/20 6/5/20 to 11/5/20 12/5/20 to 24/5/20 24/5/20 to 31/5/20
1/5/20 to 5/5/20 6/5/20 to 11/5/20 12/5/20 to 24/5/20 24/5/20 to 31/5/20
1/5/20 to 4/5/20 5/5/20 to 10/5/20 11/5/20 to 22/5/20 23/5/20 to 30/5/20
23/5/20 to 24/5/20 25/5/20 to 26/5/20 27/5/20 to 28/5/20 29/5/20 to 30/5/20
5/5/20 6/5/20 7/5/20 8/5/20
10/5/20 11/5/20 12/5/20 13/5/2020
1/5/20 31/5/20 31/5/20 31/5/20
14/5/2020 15/5/2020 16/5/2020 17/5/2020
18/5/2020 19/5/2020 20/5/2020 21/5/2020
1/6/20 to 3/6/20 4/6/20 to 8/6/20 8/6/20 to 14/6/20 14/6/20 to 18/6/20
14/6/2020 15/6/20 16/6/20 17/6/20
17/6/2020 18/6/20 19/6/20 20/6/20
21/6/2020 22/6/20 23/6/20 24/6/20
25/6/2020 26/6/20 27/6/20 28/6/20
1/5/20 30/6/20 30/6/20 30/6/20
1/6/20 to 3/6/20 4/6/20 to 7/6/20 8/6/20 to 12/6/20 13/6/20 to 16/6/20
1/6/20 to 2/6/20 3/6/20 to 5/6/20 6/6/20 to 9/6/20 10/6/20 to 13/6/20
17/6/20 to 20/6/20 21/6/20 to 23/6/20 24/6/20 to 28/6/20 29/6/20 to 30/6/20
13/6/20 to 14/6/20 14/6/20 to 15/6/20 16/6/20 to 17/6/20 18/6/20 to 19/6/20
1/6/20 to 5/6/20 6/6/20 to 11/6/20 12/6/20 to 24/6/20 24/6/20 to 30/6/20
1/6/20 to 3/6/20
4/6/20 to 5/6/20
6/6/20 to 7/6/20
8/6/20 to 12/6/20
13/6/20 to 19/6/20
20/6/20 to 25/6/20
26/6/20 to 27/6/20
28/6/20 to 30/6/20
1/6/20 to 2/6/20
1/5/20 to 8/5/20
9/5/20 to 12/5/20
13/5/20 to 24/5/20
25/5/20
25/5/20 to 31/5/20
13/5/20 to 24/5/20
1/5/20 to 3/5/20
4/5/20 to 5/5/20
6/5/20 to 9/5/20
10/5/20 to 14/5/20
15/5/20 to 18/5/20
19/5/20 to 23/5/20
1/5/20 2/5/20 3/5/20 4/5/20
1/5/20 to 3/5/20 3/5/20 to 7/5/20 7/5/20 to 14/5/20 14/5/20 to 18/5/20
18/5/20 to 20/5/20 20/5/20 to 22/5/20 22/5/20 to 26/5/20 26/5/20 to 28/5/20
24/5/2020 25/5/2020 26/5/2020 27/5/2020
1/5/20 2/5/20 3/5/20 4/5/20
6/5/20 7/5/20 8/5/20 9/5/20
10/5/20 11/5/20 12/5/20 13/5/2020
14/5/2020 15/5/2020 16/5/2020 17/5/2020
18/5/2020 19/5/2020 20/5/2020 21/5/2020

Hindrance Land
Remark
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Drain Slab
Drain Slab
Drain Slab
Drain Slab
Drain Slab
Drain Slab
Drain Slab
Drain Slab
Drain Slab
Drain Slab Widening
Drain Slab Widening
Drain Slab Widening
Drain Slab Widening
Slab Widening
Widening
Widening
Widening
Widening
Widening
Widening
Widening
Work in Progress
Drain
Drain
Drain
Drain
Drain
Drain
Drain
Drain

Hindrance (Majar)
Hindrance (Joshi Kothi)
Hindrance Land
Hindrance Land
Hindrance Land
Hindrance Land

You might also like